uran_plantpresentation1
DESCRIPTION
URAN PLANT ONGC PRESENTATION ON GAS PROCESSINGTRANSCRIPT
-
July 6, 2007Uran Plant, Uran
-
CONTENTSOverview of ONGCUran PlantPerformanceCertificationsHealth, Safety & EnvironmentSecurityCorporate Social Responsibility
-
Overview of ONGCGroup of Companies
-
OIL CONTRIBUTION OF ONGC
-
GAS CONTRIBUTION OF ONGC
-
LPG CONTRIBUTION OF ONGC
-
Possible through strong Technical Competency, Financial Health & HSE standards
-
OVERVIEW OF URAN PLANT
-
URAN PLANT : FIRST OF ITS KINDFirst:Gas based LPG Plant in India.Co-generation plant in the country.C2C3 plant of the country feeding to first gas cracker of IPCL.Flare Gas Recovery Unit (FGRU) for zero emission.
-
PERFORMANCE
-
CRUDE OILASSOCIATED GASSTABILISATION OF CRUDE OIL & SUPPLY TO CONSUMERSPRODUCTION & DISPATCH OF VALUE ADDED PRODUCTSSUPPLY OF NATURAL GASHEALTH, SAFETY AND ENVIRONMENT MANAGEMENTFUNCTIONS
-
TYPICAL INPUT FROM OFFSHOREGASCRUDE OILCONDENSATEONE OF THE LARGEST INTEGRATED OIL & GAS PROCESSING COMPLEX OF INDIA
-
PROCESS
-
URAN HANDLES ABOUT 50% OIL PRODUCTION OF THE COUNTRYOIL CONTRIBUTION : URAN
-
HANDLES 21% GAS PRODUCTION OF ONGCGAS CONTRIBUTION : URAN
-
URAN PLANT CONTRIBUTES LPG for 1 lakh LPG Cylinders per day. CNG for 1.5 lakh auto / taxis per day in Mumbai.Power generation of 24x700 MW per day by MSEBPoly Ethylene & Poly Propylene by Reliance at Nagothane - total feed by ONGC.Mahanagar gas is also supplied from Uran Plant of ONGC.
-
SALES REVENUE OF PRODUCTS
Chart2
669.47595432.3402355.88682
460.30797516.16209447.72858
661.57821669.55737722.76534
726.5901748978998.8659978646841.0920900954
LPG
C2-C3
Naphtha
Year
Revenue (Rs. In Crore)
Sheet1
XI Plan Projections
CONDENSATE2007-082008-092009-102010-112011-12Total
11th Plan
Receipt at Uran0.260.3330.4780.6010.5922.264
(MMT)
GAS2007-082008-092009-102010-112011-12TOTAL
Gas to UranBCM13.12613.30614.70714.59414.36925.615
(MMSCMD)BCF463.5469.9519.4515.4507.4904.6
Gas Sales From UranBCM3500350040004000390018.9
Assets + NMFD
(MMSCM)BCF123.6123.6141.3141.3137.7667.4
Sheet2
XI Plan Projections
Value added products (000, T)2007-082008-092009-102010-112011-12Total
11th Plan
LPG4354354354354352175
NAPHTHA2662662662662661330
C2-C35105105105105102550
Total Uran121112111211121112116055
Financial outlay205 (46)647 (145)710 (159)462 (103)68 (15)2093 (469)
Rs in Crore (Million US $)
Sheet3
Cash Outlays in XI plan
TOTAL2007-082008-092009-102010-112011-12Total
Rs. In Crores205647710462682092
Million US$4614515910315469
Sheet3
0
0
0
0
0
Year
Rs. in crores
Cash Outlays in XI Plan
Sheet4
Product Sales
Product2003-042004-052005-062006-072007-08
(TMT)
LPG501448444482478
C2-C3533527535548549
Naphtha Domestic57------------
Naphtha Export244285378425423
* Including Naphtha from Hazira
Sheet4
LPG
C2-C3
Naphtha Export
Year
Quantity (TMT)
VAP Sales
Sheet5
Sales Revenue in Million US$
PRODUCT2003-042004-052005-062006-07
LPG164.45113.07162.51178.4795320309
C2-C3106.2126.79164.47245.3613357565
NAPTHA87.42109.98177.54206.6057701045
Total358.07349.84504.52630.4466378919
669.48460.31661.58726.59
432.34516.16669.56998.87
355.89447.73722.77841.09
Sheet5
LPG
C2-C3
Naphtha
Year
Rvenue (Million US$)
Sheet6
Projected Revenue
2006-072007-082008-09
Qty.Amt.Qty.Amt.Qty.Amt.
