uscg hurricane response & hms bounty sar case north carolina 2013 all-hazards conference 12 march...
TRANSCRIPT
- Slide 1
- USCG Hurricane Response & HMS BOUNTY SAR Case North Carolina 2013 All-Hazards Conference 12 March 2013 CDR Tim Cummins Deputy Sector Commander LT Kevin Sullivan Sector NC Command Center Chief
- Slide 2
- Hurricane Response Overview Command Structure Assets/Capabilities Missions Partners
- Slide 3
- Command Structure ICS Structure Decision Point Scalability Interoperability
- Slide 4
- Assets/Capabilities Sector Assets Surge Capabilities Personnel Reservists Assets Aviation Cutters ATON Strike Teams Facility Support
- Slide 5
- Missions SAR Limitations Inland/Coastal/Offshore Missions Marine Transportation System Recovery (MTSR) Ferry System Ports (Disaster Recovery Supplies) Aids to Navigation (ATON) Marine Environmental Protection (MEP) Law Enforcement Ports, Waterways and Coastal Security (PWCS)
- Slide 6
- Missions: Inland SAR Hoist capable helos MH-60 MH-65 High Water Rescue Swift Water Rescue Communications (800 MHz) Tertiary Cell Phone ARES
- Slide 7
- Missions: Marine Environmental Protection
- Slide 8
- Missions: MTSR/ATON
- Slide 9
- Stray Buoys
- Slide 10
- Slide 11
- Partners Federal Army Corps of Engineers Environmental Protection Agency State/County/Local State/Eastern Branch/County EOCs & 911 Centers Coastal Municipalities (Fire/Police/EMS) NCDOT Bridges/Ferry Divisions NC Wildlife/Marine Patrol Industry State Ports Pilots
- Slide 12
- Partnerships: ACOE/EPA
- Slide 13
- Emergency Ferry Routes
- Slide 14
- Questions?
- Slide 15
- HMS BOUNTY SAR Case Challenges
- Slide 16
- Slide 17
- Timeline (all times local) Sunday 28 OCT 2130: SCC receives email via agent that HMS BOUNTY w/ 16POB is disabled and T.O.W. 90NM SE of Cape Hatteras. SCC is unable to establish direct comms with vessel SCC Requests C-130 from A/S E-City to investigate. ~2330: C-130 on-scene, establishes comms. Overnight the C-130 remains on-scene, provides comms link as situation worsens. SCC coordinated plan to abandon ship after sunrise.
- Slide 18
- 87NM
- Slide 19
- Timeline Continued Monday: 0426: Vessel capsizes crew forced to abandon ship 0430: SCC requests A/S E-City launch 2 MH-60s 0641: CG-6012 on-scene, hoisting one survivor 0756: CG-6012 BINGO, 5 survivors o/b 0856: CG-6031 BINGO, 9 survivors o/b ~0900: SCC determines 2 crewmembers remain missing, begins search planning. 1638: CG-6043 recovers 1 unresponsive PIW in search area. Tuesday 1632: Transferred SMC to D5 Friday 1830: D5 grants ACTSUS
- Slide 20
- 87NM
- Slide 21
- Debris 30NM
- Slide 22
- Slide 23
- SAR EFFORT STAT SHEET CASE TOTALS: Total area (SQNM): 10877.21 Total track miles: 6214.11 Searches Conducted - 22 H-60 5 C-130 7 C-144 - 2 ELM 3 GALLATIN - 5 Total Sorties 19 Investigation and Hearing Pending
- Slide 24
- Contacts SCC 24x7: 910-343-3880 LT Sullivan [email protected] 910-343-3876
- Slide 25
- Questions?