Page 1 of 11 RISK ASSESSMENT IN TERMS OF REGULATION 8 OF THE WASTE EXCLUSION REGULATIONS APPLICANT Middelburg Ferrochrome, a business unit of Samancor Chrome Limited WASTE STREAM OR PORTION OF A WASTE STREAM Ferrochrome slag BENEFICIAL USE/S Use as aggregates Concrete aggregates Road base and covering and road stabilisation Asphaltic concrete and other bituminous mixtures Construction fill Concrete products

Upload: others

Post on 02-Sep-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1 of 11

RISK ASSESSMENT IN TERMS OF REGULATION 8 OF THE WASTE

EXCLUSION REGULATIONS

APPLICANT Middelburg Ferrochrome, a business unit of Samancor Chrome Limited

WASTE STREAM OR PORTION OF A WASTE STREAM

Ferrochrome slag

BENEFICIAL USE/S

Use as aggregates

Concrete aggregates

Road base and covering and road stabilisation

Asphaltic concrete and other bituminous mixtures

Construction fill

Concrete products

Page 2 of 11

Plaster and granite sands

Railroad ballast

Roofing granules

Filtration media

Pipe filling material

Backfilling

Dam construction and stabilisation material

Construction of drainage systems

Hydroponic filling material

Production of cement

WASTE GENERATING FACILITY

PHYSICAL ADDRESS OF FACILITY Off Hendrina road

Middelburg, MP

GPS CO-ORDINATES OF WASTE GENERATING FACILITY

Corners Latitude Longitude

1 -25.80769 29.49341

Page 3 of 11

2 -25.81025 29.49677

3 -25.81469 29.49711

4 -25.81438 29.49119

5 -25.81163 29.49205

6 -25.80866 29.49118

CONTACT PERSON

NAME Heather Booysen

ADDRESS 1st Floor, Block B, Cullinan Place, Cullinan Close (off Rivonia Road), Morningside

EMAIL ADDRESS [email protected]

TELEPHONE 0132494407

* DETAILED DESCRIPTION OF WASTE GENERATING PROCESS

Ferrochrome is an essential ingredient for the production of stainless steel, and is an alloy of iron and chromium with a chromium content of between 50 and 55 percent. Stainless steel depends on chrome for its appearance and its resistance to corrosion. Ferrochrome production is essentially a carbothermic reduction operation taking place at high temperatures. The ore – an oxide of chromium and iron – is reduced by coal and coke to form an iron-chromium alloy called ferrochrome. The heat for this reaction comes from the electric arc formed between the tips of the electrodes in the bottom of the furnace and the furnace hearth. This arc creates temperatures of about 2 800°C. Tapping takes place intermittently. When enough smelted ferrochrome has accumulated in the hearth of the furnace, the tap hole is drilled open and a stream of molten metal and slag flows down a trough into a chill or ladle. The ferrochrome solidifies in large castings, while the slag is separated and stockpiled for further processing.

Page 4 of 11

The product is crushed and screened to exact customer specifications. Alternatively, the ferrochrome is granulated into a flowing stream of water. To improve total ferrochrome recovery while maintaining a high-quality product, alloy recovery plants are utilised to recover the ferrochrome from the slag produced during the charge chrome process. The slag, which has a metallic content of approximately 4 percent, is processed through a series of crushers and broken down to minus 15mm material. It then moves through a wet jigging plant where the chrome and slag are separated by means of gravity or magnets. The slag is then stockpiled into various size fractions for further use by external customers.

PRODUCTION PROCESS FLOW CHART ATTACHED

YES

NO

IDENTIFICATION OF HAZARDS Not applicable

WASTE CLASSIFICATION

HAZARDOUS GENERAL

X

*A process flow chart must be attached to the process description

RISK ASSESSEMENT WITHOUT MITIGATION

Activity Risk Description

Environmental receptors Impact Assessment of the risk

Probability Magnitude

Duration Scale Significance

Transporting of slag

Potential for slag to become air-

Surrounding environment

- Air - Roads

Deterioration of air quality

2 2 1 3 12 - low

Page 5 of 11

Activity Risk Description

Environmental receptors Impact Assessment of the risk

Probability Magnitude

Duration Scale Significance

borne during transportation

- Other road users Damage to other vehicles

Handling of slag Potential for slag to emit dust during the loading and offloading of the slag