Products(000MT)M US$(000MT)M US$(000MT)M US$
LPG456248.7435237.24435237.24
C2-C3515152.84510151.35510151.35
Naphtha280138.47266131.54266131.54
2006-072007-082008-09
LPG248.7237.24237.24
C2-C3152.84151.35151.35
Naphtha138.47131.54131.54
Sheet6
000
000
000
LPG
C2-C3
LAN
year
Million US$
Revenue Generation from VAP
Sheet7
Budget Utilization
HeadApprovedActual% Utilization
2005-062005-062005-06
Plan
Capital52.0350.1796.43
Non-plan
Capital0.930.6468.26
Contractual11.119.786.26
Stores2.482.0984.06
Spares6.414.3567.95
Other charges4.054.35107.47
Manpower10.8511.78108.73
Total87.8683.0994.57
HeadApprovedActual% UtilizationHeadApprovedActual% Utilization
2004-052004-052004-052006-072006-072006-07
PlanPlan
Capital4.141.9547Capital55.4352.8595.35
Non-planNon-plan
Capital0.680.3754.55Capital1.140.2421.05
Contractual9.868.9790.96Contractual13.589.9273.05
Stores1.111.19107.4Stores2.731.5356.04
Spares5.042.7755.03Spares6.362.8544.81
Other charges3.923.8397.73Other charges4.774.7599.58
Manpower9.7810.38106.18Manpower11.8115.21128.79
Total34.5329.4785.33Total95.8287.3591.16
Sheet8
Contribution to Exchequer-Indirect Taxes (in Million US$)
Excise dutySales Tax + VATTotal
2003-0436.1916.8553.04
2004-0528.1817.6345.81
2005-0628.2339.3967.62
2006-0736.4739.1075.57
2003-0453.04
2004-0545.81
2005-0667.62
Sheet8
0
0
0
Year
Million US$
Contribution to Exchequer - Indirect Taxes
Sheet9
Details of Fixed Assets in Million US$
YearGross BlockAccumulated DepreciationNet Book Value
2003-04168.19120.6247.56
2004-05167.52129.637.92
2005-06187.6141.7545.85
2006-07283.51155.86127.64
YearAccumulated DepreciationNet Book Value
2003-04120.6247.56
2004-05129.637.92
2005-06141.7545.85
Sheet9
00
00
00
Accumulated Depreciation
Net Book Value
Year
Million US$
Fixed Assets
Sheet10
Profitability (Million US$)
Product2003-042004-052005-062006-07*
LPG103.8264.57101.43154.37
C2-C328.3251.458.31165.25
Naptha67.8493.99147.47234.32
Total199.98209.96307.21553.95
* Transfer of Gas cost from Mumbai and HQ allocations awaited for 06-07
Sheet10
000
000
000
LPG
C2-C3
LAN
Year
Million US$
Profitability
Sheet11
Future ProductionPotential
LPG & Naphtha
Raw Material8-Jul9-Aug10-Sep11-Oct12-Nov
Available Gas processing capacity at UranMMSCMD11.511.511.517.2517.25
Addl. Condensate,MMTPA-0.0630.1780.3260.322
density; 0.585MT/Day-173488893882
Product (Value Added products from Gas + Gas Eqv. condensate + Addl. Condensate)
LPGMT/Day13831430151519081880
Density: 0.54M3/day25612648280535333482
NaphthaMT/Day846933109014671445
Density: 0.667M3/day12681399163421992166
Sheet12
Projects Envisaged during 2006-07
S.N.PROJECTS/WORKSBLOCK OF ESTIMATE PROJECT COST
Rs. (Cr.)Million US$
1ADDITIONAL CRUDE OIL STORAGE TANK OF CAPACITY 60,000 M34510.1
2FIRE WATER REVAMPING WORK204.5
3REPLACEMENT OF AIR COMPRESSORS102.2
4REPLACEMENT OF VARIOUS PIPE LINES.122.7
5MISCELLANEOUS STUDY INCLUDING FEASIBILITY & HEALTH CHECKUP102.2
6REPLACEMENT OF DG SETS122.7
7AUTO SPRINKLER SYSTEM FOR TRANSFORMERS, CABLE VAULTS & REACTORS4.51
8AIR INTAKE FILTRATION SYSTEM143.1
9REPAIR OF TANK 202 C, D & E8.82
10CUSTODY TRANSFER METERING STATION AT HPCL & BPCL4911
TOTAL185.341.5
-
PRODUCTDISTRIBUTION
-
CRUDE OIL DISTRIBUTION
-
GAS CONSUMERS NETWORK
-
VALUE ADDED PRODUCTSIOTLDOMESTIC & EXPORT
-
CERTIFICATIONS
-
CERTIFICATIONS
Certifications (Recertified)ValidityISO 9001:2000MARCH 2009ISO 14001:2004MARCH 2009OHSAS 18001:1999MARCH 2009CERTIFICATE OF FITNESSAUGUST 2008
-
HEALTH, SAFETY & ENVIRONMENT
-
INTERNATIONAL HSE STANDARDSISO-14001 for EnvironmentOHSAS-18001 for Occupational Health & SafetyInternational Safety Rating System (ISRS)Uran Plant has latest version of these international standards
-
RISK CONTROLHazards and risks identified.Risks and hazards evaluated, and control measures evolved for risk reduction.Compliance to Legal Requirements of Govt. of Maharashtra & Govt. of IndiaSystems surveillance audits by Det Norske Veritas (DNV) twice in the year.Periodic internal audits.Surprise audits by OISD, Govt. of India;External Safety Audits as per Department of Industrial Safety & Health, Govt. of Maharashtra
-
INTERNATIONAL SAFETY RATING SYSTEM (ISRS)ISRS is international system for hydrocarbon industry.
