INDEX Sr.No. Name of Equipment Page No. PART - I 1. Motorised Scrapers 1 2. Excavators 2 3. Wheeled Loaders 3 4. Crawler Loaders 4 5. Crawler Tractors 4-5 6. Dumpers 5 7. Motor Graders 5 8. Vibratory Compactors 5-6 9. Diesel Road Rollers 6 10. Tipper 6 11. Trucks 6 12. Transporters 7 13. Cranes 7 14. Air Compressors 8 15. Generating Sets 8 16. Pumping Sets 9 17. Diesel Welding Plants 9 18. Boring Machinery 11 19. General conditions for use of Boring Machinery 11 PART - II 20. Special equipment of Public Works Department 12 21. Procedure for Departmental use of Machinery 13 22. Procedure When any machine is given for use to the Civil Division 13 by the Mechanical Division 23. Machiney use rates for CADA Machinery 13 24. Conditions for hiring machinery to Contractors / Piece workers etc. 13 25. Note on works abstracts, Register of works and preparation of 17 works abstracts 27. Register of work 19 28. Form of requisition of the machinery. 22

Upload: others

Post on 06-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: use rate pdfmahayantriki.gov.in/images/source/machinary_use... · 3.2 Caterpillar 966 D 10.00 666.00 1711.00 2387.00 3.3 Terex 72-21 Wheel Loader 10.00 513.00 1484.00 2007.00 3.4

INDEX

Sr.No. Name of Equipment Page No.

PART - I

1. Motorised Scrapers 1

2. Excavators 2

3. Wheeled Loaders 3

4. Crawler Loaders 4

5. Crawler Tractors 4-5

6. Dumpers 5

7. Motor Graders 5

8. Vibratory Compactors 5-6

9. Diesel Road Rollers 6

10. Tipper 6

11. Trucks 6

12. Transporters 7

13. Cranes 7

14. Air Compressors 8

15. Generating Sets 8

16. Pumping Sets 9

17. Diesel Welding Plants 9

18. Boring Machinery 11

19. General conditions for use of Boring Machinery 11

PART - II

20. Special equipment of Public Works Department 12

21. Procedure for Departmental use of Machinery 13

22. Procedure When any machine is given for use to the Civil Division 13

by the Mechanical Division

23. Machiney use rates for CADA Machinery 13

24. Conditions for hiring machinery to Contractors / Piece workers etc. 13

25. Note on works abstracts, Register of works and preparation of 17

works abstracts

27. Register of work 19

28. Form of requisition of the machinery. 22

Page 2: use rate pdfmahayantriki.gov.in/images/source/machinary_use... · 3.2 Caterpillar 966 D 10.00 666.00 1711.00 2387.00 3.3 Terex 72-21 Wheel Loader 10.00 513.00 1484.00 2007.00 3.4

1

Rate ofDepreciation

Rate ofRepair

Rate ofRunning andMaintenance

TotalMachineryUse Rate

per hour per hour per hour per hour

A B C A+B+C

Rs. Rs. Rs. Rs.

3 4 5 621

Name fo EquipmentSr.No.

PART - IMACHINERY USE RATES FOR THE YEAR 2012-2013(1-04-2012 to 31-03-2013)

1 MOTORISED SCRAPERS

1.1 TEREX TS-24 Scraper 10.00 1840.00 4077.00 5927.00

Capacity : 18.4/24.5 cum (24/32 cu.yds.)

1.2 Caterpiller 627 B 10.00 1654.00 3251.00 4915.00

Capacity : 10.7/13.7 cum (14/18 cu.yds.)

1.3 TEREX TS-14 B Scraper 10.00 1140.00 2452.00 3602.00

Capacity : 10.7/15.3 cum (14/20 cu.yds.)

1.4 Euclid B-6 FDT 10.00 718.00 2080.00 2808.00

Capacity : 9.5/12.2 cum (12/16 cu.yds.)

1.5 John Deer J D 762 B 91.00 883.00 1847.00 2821.00

Capacity : 8.4 cum (11 cu.yds.)

Page 3: use rate pdfmahayantriki.gov.in/images/source/machinary_use... · 3.2 Caterpillar 966 D 10.00 666.00 1711.00 2387.00 3.3 Terex 72-21 Wheel Loader 10.00 513.00 1484.00 2007.00 3.4

2

Rate ofDepreciation

Rate ofRepair

Rate ofRunning andMaintenance

TotalMachineryUse Rate

per hour per hour per hour per hour

A B C A+B+C

Rs. Rs. Rs. Rs.

3 4 5 621

Name fo EquipmentSr.No.

2 EXCAVATOR

2.1 Poclain CK-300 215.00 1176.00 2473.00 3864.00

Capacity : Loader : 3.23 cum. (4.25 cu.yds.)

Back hoe : 2 cum. (2.6 cu.yds.)

2.2 Demag H 51 10.00 1123.00 2294.00 3427.00

Capacity : Loader : 3.23 cum. (4.25 cu.yds.)

Back hoe : 2 cum. (2.6 cu.yds.)

