use of radar- and lidar measurements to monitor volcanic ... · since may 2011 on the farm...

14
Use of radar- and Lidar measurements to monitor volcanic ash plumes Sigrún Karlsdóttir, Sibylle von Löwis, Geirfinnur Sigurðsson, Halldór Pétursson, Guðrún Nína Petersen and Árni Snorrason

Upload: others

Post on 05-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Use of radar- and Lidar measurements to monitor volcanic ... · Since May 2011 on the farm Önundar-horn in S-Iceland Grímsvötn eruption 2011: Moved to Keflavík airport on 22 May

Use of radar- and Lidar measurements to monitor volcanic ash plumes

Sigrún Karlsdóttir, Sibylle von Löwis, Geirfinnur Sigurðsson,

Halldór Pétursson, Guðrún Nína Petersen and Árni Snorrason

Page 2: Use of radar- and Lidar measurements to monitor volcanic ... · Since May 2011 on the farm Önundar-horn in S-Iceland Grímsvötn eruption 2011: Moved to Keflavík airport on 22 May

2

Radar System

Plume height estimation real-time input data into dispersion

models

Primary instrument for plume height estimation are weather radars

C-band Doppler weather radar located at Keflavik airport.

X-band mobile Doppler and dual polarization radar.

C-band Doppler weather radar at Teigsbjarg, eastern Iceland

(under construction).

Second X-band mobile radar.

Other observation instruments/techniques to monitor volcanic ash

Lidar / Ceilometer

Satellite data

Lightning

Aerosol particles

2

Page 3: Use of radar- and Lidar measurements to monitor volcanic ... · Since May 2011 on the farm Önundar-horn in S-Iceland Grímsvötn eruption 2011: Moved to Keflavík airport on 22 May

3

Ericsson C-band Doppler Radar at Keflavik Airport

Fixed Ericsson C-band radar in

operation since 1991.

Doppler update in 2010.

Covers big part of Iceland.

Has detected 7 eruptions.

3

Page 4: Use of radar- and Lidar measurements to monitor volcanic ... · Since May 2011 on the farm Önundar-horn in S-Iceland Grímsvötn eruption 2011: Moved to Keflavík airport on 22 May

4

EEC C-band Doppler Radar at Teigsbjarg (under construction)

Purchased in beginning of 2011.

Update of SP being made at EEC.

Constructions on site finished.

Being prepared for transportation at the

moment.

In operation first quarter of 2012.

4

Page 5: Use of radar- and Lidar measurements to monitor volcanic ... · Since May 2011 on the farm Önundar-horn in S-Iceland Grímsvötn eruption 2011: Moved to Keflavík airport on 22 May

5

Radar coverage

Complete coverage of Iceland’s active volcanic zone is accomplished, with

these two fixed C-band radars.

Improved information on low plume heights.

Mobile radars used to get

as close to volcanoes as

possible to get better

resolution data.

5

Page 6: Use of radar- and Lidar measurements to monitor volcanic ... · Since May 2011 on the farm Önundar-horn in S-Iceland Grímsvötn eruption 2011: Moved to Keflavík airport on 22 May

6

Mobile X-Band Radar

9 hr after the onset of Grímsvötn eruption

data stream to IMO.

Mobil radar was

main source for plume height

estimations.

Collected unique polarimetric data.

Data was sent to the Civil Protection

Agency in Italy and to Selex –

Gematronik to help calibrate the ash

detection module.

6

Page 7: Use of radar- and Lidar measurements to monitor volcanic ... · Since May 2011 on the farm Önundar-horn in S-Iceland Grímsvötn eruption 2011: Moved to Keflavík airport on 22 May

7

Mobile X-Band Radar

To be able to move the radar in Icelandic terrain

modification of the trailer necessary

Radar currently being constructed at Selex – Gematronik in Germany

Four weather radars in operation by IMO before the end of this year

7

Page 8: Use of radar- and Lidar measurements to monitor volcanic ... · Since May 2011 on the farm Önundar-horn in S-Iceland Grímsvötn eruption 2011: Moved to Keflavík airport on 22 May

8

Lidar and ceilometers in Iceland

Lidar – Light Detection And Ranging (Laser Radar)

Optical remote sensing device, as light source different kind of

lasers (single and multi-wavelength systems)

In atmospheric science to measure cloud droplets and aerosol

particles, for boundary layer research and wind-shear

measurements

Since March 2011: Doppler Lidar with depolarisation mode

from NCAS Leeds, UK located in South Iceland

Ceilometer

Low-powered, single frequency Lidar

Mostly used for cloud base height measurements

Used to measure the aerosol layers in the atmosphere

(backscatter signal)

Page 9: Use of radar- and Lidar measurements to monitor volcanic ... · Since May 2011 on the farm Önundar-horn in S-Iceland Grímsvötn eruption 2011: Moved to Keflavík airport on 22 May

Ceilometer in Iceland operated by IMO – Vaisala CL31, CT25K

9

Operational: 1. Hólmsheiði (Hh) 2. Hjarðarland (Hj) 3. Önundarhorn (Ö) 4. Reykjavík (R) 5. Keflavík (K)

Planned: 6. Kirkjubæjarklaustur

(Kb) 7. Eyrarbakki (E) 8. Akureyri (A) 9. Bergstaðir (B)

R Hh

Hj

E

K

Kb

Ö

A B

Ceilometers at airports...

Page 10: Use of radar- and Lidar measurements to monitor volcanic ... · Since May 2011 on the farm Önundar-horn in S-Iceland Grímsvötn eruption 2011: Moved to Keflavík airport on 22 May

Depolarisation Doppler Lidar, NCAS Leeds (Stream Line, Halo Photonics)

Since May 2011 on

the farm Önundar-

horn in S-Iceland

Grímsvötn eruption

2011: Moved to

Keflavík airport on 22

May

10

Depolarisation used to detect aerosol layers

Reykjavík, 22 May 2011, 20.30 UTC

Volcanic ash cloud arrives in Reykjavík (View to the south)

Page 11: Use of radar- and Lidar measurements to monitor volcanic ... · Since May 2011 on the farm Önundar-horn in S-Iceland Grímsvötn eruption 2011: Moved to Keflavík airport on 22 May

Measurement at Keflavík airport – 22 May 2011

The Lidar detects the arrival of dry ash at about 2050 UTC.

Backscatter coefficient

Depolarisation ratio

11

Page 12: Use of radar- and Lidar measurements to monitor volcanic ... · Since May 2011 on the farm Önundar-horn in S-Iceland Grímsvötn eruption 2011: Moved to Keflavík airport on 22 May

21/08/2010

13/08/2011

17/12/2010

MODIS 09/09/2011

Re-suspension of volcanic ash observed near Skógar

12 by courtesy of Magðalena Jónsdóttir

Page 13: Use of radar- and Lidar measurements to monitor volcanic ... · Since May 2011 on the farm Önundar-horn in S-Iceland Grímsvötn eruption 2011: Moved to Keflavík airport on 22 May

Önundarhorn – 11 September 2011

13

Backscatter coefficient

Depolarisation ratio

)

Ceilometer and Lidar Using backscatter signal

(ceilometer) Lidar instrument preferable at

Keflavík airport for ash detection Understanding of depolarisation

data

Page 14: Use of radar- and Lidar measurements to monitor volcanic ... · Since May 2011 on the farm Önundar-horn in S-Iceland Grímsvötn eruption 2011: Moved to Keflavík airport on 22 May

14

THANK YOU !