Quantifies the overall system pertaining to quality, health, safety, environment & security in terms of level 1-10.
Rolled out new ISRS 7th edition at Uran Plant in 2006-07.
-
ASSOCIATED RISKS & HAZARDSHydrocarbons are highly inflammable, and easily catch fire.Unique geographical location of Uran Plant.Intrusion of terrorist from periphery.RISKS ARE INEVITABLE, THEY ARE TO BE REDUCED
-
Emergency Preparedness Periodic Checking Of Fire & Safety Equipment Disaster Management PlanMock Drills 24 hrs Manned Fire Stations Mutual - Aid Fire Order Process Emergency ManualLife Saving EquipmentOver head Foam Storage Tank.Fire Fighting Equipments
-
Fire Pumps with Jockey Fire Tenders Hollow Jet Monitors DCP Trolleys Sprinkler Systems Halon Flooding FIXEDMOBILEFire Fighting Drenchers Fire Header NetworkHydrants & Monitors. Raw Water Storage CO2 Flooding Fire ExtinguishersFoamPourers Fire Water Storage SystemRimSeal. HVLR
-
ENVIRONMENT PROTECTIONAbide by all applicable regulatory legislations including Factory Act, EPA, Water Act etc.Real Time Monitoring Ambient Quality at 3 stations.Real Time Monitoring Stack emissions at 2 stations.
-
ENVIRONMENT PROTECTIONTreated Effluent Water tested at PPCL to ensure MPCB requirements. Water discharge through closed conduit system at sea.Noise level monitoring in noise prone areas of the plant.Hazardous Waste Disposal through M/S Mumbai Waste Management, Taloja.
-
SECURITY
-
FIBRE OPTIC BASED ELECTRONICPERIMETER PROTECTION SYSTEM
-
SECURITY MEASURESEntire Plant is enclosed with stone masonry compound wall of 2.8 Meters in height and 6.15 KM in length.Chain Link Fencing from Dronagiri Bhavan to Helipad has been erected outside the compound wall.Concertina Coil has been erected on top of wall.
Watch Towers 12 Nos.
-
SECURITY MEASURESPatrolling inside and outside carried out by road.
Perimeter Intrusion Detection System manned by CISF round the clock.
-
CORPORATE SOCIALRESPONSIBILITY
-
DIRECT & INDIRECT EMPLOYMENT GENERATION (URAN)Employment to PAPs (Distt. Raigad)
REGULAR SECONDARY WORKFORCE CASUAL / DAILY WORKERS I - 452 II - 044 III - 115 IV - 105 TOTAL - 716
III & IV 220Most of staff personnel are from around Uran 390
(Mostly are Locals)
Around 300 / day
(Mostly are through Local Contractors)
Nagoan, Mhatvali, & Chhanje Panvel Others Total 198 41 76 315
-
CORPORATE SOCIAL RESPONSIBILITYTax paid to Panchayats Every Year
2003-04 2004-05 2005-06 & 2006-07 *Mega Eye Operation Camp *Blood Donation Camp *Weekly Medical Camp*Weekly Medical Camp*Ambulance for Nagoan & Mhatvali *Equipment For (School Lab/ Local Hospital)*Weekly Medical Camp*Public Toilets and Rain Water Drain - Nagoan*Crematorium Repair*Financial Assistance to welfare unit.
Nagoan VillageRs 9,65,807/=Chhanje VillageRs 6,54,545/=Mhatvali VillageRs 4,32,968/=
-
PROPOSED DEVELOPMENT (2007-08)Special Projects for Nagoan, Mhatwali & Chhanje Villages & Indira Gandhi Rural Hospital, Uran.