2.3 L & T Poclain HC 300 10.00 1062.00 2293.00 3365.00

2.4 Poclain CK 90 10.00 371.00 1413.00 1794.00

2.5 Atlas E 1602 (Back-Hoe) 10.00 224.00 1196.00 1430.00

2.6 Poclain LC - 80 10.00 272.00 1232.00 1514.00

Capacity : 0.9 cum (1.14 cu.yds.)

2.7 Tata Hitachi EX 100 (Back Hoe) 170.00 397.00 1086.00 1653.00

2.8 JD 550 B Backhoe 90.00 210.00 1166.00 1466.00

2.9 JD Wheel Tr (2130) Backhoe) 10.00 401.00 561.00 972.00

2.10 JCB JS 80 119.000 134.00 827.00 1080.00

2.11 Tata Hitachi Ex 200 191.00 204.00 1292.00 1687.00

2.12 Terex 72-21 Backhoe 26.00 222.00 1150.00 1398.00

2.13 Tata Hitachi Ex 200 With Rock Breaker Attchment 239.00 255.00 1474.00 1968.00

(Rate for the machinery of Mechanical Organisation)

Page 4: use rate pdfmahayantriki.gov.in/images/source/machinary_use... · 3.2 Caterpillar 966 D 10.00 666.00 1711.00 2387.00 3.3 Terex 72-21 Wheel Loader 10.00 513.00 1484.00 2007.00 3.4

3

Rate ofDepreciation

Rate ofRepair

Rate ofRunning andMaintenance

TotalMachineryUse Rate

per hour per hour per hour per hour

A B C A+B+C

Rs. Rs. Rs. Rs.

3 4 5 621

Name fo EquipmentSr.No.

2.14 Tata Hitachi Ex 200 With Slope Compactor 236.00 253.00 1474.00 1963.00

2.15 Tata Hitachi Ex 70 109.00 115.00 766.00 990.00

2.16 JCB JS 140 (NEW) 172.00 194.00 1017.00 1383.00

2.17 JCB JS 140 With Slope Comp. 222.00 250.00 1141.00 1613.00

2.18 TATA EX 350 (NEW) 338.00 542.00 1850.00 2730.00

2.19 L & T Hyd. Exvacator CK - 72 (NEW) 167.00 189.00 956.00 1312.00

2.20 Tata Hitachi Zaxis20 H (NEW) 189.00 111.00 1017.00 1317.00

2.21 BEML BE 200 (NEW) 217.00 128.00 1326.00 1671.00

2.22 BEML BE 71 (NEW) 110.00 65.00 828.00 1003.00

3 WHEELED LOADER

3.1 Fiat Allis 745 C 10.00 780.00 1913.00 2703.00

3.2 Caterpillar 966 D 10.00 666.00 1711.00 2387.00

3.3 Terex 72-21 Wheel Loader 10.00 513.00 1484.00 2007.00

3.4 Caterpillar 930 35.00 415.00 1452.00 1902.00

3.5 Escort JCB-3C 40.00 357.00 910.00 1307.00

3.6 Tata Wheel Loader 143.00 216.00 1216.00 1575.00

(Rate for the machinery of Mechanical Organisation)

Page 5: use rate pdfmahayantriki.gov.in/images/source/machinary_use... · 3.2 Caterpillar 966 D 10.00 666.00 1711.00 2387.00 3.3 Terex 72-21 Wheel Loader 10.00 513.00 1484.00 2007.00 3.4

4

Rate ofDepreciation

Rate ofRepair

Rate ofRunning andMaintenance

TotalMachineryUse Rate

per hour per hour per hour per hour

A B C A+B+C

Rs. Rs. Rs. Rs.

3 4 5 621

Name fo EquipmentSr.No.

4 CRAWLER LOADER

4.1 Caterpiller 977-L 29.00 382.00 1865.00 2276.00

Capacity : 2.1 cum (2.75 cu.yds.)

5 CRAWLER TRACTOR

5.1 Komastsu D-355 A-3 10.00 1098.00 3094.00 4202.00

5.2 BEML D-355 A-3 135.00 1184.00 3094.00 4413.00

5.3 CAT D-9H 10.00 1403.00 3094.00 4507.00

5.4 BEML D-155 A-1 10.00 1168.00 2607.00 3785.00

5.5 CAT D-8-K 10.00 1346.00 2590.00 3946.00

5.6 Caterpillar D8H-68 A & 22 A 10.00 1120.00 2389.00 3519.00

5.7 CAT D-7 G Dozer 10.00 745.00 1913.00 2668.00

5.8 Bharat D-80 A12 10.00 667.00 1796.00 2473.00

5.9 CAT D-4D Dozer 10.00 254.00 1074.00 1338.00

5.10 CAT D-4-E Dozer 10.00 389.00 1013.00 1412.00

5.11 JD 550 B Dozer 10.00 378.00 963.00 1351.00

5.12 CAT D-3 B Dozer 10.00 253.00 963.00 1226.00

(Rate for the machinery of Mechanical Organisation)

Page 6: use rate pdfmahayantriki.gov.in/images/source/machinary_use... · 3.2 Caterpillar 966 D 10.00 666.00 1711.00 2387.00 3.3 Terex 72-21 Wheel Loader 10.00 513.00 1484.00 2007.00 3.4

5

Rate ofDepreciation

Rate ofRepair

Rate ofRunning andMaintenance

TotalMachineryUse Rate

per hour per hour per hour per hour

A B C A+B+C

Rs. Rs. Rs. Rs.

