Aim
To give an insight, based on Wexford County Council’s experience, into some of the practical pavement applications of geogrids from a local authority point of view.
![Page 3: Use of Geogrids in Wexford · Geosynthetic Functions & Examples SEPARATION DRAINAGE / FILTRATION ASPHALT REINFORCEMENT REINFORCEMENT ... Maintenance Strengthening Subgrade Formation](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7a4bb5daf77f336162ea11/html5/thumbnails/3.jpg)
Content
• Brief Overview of Geosynthetics• Main types used for road construction applications.
• Historical applications in WCC
• Case study • N25 Primary Road Overlay
• Site selection
• Design
• Works
![Page 4: Use of Geogrids in Wexford · Geosynthetic Functions & Examples SEPARATION DRAINAGE / FILTRATION ASPHALT REINFORCEMENT REINFORCEMENT ... Maintenance Strengthening Subgrade Formation](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7a4bb5daf77f336162ea11/html5/thumbnails/4.jpg)
Types of Geosynthetics
![Page 5: Use of Geogrids in Wexford · Geosynthetic Functions & Examples SEPARATION DRAINAGE / FILTRATION ASPHALT REINFORCEMENT REINFORCEMENT ... Maintenance Strengthening Subgrade Formation](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7a4bb5daf77f336162ea11/html5/thumbnails/5.jpg)
Geosynthetic Functions & Examples
SEPARATION
DRAINAGE / FILTRATION
ASPHALT REINFORCEMENT
REINFORCEMENT
REINFORCEMENT
![Page 6: Use of Geogrids in Wexford · Geosynthetic Functions & Examples SEPARATION DRAINAGE / FILTRATION ASPHALT REINFORCEMENT REINFORCEMENT ... Maintenance Strengthening Subgrade Formation](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7a4bb5daf77f336162ea11/html5/thumbnails/6.jpg)
Unbound Sub-Base
Asphalt Base/Bearing course
Binder course
Asphalt Surface course New Construction
AdequateFormation
Poor Formation
Two main Types.
• Unbound Sub base reinforcement.
• Asphalt/ surface course reinforcement
Geogrids and Road Construction
Existing
Maintenance Strengthening
Subgrade Formation
![Page 7: Use of Geogrids in Wexford · Geosynthetic Functions & Examples SEPARATION DRAINAGE / FILTRATION ASPHALT REINFORCEMENT REINFORCEMENT ... Maintenance Strengthening Subgrade Formation](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7a4bb5daf77f336162ea11/html5/thumbnails/7.jpg)
Geosynthetics for Sub-base Reinforcement
• Reduces deformations in the sub-base.
• Provides soil separation (With a backing Geotextile)
• Mitigation of settlements => extension of road service life.
• Reduces the need for large depths of construction.
Different Types of Reinforcement
![Page 8: Use of Geogrids in Wexford · Geosynthetic Functions & Examples SEPARATION DRAINAGE / FILTRATION ASPHALT REINFORCEMENT REINFORCEMENT ... Maintenance Strengthening Subgrade Formation](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7a4bb5daf77f336162ea11/html5/thumbnails/8.jpg)
Geosynthetics for Asphalt Reinforcement.
• Retardation of reflection cracking.
• Extends rehabilitation intervals.
• Extends the service life of road.
• Economic solution to add strength to a road.
• Reduces maintenance costs.
Different Types of Reinforcement
![Page 9: Use of Geogrids in Wexford · Geosynthetic Functions & Examples SEPARATION DRAINAGE / FILTRATION ASPHALT REINFORCEMENT REINFORCEMENT ... Maintenance Strengthening Subgrade Formation](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7a4bb5daf77f336162ea11/html5/thumbnails/9.jpg)
Typical Pavement Crack (Without Reinforcement)Dynamic Fatigue Tests
![Page 10: Use of Geogrids in Wexford · Geosynthetic Functions & Examples SEPARATION DRAINAGE / FILTRATION ASPHALT REINFORCEMENT REINFORCEMENT ... Maintenance Strengthening Subgrade Formation](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7a4bb5daf77f336162ea11/html5/thumbnails/10.jpg)
Typical Pavement Crack (With Reinforcement)Dynamic Fatigue tests
![Page 11: Use of Geogrids in Wexford · Geosynthetic Functions & Examples SEPARATION DRAINAGE / FILTRATION ASPHALT REINFORCEMENT REINFORCEMENT ... Maintenance Strengthening Subgrade Formation](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7a4bb5daf77f336162ea11/html5/thumbnails/11.jpg)
R702 Rehabilitation/ Water Main Rehabilitation
Wexford Co. Co. Experience
Sub-Base Reinforcement Application
![Page 12: Use of Geogrids in Wexford · Geosynthetic Functions & Examples SEPARATION DRAINAGE / FILTRATION ASPHALT REINFORCEMENT REINFORCEMENT ... Maintenance Strengthening Subgrade Formation](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7a4bb5daf77f336162ea11/html5/thumbnails/12.jpg)
R730 Wexford Quay 2009 2019
Wexford Co. Co. Experience
Asphalt Reinforcement Application
![Page 13: Use of Geogrids in Wexford · Geosynthetic Functions & Examples SEPARATION DRAINAGE / FILTRATION ASPHALT REINFORCEMENT REINFORCEMENT ... Maintenance Strengthening Subgrade Formation](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7a4bb5daf77f336162ea11/html5/thumbnails/13.jpg)
Case studyN25 Ballynabola to Raheenvarren
Pavement Scheme
![Page 14: Use of Geogrids in Wexford · Geosynthetic Functions & Examples SEPARATION DRAINAGE / FILTRATION ASPHALT REINFORCEMENT REINFORCEMENT ... Maintenance Strengthening Subgrade Formation](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7a4bb5daf77f336162ea11/html5/thumbnails/14.jpg)
N25 Site Specific Information.
