urban renewal, the 15th ward, the empire stateway and the ... · to the east, east adams and burt...
TRANSCRIPT
Urban Renewal, the 15th Ward, the Empire Stateway and the City of Syracuse, New York
Aaron C. Knight
Candidate for B.S. Degree in History and Computer Science with Honors
May 2007
APPROVED
Thesis Project Advisor: ____________________________ J. Scott Strickland
Honors Reader: __________________________________
William Stinchcombe
Honors Director: __________________________________ Samuel Gorovitz
Date:___________________________________________
Copyright © 2007 by Aaron C. Knight.
All rights reserved
Abstract
Urban renewal programs of the 1950s through 1970s coupled
with the connection of older cities to the federal Interstate Highway
system during the same time dramatically changed the look of those
cities. Syracuse, New York is a perfect example city from which we can
examine the impact – good and bad – of these developments and the
effects they had.
Syracuse’s projects centered in and near the 15th Ward, a
predominantly lower-income neighborhood situated north of the
Syracuse University campus and east of Downtown Syracuse. This
neighborhood of nearly 3,500 people would fall nearly completely
between the different renewal programs and the construction of
Interstate 81, the Empire Stateway.
From the late 1950s to the early years of Lee Alexander’s tenure
as mayor of Syracuse in the 1970s, this is an examination of the failures
at renewal and at stemming the exodus of city residents to the suburbs
as Syracuse declined by over 25,000 people during that period.
Table of Contents
Acknowledgements..........................................................i
Capstone Thesis................................................................1
Appendices .......................................................................58
A. Annotated 1958 Syracuse Map........................58
B. Annotated 1955 Photo ......................................59
C. 1975 Projects Diagram......................................60
D. University East Structures, 1965 .....................61
Works Cited ......................................................................62
i
Acknowledgements
I’d like to acknowledge a few people whose assistance greatly
helped form this thesis. The first of which is my father, whose hours
devoted to fixing my use of passive language and to helping turn this
into something readable; to my advisor, J. Scott Strickland, and to my
reader, William Stinchcombe. This thesis could not have happened
without the hours of assistance given in research by the staff of the
Onondaga County Public Library in Downtown Syracuse and the staff
of the Onondaga Historical Association Research Center. The
inspiration for this in many ways derives from the columns of Sean
Kirst with the Syracuse Newspapers, whose assistance as well is
greatly appreciated.
1
Capstone Thesis
1956 ushered in the National Interstate and Defense Highways
Act, the start of a new era spanning nearly two decades that
dramatically changed the face of the United States. Its decree: the
construction of a massive system of high-speed modern thoroughfares
crossing the United States. The act spurred major changes in
development patterns and brought new attention and focus to inner
cities that they would traverse. While the construction of these
highways contributed greatly to the growth and success of newer
cities, many challenges were faced when connecting older cities (such
as those in the Northeast) to the highway system.
Recognizing the challenge of adapting older cities to these new
expressways as well as the blight inherent in an older city, community
governments used federal urban renewal grants established under the
Housing Acts of 1949 and 1954 to clear blighted areas. These cleared
areas would form rights-of-way for new highways and allow modern
buildings to be constructed, thus “renewing” cities trying to stem the
flight of their citizens who were taking their taxes with them to the
suburbs. The city of Syracuse in upstate New York was no exception to
this method.
This is an examination of the modernization movements that
dominated Syracuse in the 1960s and early 1970s, along with their
successes and failures.
2
Many of Syracuse’s urban renewal projects happened within a
neighborhood designated as the 15th Ward. Bounded1 (roughly) by Erie
Boulevard to the north, Irving and University Avenues and Pine Street
to the east, East Adams and Burt Streets to the south, and Montgomery
Street to the west, the 15th Ward was a community just east of the
Central Business District and just northwest of Syracuse University.
Pictures from the 1950s depict an older and “sub-standard” run-down
community. Streets were lined with mostly two-family homes, in
various states of disrepair and neglect. Many articles referred to the
area as “a Slum Area,”2 home to lower-income people and the highest
crime rates3 in Syracuse.
The 15th Ward would give way almost completely under three
urban renewal proposals and the construction of Interstate 81. A
detailed map from 1958 which shows the projects that would
drastically change Syracuse is included as an appendix.
The first of these urban renewal proposals was for the
expansion of downtown Syracuse. At the time, the majority of
downtown activity still revolved around the central business district,
along South Salina and South Warren Streets, west of the 15th Ward.
With the Community Plaza proposal and other parts of the Central
Business District renewal plan, the new downtown would reach as far
as the route of the new Interstate Highway, nearly doubling
1 See appendix map for detailed boundaries. 2 Ganley, Joseph V. “Stateway Elevation Fear Unfounded.” (Syracuse Herald-American, 27 Apr 1958) 3 No hard data was available, but time editoria ls as well as retrospective ones depict it as such.
3
downtown’s footprint and presenting passers-by a clean, modern
downtown.
The eastern areas of the 15th Ward fell under the latter two
portions. Buildings in the middle would be demolished nearly
completely for the construction of the Empire Stateway, and the
easternmost third of the Ward would nearly completely be demolished
under the Near East Side Redevelopment Plan.
In the early 1950s, the states of New York and Pennsylvania
began discussing a north-south highway that would run from
Pennsylvania to Canada through the center of New York State. Talks
progressed further with the Federal Aid Highway Act of 1956, which
forced the creation of interstate highway plans by each state. Under a
variety of names (Empire Stateway, Rt. 11 Northway, and Penn-Can
Highway, among others), what would become Interstate Highway 814
(henceforth “Stateway”) would follow the path of U.S. Highway 115
through Pennsylvania up to Binghamton, then either follow U.S.
Highway 12 through Utica and then on to Watertown, or continue
following U.S. 11 through Syracuse to Watertown. The U.S. 12 route
was quickly decided against, in light of the much larger population in
Syracuse and the connected higher traffic volumes.
The first section of the Stateway built within the Syracuse city
limits stretched from the northern city limit to just north of Downtown,
4 Interstate 81 was originally designated Interstate 505, prior to the final numbering convention. Original construction signs showed a combination of the two numberings, a lthough it was numbered 81 at its officia l opening. 5 From Nedrow, south of Syracuse, through to Downtown, U.S. Highway 11 is made up of South Salina and South Townsend Streets.
4
at East Willow Street (just north of what is now Interstate 690). For the
stretch between there and the southern city limit, there were two
proposed routes, with two different methods. The original plan was to
sink the highway below street level alongside Townsend Street. The
later (and current) solution was to use the nearby Almond Street
arterial and to elevate the highway, leaving Almond Street below it (a
similar below-grade highway solution was considered there as well).
The city Stateway segment encountered much resistance. The
highway was planned to go through an existing neighborhood and
required the use of eminent domain. Arguments ensued over what
constituted proper compensation for the property being taken.
Proposals to elevate or to depress the highway generated much
controversy, also. Studies indicated6 that the costs would increase
significantly if the highway were depressed, because of the significant
drainage problems and the geology of the area.
Another project proposed during this time within the 15th Ward
(and including the depressed original path of the Stateway) was a
Community Plaza. Sandwiched between South State and Townsend
Streets to the east and west, and East Genesee and Harrison Streets to
the north and south, the Plaza was envisioned a grandiose
governmental and cultural plaza. Proposed by then-Mayor Anthony
A. Henninger, the plaza would consist of a large community courtyard
surrounded by new government buildings such as a new ten-story city
6 Ganley, Joseph V. “Depressed Grade Stateway Hinges on Drainage Problem.” (The Post-Standard, 17 Aug 1958)
5
hall, a new art museum and a new police headquarters. Some were
built, others were not; the plaza itself was built, as was the museum
(the Everson Museum of Art) and the public safety building.
The Stateway wasn’t the only highway proposed to go through
the city limits. The East-West highway (Interstate 690), constructed in
the late 1960s on old elevated railroad tracks, cut just north of the
northern border of the 15th Ward. As the structures were mostly in
place for this already, much less controversy was encountered in
building it through the city limits.
Finally, while the 15th Ward was the one most changed by the
urban renewal projects of the 1960s, it was far from the only city area
affected by urban renewal. Other projects, including several covering
the southwest quadrant of the city and the Central Business District
itself, similarly dramatically changed the fabric of those neighborhoods
and had all been completed fully, certainly would have left us with a
very different Syracuse than the one which exists today.
Now that the various components have briefly been introduced,
it is time to examine them individually in more detail. We’ll begin this
with the construction of the Empire Stateway.
The Great Divide
Originally proposed in the early 1950s, the Penn-Can Highway
became part of New York’s master highway plan and was all but
assuredly going to be routed through Central New York’s largest city
(and fastest-growing metropolitan area, at the time), Syracuse.
Segments were completed on both sides of the city limits long before
6
the segment we will cover here was, as the path was straightforward,
mostly rural, and encountered much less resistance.
The first segment of the highway to be constructed within the
city limits spanned from Brewerton into the northern end of
downtown Syracuse, and opened on October 28, 1959. At that time,
according to District Department of Transportation Engineer Earle E.