3 4 5 621

Name fo EquipmentSr.No.

5.13 CAT D-3-79 -U Dozer 10.00 212.00 905.00 1127.00

5.14 Shantui SD-13 Dozer 337.00 862.00 1222.00 2421.00

5.15 Shantui SD-16 Dozer 471.00 1206.00 1398.00 3075.00

6. DUMPER

6.1 WABCO-35 Dumper 10.00 727.00 2354.00 3091.00

6.2 Bharat Haulpack-35 99.00 846.00 2073.00 3018.00

6.3 BHARAT -25 Haulpack Dumper 10.00 741.00 2061.00 2812.00

6.4 Terex-R-25-H-4 TD 65.00 629.00 1897.00 2591.00

6.5 AL Hippo ALH 1/5 10.00 423.00 1556.00 1989.00

6.6 A.L. Beaver 12.00 148.00 1163.00 1323.00

7. MOTOR GRADER

7.1 Komatsu GD-605-A-3 87.00 567.00 1116.00 1770.00

7.2 BEML GD 605 R-1 10.00 617.00 1116.00 1743.00

8. VIBRATORY COMPACTOR

8.1 Dynapack CA 51- P 10.00 988.00 1495.00 2493.00

8.2 Aveling Barford Vib. Comp 10.00 544.00 1026.00 1580.00

(Rate for the machinery of Mechanical Organisation)

Page 7: use rate pdfmahayantriki.gov.in/images/source/machinary_use... · 3.2 Caterpillar 966 D 10.00 666.00 1711.00 2387.00 3.3 Terex 72-21 Wheel Loader 10.00 513.00 1484.00 2007.00 3.4

6

Rate ofDepreciation

Rate ofRepair

Rate ofRunning andMaintenance

TotalMachineryUse Rate

per hour per hour per hour per hour

A B C A+B+C

Rs. Rs. Rs. Rs.

3 4 5 621

Name fo EquipmentSr.No.

8.3 L & T Sismopactor TT 900 107.00 761.00 1143.00 2011.00

8.4 Sismopactor 850-S 55.00 459.00 1143.00 1657.00

9. DIESEL ROAD ROLLER

9.1 DRR 8/10 Ton 11.00 134.00 445.00 590.00

10. TIPPER

Note : Assumption for fixing hourly use rates for 7.5 Tones Capacity Tipperes

plant hourly rate x 8 Hrs. = KM Rate x 96 KM

Assuming Average running of 12 KM/Hr for a Tipper Working on project under a loader with average

lead of 1.5 Km. one way (4 Trips/Hr.) and 15 Km./Hr. for P.W.D. and long distance running.

10.1 7.5 Ton ( Per Km) 2.50 12.00 38.50 53.00

10.2 7.5 Ton (Per Hr) (12 Km/hr) 30.00 144.00 462.00 636.00

10.3 10 Ton (Per Km) Tipper 4.50 9.00 41.50 55.00

10.4 10 Ton (Per Hr) (12 Km/hr) 54.00 108.00 498.00 660.00

11. TRUCK/TANKER/VAN

11.1 7.5 Ton (Per Km) 1.00 10.00 38.00 49.00

11.2 Water Tanker 7000/9000 Ltr Mounted on 5.00 108.00 460.00 573.00

Tata 1210/ AL Chassis (Per Hr.)

11.3 School Bus 39/49 Seater Mounted 1.00 10.00 38.00 49.00

on Tata 1210/AL Chasis (Per Km)

(Rate for the machinery of Mechanical Organisation)

Page 8: use rate pdfmahayantriki.gov.in/images/source/machinary_use... · 3.2 Caterpillar 966 D 10.00 666.00 1711.00 2387.00 3.3 Terex 72-21 Wheel Loader 10.00 513.00 1484.00 2007.00 3.4

7

Rate ofDepreciation

Rate ofRepair

Rate ofRunning andMaintenance

TotalMachineryUse Rate

per hour per hour per hour per hour

A B C A+B+C

Rs. Rs. Rs. Rs.

3 4 5 621

Name fo EquipmentSr.No.