Pune based NGO-BAIF has been assigned the project to initiate development process in the villages of Nagoan, Mhatvali and Chhanje through Self Help Groups (SHG) covering Women, Youth and Others.
One Mega Eye and two Health Camps in addition to Weekly Medical Camps.
-
Thank YouLet us Make Tomorrow Brighter
-
CONTRIBUTION TOEXCHEQUER - INDIRECT TAXES (URAN)
Chart1
215.92584
186.49251
275.28102
307.6452850386
Year
Rs. In Crore
Sheet1
XI Plan Projections
CONDENSATE2007-082008-092009-102010-112011-12Total
11th Plan
Receipt at Uran0.260.3330.4780.6010.5922.264
(MMT)
GAS2007-082008-092009-102010-112011-12TOTAL
Gas to UranBCM13.12613.30614.70714.59414.36925.615
(MMSCMD)BCF463.5469.9519.4515.4507.4904.6
Gas Sales From UranBCM3500350040004000390018.9
Assets + NMFD
(MMSCM)BCF123.6123.6141.3141.3137.7667.4
Sheet2
XI Plan Projections
Value added products (000, T)2007-082008-092009-102010-112011-12Total
11th Plan
LPG4354354354354352175
NAPHTHA2662662662662661330
C2-C35105105105105102550
Total Uran121112111211121112116055
Financial outlay205 (46)647 (145)710 (159)462 (103)68 (15)2093 (469)
Rs in Crore (Million US $)
Sheet3
Cash Outlays in XI plan
TOTAL2007-082008-092009-102010-112011-12Total
Rs. In Crores205647710462682092
Million US$4614515910315469
Sheet3
0
0
0
0
0
Year
Rs. in crores
Cash Outlays in XI Plan
Sheet4
Product Sales
Product2003-042004-052005-062006-072007-08
(TMT)
LPG501448444482478
C2-C3533527535548549
Naphtha Domestic57------------
Naphtha Export244285378425423
* Including Naphtha from Hazira
Sheet4
000
000
000
000
000
LPG
C2-C3
Naphtha Export
Year
Quantity (TMT)
VAP Sales
Sheet5
Sales Revenue in Million US$
PRODUCT2003-042004-052005-062006-07
LPG164.45113.07162.51178.4795320309
C2-C3106.2126.79164.47245.3613357565
NAPTHA87.42109.98177.54206.6057701045
Total358.07349.84504.52630.4466378919
Sheet5
000
000
000
000
LPG
C2-C3
Naphtha
Year
Rvenue (Million US$)
Sales Revenue of Products
Sheet6
Projected Revenue
2006-072007-082008-09
Qty.Amt.Qty.Amt.Qty.Amt.
Products(000MT)M US$(000MT)M US$(000MT)M US$
LPG456248.7435237.24435237.24
C2-C3515152.84510151.35510151.35
Naphtha280138.47266131.54266131.54
2006-072007-082008-09
LPG248.7237.24237.24
C2-C3152.84151.35151.35
Naphtha138.47131.54131.54
Sheet6
000
000
000
LPG
C2-C3
LAN
year
Million US$
Revenue Generation from VAP
Sheet7
Budget Utilization
HeadApprovedActual% Utilization
2005-062005-062005-06
Plan
Capital52.0350.1796.43
Non-plan
Capital0.930.6468.26
Contractual11.119.786.26
Stores2.482.0984.06
Spares6.414.3567.95
Other charges4.054.35107.47
Manpower10.8511.78108.73
Total87.8683.0994.57
HeadApprovedActual% UtilizationHeadApprovedActual% Utilization
2004-052004-052004-052006-072006-072006-07
PlanPlan
Capital4.141.9547Capital55.4352.8595.35
Non-planNon-plan
Capital0.680.3754.55Capital1.140.2421.05
Contractual9.868.9790.96Contractual13.589.9273.05
Stores1.111.19107.4Stores2.731.5356.04
Spares5.042.7755.03Spares6.362.8544.81
Other charges3.923.8397.73Other charges4.774.7599.58
Manpower9.7810.38106.18Manpower11.8115.21128.79
Total34.5329.4785.33Total95.8287.3591.16
Sheet8
Contribution to Exchequer-Indirect Taxes (in Million US$)
Excise dutySales Tax + VATTotal
2003-0436.1916.8553.04147.3368.60215.93
2004-0528.1817.6345.81114.7271.77186.49
2005-0628.2339.3967.62114.92160.36275.28
2006-0736.4739.1075.57307.65
2003-0453.04
2004-0545.81
2005-0667.62
2006-0775.57
Sheet9
Details of Fixed Assets in Million US$
YearGross BlockAccumulated DepreciationNet Book Value
2003-04168.19120.6247.56
2004-05167.52129.637.92