Towlson, the remaining stretch through the city would “be under
design very soon.”7 A few years earlier, in an interview with the
Syracuse Herald-Journal, Towlson had indicated, “Through Syracuse,
the expressway would be tied in with the city’s arterial routes.”8
The original path of the Stateway was to follow the Townsend
Street arterial, extending south from the terminus of the already
finished northern segment at East Willow Street. The Almond Street
arterial path, upon which the final highway was constructed,
according to Towlson, initially was “discarded … because such a route
would have eliminated a portion of the Pioneer Homes housing
project.”9
Following the Townsend Street arterial would have placed the
highway closer to the Central Business District. Originally planned to
be a depressed (below ground-level) highway, the highway would
pass below parts of the Community Plaza (which will be discussed as
7 Fredenburgh, Don. “Lack of Federal Funds Stal ls Work on Penn-Can Expressway” (Syracuse Herald-Journal, 23 Jan 1958) 8 “Air Surveys to Fix North-South Route” (Syracuse Herald-Journal,19 May 1955) 9 “Empire Stateway Link Shif ted to Almond St.” (The Post-Standard, 22 Oct. 1958)
7
its own portion later), and link up to East Willow Street six blocks to
the north.
A preliminary report10 on the drainage situation for depressing
the highway down the Townsend Street arterial indicated that the
highway, through downtown, could not be depressed more than 11
feet if standard draining techniques were employed. Relocation of
existing sewer systems would also be required, at a then-estimated
cost of nearly two and a half million dollars. It would also require the
Community Plaza elements straddling the expressway to clear it by
nine feet above ground. Problems were also noted with East Genesee
Street, a major east-west arterial (designated New York Route 92), and
creating sufficient clearance with a bridge over the planned route.
Depressing the highway would have caused many problems and
significantly increased the cost of the project11. Not surprisingly, an
alternate route and method was selected.
The Almond Street arterial upon which the highway was
constructed initially had been decided against for not only the reason
above but for the impact it would have on the development of the State
University of New York’s (SUNY) Upstate Medical University complex
which was to be constructed immediately adjacent to it along East
Adams Street. SUNY officials had previously (and unsuccessfully)
petitioned the city to close East Adams Street, a major arterial which
10 Ganley, “Stateway Hinges on Drainage” 11 The drainage concern, as well as the reconfiguration of major trunk sewer lines buried under Almond Street at the time, would have significantly increased the cost. No hard data was available; estimates ranged from eight to 10 times the cost of elevated bridges.
8
received instead an exit from the Stateway, as it passed through the
Upstate complex, for congestion concerns.
Evidence suggests that a similar study to the Townsend Street
study was undertaken to consider depressing the expressway through
the Almond Street routing as well, and was discarded as a result of the
same challenges – increased cost and complications with certain major
routes for overpasses and exits. Towlson declared that “it would be
‘more prudent’ to construct the new Almond St. arterial as an elevated,
rather than as a depressed highway … the city has expensive sewer
installations underground along the Almond St. route which would be
affected if it was decided to depress the new arterial.”12
The depressed expressway model had been championed by
then-Mayor Henninger (for whom the high school on the north side is
named). Many members of the community feared that the elevated
design would lead to an ugly “China Wall”13 Henninger did however
throw his support behind the elevated Almond Street routing and it
would be built in that fashion. Ultimately, the decision was made for
an elevated expressway along the Almond Street route with Almond
Street itself passing below the expressway for the majority of the
downtown section.
The challenges in site selection were far from the end of the
project’s many setbacks and delays. While the expressway would
12 “Empire Stateway Link Shif ted to Almond St.” (The Post-Standard, 22 Oct. 1958) 13 “Stateway Link Shif ted” The “China Wall” naming referred to China’s Great Wal l and how the Stateway would close off the inner city and “stunt expansion” of Downtown Syracuse.
9
officially open, save the segment from Nedrow to East Willow Street,
in 1962, the remaining segment would suffer many setbacks and not be
opened until 1969.
It was generally regarded, according to newspaper articles
published at the time, that the area was dilapidated and most residents
weren’t objecting to the proposed path and construction. However,
many objected to the methods used in obtaining land and how much
they were being compensated for having to move elsewhere.
This problem had several components. Firstly, the Syracuse
Department of Urban Renewal, charged with helping displaced
families be recompensed and easing the transition, did not have
jurisdiction over the majority of the highway path. By its charter, the
Syracuse Urban Renewal Agency had jurisdiction solely over the 101-
acre Near East Side Urban Renewal project, which while covering the
segment between East Adams Street and Erie Boulevard would neglect
the vast majority of the families in question. In total, while reported
estimates conflict14, some 790-900 families were displaced by this
project – nearly a quarter of those who would eventually be displaced
by urban renewal projects in Syracuse.
Another concern was with how the Highway Acts were written.
No provision was originally written into the legislation to compensate
14 The next two numbers, cited by the articles below, are separated by four years’ time and show a discrepancy accounted for likely by the shift to the Almond Street path, which routed through a denser-populated area which was part of the Pioneer Homes project. “Only 718 Units In Housing For Uprooted.” (The Post-Standard, 5 May 1957); Carroll, Walter. “Renewal Dept. Stymied By Lack of Funds, Staff.” (The Post-Standard, 13 Sep 1961)
10
those in the projected path for their moving expenses. Even if the
Syracuse Urban Renewal Agency had had the authority to assist those
affected by the highway’s construction, it would be doing so solely
from the budget of the City of Syracuse rather than those constructing
the expressway. This oversight was corrected in 1962 with a bill
persistently introduced15 by Senator Jacob K. Javits.
The State of New York faced fierce community opposition in
one sense simply due to dissatisfaction with the amounts residents
were being forced to sell their homes for. A neighborhood already in
flux, with residents trying to move from the original routing along
Townsend Street and the Near East Side Urban Renewal project areas,
residents in the new path of the highway were concerned with the lack
of input they had in the process and what they believed were poor
values offered.
The residents in the area didn’t as much object to moving but to
the lack of input they had on the decisions being made. A reporter in
the same week as the announcement of the Almond Street shift of the
Stateway plans interviewed several16 in the area who were resigned to
moving. Concerns were raised in some cases about where they would
go. Some, such as a garage owner in the area, were using the Stateway
as their final excuse to move on and do something else.
15 The Senator previously introduced this measure at least once prior in 1961. It passed in the Senate, but fai led in the House of Representatives. 16 Driver, Bob, “Stateway Fails to Stir Almond St. Folk.” (Syracuse Herald-Journal, 22 Oct 1958)
11
Perhaps the most telling reaction “is found in the words of the
last man questioned. ’I’m not going to worry about it,’ … ‘It will be 10
years before they do anything.’” 17 Little did he know how right he
would be, although for the wrong reasons. It would be because of
resistance resulting from state land evaluations that the progress is
delayed, rather than the typical bureaucratic pace the interviewed man
alluded to.
The basis for many area residents’ resistance is best summed up
by one anonymous interviewee’s statement that “’They [the state]
never pay you the money you deserve for your property.’” 18 The
concern here proved correct. 1961 and 1962 saw many complaints, as
assessments were completed of property to be acquired for the right-
of-way. Re-checks of assessments were announced in 196219 to resolve
complaints received to that point, for 37 properties.
The South Side Home Owners Association (henceforth the
“South Siders”) formed three weeks prior to the announcement of re-
checks because they felt that the state had offered them low prices for
their property. Members claimed that “[the state] will not negotiate
with them over the price.”20 The South Siders were wholly comprised
of homeowners south of Brighton Avenue, mostly in the Valley area of
Syracuse. The organization joined forces with the East Side
17 Driver, “Stateway Fails to Stir” 18 Driver, “Stateway Fails to Stir” 19 Haggart, Robert. “State Begins Rechecking Route 81 Home Offers.” (The Post-Standard, 24 Feb 1962) 20 Stevens, Will iam S. “Property Owners Balk.” (Syracuse Herald-Journal, 6 Feb 1962)
12
Cooperative Council21, which covered the 15th Ward segment, the
following month to press for aid and assistance for the homeowners
who had to relocate.
The spot re-checks of assessments in response to complaints did
not end project resistance, however. Conflict arose, primarily with the
South Siders, who disagreed with the payment process: it paid 60
percent up front and the remainder in monthly payments. In May
1962, the group attempted to meet directly with Governor Nelson
Rockefeller, whose staff rebuffed their request.22
After complaining of the time it was taking to negotiate with the
South Siders, the state spent would then spend the next two years
stalling the project themselves. A May 1963 article23 says that while
homeowners in the area have been contacted with assessments and
instructions to prepare to move, and had heard nothing since. Deemed
the “forgotten link” 24 by The Post-Standard, residents in the area
began to wonder if anything would ever be built at all. Per one public
works official, the process of gaining a right of way is a “‘long tortuous
process.’”25 The first 84 of the homes in the path would not be
demolished until May 196426, and the full highway would not open
21 “Home Owners Join Forces.” (The Post-Standard, 28 Mar 1962) 22 “Governor Won’t Meet With South Siders.” (Syracuse Herald-Journal, 10 May 1962) 23 Cosgrove, James M., “The ‘Forgotten Link.’” (Syracuse Herald-Journal, 12 May 1963) 24 Cosgrove, “‘Forgotten Link.’” 25 Cosgrove, “‘Forgotten Link.’” 26 Lee, Maurice D. “South Side Buildings Begin to Fall.” (The Post-Standard, 15 May 1964)
13
until 1969 with the opening of the Onondaga Interchange, with
Interstate 690.
Interstate 690, also known as the East-West Highway,
encountered far less opposition. In the 1930s, elevated embankments
had already been constructed through the city to raise railroad tracks
from their traffic problem-causing street level route. The railroad beds,
which would become the path for the new highway, provided a nearly
uninterrupted, save street underpasses, wall blocking Downtown from
the city’s North Side.
The plans for Interstate 690 were to acquire and then use the
elevated railroad beds, as this would be the most economical solution.