• National Primary Road
• Single Carriageway with hard shoulders
• AADT = 8000
• %HGV = 7.8
• Pavement Deteriorating (2014/2015)
![Page 15: Use of Geogrids in Wexford · Geosynthetic Functions & Examples SEPARATION DRAINAGE / FILTRATION ASPHALT REINFORCEMENT REINFORCEMENT ... Maintenance Strengthening Subgrade Formation](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7a4bb5daf77f336162ea11/html5/thumbnails/15.jpg)
Existing Pavement Condition : Rutting in wheel Track
![Page 16: Use of Geogrids in Wexford · Geosynthetic Functions & Examples SEPARATION DRAINAGE / FILTRATION ASPHALT REINFORCEMENT REINFORCEMENT ... Maintenance Strengthening Subgrade Formation](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7a4bb5daf77f336162ea11/html5/thumbnails/16.jpg)
Existing Pavement Condition : Cracking
![Page 17: Use of Geogrids in Wexford · Geosynthetic Functions & Examples SEPARATION DRAINAGE / FILTRATION ASPHALT REINFORCEMENT REINFORCEMENT ... Maintenance Strengthening Subgrade Formation](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7a4bb5daf77f336162ea11/html5/thumbnails/17.jpg)
Existing Hard Shoulder Failure
![Page 18: Use of Geogrids in Wexford · Geosynthetic Functions & Examples SEPARATION DRAINAGE / FILTRATION ASPHALT REINFORCEMENT REINFORCEMENT ... Maintenance Strengthening Subgrade Formation](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7a4bb5daf77f336162ea11/html5/thumbnails/18.jpg)
TII Pavement Management System
• TII Asset Management Survey (2015 Red Flag).Wheel track rutting CrackingLoss of skid resistance
• Identified the condition of the carriageway as Fair / Poor
• Local Authority survey work / interventions also backed up survey results.
• TII recommended that preliminary investigations be carried out, with a view to demonstrating the need for a proposed pavement scheme.
![Page 19: Use of Geogrids in Wexford · Geosynthetic Functions & Examples SEPARATION DRAINAGE / FILTRATION ASPHALT REINFORCEMENT REINFORCEMENT ... Maintenance Strengthening Subgrade Formation](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7a4bb5daf77f336162ea11/html5/thumbnails/19.jpg)
![Page 20: Use of Geogrids in Wexford · Geosynthetic Functions & Examples SEPARATION DRAINAGE / FILTRATION ASPHALT REINFORCEMENT REINFORCEMENT ... Maintenance Strengthening Subgrade Formation](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7a4bb5daf77f336162ea11/html5/thumbnails/20.jpg)
Recommended Solution
• Main Carriageway
• Sectional repair of compromised pavement to a depth of 200mm
• Overlay existing pavement with 55mm Binder Course & 45mm HRA
• Install Asphalt Reinforcement to upper Layers to prevent future cracking
& extend the life of the pavement
• Hard Shoulder
• Cold mill Hard Shoulder to Sub-base level & install geo-composite
reinforcement (Geogrid + Geotextile)
![Page 21: Use of Geogrids in Wexford · Geosynthetic Functions & Examples SEPARATION DRAINAGE / FILTRATION ASPHALT REINFORCEMENT REINFORCEMENT ... Maintenance Strengthening Subgrade Formation](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7a4bb5daf77f336162ea11/html5/thumbnails/21.jpg)
Cross Section
Asphalt Reinforcement Sub base reinforcement
![Page 22: Use of Geogrids in Wexford · Geosynthetic Functions & Examples SEPARATION DRAINAGE / FILTRATION ASPHALT REINFORCEMENT REINFORCEMENT ... Maintenance Strengthening Subgrade Formation](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7a4bb5daf77f336162ea11/html5/thumbnails/22.jpg)
Reinforcement
• Sub-Base Reinforcement
• Reinforcement, filtration, separation (All in one)
• Easy to install
• Good resistance against installation damage
• Asphalt Reinforcement
• Flexible and easy to install
• Bitumen coated polyester (suitable for fine milled surface)
• Good resistance against installation damage
![Page 23: Use of Geogrids in Wexford · Geosynthetic Functions & Examples SEPARATION DRAINAGE / FILTRATION ASPHALT REINFORCEMENT REINFORCEMENT ... Maintenance Strengthening Subgrade Formation](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7a4bb5daf77f336162ea11/html5/thumbnails/23.jpg)
Extent of the Works
• Total length of works 3.6 km
• Application of Asphalt Reinforcement over affected area
• Application of Unbound Reinforcement in Hard Shoulder
• Contract awarded to Roadstone Ltd.