11.4 Mahindra Bolero Camper 2.50 2.50 13.00 18.00

11.5 Mahindra Maxx Pick up 2.50 2.50 13.00 18.00

11.6 Tata 407 3.00 3.00 14.00 20.00

12 TRANSPORTER

12.1 60 Ton (Mack) (Per Hr) 10.00 286.00 1317.00 1613.00

12.2 40 Ton (Mack/Scamell) 10.00 266.00 1266.00 1542.00

12.3 30 Ton(AL Hippo /ERP) 8.00 209.00 1151.00 1368.00

12.4 20 Ton (AL Beaver/Mac) 5.00 182.00 1104.00 1291.00

12.5 11 Ton AL Semigama 1.00 10.00 52.00 63.00

13. CRANE

13.1 Voltas Omega -35 190.00 370.00 1427.00 1987.00

13.2 Coles Endurance 30 T 131.00 441.00 1427.00 1999.00

13.3 Coles Hydra 830-30 T 165.00 587.00 1226.00 1978.00

13.4 Marshall Demag 30 T 182.00 363.00 1423.00 1968.00

13.5 Coles 1510 (S) 15.85 T 31.00 232.00 703.00 966.00

(Rate for the machinery of Mechanical Organisation)

Page 9: use rate pdfmahayantriki.gov.in/images/source/machinary_use... · 3.2 Caterpillar 966 D 10.00 666.00 1711.00 2387.00 3.3 Terex 72-21 Wheel Loader 10.00 513.00 1484.00 2007.00 3.4

8

Rate ofDepreciation

Rate ofRepair

Rate ofRunning andMaintenance

TotalMachineryUse Rate

per hour per hour per hour per hour

A B C A+B+C

Rs. Rs. Rs. Rs.

3 4 5 621

Name fo EquipmentSr.No.

13.6 Coles Mobile Aneas 12.5 T 13.00 235.00 696.00 944.00

13.7 Escort MOC - 8E (Cap 8 T) 18.00 77.00 491.00 586.00

13.8 Escort Mobile ( 8 T) 58.00 109.00 491.00 658.00

13.9 Escort MOC ( 5 T) 22.00 61.00 469.00 552.00

13.10 Escort MOC ( 3 T ) 10.00 68.00 439.00 517.00

13.11 J.D. Wheel Tractor Crane 52.00 124.00 406.00 582.00

13.12 Usha Atlas DC-6 18.00 66.00 393.00 477.00

14. AIR COMPRESSOR

14.1 510 CFM. Elect. 4.00 89.00 567.00 660.00

14.2 400 Cfm. 10.00 94.00 918.00 1022.00

14.3 260/250 Cfm. 6.00 44.00 641.00 691.00

14.4 280 Cfm 6.00 44.00 641.00 691.00

14.5 210 Cfm. 4.00 43.00 640.00 687.00

14.6 175 Cfm 3.00 32.00 472.00 507.00

Note : If the purchase cost of the Machine is more than indicated, the owner should work out the depre-

ciation as per following formula

Depreciation = Purchase cost - 15% Salvage Value

Life in Hrs.

(Rate for the machinery of Mechanical Organisation)

Page 10: use rate pdfmahayantriki.gov.in/images/source/machinary_use... · 3.2 Caterpillar 966 D 10.00 666.00 1711.00 2387.00 3.3 Terex 72-21 Wheel Loader 10.00 513.00 1484.00 2007.00 3.4

9

Rate ofDepreciation

Rate ofRepair

Rate ofRunning andMaintenance

TotalMachineryUse Rate

per hour per hour per hour per hour

A B C A+B+C

Rs. Rs. Rs. Rs.

3 4 5 621

Name fo EquipmentSr.No.

Life may be assumed as below :

For Item Nos. 16.1 to 16.5 = 12000 Hrs.

For Item Nos. 16.6 to 16.12 = 10000 Hrs.

15. GENERATING SET

15.1 125 To 135 KVA 5.00 73.00 1023.00 1101.00

15.2 100 KVA 4.00 55.00 919.00 978.00

15.3 41 to 60 KVA 2.00 30.00 638.00 670.00

15.4 31 to 40 KVA 2.00 37.00 494.00 533.00

15.5 21 To 30 KVA 2.00 29.00 362.00 393.00

15.6 10 To 20 KVA 1.00 26.00 276.00 303.00

15.7 6 To 7.5 KVA 1.00 15.00 213.00 229.00

15.8 5 KVA 1.00 12.00 151.00 164.00

Note : If the purchase cost of the Machine is more than indicated, the owner should work out the depre-

ciation as per following formula

Depreciation = Purchase cost - 15% Salvage Value

Life in Hrs.

Life may be assumed as below :

For Item Nos. 17.1 to 18.6 = 3000 Ltrs

For Item No. 17.7 to 18.10 = 2000 Ltrs

For Item Nos. 18.11 = 10000 Ltrs

(Rate for the machinery of Mechanical Organisation)

Page 11: use rate pdfmahayantriki.gov.in/images/source/machinary_use... · 3.2 Caterpillar 966 D 10.00 666.00 1711.00 2387.00 3.3 Terex 72-21 Wheel Loader 10.00 513.00 1484.00 2007.00 3.4

10

Rate ofDepreciation

Rate ofRepair

Rate ofRunning andMaintenance

TotalMachineryUse Rate

per hour per hour per hour per hour

A B C A+B+C

Rs. Rs. Rs. Rs.

3 4 5 621

Name fo EquipmentSr.No.

16 PUMPING SET (DIESEL & ELECTRICAL)

16.1 75 HP 3.00 33.00 386.00 422.00

16.2 50 To 60 HP 2.00 32.00 373.00 407.00

16.3 30 To 40 HP 2.00 29.00 284.00 315.00

16.4 20 Tp 29 HP 1.00 23.00 242.00 266.00

16.5 10 To 19 HP 1.00 20.00 189.00 210.00

16.6 5 To 9 HP 1.00 12.00 149.00 162.00

16.7 3 HP 1.00 8.00 90.00 99.00.