The editorial board of the Syracuse Herald-Journal took issue with this;
they wished instead that the State Department of Transportation
would replace the embankments with stilts like the Stateway was to be
built upon. The editorial board concluded that “this east-west arterial
should rest on stilts. … Remember, we’re building for the next 50, 75
years. These embankment plans for a city-dividing barrier can’t
conform to the city’s or the citizen’s desires.”27 The board indicated
that the only response they had received from the Department of
Transportation was that removal of the embankments and replacing
them with the stilts being constructed for the Stateway would increase
the costs eight-fold.28
27 Editoria l: “Open the north barrier!” (Syracuse Herald-Journal, 12 Dec 1965) 28 Editoria l: “A divided city sti l l.” (Syracuse Herald-Journal, 11 Jan 1966)
14
The construction of Interstate 690 would require displacing
another 232 rental units to expand the embankments which ran
between Erie Boulevard East and Burnet Avenue heading east of
Downtown. These units, in many cases similar to those displaced by
other renewal projects, would add to the housing shortages caused by
other projects.29
Both the Stateway and the East-West Highway were the source
of many concerns and displaced residents. What follows now is a
discussion of the surrounding Near East Side and Downtown-1 plans,
which were to address the surrounding area of the highways and
revitalize the urban core.
The Near East Side and Downtown-1 Urban Renewal Plans
Urban renewal in the 15th Ward was comprised of two plans
which would eventually displace over 2,200 families.30 1,242 families
faced displacement in the Near East Side Urban Renewal Plan, the first
urban renewal program initiated in the city of Syracuse. This program
covered the majority of the 15th Ward, excepting some of the
southwestern portion which fell under the Downtown-1 program. At
the time of the projection, a total of 3,337 families were to be displaced
by the Near East Side program, the Upstate Medical University
expansion and other programs, from 1957 to 1960 alone. “The figures
for families that will be displaced by this ‘face-lifting’ project do not
include the portion of the area that will be utilized for highway
29 “Open the north barrier!” 30 “Only 718 Units”
15
purposes.”31 This gives an indication of the sheer magnitude of the
programs and their effect on the 15th Ward. The first and foremost
major program operating in the 15th Ward is the Near East Side
program, which began in 1957.
It is because of this program that the Department of Urban
Renewal, separate from the Department of City Planning, was formed.
Later renamed the Department of Civic Improvement, and then folded
back into the general City Planning department, this agency had near-
total local control over the relocation of area residents and selection
and acquisition of properties. It also served as the liaison with the
federal government for proposals, funding and approvals necessitated
by the department of Housing and Urban Development.
The Downtown-1 project entered planning stages in 1964, and
was officially proposed in 1965. Comprising the southwest corner of
the 15th Ward and surrounding areas, and bounded by South State,
East Jefferson, South Clinton and East Adams Streets, the Downtown-1
project was to rehabilitate many older structures and connect on the
southern end the Central Business District to new civic structures in
the Community Plaza. Designed mostly for commercial office space,
with retail and food establishments on their first levels, the
Downtown-1 project was much smaller in scope and one of the more
successful projects.
31 “Only 718 Units”
16
One of the largest accomplishments of the project was the
construction of MONY Center32, initially a one-tower 20-story
commercial skyscraper that opened in 1967. Connected via tunnel to
the Hotel Syracuse, then a thriving civic jewel, the Center’s tower
landed the offices of Carrier Corporation and a new-to-Syracuse office
of the Mutual of New York (MONY) for which it is named. Later, in
the early 1970s, a second tower alongside it was constructed that is
visibly planned for in the original plans for the first. The MONY
Center displaced mostly small businesses and the local Greyhound Bus
depot. The bus depot itself was planning a new, modern station
elsewhere within the Downtown-1 project, but eventually took over
the former railroad station building on Erie Boulevard when the
railroad tracks are diverted for the construction of Interstate 690.
The Downtown-1 proposal represents a departure from the
previous Near East Side program, and a change in tone of the renewal
programs under Mayor William F. Walsh. Unlike the Near East Side
program, the program was much more focused, with developments in
several cases planned before a single building was razed. Some of
these fell through, like the Greyhound Bus station, but there were
definite plans for the sort of structures that would be replacing those
coming down.
The Syracuse department of Urban Renewal was led by George
A. McCulloch, who would start as the office’s director and advance to
the position of Commissioner of Urban Renewal until taking a position 32 "MONY Center Building Contract Awarded." (The Post-Standard, 16 Oct. 1964)
17
in Stamford, Connecticut in October 1964. One of the area’s staunchest
supporters of urban renewal, the Syracuse Post-Standard newspaper at
the time of his announced departure credited him with being the
“driving force” behind urban renewal in Syracuse for nearly 20 years,
since 1945.33
There is merit to The Post-Standard’s claim. Rising through
various positions in city planning, and as one of the chief architects of
the Near East Side Urban Renewal Project from its design nearly to its
completion, McCulloch certainly had a lot of power, early in his
tenure, in shaping the future of the 15th Ward and other areas of
Syracuse.
It is acknowledged, however, in the same article that “it was no
secret that McCulloch has been unhappy about renewal operations
here … he is reported as having told associates that he was not directly
involved in negotiations34 and got his information from secondary
sources.” What appears to be the case, inferred here, is a growing
rivalry in leadership of urban renewal projects between a city official
who had come up through several administrations and a rising star
mayor whose ever-expanding renewal plans pre-empted McCulloch’s
and depended on his subservience to Walsh’s plans, rather than
leadership of renewal projects. While the article takes pains not to say
that this was McCulloch’s reason for resigning, McCulloch was less
33 “George A. McCulloch Quits as City UR Chief” (The Post-Standard, 6 August 1964) 34 The full quote indicates two projects, primarily, which this refers to: The MONY Center project and the relocation of the Greyhound Bus terminal, which had been located on the MONY Center’s future site.
18
than satisfied with his level of control of shaping the urban renewal
progress in Syracuse later in his tenure.
Then-Mayor Walsh was another staunch and powerful
supporter of urban renewal to revitalize the downtown core and stem
the flow of people to suburban towns. It is likely that McCulloch and
Walsh had faced off politically in an effort for Walsh35 to claim more
credit for the MONY Center project and that the turf battle which
ensued over the future of renewal projects in Syracuse led to his
departure.
A former assistant director of New Haven, Connecticut’s urban
renewal program36, George B. Schuster, was selected in a national
search to replace McCulloch as commissioner of the Department of
Urban Improvement.37 Under Mayor Walsh and Commissioner
Schuster, the scope and extent of urban renewal’s reach was expanded
significantly. The projects, overall, became more grandiose and more
focused than the razing efforts of the Near East Side project. While the
Near East Side projects’ sites were cleared in many instances before a
firm plan for the site was created, nearly the reverse was the case for
other proposals that developed under their influence. In the case of the
Clinton Square proposal, which will be discussed later, completed
designs for the space (which never were fully realized) were in place
before a single lot was acquired for demolition.
35 Will iam F. Walsh was Mayor of Syracuse from 1962 to 1969, spanning the majority of the Urban Renewal period. He was preceded by Anthony A. Henninger, mentioned previously, who was Mayor from 1958 to 1961. 36 The New Haven Redevelopment Agency 37 “Schuster Replaces McCulloch in UI.” (The Post-Standard, 20 Sept. 1964)
19
With the change in leadership came an expansion of the office
involved. Early criticisms of the office, in conjunction especially with
its initial limited focus, came from the large programs outside of the
office’s scope – action in the Stateway corridor, in the Upstate Medical
University area, and other areas. As urban renewal programs
expanded, it was clearly necessary to expand the staff to assist with
planning and executing programs. With the creation of larger plans
under Schuster and Walsh, higher level of staffing was required, which
led to incorporation of the department into the City Planning unit in
1966.
The consolidation of the City Planning units would not end the
changes in urban renewal program leadership. 1968 would see a
change in party control in the Common Council, the city legislative
body. It would also see a change in the way urban renewal programs
were managed. A city-county urban renewal agency was formed,
recognizing the importance of renewal to not only the city but the
county for which it was the seat.
The Community Plaza Proposal
Mayor Henninger in 1958 proposed a grand vision: a central
civic and cultural hub that would transform a run-down neighborhood
into a gleaming community showcase. Located just east of the Central
Business District and bounded by McCarthy Avenue38, South State,
Townsend, and Harrison Streets, the new cultural center of the city
was included as part of the Near East Side Urban Renewal Program. It 38 McCarthy Avenue, a one-block al leyway, is just south of East Genesee Street
20
is of such separate significance that it deserves a more detailed
examination.
The Community Plaza was designed to include a New City
Hall, a new Public Safety Building, a common pedestrian plaza with a
reflecting pool, and an art museum, among other things. At the time of
its original proposal, it would straddle the then-sunken Stateway
corridor just west of Townsend Street. This element would be removed
six months later when the Stateway was moved to the elevated
Almond Street path.
The plaza would also include improvements to the existing
county steam station (the only building in the Community Plaza
footprint that wasn’t demolished)39 and a new commercial building or
parking facility on the north end. The Public Safety building was
constructed in 1964. The northern end of the property was developed40,
although those structures were replaced in 2003 by a new joint city-
county criminal courthouse building.
The City Hall proposal is an interesting study: designed to be
the city’s third City Hall, a new building would ease cramping in the
existing (and presently used) stone structure on East Washington
Street for a growing government. Several city offices at the time (as
well as the Common Council legislative body), used office spaces in
39 The steam station was originally constructed in conjunction with the eight story county office building, constructed in the 1950s, which sits across State Street from the Community Plaza site. 40 Details remain vague as to what was constructed in that end, although the land was zoned for small commercial buildings. They were demolished for the construction of the criminal courthouse building in 2003.