2005-06187.6141.7545.85
2006-07283.51155.86127.64
YearAccumulated DepreciationNet Book Value
2003-04120.6247.56
2004-05129.637.92
2005-06141.7545.85
Sheet9
00
00
00
Accumulated Depreciation
Net Book Value
Year
Million US$
Fixed Assets
Sheet10
Profitability (Million US$)
Product2003-042004-052005-062006-07*
LPG103.8264.57101.43154.37
C2-C328.3251.458.31165.25
Naptha67.8493.99147.47234.32
Total199.98209.96307.21553.95
* Transfer of Gas cost from Mumbai and HQ allocations awaited for 06-07
Sheet10
000
000
000
LPG
C2-C3
LAN
Year
Million US$
Profitability
Sheet11
Future ProductionPotential
LPG & Naphtha
Raw Material8-Jul9-Aug10-Sep11-Oct12-Nov
Available Gas processing capacity at UranMMSCMD11.511.511.517.2517.25
Addl. Condensate,MMTPA-0.0630.1780.3260.322
density; 0.585MT/Day-173488893882
Product (Value Added products from Gas + Gas Eqv. condensate + Addl. Condensate)
LPGMT/Day13831430151519081880
Density: 0.54M3/day25612648280535333482
NaphthaMT/Day846933109014671445
Density: 0.667M3/day12681399163421992166
Sheet12
Projects Envisaged during 2006-07
S.N.PROJECTS/WORKSBLOCK OF ESTIMATE PROJECT COST
Rs. (Cr.)Million US$
1ADDITIONAL CRUDE OIL STORAGE TANK OF CAPACITY 60,000 M34510.1
2FIRE WATER REVAMPING WORK204.5
3REPLACEMENT OF AIR COMPRESSORS102.2
4REPLACEMENT OF VARIOUS PIPE LINES.122.7
5MISCELLANEOUS STUDY INCLUDING FEASIBILITY & HEALTH CHECKUP102.2
6REPLACEMENT OF DG SETS122.7
7AUTO SPRINKLER SYSTEM FOR TRANSFORMERS, CABLE VAULTS & REACTORS4.51
8AIR INTAKE FILTRATION SYSTEM143.1
9REPAIR OF TANK 202 C, D & E8.82
10CUSTODY TRANSFER METERING STATION AT HPCL & BPCL4911
TOTAL185.341.5
-
FINANCE
-
PRODUCT SALES
Chart5
501533244
448527285
444535378
482548425
LPG
C2-C3
Naphtha Export
Year
Quantity (TMT)
Sheet1
XI Plan Projections
CONDENSATE2007-082008-092009-102010-112011-12Total
11th Plan
Receipt at Uran0.260.3330.4780.6010.5922.264
(MMT)
GAS2007-082008-092009-102010-112011-12TOTAL
Gas to UranBCM13.12613.30614.70714.59414.36925.615
(MMSCMD)BCF463.5469.9519.4515.4507.4904.6
Gas Sales From UranBCM3500350040004000390018.9
Assets + NMFD
(MMSCM)BCF123.6123.6141.3141.3137.7667.4
Sheet2
XI Plan Projections
Value added products (000, T)2007-082008-092009-102010-112011-12Total
11th Plan
LPG4354354354354352175
NAPHTHA2662662662662661330
C2-C35105105105105102550
Total Uran121112111211121112116055
Financial outlay205 (46)647 (145)710 (159)462 (103)68 (15)2093 (469)
Rs in Crore (Million US $)
Sheet3
Cash Outlays in XI plan
TOTAL2007-082008-092009-102010-112011-12Total
Rs. In Crores205647710462682092
Million US$4614515910315469
Sheet3
0
0
0
0
0
Year
Rs. in crores
Cash Outlays in XI Plan
Sheet4
Product Sales
Product2003-042004-052005-062006-072007-08
(TMT)
LPG501448444482478
C2-C3533527535548549VAP Sales
Naphtha Domestic57------------
Naphtha Export244285378425423
* Including Naphtha from Hazira
Product2003-042004-052005-062006-07
(TMT)
Gas Sales3597369635233725
Sheet4
000
000
000
000
LPG
C2-C3
Naphtha Export
Year
Quantity (TMT)
Sheet5
Sales Revenue in Million US$
PRODUCT2003-042004-052005-062006-07
LPG164.45113.07162.51178.4795320309
C2-C3106.2126.79164.47245.3613357565
NAPTHA87.42109.98177.54206.6057701045
Total358.07349.84504.52630.4466378919
Total Sales Revenue
PRODUCT2003-042004-052005-062006-07
Total358.07349.84504.52630.45
Sheet5
000
000
000
000
LPG
C2-C3
Naphtha
Year
Rvenue (Million US$)
Sales Revenue of Products
Sheet6
00
00
00
00
Total Revenue grom VAP
Year
Rvenue (Million US$)
Sheet7
Projected Revenue
2006-072007-082008-09
Qty.Amt.Qty.Amt.Qty.Amt.