16.8 2 HP 1.00 8.00 79.00 88.00

Note : If the purchase cost of the Machine is more than indicated, the owner should work out the

depreciation as per following formula.

Depreciation = Purchase Cost - 15% Salvage Value

Life in Hrs.

Life may be assumed as 10000 Hrs. for each Item.

17 DIESEL WELDING PLANT

17.1 30 HP 3.00 35.00 298.00 336.00

(Rate for the machinery of Mechanical Organisation)

Page 12: use rate pdfmahayantriki.gov.in/images/source/machinary_use... · 3.2 Caterpillar 966 D 10.00 666.00 1711.00 2387.00 3.3 Terex 72-21 Wheel Loader 10.00 513.00 1484.00 2007.00 3.4

11

Rate ofDepreciation

Rate ofRepair

Rate ofRunning andMaintenance

TotalMachineryUse Rate

per hour per hour per hour per hour

A B C A+B+C

Rs. Rs. Rs. Rs.

3 4 5 621

Name fo EquipmentSr.No.

18 BORING MACHINERY (RATEIN Rs. / METER)

18.1 Over Burden by Diamond Drilling Machine 10.00 89.00 740.00 839.00

18.2 Quartzite by Diamond Drilling Machine 16.00 540.00 3367.00 3923

with NX Bitcore size 54 mm (2/8 inch)

18.3 Quartzite by Diamond Drilling Machine with 10.00 409.00 2545.00 2964.00

BX Bit Core Size 41.3 mm (1 5/8 inch)

18.4 Quartzite by Diamond Drilling Machine with 8.00 267.00 1700.00 1975.00

AX Bit Core Size 30.2 mm (13/16 inch)

18.5 Other Rock With diamond Drill with NX 15.00 226.00 1664.00 1905.00

Bit Machine ( 0 to 50 Meters) Core Size

54 mm ( 2/8 inch)

Note : For boring Mokre than 50 Meters below the ground level the charges will be at actuals.

18.6 SAMPLE CORES - 18" (45.7 cm), 24" (60.9 cm)

36" (91.4 cm) Dia in masonary/ Concrete upto 0.9 mtr.

i) 18" 0.00 2322.00 4421.00 6743.00

ii) 24" 0.00 3440.00 6118.00 9558.00

iii) 36" 0.00 4586.00 8162.00 12748.00

Note : The Charges of Air Compressor Will be extra at the Sanctioned rates. Cost of Diamond Bits, Drill,

Rods, Remaing Shell, Core Lifter, Core Barrel, Impregnated Diamont Bits, Air Houses, Water

Sweivel Etc. will be extra at actuals.

(Rate for the machinery of Mechanical Organisation)

Page 13: use rate pdfmahayantriki.gov.in/images/source/machinary_use... · 3.2 Caterpillar 966 D 10.00 666.00 1711.00 2387.00 3.3 Terex 72-21 Wheel Loader 10.00 513.00 1484.00 2007.00 3.4

12

GENERAL CONDITIONS FOR USE OF BORING MACHINERY

1. Percolation and permeability test charges are Rs. 150 per day plus Rs. 40.00 per pocket of

10 ft. and Rs. 20.00 per packet of 5 ft.

2. Soil sampling of 4" (100 m.m.) size will be Rs. 150.00 per sample excluding drill and material

charges.

3. Above rates do not include labour required for loading, unloading, erection, shifting and

operation of machine which will be provided by the user Division / project.

4. The transport charges of machine will be separate for each work.

5. The water supply charges will be extra at actual according to site conditions.

6. Boulders met in overburden will be charged at the rate of respective rock.

7. The casing pipe if required to be kept permanently in the bore will be charged extra at actual.

8. For re boring the charges will be at half rates.

9. The charges of watchman to be provided for the machines would be charged extra at actual.

10. Idle charges per day will be Rs. 200 for all days the machine is not used on the site for want

of work.

11. For angle boring and drilling in standing water the rate will be 1.5 times the usual drilling

charges. The cost of extra bits and material would be charged at actual.

12. Approach road to boring site so also approach road from one - bore point to another bore

point should be done by user Division / Project.

13. If casing pipes or any material is lost in bore that will be charged extra as per actual.

14. For relief well the perforated pipes which are to be kept permanently in bore should be supplied

by the project authority. Program should be given in advance estimates to be prepared and

budget provision to be made.

Page 14: use rate pdfmahayantriki.gov.in/images/source/machinary_use... · 3.2 Caterpillar 966 D 10.00 666.00 1711.00 2387.00 3.3 Terex 72-21 Wheel Loader 10.00 513.00 1484.00 2007.00 3.4

13

Rate ofDepreciation

Rate ofRepair

Rate ofRunning andMaintenance

TotalMachineryUse Rate

per hour per hour per hour per hour

A B C A+B+C

3 4 5 621

Item fo EquipmentSr.No.