21
other nearby buildings due to a lack of room in the City Hall building.
The building was designed and present in many renderings of the
Community Plaza proposal and in the 196541 was stated to be “in an
advanced design stage.”
It is not mentioned again in either the 1966 or 1968 Workable
Program annual reports, but the building remained on planning grids
as late as 1969, when the pedestrian plaza and Everson Museum of Art
opened. Under a later plan for a civic center and county office building
across the street, the City Hall building disappeared from plans and is
replaced with a county library to replace the main Carnegie-built
library on Montgomery and Jefferson Streets.
As it turns out, neither proposal was built at any point on the
City Hall site. The site remained completely vacant until a new Justice
Center building, complementing the Public Safety building, was
constructed in the early 1990s. The newer focus on the Model Cities
program (which will be discussed later) and other downtown projects
likely contributed to the project sitting on the back burner before
finally being wholly discarded.
The consolidation of urban renewal and planning agencies of
the late 1960s, coupled with the change in party of city leadership from
1968 to 1970 (first of the Common Council, then of the Mayor’s Office)
led to a change in priorities which will be discussed further later.
41 City of Syracuse, New York. Office of the Mayor.A Workable Program for Community Improvement, 1965 Progress Report for the Elimination and Prevention of Slums and Blight in Syracuse, New York. (City of Syracuse, 1965). Workable Program reports are a pre-requisite for receiving federal a id under the Housing Act of 1954.
22
City Democrats had since the beginning of the Near East Side
program criticized the renewal programs’ handling by the Republican
mayors under which most of them occurred. Once they gained power,
the focus would change somewhat as well. The Community Plaza
proposal, still under way, was one of those priorities which changed.
No more than half of the major components of the Community
Plaza, then, were successfully carried to completion. What is
interesting, however, is how the Syracuse community received those
parts that were completed.
The South Plaza, like most components of the originating Near
East Side program, was a mixed success. An underground garage was
constructed below the plaza, which later proved to be an issue. The
reflecting pool, originally designed for ice-skating in the wintertime,
turned out to be feasible for neither purpose. Drainage system issues
plagued the pool; the pool did not hold water, and when filled, water
seeped onto the cars parked below in the underground garage. The
commissioner of Parks and Recreation determined that the pool was
not suitable to be adapted for its original wintertime purpose, ice-
skating, either. What this effectively means, then, is that a large sum of
money was poured into a beautiful reflecting pool for it to sit as a
concrete trash basin to the public.
Adjacent to the plaza is one of the enduring successes of the
Community Plaza proposal, the Everson Museum of Art. Designed by
23
famous architect I.M. Pei42, the structure sits on the southwest corner of
the Plaza, a well-known and established art museum that draws many
to the Plaza area. The new home of the museum was completed and
opened in 1968, moving from an older site.43 The museum celebrated
its 100-year anniversary with a gala in the South Plaza in 1997. Dick
Case, columnist for the Syracuse Post-Standard, reflected upon the
event, stating that it was the first time that the South Plaza had actually
realized the potential its 1960s designers envisioned. He quotes44 from
the original proposal, the 1960 design statement for the Community
Plaza:
This plaza should be in direct contrast to the formal, government plaza, with an atmosphere of playful activity. This may be accomplished by landscaping, sculpture, mosaics, murals, etc. It is proposed that more sitting spaces be provided in a small depressed area, for enjoyment of outdoor concerts. This informal cultural plaza will attract people during the daytime or nighttime, and during intermissions of events in the various buildings, people will congregate in this plaza. The design statement is an ambitious one. As Case points out,
however, there is a disconnect between the design statement and the
product which resulted. The reflecting pool (which was finally
repaired in the mid-1970s to allow its use), he argues, draws people in
42 I.M. Pei, an internationally famous and well-recognized architect, a lso designed the Newhouse Communications complex for Syracuse University. 43 The former site of the Everson Museum of Art was at the corner of James and North State Streets. It has since been demolished and replaced with a gas station. 44 Case, Dick. “A downtown dream fl ickered to life on Community Plaza” (Syracuse Herald-Journal, 6 June 1997)
24
the summer when it is operating. The remainder of the year, “the place
is as bare as the tundra.”45 Because the plaza features little that would
attract citizens in wintertime – no skating rink, or winter exhibits, or
anything besides shaped concrete – the plaza sits vacant save as an
occasional resting place during Syracuse’s long winter months, far
from the potential its designers intended and somewhat symbolic of
the void the project left in terms of community, and unlike the year-
round community activity center it was designed to be.
The Community Plaza was but a small portion of the Near East
Side program that affected the 15th Ward. But it is symbolic in many
ways of the damage that the program wreaked upon the 15th Ward and
the dramatic upheaval that urban renewal programs caused in
Syracuse. What follows is a written depiction of what rose from the
rubble of the 15th Ward.
East of the 15th Ward: Thornden East
Early urban renewal efforts went beyond the 15th Ward. Plans
were generated for nearly every city neighborhood, including some
four or five plans at any given time for parts of Downtown Syracuse.
The area just east of the 15th Ward is hardly an exception to this; the
Thornden East46 plan, developed in 1964, covered effectively the area
due east of the 15th Ward and south of the East-West Highway, with
the exception of the then-still-developing Meadowbrook area. This
45 Case, “Community Plaza” 46 The Thornden East plan spawned from a project jointly created with students from the Syracuse University School of Architecture that is also referred to as the University East project. They are interchangeable.
25
area, referred to as the East Side was, as it is now, split between
general residential and off-campus student housing.
The Thornden East plan was split along those lines. The
majority of the structures classified as dilapidated or deteriorated47
were in the lower-income residential areas north of the Westcott Street
business district and between East Fayette and East Genesee Streets.
Some of these structures were within the actual business district; many
of those have since been converted to storefronts or demolished to
make way for them.
In the Syracuse University off-campus housing portion of the
project (primarily those areas within two blocks of Euclid Avenue and
southwest of the Westcott Street business district, as it remains today),
the primary concern of the study was the elimination of deteriorated
apartments and homes and solving the parking challenges of the older
neighborhood.
The primary fault that students from a Syracuse University
architecture team studying with this neighborhood’s student housing
areas of this project is a lack of parking and poorly conceived
infrastructure. This conclusion was reached from the narrow older
roads spanning the neighborhood, many of which predated cars, and
the division of many homes into multiple apartments and a perceived
need for additional parking from the increased density of the
neighborhood. Narrow brick-paved hills, showing the age of the roads,
47 See Appendix D: Map displaying 1964 structure classifications for Thornden East plan, from the University East Physical Development Plan.
26
remain in the project area to this day. Many homes in the area were
without or with inadequate driveways, and the streets were narrow to
the point that street parking was difficult.
The topography of the entire planning project area itself
challenges proposals for the area. Non-right angle intersections such as
that of South Beech and Westcott Streets were problematic traffic
concerns (South Beech Street is a primary conduit between Thornden
Park and the Westcott Street business district, and Westcott Street is
the high-traffic primary arterial road through the planning project
area; the two streets intersect in an acute triangle, with limited
visibility). Other roads through the project area, such as Clarendon
Street and Ackerman Avenue, are narrow and steep due to the hilly
topography.
North of the Westcott Street business district is another story.
While the same parking and transportation issues plagued this area as
well (its topography was similarly difficult), this area was plagued
with substandard housing which from 1950 to 1960 had increased from
5.4% to 7.6%; the percentage of this portion, however, was nearly
50%.48 The area was also home to two schools which were being
considered for retirement. Levy Junior High, at Fellows Avenue and
Harvard Place, started as high school and was deemed inadequate due
to the inability to expand its facilities and its small physical plant.
Sumner Elementary, at Bassett and South Beech Streets just east of
Thornden Park was decommissioned several years later for similar 48 University East, Syracuse, New York Physical Development Plan, pp. 9-10
27
reasons. These schools’ potential closure and the designated
substandard housing in the area made it a ripe target for
redevelopment.
The most radical proposal came from architecture students at
Syracuse University, who proposed realigning the area with a new
arterial and displacing more than 250 housing units in the process. The
proposal would have created wider streets, a new modern shopping
district near the Westcott Street district (which would be turned into a
residential street by the new arterial connecting Comstock Avenue and
Columbus Street) and turning an the site of an envisioned
decommissioned Levy site into new apartment housing. The plan
indicated as its primary concern the modernization of the
transportation infrastructure and the creation of new housing units,
which due to projected university expansion would be in high
demand.
The proposed plan put forth by the Walsh administration was
much more conservative; the administration was far more concerned
with the removal of blight and reconstruction of new housing units in
their place than in radically altering the neighborhood.
In the concentrated blight areas, one particularly poor block was
considered for higher density housing. This block would eventually be
home to the Cherry Hill apartment complex, although other project
delays would push the start of its construction back for nearly five
years.
28
Corruption scandals over the awarding of demolition contracts
and the overall operations of the urban renewal agency arose in the
late 1960s, stopping any progress on the Thornden East project. By the
end of the Walsh administration, many substandard homes had been
demolished in the concentrated blight areas; the fate of these areas
would however be left to planners during the Alexander
administration. Many of the ideas for these areas of the project would
eventually be rolled into the larger Syracuse Hill plan in the early
1970s.
While this plan is entirely outside of the 15th Ward, it is the area
immediately east of it. It is not surprising to find from the table of
structural conditions that the highest concentration of substandard-
rated housing is in the areas directly adjacent to the 15th Ward
boundary; political boundaries rarely exactly contain the problems
which had made the neighborhoods targets in the first place. In the
same way, the boundaries of the Near East Side Urban Renewal
program hardly contained the city’s desire to redevelop its
neighborhoods and reduce blight, and this continued into this area.