Products(000MT)M US$(000MT)M US$(000MT)M US$
LPG456248.7435237.24435237.24
C2-C3515152.84510151.35510151.35
Naphtha280138.47266131.54266131.54
2006-072007-082008-09
LPG248.7237.24237.24
C2-C3152.84151.35151.35
Naphtha138.47131.54131.54
Sheet7
000
000
000
LPG
C2-C3
LAN
year
Million US$
Revenue Generation from VAP
Sheet8
Budget Utilization
HeadApprovedActual% Utilization
2005-062005-062005-06
Plan
Capital52.0350.1796.43
Non-plan
Capital0.930.6468.26
Contractual11.119.786.26
Stores2.482.0984.06
Spares6.414.3567.95
Other charges4.054.35107.47
Manpower10.8511.78108.73
Total87.8683.0994.57
HeadApprovedActual% UtilizationHeadApprovedActual% Utilization
2004-052004-052004-052006-072006-072006-07
PlanPlan
Capital4.141.9547Capital55.4352.8595.35
Non-planNon-plan
Capital0.680.3754.55Capital1.140.2421.05
Contractual9.868.9790.96Contractual13.589.9273.05
Stores1.111.19107.4Stores2.731.5356.04
Spares5.042.7755.03Spares6.362.8544.81
Other charges3.923.8397.73Other charges4.774.7599.58
Manpower9.7810.38106.18Manpower11.8115.21128.79
Total34.5329.4785.33Total95.8287.3591.16
Sheet9
Contribution to Exchequer-Indirect Taxes (in Million US$)
Excise dutySales Tax + VATTotal
2003-0436.1916.8553.04
2004-0528.1817.6345.81
2005-0628.2339.3967.62
2006-0736.4739.1075.57
2003-0453.04
2004-0545.81
2005-0667.62
2006-0775.57
Sheet9
0
0
0
0
Year
Million US$
Sheet10
Details of Fixed Assets in Million US$
Fixed Assets
YearGross BlockAccumulated DepreciationNet Book Value
2003-04168.19120.6247.56
2004-05167.52129.6037.92
2005-06187.60141.7545.85
2006-07283.51155.86127.64
YearAccumulated DepreciationNet Book Value
2003-04120.6247.56
2004-05129.637.92
2005-06141.7545.85
2006-07155.86127.64
Sheet10
00
00
00
00
Accumulated Depreciation
Net Book Value
Year
Million US$
Sheet11
Profitability (Million US$)
Product2003-042004-052005-062006-07*
LPG103.8264.57101.43154.37
C2-C328.3251.458.31165.25
Naptha67.8493.99147.47234.32
Total199.98209.96307.21553.95
* Transfer of Gas cost from Mumbai and HQ allocations awaited for 06-07
Sheet11
000
000
000
LPG
C2-C3
LAN
Year
Million US$
Profitability
Sheet12
Future ProductionPotential
LPG & Naphtha
Raw Material8-Jul9-Aug10-Sep11-Oct12-Nov
Available Gas processing capacity at UranMMSCMD11.511.511.517.2517.25
Addl. Condensate,MMTPA-0.0630.1780.3260.322
density; 0.585MT/Day-173488893882
Product (Value Added products from Gas + Gas Eqv. condensate + Addl. Condensate)
LPGMT/Day13831430151519081880
Density: 0.54M3/day25612648280535333482
NaphthaMT/Day846933109014671445
Density: 0.667M3/day12681399163421992166
Projects Envisaged during 2006-07
S.N.PROJECTS/WORKSBLOCK OF ESTIMATE PROJECT COST
Rs. (Cr.)Million US$
1ADDITIONAL CRUDE OIL STORAGE TANK OF CAPACITY 60,000 M34510.1
2FIRE WATER REVAMPING WORK204.5
3REPLACEMENT OF AIR COMPRESSORS102.2
4REPLACEMENT OF VARIOUS PIPE LINES.122.7
5MISCELLANEOUS STUDY INCLUDING FEASIBILITY & HEALTH CHECKUP102.2
6REPLACEMENT OF DG SETS122.7
7AUTO SPRINKLER SYSTEM FOR TRANSFORMERS, CABLE VAULTS & REACTORS4.51
8AIR INTAKE FILTRATION SYSTEM143.1
9REPAIR OF TANK 202 C, D & E8.82
10CUSTODY TRANSFER METERING STATION AT HPCL & BPCL4911
TOTAL185.341.5
-
GAS SALES
Chart6
2003-043597
2004-053696