PART - IIMACHINERY USE RATES FOR THE YEAR 2012-2013 (1-4-2012 to 31-3-201 3 )

19 SPECIAL EQUIPMENT OF PUBLIC WORKS DEPARTMENT

19.1 Branto Sky Lift Bridge 360.00 751.00 1642.00 2753.00 22024.00

Inspection Unit +95.00 Insurance

19.2 Asphalt Boiler 1125 Ltr 1.00 11.00 0.00 12.00 128.00

Note :- 1. The above machinery use rate do not include the charges on account of Watchman

Mistries and any labour and material required for Civil works. They include the

charges of labour and material for operation maintenance and repairs to the

machine only. Therefore the charges for labour and material for Civil works will be

extra.

2. The machinery use rates for all the other machinery will be the same as specified

for the machines of Water Resources Department

3. All other terms and conditions for hiring of these machines to contractor will be the

same as specified for the machines of Water Resources Department.

4. For Asphalt Boiler at Sr.No. 23.2 Fuel and labour is to be provided by the Civil

Division which is charged to work.

(J. D. PARMAR)

Chief Engineer (Mechanical),

Water Resources Department, Nashik - 2.

Machinery userate per day (8Hrs. Inclusiveof 1 Hr. rest

recess to thecrew

7

Page 15: use rate pdfmahayantriki.gov.in/images/source/machinary_use... · 3.2 Caterpillar 966 D 10.00 666.00 1711.00 2387.00 3.3 Terex 72-21 Wheel Loader 10.00 513.00 1484.00 2007.00 3.4

14

If Rs. "H" is the machinery use rate, I.I.H. will be the machinery use rate to be adopted

in respect of the machinery given on hire to contractor / piece worker and local bodies,Zilla Parishads, Munipalities, Mah. State Elect Boards etc. On this 10% Supervisioncharges should be levied as per Government Memorandum Irrigation and powerDepartment No. MCN. 1064/14858 - IP (1), dated 8-12-64 and MCN-1073/159062-

IP (1), dated 12-12-73.Sample calculations of charges for hiring.

23.2 In respect of Special Equipments of Public Works Department (Shown in part - II) theCharges for hiring the equipment to the Contractor / Piece worker and Local bodies

Zillah Parishads, Municipalities, Mah. State Elect. Boards etc. shall be worked out asbelow and charged accordingly. If Rs. 'D' is the use rate per day 1.1 D will be the

Daily use rate to the adopted in respect of the machinery given on hire to Contractor/ piece worker. On this 10% Supervision Charges should be levied.Sample calculations of charges for hiring :-

23.3 In case of Minor Irrigation works the terms and conditions for hiring the machinery

as stipulated in Government letter No. MNs/1078 (617/78) / MIN-1 of 7-10-78 should

be made applicable. However the hourly use rate for Diesel Road Roller may be takenas per the current use rate read with hiring conditions.

23.4 Requisition should come through the Civil Authorities as per the enclosed form.

23.5 Agreement in form No. 587 and other formalities should be completed by the civil

authorities.

23.6 The hire charges do not include the following charges which will be extra :-

(a) Transportation of machinery from the Sub-Divisional Head Quarters Garagestores to the work site and back.

(b) Transportation of machinery from one work site to another work site.

(c) Transportation of fuel, Lubricant spares, tools, OMR staff etc. from Sub-Divisional

Head Quarter / Garage / Stores to the work site and back.

(d) Transportation of machinery for carrying out major repairs to the nearest workshop.

(e) The charges of watchman to be provided for the machine working at isolatedplace.

(f) If the machines are required for a period less than a working season the D.A.of crew will be charged extra.

Name of Equipment Total UseRate Rs.(H)

1.1 (H)

Hiring Charges forContractor / Piece Worker

after adding 10% Supervision on 1.1 (H)

8/10 Ton Diesel Road Roller 590/Hr. 649.00/Hr. Rs.713.9/Hr.

Name of Equipment

Total DailyUse RateRs. D per

Day

1.1 D

Hiring Charges forContractor / Piece Worker

after adding 10% Supervision on 1.1 (H)

Asphalt Boiler 140.80 Rs.154.88 Say Rs.155/-Rs.16x8 Hrs

= 128

Page 16: use rate pdfmahayantriki.gov.in/images/source/machinary_use... · 3.2 Caterpillar 966 D 10.00 666.00 1711.00 2387.00 3.3 Terex 72-21 Wheel Loader 10.00 513.00 1484.00 2007.00 3.4

15

23.7 Quarters for Mechanical staff and workers and shades for parking and reqpirs tomachinery and for stores be provided by the project authorities.

23.8 Machinery will be made available on hire to contractors and piece workers, wheneverit is possible to do so and as it is available without affection Government works.

23.9 When any machinery is allocated to a work for issue to contractor/piece worker it willbe hired out for period of not less than 1 month and the contractor / piece worker

will be charged for it for minimum 5 hours utilization in a day when the machinery isavailable for use being in working condition. If the machine works for more then 5 hours

in a day the contractor / piece worker will be charged for the actual number of hoursthe machine works. Any fraction of an hour over and above 5 hours will be countedas one full hour. If the machine fails after working for some hours the contractor will

be charged for the actual number of hours the machine has worked any fraction ofan hour being counted as one hour. The machinery will stand issued to the contractor

/ piece worker for use on the work let out on contract.