By the end of the 1960s, redevelopment projects in and around
the 15th Ward had stagnated, and the voters of Syracuse elected a new
leader, Lee Alexander. The redevelopment of the 15th Ward and other
areas of the city would fall nearly exclusively under the new mayor,
Lee Alexander, and his administration’s control.
Reflecting Changing Priorities: The Alexander Years
29
The end of the 1960s brought the election of perhaps one of the
most notorious mayors in Syracuse history: Lee Alexander. A
Democrat, Alexander served as mayor of Syracuse from 1970 to 198549
and over a dramatic change in priorities with regard to urban renewal
and urban planning.
Alexander’s campaign and inauguration were both described as
non-traditional and upbeat. His inauguration ceremony was held for
the first time not in City Hall but in the newly finished Everson
Museum of Art in the Community Plaza. He envisioned “a greater city
whose people will face the future with confidence…”50 and stressed a
new direction for Syracuse in his inaugural address.
The end of the Walsh years had left little closure on the urban
renewal programs in Syracuse. The Alexander administration
remained devoted to finishing those projects started under Walsh
along with some new initiatives to stem Syracuse’s population decline.
With the passage in 1974 of the Housing and Community
Development Act, focus returned to urban renewal programs and new
initiatives. It was clear from the 1970 census51 that the programs of the
past had not yet stemmed the population losses in Syracuse, and that
change was necessary; the city population dropped by nearly 19,000
people while gaining almost 1,500 housing units.
49 “Mayors of Syracuse”. Web page of the City of Syracuse, New York, http://www.syracuse.ny.us/syracuseMayors.asp 50 Bl iven, “Alexander Sworn in as Mayor” 51 The 1960 census reports the population of Syracuse as 216,038; the 1970 census reported a city population of 197,297. Source: 1990 Census report, Table 46, pp. 608.
30
The Housing and Community Development Act of 1974
brought in Community Development Grant programs that cities could
use as incentives for home improvements in impoverished
neighborhoods. These incentives were planned into the redevelopment
of the rest of the 15th Ward and nearby areas, including the housing
complexes mentioned previously.
The Walsh years had left a legacy of displacement for Alexander
to solve. With the construction of the Cherry Hill and Kennedy Square
complexes in the early 1970s, and other projects elsewhere in the city,
the number of housing units per the census increased from 71,844 units
at the start of his term to 73,175 by 1980.
During Alexander’s term there were also major school
renovation projects. The first city high school, Central High School,
was replaced with a new building on the city’s Southwest side. Major
renovations, including the installation of air conditioning in many
school buildings, were accomplished during his term.
The federal Model Cities program, which had been applied for
in the late 1960s under Walsh, was executed under the Alexander
administration. This program briefly revitalized the city’s Southwest
and Valley neighborhoods but would fizzle out before solving the
underlying problems in those neighborhoods. The Model Cities
program will be but mentioned here; the list of its failings could fill a
paper of its own of similar length.
The Alexander years saw changes in the city’s core, as well. A
new performing arts and office space complex was designed and
31
constructed as the Civic Center (a part of the OnCenter complex
today), adjacent to Columbus Circle in the Downtown-1 project area.
By and large, the majority of urban renewal programs outside of
the Model Cities program under Alexander dealt with the
redevelopment of areas razed in previous programs. After the
Stateway was constructed, areas to its east had stagnated somewhat.
What follows details two other major proposals in and around the 15th
Ward: the University East plan from the Walsh administration and the
Syracuse Hill program from the Alexander administration.
At the eastern edge of the Near East Side project area, a new
state psychiatric facility would rise in the razed areas adjacent to the
former Washington Irving School on Harrison Street. This and other
developments would come in under the Syracuse Hill program, which
will be covered later.
The Syracuse Hill project should have formed the cornerstone of
the Alexander administration. It contained clear, definite plans,
provided nearly sufficient additional housing to replace that which
had been demolished in the 15th Ward under the previous
administrations, and picked up the end of another project (Thornden
East) of the previous administration. But before the results are
criticized, perhaps the project should be explained.
The Syracuse Hill project spans both Thornden East’s areas
north of the Westcott Street business district and the remainder of the
15th Ward projects east of the Stateway. The Syracuse Hill
32
Neighborhood Development Plan, which started in 197152, would
renew the University Hill planning area. This, coupled with an
expanded code enforcement project for the remainder of the Thornden
East area, would attempt to fix the problems left unsolved by the
stunted Thornden East project.
Syracuse Hill: A Plan for Rebuilding the 15th Ward
The intricate patchwork of urban renewal plans and existing
projects in that eastern 15th Ward challenged development in the 15th
Ward’s eastern areas (as well as other areas east of the Stateway).
Several proposals over the late 1960s and early 1970s, as well as the
initial construction and subsequent expansion of the Upstate Medical
Center complex, culminated in the Syracuse Hill project, which
eventually spanned from the East-West Highway south to Syracuse
University and from the Stateway east to Thornden Park and
Columbus Street along East Genesee Street. This plan, coupled with
the earlier53 University East plan (the eastern blocks of the Syracuse
Hill plan east through to Cumberland Avenue and south to Broad
Street) formed the majority of urban renewal programs in the
southeast quadrant of Syracuse.
The Syracuse Hill proposal itself was the product of several
other smaller proposals, shelved in the late 1960s and revived under
Mayor Lee Alexander in the early 1970s. While the final details of the
52 A Workable Program for Community Improvement for the city of Syracuse, New York (1971 report), Planning and Programming section, pp. 18. 53 University East proposal is dated June 1964; final Syracuse Hil l report was completed in November 1973.
33
proposal were not finalized until the late fall of 1973, the plan entered
execution as early as 1971. More concrete than the earlier University
East and Near East Side projects, this project at the outset had plans
firmly in place for what would be placed in specific sites, whereas the
first was mostly confined to general planning and the latter was
devoted to a near-complete leveling of the entire area with little
prejudice. In many ways, the Near East Side project and other razing in
the eastern 15th Ward had left the Alexander administration with a
nearly blank slate for redevelopment. Large portions of the 15th Ward
had been cleared during the Walsh years and then left undeveloped as
renewal progress slowed.
The planned erection of two moderate income housing
complexes within the project would replace some of the housing units
displaced by previous projects. Kennedy Square, on the northern edge
of the 15th Ward along East Fayette Street, would contain 409 housing
units and replace primarily light commercial and industrial sites
cleared in the Near East Side program.
Cherry Hill apartments, located along East Genesee Street just
east of the 15th Ward boundary, would install 164 more housing units
in place of substandard housing identified and partially cleared under
the Thornden East project. The two apartment complexes, discussed
earlier, would with other projects throughout the city attempt to ease
the housing shortage created by other renewal programs. Both
34
complexes opened in 1974, adding 57354 new low- to moderate-income
housing units to the area.
An additional 300 units of housing were proposed for a 6.3 acre
parcel bounded by Irving Avenue, Harrison and Madison Streets, and
University Avenue. In the 1974 program proposal, an unnamed
developer has been selected and plans were being prepared, including
closure of two blocks of Madison Street to serve the community.
The next component of the Syracuse Hill project involved
commercial districts. Three existing commercial districts55 were within
the boundaries of the project: the Marshall Street, East Genesee Street-
Irving Avenue, and East Genesee Street-Columbus Park business
districts.
The East Genesee Street-Columbus Park district, a small
commercial district serving the immediate vicinity with cleaners, and
markets, would remain largely untouched by the Syracuse Hill project
save the increase in business spurred by the construction of Cherry
Hill apartments across the street. Constrained on all sides by
residential or recreational land, the business district had little room to
expand save into the light industrial areas closer to Erie Boulevard.
The plans surrounding the East Genesee-Irving Avenue district
are less clear. This business district, built up along East Genesee Street
near the Regent Theatre complex (renamed in 1974 with the founding
54 Economic and Market Analysis Study: Syracuse Hill, Syracuse, New York pp. 4-5 55 The two East Genesee Street business districts are combined for the purposes of the 1974 Economic and Market Analysis Study: Syracuse Hill, Syracuse, New York, but they as they are separated by a half mile of residential neighborhoods, they are considered separately here.
35
of Syracuse Stage), contained small specialty shops serving
professionals working in the area, as well as the residents of nearby
neighborhoods. The housing being developed a block south of the
district would impact demand in the district. Block 240, bounded by
South Crouse and Irving Avenues and East Genesee and East Fayette
Streets, the block is generically dedicated for further retail functions
with no specific plans as of the plan’s publication.
It is the Marshall Street district which will be most affected
under this plan. A retail and restaurant district which served much of
the Syracuse University and adjacent medical complex community,
this business district was slated for expansion both in retail capacity
and in vehicle parking capacity. A new parking garage was to be
constructed across Irving Avenue from the Upstate Medical Center
and Crouse Irving Hospital, providing 680 parking spaces for staff and
patients of the medical centers. Other off-street parking would be
created in places too small to construct larger structures. The retail
community in the Marshall Street business district would gain some
room to grow under the Syracuse Hill proposal as well. Plans in 1974
called for new retail space in what is presently Marshall Square Mall;
little was specified as far as what would be built at that time.
The majority of the sites planned for redevelopment above were
previously cleared by the Syracuse Urban Renewal Agency, where
homes deemed substandard had been condemned and demolished.