2005-063523
2006-073725
Year
Quantity (MMSCM)
Sheet1
XI Plan Projections
CONDENSATE2007-082008-092009-102010-112011-12Total
11th Plan
Receipt at Uran0.260.3330.4780.6010.5922.264
(MMT)
GAS2007-082008-092009-102010-112011-12TOTAL
Gas to UranBCM13.12613.30614.70714.59414.36925.615
(MMSCMD)BCF463.5469.9519.4515.4507.4904.6
Gas Sales From UranBCM3500350040004000390018.9
Assets + NMFD
(MMSCM)BCF123.6123.6141.3141.3137.7667.4
Sheet2
XI Plan Projections
Value added products (000, T)2007-082008-092009-102010-112011-12Total
11th Plan
LPG4354354354354352175
NAPHTHA2662662662662661330
C2-C35105105105105102550
Total Uran121112111211121112116055
Financial outlay205 (46)647 (145)710 (159)462 (103)68 (15)2093 (469)
Rs in Crore (Million US $)
Sheet3
Cash Outlays in XI plan
TOTAL2007-082008-092009-102010-112011-12Total
Rs. In Crores205647710462682092
Million US$4614515910315469
Sheet3
0
0
0
0
0
Year
Rs. in crores
Cash Outlays in XI Plan
Sheet4
Product Sales
Product2003-042004-052005-062006-072007-08
(TMT)
LPG501448444482478
C2-C3533527535548549VAP Sales
Naphtha Domestic57------------
Naphtha Export244285378425423
* Including Naphtha from Hazira
Product2003-042004-052005-062006-07
(TMT)
Gas Sales3597369635233725
Sheet4
000
000
000
000
LPG
C2-C3
Naphtha Export
Year
Quantity (TMT)
Sheet5
00
00
00
00
Year
Quantity (TMT)
Sheet6
Sales Revenue in Million US$
PRODUCT2003-042004-052005-062006-07
LPG164.45113.07162.51178.4795320309
C2-C3106.2126.79164.47245.3613357565
NAPTHA87.42109.98177.54206.6057701045
Total358.07349.84504.52630.4466378919
Total Sales Revenue
PRODUCT2003-042004-052005-062006-07
Total358.07349.84504.52630.45
Sheet6
000
000
000
000
LPG
C2-C3
Naphtha
Year
Rvenue (Million US$)
Sales Revenue of Products
Sheet7
00
00
00
00
Total Revenue grom VAP
Year
Rvenue (Million US$)
Sheet8
Projected Revenue
2006-072007-082008-09
Qty.Amt.Qty.Amt.Qty.Amt.
Products(000MT)M US$(000MT)M US$(000MT)M US$
LPG456248.7435237.24435237.24
C2-C3515152.84510151.35510151.35
Naphtha280138.47266131.54266131.54
2006-072007-082008-09
LPG248.7237.24237.24
C2-C3152.84151.35151.35
Naphtha138.47131.54131.54
Sheet8
000
000
000
LPG
C2-C3
LAN
year
Million US$
Revenue Generation from VAP
Sheet9
Budget Utilization
HeadApprovedActual% Utilization
2005-062005-062005-06
Plan
Capital52.0350.1796.43
Non-plan
Capital0.930.6468.26
Contractual11.119.786.26
Stores2.482.0984.06
Spares6.414.3567.95
Other charges4.054.35107.47
Manpower10.8511.78108.73
Total87.8683.0994.57
HeadApprovedActual% UtilizationHeadApprovedActual% Utilization
2004-052004-052004-052006-072006-072006-07
PlanPlan
Capital4.141.9547Capital55.4352.8595.35
Non-planNon-plan
Capital0.680.3754.55Capital1.140.2421.05
Contractual9.868.9790.96Contractual13.589.9273.05
Stores1.111.19107.4Stores2.731.5356.04
Spares5.042.7755.03Spares6.362.8544.81
Other charges3.923.8397.73Other charges4.774.7599.58
Manpower9.7810.38106.18Manpower11.8115.21128.79
Total34.5329.4785.33Total95.8287.3591.16
Sheet10
Contribution to Exchequer-Indirect Taxes (in Million US$)
Excise dutySales Tax + VATTotal
2003-0436.1916.8553.04
2004-0528.1817.6345.81
2005-0628.2339.3967.62
2006-0736.4739.1075.57
2003-0453.04
2004-0545.81