Air Deterioration of local air quality

2 2 1 1 8 - low

Material storage Potential for stockpiled material to enter the surrounding environment

Soil (primary)

Surface water (secondary)

Slag spillage on soil

Slag spillage in water causing siltation

3 2 1 1 12 – low

Material handling and processing

Potential for slag to emit dust during handling, crushing and screening activities

Air

Deterioration of air quality

2

4 2 1 14 – low

Page 6 of 11

Activity Risk Description

Environmental receptors Impact Assessment of the risk

Probability Magnitude

Duration Scale Significance

Material handling and processing of slag

Potential for skin exposure of humans whilst working with slag

Health - skin Potential for skin irritation and abrasion

4

2 1 1 16– low

Material handling and processing of slag

Potential for eye contact exposure of humans whilst working with slag

Health - eye Potential for eye irritation and abrasion

4

2 1 1 16– low

Page 7 of 11

Activity Risk Description

Environmental receptors Impact Assessment of the risk

Probability Magnitude

Duration Scale Significance

Material handling and processing of slag

Potential for inhalation of dust exposure of humans whilst working with slag

Health – respiratory system

Potential for respiratory irritation

4

2 1 1 16– low

Material handling and processing of slag

Potential for ingestion of slag dust by humans whilst working with slag

Health Potential for irritation

2

2 1 1 8 – low

Environmental spillage

Potential for accidental release of slag into the environment

Soil, surface water. Minor localised silt contamination

Visual impacts

1 2 1 1 4 – low

Page 8 of 11

Activity Risk Description

Environmental receptors Impact Assessment of the risk

Probability Magnitude

Duration Scale Significance

during transport and material handling

Page 9 of 11

The following factors and criteria must be used to assess the impacts of the activities:

Criteria MAGNITUDE (Severity) DURATION

10 - Very high 5 – Permanent (longer than 10 years) 8 – High 4 - Long-term (5 to 10 years) 6 – Moderate 3 - Medium-term (12 months to 5 years) 4 – Low 2 - Short-term (0 to 12 months) 2 – Minor 1 – Immediate

SCALE PROBABILITY (Likelihood) 5 – International 5 - Definite 4 – National 4 - Highly probable 3 – Regional 3 - Medium probability 2 – Local 2 - Low probability 1 - Site only 1 – Improbable 0 – None 0 – None

Magnitude Magnitude measures the size of the impact

Duration Duration refers to the lifetime of the impact i.e. how long it will last

Scale The scale refers to the extent of the impact.

Probability The probability refers to the chance of impact to occur. The potential impact could be most likely to occur, unlikely, etc.

Page 10 of 11

Assessment of Significance of impact Significance rating of the potential impacts illustrates the importance of the impact itself. The size of area affected by pollution may be extremely high but the significance of this effect is dependent on the concentration or level of pollution in that area. In order to determine the significance of impact, the following method was used: Significance Points (SP) = (Magnitude + Duration + Scale) x Probability The values of SP are then ranged as follows:

Rating Description

SP >60 Indicates high environmental significance

An impact which could influence the decision about whether or not to proceed with the activities regardless of any possible mitigation.

SP 30 – 60 Indicates moderate environmental significance

An impact or benefit which is sufficiently important to require management and which could have an influence on the decision unless it is mitigated.

SP <30 Indicates low environmental significance

Impacts with little real effect and which will not have an influence on or require modification of the activities.

+ Positive impact An impact that is likely to result in positive consequences/effects

Page 11 of 11

I, Heather Booysen hereby declare that I have read the completed the Risk Assessment form and hereby confirm that the information is to the best of my knowledge true and correct.

Furthermore, I declare that I am fully aware of my responsibilities in terms of the Waste Exclusion Regulations, and that failure to comply with these Regulations may constitute an offence in terms of the National Environmental Management: Waste Act, 2008 (Act 59 of 2008).