At the Syracuse Hill project’s western boundaries is the
Hutchings Psychiatric Center, located along the Almond Street and the
36
Stateway. An initial portion was constructed alongside the Upstate
Medical Center facilities earlier; according to plan documents56 the
facility was to expand by 13 buildings covering four blocks, extending
east to Irving Avenue, north in parts to East Genesee Street, south to
Harrison Street and west to Almond Street and the Stateway.
The redevelopment projects constitute approximately a third of
the land area controlled by the Syracuse Hill project. Another third is
occupied by existing medical facilities. The remaining third mostly
comprises existing homes and neighborhoods deemed in sufficiently
good condition or else slated for demolition and replacement
individually.
As we’ve seen with other urban renewal projects, all fall short of
their initial expectations. The Syracuse Hill project is no exception.
Cherry Hill and Kennedy Square both opened in early 1975, only
slightly behind schedule. The two complexes quickly showed their
poor construction; Cherry Hill was condemned thirty years later and is
now slated for demolition later this year. Kennedy Square remains
open but in disrepair, a function of poor construction, poorer
maintenance and a general lack of attention since the end of the
Alexander administration.
The 300 units of housing, near as can be determined, were never
built, or if they were they were quickly displaced. A medical office
building and parking garage, a few parking lots, and a research facility
56 Economic and Market Analysis Study: Syracuse Hill, Syracuse, New York, pp. 10-12
37
of Upstate Medical University currently occupy the space slated in the
1974 plans. Madison Street remains passable through the planned
space to this day.
Marshall Square Mall was constructed on the site slated for
retail expansion; the one-acre two-story mall currently houses a few
general service providers, a post office and fast-food restaurants as a
supplement to the Marshall Street business district. It never truly
caught on as a major retail center, but did alleviate the retail space
constraints which had stalled expansion of the district. The mall is now
owned by Syracuse University and is now a semi-academic building,
with classrooms on its upper level since the mid-1990s. Parking
garages now dot the eastern approach to the university; in addition to
the planned garage, recently reconstructed, two additional garages
have been constructed along East Adams Street to handle the parking
needs of the medical university and its patients at University Hospital.
The psychiatric complex did complete its expansion. Upstate
Medical University has expanded to include new buildings alongside
it down Irving Avenue, preventing any further expansion.
The block in the East Genesee Street-Irving Avenue business
district has seen little change since the proposal. It remains a fairly run-
down block of half-vacant retail storefronts, in part affected by the
decline of the Kennedy Square complex nearby. Increased office space
usage and classroom expansion by medical institutions and Syracuse
University’s drama programs have nearly wholly supplanted the
business district’s storefronts.
38
The Syracuse Hill project began with the best of intentions, not
unlike many of the other projects that have been discussed here. With
the exception of the much smaller Community Plaza project, it is likely
the most successful of the projects presented here; most of the
components which were planned were built, with a few exceptions.
The hallmark of the Syracuse Hill project would be not what it
accomplished but what it failed to accomplish. One of the primary
objectives of urban renewal programs, besides obviously renewing and
redeveloping urban areas, was to stem the flow of citizens to the
suburbs and to other cities. While the metropolitan population57
increased by 6,375 from 1970 to 1980, the city population during the
same period declined by 27,192 – the steepest population decline on
record for Syracuse58. The population declines which had spawned the
urban renewal programs in the late 1950s were far smaller.
While the 15th Ward was far from the only area of Syracuse
affected by urban renewal, it was certainly the most affected. Of
structures which were present in the ward in 1960, perhaps a dozen
remain. With the Syracuse Hill plan and other projects as will be
discussed now, the landscape of the 15th Ward would be changed
forever.
Dealing with the Housing Shortage
57 Source: 1990 Census Report, Table 48, pp. 646. Comparative data table for metropolitan populations, 1970-1990. 58 The city population declined from 197,297 to 170,105. Source: 1990 Census Report, Table 48, pp. 646.
39
Beyond those homes razed in the construction of the Stateway,
the remaining portions of the 15th Ward were not to remain standing
for very long. Partially as a result of the displacement of lower-income
families and the partial demolition of the Pioneer Homes development,
an area just south of Erie Boulevard near South Crouse Avenue was
demolished for the construction of the Kennedy Square housing
complex in the early 1975. The Kennedy Square complex was built in
effect to solve some of the housing shortages that were indicated
earlier. Designed to include townhouse-style as well as apartment-
style housing, the buildings housed a total of 409 families.
Just southeast of the Kennedy Square complex and of the 15th
Ward, a similar complex called Cherry Hill apartments was
constructed under the Syracuse Hill project. Also built in 1975, the
complex was comprised of 164 apartments. The complex closed in
2004, and is slated for demolition as the building has fallen into
disrepair.
These two were elements of the plan to create more housing
options to those whose homes were demolished in the urban renewal
programs in the area. Other projects were constructed, including
several high-rise apartment complexes along Gifford and West Streets
on the near west side. These high-rise projects, which include
complexes in all four quadrants of Syracuse, resolved the shortage of
lower-income housing units and spread them throughout the
community.
40
The Townsend Towers and Madison Towers complexes,
adjacent to the Community Plaza, were built with the caveat that they
would reserve housing space for elderly tenants. The former Madison
School, on Madison Street near Syracuse University, was converted
into condominiums.
But by and large, period editorials indicate59 the housing which
rose in and immediately around the 15th Ward did not have sufficient
apartments, subsidized or otherwise targeting lower-income
households, for those who lost their homes. Many displaced residents
were forced into the high-rise complexes, which moved them, as well
as the crime problems for which the 15th Ward had become notorious,
into these spread out high-rise complexes around the city. Not unlike
other cities nationwide, these projects created new, modern
apartments which immediately encountered even larger problems than
the previous communities had by concentrating the previous
problems. Lower-density complexes, which didn’t become as major
crime issues, fell into disrepair. Cherry Hill has been condemned and
is demolition-bound. Kennedy Square remains open for the time being,
but its future is in question.
The 15th Ward Razing and Redevelopment
Other areas were demolished, such as along the Townsend
Street corridor, for the Community Plaza earlier discussed. In fact,
59 Editoria l: “Urban Renewal” (The Daily Orange, 12 Nov 1971)
41
plans60 indicated that nearly 90 percent of the 15th Ward was to be
demolished or rehabilitated over the course of the Near East Side and
Downtown-1 urban renewal programs.61
Large portions of the 15th Ward would remain vacant and serve
as parking lots (including the parking lots still existing along Harrison
Street, soon to be the site of a new hotel62). The opposite side, between
South State and Montgomery Streets, would not be developed until
they became the site of the Onondaga County Convention Center in
the mid-1980s.63
The Hutchings Psychiatric Center, a later addition to the SUNY
Upstate Medical Center complex, rose around the former Washington
Irving School from the site of razed homes along Madison and
Almond Streets. Its first buildings were constructed in the 1960s; over
the 1970s under the Syracuse Hill program it underwent a major
expansion which opened in the late 1970s. A state medical facility, the
psychiatric facility surrounded the decommissioned Washington
Irving School on Harrison Street, the last remnants of the community
there. The school had closed shortly after the community around it fell
and has since then been used Syracuse City School District as its
district offices.
60 A copy of the diagram from the report is included as an appendix to this thesis for reference purposes. 61 See appendix for annotated project diagram. 62 Proposed since the construction of the Convention Center, a new Convention Center Hotel tower (projected at 6-10 stories tal l ) is to begin construction in late 2007. This site was cleared during this period, and has been used since clearing as a parking lot. 63 The OnCenter complex began construction in the late 1980s and was completed in 1992.
42
The SUNY Upstate complex, including the University Hospital
complex, would encompass the area west of Irving Avenue and south
of Harrison Street all the way to what pieces remain of the Pioneer
Homes complex to the east of Almond Street and I-81. Parking garages
now cover what once was a neighborhood.
In the northeast corner of the Ward, one area remained vacant
for twenty years until a business incubator was constructed on a site at
the corner of East Fayette Street and University Avenue. The
surrounding areas were developed nearly as haphazardly and
lethargically; a more recent renewal project, the razing of the old
Midtown Plaza64 along Water Street and Erie Boulevard in the mid-
1990s gave way to current construction work on the Syracuse Center of
Excellence project. Several lots in that area, razed in the 1960s, remain
vacant even today.
Assessing the Damage: Reflections, Then and Now
Urban renewal programs, in particular the haphazardly
executed Near East Side program and subsequent Syracuse Hill
proposal, came under heavy fire at the time of their proposal. While
progress everywhere was agreed to be a positive step, many believed
that a middle ground could be reached. Not everyone had given up
hope on the 15th Ward enough to want to see it leveled completely.
In 1961, laying out his vision for urban renewal in Syracuse,
George A. McCulloch wrote that “the program will fail in its objectives 64 The Midtown Plaza building, once home to Smith-Corona and other industries over its long life, was one of less than a dozen buildings spared the wrecking ball in the Near East Side program. It was demolished in 1999.
43
if we displace families without ultimately providing better homes in
better neighborhoods.”65 If the Near East Side program (or most other
Syracuse renewal programs, for that matter) were to be judged by that
statement, then ultimately urban renewal in Syracuse was a failure. It
failed to eradicate slums and run-down neighborhoods; it simply
moved them around, which in turn expedited rather than stemmed the
flow of those who could afford a move to suburban communities. The
population of the Syracuse Metropolitan Statistical Area (MSA)
remained for the most part stable (in fact slowly growing) since the
time of these programs, while the population of the city of Syracuse
had dropped by over 45,000 people between 1960 and 1980.66
An editorial67 published in the Daily Orange student newspaper
in 1971 openly criticized the city of Syracuse for failing miserably in
these relocation programs. To level an entire community, most
members of which are lower-income residents, requires a plan to put
them somewhere. Yet housing developments and high rise apartments,
which rose to replace the neighborhoods, targeted primarily middle-
class tenants rather than replacing the lower-income housing whose
shortage should have been an obvious result of displacing nearly 3,000
low- to moderate-income families over a short period of time.
