Page 1: US 97 Spanish Hollow Creek and Trout Creek Bridge€¦ · US 97 Spanish Hollow Creek and Trout Creek Bridge • Technical Information • Project Completion Date: 04/15/2019 • Project

US 97 Spanish Hollow Creek and Trout Creek Bridge

Willowdale, OR

Page 2: US 97 Spanish Hollow Creek and Trout Creek Bridge€¦ · US 97 Spanish Hollow Creek and Trout Creek Bridge • Technical Information • Project Completion Date: 04/15/2019 • Project

US 97 Spanish Hollow Creek and Trout Creek Bridge • Technical Information

• Project Completion Date: 04/15/2019

• Project Location: Willowdale, OR

• Size of Project: 1000 cy

• Strength Requirements: ODOT Class 4000 HPC(IC) ODOT Class 4000 HPC ODOT Class 4000 Structural Concrete

• Water/Cement Ratio(s): ODOT Class 4000 HPC(IC) - 0.36 w/c ODOT Class 4000 HPC - 0.37 w/c ODOT Class 4000 Structural Concrete - 0.48 w/c

• Unique or High Volume Admixtures: retarder at a dosage rate range of 6-10 oz per hundred weight; high range water reducer at a 4 oz per hundred weight

Page 3: US 97 Spanish Hollow Creek and Trout Creek Bridge€¦ · US 97 Spanish Hollow Creek and Trout Creek Bridge • Technical Information • Project Completion Date: 04/15/2019 • Project

US 97 Spanish Hollow Creek and Trout Creek Bridge

• Describe unique mix designs: The ODOT Class 4000 HPC (IC) which uses 300 lbs per cubic yard of a high absorption, light weight fine aggregate to allow internal curing of the HPC bridge deck. This was the very first project in the state to use this light weight fine aggregate mixture. In addition there was the standard ODOT Class 4000 HPC for the impact panels and an ODOT Class 4000 structural concrete.

• Describe unique specifications/requirements (flatness, color, etc.): ODOT Class 4000 HPC(IC) was a unique design due to never using the ultra-light weight fine aggregate in a mix design in the state before

• Describe placement challenges or unique techniques: Due to the remote location and pouring in the summer months lots of planning and communication was needed to ensure that the concrete mixtures arrived within ODOT specifications.

• Describe other special technical aspects: The ODOT Class 4000 HPC(IC) had some very unique requirements due to the ultra-light weight fine aggregate that was sourced and delivered from Utah. The fine aggregate had to be over-saturated for 7 days then allow 2 days for drain down prior to the pour date while running moisture's using a centrifuge to determine total moisture content

Page 4: US 97 Spanish Hollow Creek and Trout Creek Bridge€¦ · US 97 Spanish Hollow Creek and Trout Creek Bridge • Technical Information • Project Completion Date: 04/15/2019 • Project

US 97 Spanish Hollow Creek and Trout Creek Bridge

Starting the pour on the Trout Creek bridge deck using the ODOT HPC(IC) mixture

Page 5: US 97 Spanish Hollow Creek and Trout Creek Bridge€¦ · US 97 Spanish Hollow Creek and Trout Creek Bridge • Technical Information • Project Completion Date: 04/15/2019 • Project

US 97 Spanish Hollow Creek and Trout Creek Bridge

Pumping the concrete on the bridge deck

Page 6: US 97 Spanish Hollow Creek and Trout Creek Bridge€¦ · US 97 Spanish Hollow Creek and Trout Creek Bridge • Technical Information • Project Completion Date: 04/15/2019 • Project

US 97 Spanish Hollow Creek and Trout Creek Bridge

Pumping the concrete on the bridge deck.

Page 7: US 97 Spanish Hollow Creek and Trout Creek Bridge€¦ · US 97 Spanish Hollow Creek and Trout Creek Bridge • Technical Information • Project Completion Date: 04/15/2019 • Project

US 97 Spanish Hollow Creek and Trout Creek Bridge

Pumping the concrete on the bridge deck.

Page 8: US 97 Spanish Hollow Creek and Trout Creek Bridge€¦ · US 97 Spanish Hollow Creek and Trout Creek Bridge • Technical Information • Project Completion Date: 04/15/2019 • Project

US 97 Spanish Hollow Creek and Trout Creek Bridge

Completed Bridge

Page 9: US 97 Spanish Hollow Creek and Trout Creek Bridge€¦ · US 97 Spanish Hollow Creek and Trout Creek Bridge • Technical Information • Project Completion Date: 04/15/2019 • Project

US 97 Spanish Hollow Creek and Trout Creek Bridge

Completed Bridge

Page 10: US 97 Spanish Hollow Creek and Trout Creek Bridge€¦ · US 97 Spanish Hollow Creek and Trout Creek Bridge • Technical Information • Project Completion Date: 04/15/2019 • Project

US 97 Spanish Hollow Creek and Trout Creek Bridge

Completed Bridge