Applicant (Full names) : Heather Booysen

Designation: Group SHEQ: Environmental Superintendant

Signature:

Date: 18 August 2018 Place: Middelburg

FOR OFFICE USE ONLY

Date Received

Decision Taken Authorised Not Authorised( provide reasons)

Reference Number

environmental affairs Department: Environmental Affairs REPUBLIC OF SOUTH AFRICA

RISK MANAGEMENT PLAN IN TERMS OF REGULATION 10 OF WASTE EXCLUSION REGULATONS

APPLICANT Middelburg Ferrochrome, a business unit of Samancor Chrome Limited

SOURCE(S) OF Ferrochrome smelter producing slag WASTE

WASTE TO BE Ferrochrome slag BENEFICIATED

BENEFICIAL USE/S Use as aggregates

Concrete aggregates

Road base and covering and road stabilisation

Asphaltic concrete and other bituminous mixtures

Construction fill

Concrete products

Plaster and granite sands

Railroad ballast

Roofing granules

Filtration media

Pipe filling material

Backfilling

Dam construction and stabilisation material

Construction of drainage systems

Hydroponic filling material

Page 1 of 5

Production of cement

MSDS YES NO,( Not hazardous ATTACHED IF HAZARDOUS

WASTE Middelburg Ferrochrome, a business unit of Samancor GENERATING Chrome Limited FACILITY

Off Hendrina road

PHYSICAL Middelburg ADDRESS

MP

Corners Latitude Longitude

GPS CO- 1 -25.80769 29.49341

ORDINATES OF 2 -25.81025 29.49677 WASTE GENERATING 3 -25.81469 29.49711 FACILITY (e.g. 60° 29' 30" 4 -25.81438 29.49119 Latitude; 34 ° 20'

5 -25.81163 29.49205 15" Longitude)

6 -25.80866 29.49118

POSTAL PostNet Suite 803 Private Bao X9

ADDRESS Ben more, 2010

CONTACT Heather Booysen PERSON

TELEPHONE +27 13 249 4407 CELL: 0824173889

EMAIL [email protected] FAX:

Page 2 of 5

RISK MANAGEMENT PLAN

Transporting of slag

Handling of slag

Material storage

Material handling and processing

Material handling and processing of slag

Potential for slag to become air-borne during transportation

Potential for slag to emit dust during the loading and offloading of the slag

Potential for stockpiled material to enter the surrounding environment

Potential for slag to emit dust during handling, crushing and screening activities

Potential for skin exposure of humans whilst working with slag

Make use of tarpaulin Transporter over slag during transportation if slag has potential to cause dust or to be thrown from the vehicle.

Slag is a heavy and Operator dense material. The potential to cause dust is low. Take precautions to minimize dust formation by wetting of the slag when necessary.

The slag is stable in Operator storage. Slag is usually consumed in large volumes for which packaging is impractical. Avoid deposition outside areas of intended use. Store in demarcated areas. Avoid storage conditions that may generate dust.

Manage stormwater collected in slag stockpile areas.

Slag is a heavy and Operator dense material. The potential to cause dust is low. Take precautions to minimize dust formation by wetting of the slag when necessary.

Special attention other than routine personal hvr1iP.r1P. not required.

with water

Operator

Page 3 of 5

and soap. Wear the appropriate PPE. Overalls and safety boots; gloves for hands, where applicable.

I

Material handling Potential for eye Eye protection should Operator and processing of contact exposure of be worn were dust is a slag humans whilst potential hazard.

working Safety goggles and face shield if the potential exists for the generation of sharp, small chips, sharp flakes or excess dust.

Material handling Potential for Take precautions to Operator and processing of inhalation of dust minimize dust slag exposure of humans formation by the

whilst working with wetting of the product slag and use appropriate

personal protective equipment to prevent dust inhalation

Material handling Potential for Operator and processing of ingestion of slag

slag dust by humans Wash out mouth with whilst working with water. Wash hands slag and not wearing thoroughly after PPE or washing handling. hands

Environmental Potential for Clean slag spills Transporter and spillage accidental release of immediately and operator

slag into the remove to suitable environment during storage area. transport and material handling

Page 4 of 5

DECLARATION

I, Y~> &co~ hereby declare that I have read the completed Risk Management form and her y confirm that the 1nformat1on IS to the best of my knowledge true and correct.

Furthermore, I declare that I am fully aware of my responsibilities in terms of the Waste Exclusion Regulations, and that failure to comply with these Regulations may constitute an offence in terms of the National Environmental Management: Waste Act, 2008 (Act 59 of 2008).

Applicant (Full names) l-\~ther&:,~ Designation C:r<-c""f '5\-\ EQ \ 6----'-"' ~I

I FOR OFFICE USE ONLy

Date Received

Decision Taken Authorised Not authorised (provide reason)

Reference Number

Page 5 of 5