Conclusions
65 McCulloch, George A. “Urban Renewal ‘Must’ For Syracuse in Sixties.” (The Post-Standard, 8 Jan 1961) 66 Population in 1960: 216,038; Population in 1980: 170,105, a decline of 45,933. Source: 1990 Census report, Table 46, pp. 608. 67 “Urban Renewal”
44
Urban renewal programs in Syracuse have left a lasting imprint
upon the city and metropolitan area as a whole. Designed to stem the
suburban exodus, the trickle of the 1950s (a loss of only 5,000 people
and change) became a full-fledged river as the city population had
declined by nearly 60,000 people by the year 2000.
There are successes that survive from this era for which the city
planners should be congratulated. Landing a world-famous architect
for the construction of not one but two buildings in Syracuse put the
city on the map internationally for architecture. It is only too
unfortunate that the path of progress shortsightedly caused many
other buildings, including the former home of the Everson Museum of
Art68, to fall victim to the wrecking ball rather than restoration as
excellent examples of older and interesting architecture.
The 15th Ward faced many difficult challenges in dealing with
its problems. But, as the Post-Standard editorial board wrote in 2003
reflecting on it, "It was the mid-60s and African-Americans were still
fighting for the right to sit at a lunch counter — let alone the right to sit
at the table during economic development discussions that would
profoundly affect them.”69
Lee Alexander brought in 1970 a new vision of how Syracuse
could be a great city again. And in a way, it worked: his plans brought
closure to many of the previous urban renewal failures, including
finally finishing the reflecting pool in the Community Plaza properly. 68 The original turn-of-the-century brick building for the Everson Museum of Art, at the corner of State and James Streets, gave way for a gas station. 69 “Editoria l: 40 Years Later." The Post-Standard 23 Sep 2003.
45
Where his predecessors had failed to carry renewal plans to
completion, his projects were the most complete and best planned.
Towards the end of his term, it was determined just why that
had moved as smoothly as it had. Alexander was imprisoned in 1988,
for extorting “$1.43 million in kickbacks from businesses while he was
Mayor in Syracuse,”70 for a six year term.
Despite these development successes and the later corruption
charges, Alexander also presided over the worst population decline in
Syracuse history. Even without the corruption charges, we cannot
declare the renewal efforts under his administration to be a success
either. The Central Business District declined under his administration
as well, as it did across the nation. The flow of people and of
businesses into the suburbs, while hardly under the Alexander
administration’s control, do not speak well of the success of his urban
renewal plans.
His inaugural address was quoted earlier, speaking of promise
and vision for Syracuse and whose people would look to the future
with confidence. The census tells us that the citizens of Syracuse
weren’t confident about the city’s future, and while the metropolitan
area grew, the city lost over 25,000 people by 1980 – or over 50,000
from 1950 to 1980.
It is safe to say that urban renewal in Syracuse was ultimately a
failure. While pockets of blighted areas indeed disappeared under new
buildings and civic structures, others still remain vacant today. 70 “Ex-Syracuse Mayor Completes His Sentence.” The New York Times 12 Feb 1994
46
Looking around today at the sites that were to be renewed then, you’ll
see structures were less architecturally interesting and several poorly
constructed ones. Witness the fate of the housing projects developed
during this time, as with housing projects nationwide constructed at
low cost and carrying with them many of the same problems as were
the original reason for razing much of the 15th Ward in the first place.
Fowler High School, which replaced the Central High School under
Alexander, is in the first tier of schools marked in the present ten-year
reconstruction plan due to poor construction – ahead of the other three
built in the fifteen years prior.
Describing the Community Plaza’s lifelessness earlier, Dick
Case wrote that it was “bare as the tundra.” Arguably, outside of
normal business hours, so is the majority of Downtown Syracuse, and
it is in no small part the fault of urban renewal programs and the lively
neighborhood destroyed as their result.
Case’s statement could easily be applied to the architecture of
the period as well – little architecturally interesting, save the Everson
Museum itself, was constructed as a result of these programs; in the
name of progress, interesting older buildings came down in favor of
bland architecture that took the character of downtown Syracuse with
it. Some of the remaining architecture is being reclaimed now, with the
return of residential components of downtown in converted
warehouses.
Imagining Syracuse without the Divide
47
Lamented throughout its construction and by many ever since
for the utilitarian eyesore it has become, the Stateway bridges running
through downtown Syracuse have been in recent years the subject of
an ongoing debate. According to State Department of Transportation
officials, the bridge spans have an estimated lifespan of 50 years71, and
will require substantial overhauling if not complete reconstruction.
Syracuse Common Councilor Van Robinson in 2006 held the
first of what he anticipated as several community discussions on the
future of the elevated bridges. “’It’s time to very seriously consider
taking that highway down and the benefits that could accrue,’
Robinson said”72 at the time. State Transportation Department
spokesman Anthony Ilacqua had indicated to him and to other officials
that decisions would need to be made “in the next five to 10 years”73
regarding its future. He indicated that recent studies estimate 90,000
cars traverse the affected stretch daily.
Van Robinson envisions a tree-lined boulevard, creating an
inviting access that is pedestrian-friendly and encourages connecting
the Syracuse University hill with downtown. Echoing sentiments from
the time of its construction, he believes that the Stateway’s elevated
spans are an “eyesore,”74 creating a barrier rather than an access to the
center of Syracuse.
71 Editoria l. “I-81: Stay or Nay?” The Post-Standard 26 Mar 2006 72 Kirst, Sean. “Tear Down This Wall” The Post-Standard 20 Mar 2006 73 Eisenstadt, Marnie. “State Urged to Remove Syracuse’s I-81” The Post-Standard 22 Mar 2006 74 Kirst. “Tear Down This Wall”
48
Sean Kirst, whose columns on the character of Syracuse and its
people covered these developments, himself alongside many area
residents believe as 1950s Chamber of Commerce president Carl Marr
did that the Stateway’s bridges form an elevated “Chinese Wall”-esque
barrier. In a profile of Mark Robbins, dean of the Syracuse University
School of Architecture, Kirst and Robbins reflect on the 1950s and
1960s planning ideas: that “the only way of keeping Upstate cities
viable was by shoving motorists in and out, at any cost.”75
The Empire Stateway was envisioned as the savior of
downtown Syracuse, a conduit to bring people and businesses into the
city. Instead, as the long lines at off-ramps just before the opening of
business hours and similarly long lines at on-ramps at their close show
it has instead become a primary conduit for the suburban exodus that
it was designed to avoid.
While the Stateway was but one component of the urban
renewal programs in Syracuse, it is perhaps the perfect embodiment of
the programs’ failures. Instead of a vital link, bringing visitors and
residents alike back into a revitalized city core, it serves as an express
corridor away from an area whose government-encouraged
revitalization is only now beginning to be realized through recent
public and private ventures, performed not by tearing to shreds but
repairing the torn pieces of Syracuse’s urban core.
75 Kirst, Sean. “Wall Stands In Way of Downtown Renaissance” The Post-Standard 30 Mar 2005
49
Recent ventures under a new community-oriented Syracuse
University chancellor who envisions integrating with rather than
segregating the university from the city have spawned a “Connective
Corridor” project underway to highlight bright pockets and connect
the university to new downtown campus buildings – and downtown
to the campus – with bus and walking routes taking a lazy L around
the busiest underpasses of the Stateway.
Imagine, as some already have, Syracuse without that wall to
connect around and instead a vibrant community of walkable
businesses and parks that invited community gathering and
connections. Imagine further still creating from the rubble of these
overpasses an actual downtown renaissance, right in the center of the
city, finally realizing the promise of the Community Plaza and other
facilities and reuniting a downtown currently cordoned off by a
railway and two major highways with the rest of the city.
There are those who believe that exactly this could happen. As
Kirst wrote, describing Robbins and the separation the highway
created as a “separation of the campus from the core of Syracuse…that
became as spiritual as it is physical.”76 Robbins wrote of the School of
Architecture’s efforts in this area were intending was “to open
corridors between things that work, not just physically, but
academically and intellectually as well.” With a little imagination,
some strong leadership, and a little hard work, we can achieve exactly
what urban renewal efforts intended, and realize the potential of its 76 Kirst, “Downtown Renaissance”
50
few successes by undoing the efforts and repairing the areas that those
efforts damaged.
51
Appendices Appendix A: 1958 map of the 15th Ward and surrounding area projects.
52
Appendix B: 1955 Photo, Annotated, of Western portions of 15th Ward.
53
Appendix C: Diagram depicting Urban Renewal programs in Syracuse as planned in 1975. Source: Syracuse Community Development First Year Plan February 75
54
Appendix D: Structure classifications, from University East Physical Development Plan (1964)
55
Works Cited
City of Syracuse, New York. Interim Committee on Regional Planning.A Regional Planning and Development Board for Central New York. Syracuse, NY: 1965.
City of Syracuse, New York. Office of Urban Renewal. 1959 Progress Report,
The Workable Program, City of Syracuse. Syracuse, NY: City of Syracuse, 1959.
City of Syracuse, New York. Office of the Mayor.A Workable Program for
Community Improvement, 1960 Progress Report for the Elimination and Prevention of Slums and Blight in Syracuse, New York. Syracuse, NY: City of Syracuse, 1960.