• Contract value - €2 million.
Works Programme Summer 2017
1. Sectional repair of main carriageway
2. Excavate and repair WBHS. Including unbound reinforcement.
3. Pavement overlay Main Carriageway. Install Asphalt
reinforcement on affected sections.
![Page 24: Use of Geogrids in Wexford · Geosynthetic Functions & Examples SEPARATION DRAINAGE / FILTRATION ASPHALT REINFORCEMENT REINFORCEMENT ... Maintenance Strengthening Subgrade Formation](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7a4bb5daf77f336162ea11/html5/thumbnails/24.jpg)
Hard shoulder Rehabilitation.
![Page 25: Use of Geogrids in Wexford · Geosynthetic Functions & Examples SEPARATION DRAINAGE / FILTRATION ASPHALT REINFORCEMENT REINFORCEMENT ... Maintenance Strengthening Subgrade Formation](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7a4bb5daf77f336162ea11/html5/thumbnails/25.jpg)
Asphalt Reinforcement – Bond Coating
![Page 26: Use of Geogrids in Wexford · Geosynthetic Functions & Examples SEPARATION DRAINAGE / FILTRATION ASPHALT REINFORCEMENT REINFORCEMENT ... Maintenance Strengthening Subgrade Formation](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7a4bb5daf77f336162ea11/html5/thumbnails/26.jpg)
Asphalt Reinforcement – Laying Process
![Page 27: Use of Geogrids in Wexford · Geosynthetic Functions & Examples SEPARATION DRAINAGE / FILTRATION ASPHALT REINFORCEMENT REINFORCEMENT ... Maintenance Strengthening Subgrade Formation](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7a4bb5daf77f336162ea11/html5/thumbnails/27.jpg)
Main Carriageway
![Page 28: Use of Geogrids in Wexford · Geosynthetic Functions & Examples SEPARATION DRAINAGE / FILTRATION ASPHALT REINFORCEMENT REINFORCEMENT ... Maintenance Strengthening Subgrade Formation](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7a4bb5daf77f336162ea11/html5/thumbnails/28.jpg)
Asphalt Reinforcement – Rolling
• Ultra light Weight nonwoven Backing• Tensile Strength 50 Kn/m• Bitumen content of Coating > 60%
Combination of bitumen coating grid & bond coat emulsion provided an extremely strong bond between the asphalt layers & geogrid
![Page 29: Use of Geogrids in Wexford · Geosynthetic Functions & Examples SEPARATION DRAINAGE / FILTRATION ASPHALT REINFORCEMENT REINFORCEMENT ... Maintenance Strengthening Subgrade Formation](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7a4bb5daf77f336162ea11/html5/thumbnails/29.jpg)
Asphalt Reinforcement – Paving
![Page 30: Use of Geogrids in Wexford · Geosynthetic Functions & Examples SEPARATION DRAINAGE / FILTRATION ASPHALT REINFORCEMENT REINFORCEMENT ... Maintenance Strengthening Subgrade Formation](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7a4bb5daf77f336162ea11/html5/thumbnails/30.jpg)
Today:
Completed Scheme
![Page 31: Use of Geogrids in Wexford · Geosynthetic Functions & Examples SEPARATION DRAINAGE / FILTRATION ASPHALT REINFORCEMENT REINFORCEMENT ... Maintenance Strengthening Subgrade Formation](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7a4bb5daf77f336162ea11/html5/thumbnails/31.jpg)
Completed Scheme
![Page 32: Use of Geogrids in Wexford · Geosynthetic Functions & Examples SEPARATION DRAINAGE / FILTRATION ASPHALT REINFORCEMENT REINFORCEMENT ... Maintenance Strengthening Subgrade Formation](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7a4bb5daf77f336162ea11/html5/thumbnails/32.jpg)
Completed Scheme
![Page 33: Use of Geogrids in Wexford · Geosynthetic Functions & Examples SEPARATION DRAINAGE / FILTRATION ASPHALT REINFORCEMENT REINFORCEMENT ... Maintenance Strengthening Subgrade Formation](https://reader034.vdocuments.us/reader034/viewer/2022042022/5e7a4bb5daf77f336162ea11/html5/thumbnails/33.jpg)
Thank You
Donal Mcloughlin BEng CEng
Wexford County Council
March 2019