23.10 In respect of vehicles such as Trucks, Tippers and Water Tankers the contractor orpiece worker will be charged for minimum 5 hours utilization or 96 Kms. as applicablerun in a day when the machines are available for use being in working conditionsexcepts for the machines which are given on hire under condition No. 27.12 mentioned

below if the truck, Tipper, Water Tankers fail after working for sometime the contractoror piece worker will be charged for the actual hours / Kms. the machine have workedany fraction of an hour being counted as one full hour if this machines work for morethen 5 hours or 96 Kms. in a day, the contractor or piece worker will be charged on

hourly or Km. basis (whichever recovery is higher) for actual number of hours / Kms.

The machines have worked any fraction of an hour being counted as one full hour.

23.11 When the machinery allocated to a work which is being carried out through several

piece-workers and many small contractor, the machinery may stand issued to the localproject authority which will be charged for its utilization as per condition 27.9 aboveand the local proejct authority may issue it to different agencies according torequirements and for such period or time, as the project authorities may find expedient

and charge them accordingly.

23.12 When machinery is regularly working on a Project on departmental execution of work

and some of its is required for a short time for emergency, or casually, not amountingto regular execution of work, by any contractor or piece worker employed on theproejct, it may be hired out for the purpose on hourly / Km. charges, any fraction of

any hour being counted a one full hour. The period reckoned will be the time for whichthe machinery leaves for such a use to the time it returns to the original location. This

provision is intended to cover casual requirements of small agencies on proejctsexecuted departmentally.

23.13 During rainy season, the machines may be hired out on hourly / Km. charges The

period of rainy season may be generally taken from 15th June to 30th September.

(J. D. PARMAR)

Chief Engineer (Mechanical)

Water Resources Department, Nashik - 2.

Page 17: use rate pdfmahayantriki.gov.in/images/source/machinary_use... · 3.2 Caterpillar 966 D 10.00 666.00 1711.00 2387.00 3.3 Terex 72-21 Wheel Loader 10.00 513.00 1484.00 2007.00 3.4

16

NOTE ON WORKS ABSTRACTS AND REGISTER OF WORKS PREPARATION OF WORKS

ABTRACTS

On account of all the transaction related to the work (O, M and R to machinery during a month

in respect of cash is to be prepared by the SDO in the form of works. Abstracts From No. 56 PW424),

in which the account of the final outlay is kept by sub-heads. The transaction occured in the Sub-

Division from 21st of the month to 20th of the next month will appear in the works abstracts. On

receipt of the works abstracts in the Divisional Office from the Sub-Divisional Office along with

monthly account, the transactions appeared in the Cash Book and Transfer Entry Book of the

Divisional Office and stock account submitted by the Sub-Divisional Office will be included in the

works abstracts by the Divisional Office.

The expenditure will be booked in the works abstracts by sub-heads as mentioned below:-

B REPAIRS :

(i) B-1 Cost of OEM Genuine Spare Parts, Materials and Batteries.

(ii) B-2 Cost of spare parts, got manufactured.

(iii) B-3 Cost of Tyres, Tubes and Flaps.

(iv) B-4 Sundries (Misc. expenditure relating to repairs)

(v) B-5 Expenditure on jobs done by outside agencies.

(vi) B-6 Expenditure on jobs done by Departmental Workshops.

C RUNNING AND MAINTENANCE :

(i) C-1 Cost of fuel.

(ii) C-2 (a) Cost of Lub. Oil and Grease.

(iii) C-2 (b) Cost of Hyd. Oil and Brake Oil.

(iv) C-3 Expenditure on Operating Crew.

(v) C-4 Expenditure on Maintenance Crew.

(vi) C-5 Expenditure on labour for Repairs.

(vi) C-6 Sundries (Misc. expenditure relating to R and M)

Credits : The debit memos for the use of machinery are prepared by the Sub-Divisional Officer

based on the Hours / Km done and the machinery use rates sanctioned by the Chief Engineer

(Mech.). W.R.D., Nashik and they are adjusted in the Divisional office by debit to the works

or Division concerned. The credits in this connection will appear under the head Receipts

and Recoveries on 'Capital Account'. The transaction of credits mentioned above which are

shown as "Receipts and Recoveries on Capital Account" are shown in the works abstracts

as under to get the position of difference between the amount worked out at sanctioned rates

and actual expenditure on working of machinery.

(i) Running of machinery in Kms. or hours.

(ii) Depreciation.

(iii) Repairs.

(iv) Running and Maintenance.

(v) Total Credits

Page 18: use rate pdfmahayantriki.gov.in/images/source/machinary_use... · 3.2 Caterpillar 966 D 10.00 666.00 1711.00 2387.00 3.3 Terex 72-21 Wheel Loader 10.00 513.00 1484.00 2007.00 3.4

The monthly totals of sub-heads of work abstracts are then posted in the Register of works

in the Divisional Office.