City of Syracuse, New York. Office of the Mayor.A Workable Program for
Community Improvement, 1962 Progress Report for the Elimination and Prevention of Slums and Blight in Syracuse, New York. Syracuse, NY: City of Syracuse, 1962.
City of Syracuse, New York. Office of the Mayor.A Workable Program for
Community Improvement, 1965 Progress Report for the Elimination and Prevention of Slums and Blight in Syracuse, New York. Syracuse, NY: City of Syracuse, 1965.
City of Syracuse, New York. Office of the Mayor.A Workable Program for
Community Improvement, 1966 Progress Report for the Elimination and Prevention of Slums and Blight in Syracuse, New York. Syracuse, NY: City of Syracuse, 1966.
City of Syracuse, New York. Office of the Mayor.A Workable Program for
Community Improvement, 1968 Progress Report for the Elimination and Prevention of Slums and Blight in Syracuse, New York. Syracuse, NY: City of Syracuse, 1968.
City of Syracuse, New York. Office of the Mayor.A Workable Program for
Community Improvement for the city of Syracuse, New York. Syracuse, NY: City of Syracuse, 1971.
City of Syracuse, New York. Citizens' Council on Urban Renewal.1st Annual
Report, 1959-1964. Syracuse, NY: City of Syracuse, 1964. City of Syracuse, New York. Department of City Planning.Planning Central
Area Syracuse: 1958. Syracuse, NY: City of Syracuse, 1958. City of Syracuse, New York. City Planning Commission.Planning
Information Bulletin, 1958. Syracuse, NY: City of Syracuse, 1958. City of Syracuse, New York. City Planning Commission.Capital
Improvements as Requested by City Agencies, 1959-1964. Syracuse, NY: City of Syracuse, 1958.
City of Syracuse, New York. Larry Smith and Co., for the Metropolitan
Development Association of Syracuse and Onondaga.Central Business District Study, Syracuse, N.Y.. Washington, D.C.: Larry Smith and Co., 1959.
56
Illustrative Plan: Central Syracuse, 1980. Syracuse, NY: Syracuse Urban
Renewal Agency, 1965. “Means of Transportation, 1967." Chart. Syracuse, NY: City of Syracuse
Planning Department, 1967. "Bus Routes and Terminals, 1967." Chart. Syracuse, NY: City of Syracuse
Planning Department, 1967. An Exciting Redevelopment Opportunity. Syracuse, NY: City of Syracuse. Economic and Market Analysis Study: Syracuse Hill, Syracuse, New York.
Washington, D.C.:Hammer, Siler, George Associates for Syracuse Urban Renewal Agency. Nov. 1973.
University East , Syracuse, New York Physical Development Plan. Syracuse,
N.Y.:Syracuse University School of Architecture. 3 June 1964 University Hill: a Long-Range Plan for Urban Renewal. Syracuse, NY: City of
Syracuse University Hill Supplement Report. Buffalo, NY:Alan M. Voorhees and
Associates, Inc. Mar. 1972. Syracuse Community Development First Year Plan: February 75. Syracuse,
NY: City of Syracuse. 1975. 1990 Census of Population and Housing: Population and Housing Unit
Counts, United States. Bureau of the Census, Economics and Statistics Administration. 1990.
"Map of the City of Syracuse, 1958." Map. 1958. "City of Syracuse New Ward Map, 1899." Map. Syracuse, NY: Bailey and
Sackett, 1899. "MONY Center Building Contract Awarded." The Post-Standard 16 Oct.
1964. Rosebrugh, Eleanor. "Planner Sees Syracuse a City of Beauty." The Post-
Standard 15 Dec. 1963: 1. Lee, Maurice D. "New City Hall Slated in 1965." The Post-Standard 8 July
1962: 9+. Haggart, Robert R. "Solving the Big Puzzle." Herald-American 10 July 1966,
sec. 2: 17. Fredenburgh, Don. “Lack of Federal Funds Stalls Work on Penn-Can
Expressway." Syracuse Herald-Journal 23 Jan. 1958 “Air Surveys to Fix North-South Route." Syracuse Herald-Journal 19 May
1955 Ganley, Joseph V. “How Blighted Can a Slum Area Be? Stateway Elevation
Fear Unfounded.” Herald-American 27 Apr 1958
57
Ganley, Joseph V. and Richard Hoffmann. “Elevated Route Mapped.” Syracuse Herald-Journal 21 Oct 1958
Ganley, Joseph V. “Depressed Grade Stateway Hinges on Drainage
Problem." Syracuse Herald-Journal 17 Aug 1958 Lee, Maurice D. “Artistry in Stateway Is Hope of Planners." The Post-
Standard 28 Nov 1958 “Survey of Underground Utilities, Sewers On Near East Side Is Put on
Schedule." Syracuse Herald-Journal 27 Jun 1958 Driver, Bob. “Stateway Fails to Stir Almond St. Folk." Syracuse Herald-
Journal 22 Oct 1958 “Empire Stateway Link Shifted to Almond St.” The Post-Standard 22 Oct
1958 Hancock, Stewart F. “Time to Debate Urban Renewal For East Side." The
Post-Standard 8 Aug 1958 “Only 718 Units In Housing For Uprooted." The Post-Standard 5 May 1957 “Relocation Survey Set For East Side Renewal." Herald-American 8 June 1958 “2 Housing Leaders In Clash On Urban Renewal Direction." Portchester N.Y.
Daily 18 Nov 1959 “Stevens, William S. Construction of Expressway To Cause Valley
Facelifting." Syracuse Herald-Journal 14 Jan 1962 “South Siders to Receive Full Value of Property." The Post-Standard 30 Mar
1962 Haggart, Robert. “State Begins Rechecking Route 81 Home Offers." The Post-
Standard 24 Feb 1962 “State Agrees To Act Quickly On '81' Houses." The Post-Standard 15 Mar
1964 “Home Owners Join Forces." The Post-Standard 28 Mar 1958 “City Gives State Permit to Raze 28 Dwellings." The Post-Standard 24 Nov
1962 Ehrsam, Carol. “Route 81 Link 'Hurts,' But S. Salina Quiet." The Post-
Standard 28 Jan 1966 “Governor Won't Meet With South Siders." Syracuse Herald-Journal 10 May
1962 Stevens, William S. “Property Owners Balk." Syracuse Herald-Journal 6 Feb
1962 “Map Shows Area Superhighway Work And Plans." Eagle-Bulletin 26 July
1962
58
Lee, Maurice D. “South Side Buildings Begin to Fall." The Post-Standard 15 May 1964
Roth, A. Brohmann. “Leaders Push For Speedup Of Route 81." Syracuse
Herald-Journal 2 Sep 1964 Cosgrove, James M. “The 'Forgotten Link'." Syracuse Herald-Journal 12 May
1963 “South Siders Ask Hughes For Reimbursement Action." The Post-Standard
18 Mar 1962 “Editorial: 40 Years Later." The Post-Standard 23 Sep 2003 Sieh, Maureen. “15th Ward Stood Tall, Fell." The Post-Standard 21 Sep 2003 Case, Dick. “A downtown dream flickered to life on Community Plaza.”
Syracuse Herald-Journal 6 June 1997 Carroll, Walter. “Renewal Dept. Stymied By Lack of Funds, Staff.” The Post-
Standard 13 Sep 1961 McCulloch, George A. “Urban Renewal ‘Must’ For Syracuse in Sixties.” The
Post-Standard 8 Jan 1961 “Conference Is Scheduled On Stateway.” The Post-Standard 25 June 1958 “Empty Property Proves Hazard.” The Post-Standard 27 Aug 1961 “We Can Juggle Three Balls at Same Time.” Herald-American 10 December
1961 McCulloch, George A. “Urban Renewal Is Tool of City Redevelopment.” The
Post-Standard 30 Aug 1962 “McCulloch Predicts End to Site Acquisition.” The Post-Standard 12 Sep 1962 Case, Richard G. “Troubled Waters. Plaza pool termed ‘failure.’” Syracuse
Herald-Journal 14 Apr 1970 “South Plaza to get facelift.” Syracuse Herald-Journal 5 June 1973 Ganley, Joseph V. “Year Can Set Format for City Renewal.” The Post-
Standard 12 Jan 1964 “George A. McCulloch Quits as City UR Chief.” The Post-Standard 8 Aug
1964 “Lease OKd For MONY” The Post-Standard 9 Aug 1965 “Urban Renewal” The Daily Orange 12 Nov 1971 “Schuster Replaces McCulloch in UI” The Post-Standard 20 Sep 1964 Rosebrugh, Eleanor. “Specific Plans Aim At UR Social Issues.” The Post-
Standard 15 Jan 1964 “Open the north barrier!” Syracuse Herald-Journal 12 Dec 1965
59
“A divided city still.” Syracuse Herald-Journal 11 Jan 1966 Peters, Kenn. “690 segment to open soon.” Syracuse Herald-Journal 5 Mar
1969 “Opening of 690 Strip Seen Sometime in April.” The Post-Standard 11 Mar
1969 Bliven, Luther F. “Alexander Sworn in as Mayor, Pledges Greater Syracuse.”
The Post-Standard 2 Jan 1970 “Ex-Syracuse Mayor Completes His Sentence.” The New York Times 12 Feb
1994 Editorial. “I-81: Stay or Nay?” The Post-Standard 26 Mar 2006 Eisenstadt, Marnie. “State Urged to Remove Syracuse’s I-81” The Post-
Standard 22 Mar 2006