Results : The Resultant position of the machinery showing the difference between the

amount worked out at sanctioned rate and actual expenditure is shown in the Register of Works

as under :-

1. Repairs : (Credit under repairs minus expenditure on repairs).

2. Running and Maintenance : (Credit under Running and Maintenance minus expendutire

on Running and Maintenance)

3. Net Result : (1 + 2)

Depreciation : The Depreciation earned due to use of the machinery in hours / Km. on works

(construction of Dams, Canals etc) based on the hourly / K.M. rates depreciation is credited

to the capital account of the machinery and debited to the works.

**************

17

Page 19: use rate pdfmahayantriki.gov.in/images/source/machinary_use... · 3.2 Caterpillar 966 D 10.00 666.00 1711.00 2387.00 3.3 Terex 72-21 Wheel Loader 10.00 513.00 1484.00 2007.00 3.4

18

REGISTER OF WORKS DEBIT SIDE

Name of the group of the Machinery

B1 B2 B3 B4 B5 B6 B C1Month

Expdr. onOEM

GenuineParts

Materials &Batteries

Cost ofSpare Partsgot Manu-factured

Cost ofTyres,

Tubes &Flaps

Sundries Expdr. onJobs doneby outsideagencies

Expdr. onJobs doneby Deptt.

Work- shop

TotalExpd. onRepairs

Cost ofFuel

2 3 4 5 6 7 8 91

Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs.

Page 20: use rate pdfmahayantriki.gov.in/images/source/machinary_use... · 3.2 Caterpillar 966 D 10.00 666.00 1711.00 2387.00 3.3 Terex 72-21 Wheel Loader 10.00 513.00 1484.00 2007.00 3.4

19

REGISTER OF WORKS DEBIT SIDE

Estimted Plant Hrs. of the group Amount of Sanction estimate Rs.

C-2(a) C-2(b) C-3 C-4 C-5 C-6 TotalExpendi-ture onR & M

'C'

Expendi-ture onOM & R(B+C)

Signaureof

ExecutiveEngineer

Cost ofLub Oil &

Gease

Cost ofHyd. Oil

& Brake Oil

Experidureon

OperatingCrew

Expendureon

Mainte-nanceCrew

Expendureon

Labourfor

Repairs

Sundries

10 11 12 13 14 15 16 17 18

Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs.

Page 21: use rate pdfmahayantriki.gov.in/images/source/machinary_use... · 3.2 Caterpillar 966 D 10.00 666.00 1711.00 2387.00 3.3 Terex 72-21 Wheel Loader 10.00 513.00 1484.00 2007.00 3.4

20

REGISTER OF WORKS CREDIT SIDE

Month

19

Kms. Run

20

Rs.

HoursWorked

21

Rs.

Depreciation(A)

22

Rs.

Repairs(B)

23

Rs.

R and M(C)

24

Rs.

TotalCredits

(A+B+C)

25

Rs.

Page 22: use rate pdfmahayantriki.gov.in/images/source/machinary_use... · 3.2 Caterpillar 966 D 10.00 666.00 1711.00 2387.00 3.3 Terex 72-21 Wheel Loader 10.00 513.00 1484.00 2007.00 3.4

21

REGISTER OF WORKS CREDIT SIDE

Results

Repairs(Colomn No. 23-8)

26

Rs.

27

Rs.

28

Rs.

R and M(Column No. 24-16)

TotalColumn No. 26+27

Page 23: use rate pdfmahayantriki.gov.in/images/source/machinary_use... · 3.2 Caterpillar 966 D 10.00 666.00 1711.00 2387.00 3.3 Terex 72-21 Wheel Loader 10.00 513.00 1484.00 2007.00 3.4

22

REQUISITION FOR THE MACHINERY

Name of work on which machiney is required -----------------------------------------------------------

Particulars of machinery required Quantity

Particulars of machinery required

(i) -------------------------------------------------------------------------------------------------------------

(ii) -------------------------------------------------------------------------------------------------------------

(iii) ------------------------------------------------------------------------------------------------------------------

(iv) ----------------------------------------------------------------------------------------------- -----------------

(v) -----------------------------------------------------------------------------------------------------------

Name of the Division -------------------------------------------------------------------------------------------------

Name of the Sub-Division -------------------------------------------------------------------------------------------

Name of the contractor / Piece worker (in block letters) ----------------------------------------------------

Period for which the machinery is required from ---------------------------- to -----------------------------

The relevant machinery use rates as laid down in the booklet of Machinery use rates and conditionsthereof prescribed by the Chief Engineer (Mechanical), Nashik are accepteable.

Note :- Minimum period should not be less than one month as prescribed in the conditions of hire charges.

Signature of the Piece WorkerContersigned

Executive Engineer / Dy. Engineer

Forwarded with compliments to the Executive Engineer/Deputy Engineer/Mechanical Division/Sub- Division for further action.

The necessary agreement in form 587 has been signed by the Contractor / Piece worker.

The hire charges and the supervision charges will be recovered from the Contractor / Piece workerby this office.

No. Date Executive Engineer Division