2005-0667.62
2006-0775.57
Sheet10
0
0
0
0
Year
Million US$
Sheet11
Details of Fixed Assets in Million US$
Fixed Assets
YearGross BlockAccumulated DepreciationNet Book Value
2003-04168.19120.6247.56
2004-05167.52129.6037.92
2005-06187.60141.7545.85
2006-07283.51155.86127.64
YearAccumulated DepreciationNet Book Value
2003-04120.6247.56
2004-05129.637.92
2005-06141.7545.85
2006-07155.86127.64
Sheet11
00
00
00
00
Accumulated Depreciation
Net Book Value
Year
Million US$
Sheet12
Profitability (Million US$)
Product2003-042004-052005-062006-07*
LPG103.8264.57101.43154.37
C2-C328.3251.458.31165.25
Naptha67.8493.99147.47234.32
Total199.98209.96307.21553.95
* Transfer of Gas cost from Mumbai and HQ allocations awaited for 06-07
Sheet12
000
000
000
LPG
C2-C3
LAN
Year
Million US$
Profitability
Future ProductionPotential
LPG & Naphtha
Raw Material8-Jul9-Aug10-Sep11-Oct12-Nov
Available Gas processing capacity at UranMMSCMD11.511.511.517.2517.25
Addl. Condensate,MMTPA-0.0630.1780.3260.322
density; 0.585MT/Day-173488893882
Product (Value Added products from Gas + Gas Eqv. condensate + Addl. Condensate)
LPGMT/Day13831430151519081880
Density: 0.54M3/day25612648280535333482
NaphthaMT/Day846933109014671445
Density: 0.667M3/day12681399163421992166
Projects Envisaged during 2006-07
S.N.PROJECTS/WORKSBLOCK OF ESTIMATE PROJECT COST
Rs. (Cr.)Million US$
1ADDITIONAL CRUDE OIL STORAGE TANK OF CAPACITY 60,000 M34510.1
2FIRE WATER REVAMPING WORK204.5
3REPLACEMENT OF AIR COMPRESSORS102.2
4REPLACEMENT OF VARIOUS PIPE LINES.122.7
5MISCELLANEOUS STUDY INCLUDING FEASIBILITY & HEALTH CHECKUP102.2
6REPLACEMENT OF DG SETS122.7
7AUTO SPRINKLER SYSTEM FOR TRANSFORMERS, CABLE VAULTS & REACTORS4.51
8AIR INTAKE FILTRATION SYSTEM143.1
9REPAIR OF TANK 202 C, D & E8.82
10CUSTODY TRANSFER METERING STATION AT HPCL & BPCL4911
TOTAL185.341.5
-
TOTAL SALES REVENUE OF VAP
Chart1
2003-04358.07
2004-05349.84
2005-06504.52
2006-07630.45
Total Revenue grom VAP
Year
Rvenue (Million US$)
Sheet1
XI Plan Projections
CONDENSATE2007-082008-092009-102010-112011-12Total
11th Plan
Receipt at Uran0.260.3330.4780.6010.5922.264
(MMT)
GAS2007-082008-092009-102010-112011-12TOTAL
Gas to UranBCM13.12613.30614.70714.59414.36925.615
(MMSCMD)BCF463.5469.9519.4515.4507.4904.6
Gas Sales From UranBCM3500350040004000390018.9
Assets + NMFD
(MMSCM)BCF123.6123.6141.3141.3137.7667.4
Sheet2
XI Plan Projections
Value added products (000, T)2007-082008-092009-102010-112011-12Total
11th Plan
LPG4354354354354352175
NAPHTHA2662662662662661330
C2-C35105105105105102550
Total Uran121112111211121112116055
Financial outlay205 (46)647 (145)710 (159)462 (103)68 (15)2093 (469)
Rs in Crore (Million US $)
Sheet3
Cash Outlays in XI plan
TOTAL2007-082008-092009-102010-112011-12Total
Rs. In Crores205647710462682092
Million US$4614515910315469
Sheet3
0
0
0
0
0
Year
Rs. in crores
Cash Outlays in XI Plan
Sheet4
Product Sales
Product2003-042004-052005-062006-072007-08
(TMT)
LPG501448444482478
C2-C3533527535548549
Naphtha Domestic57------------
Naphtha Export244285378425423
* Including Naphtha from Hazira
Sheet4
000
000
000
000
000
LPG
C2-C3
Naphtha Export
Year
Quantity (TMT)
VAP Sales
Sheet5
Sales Revenue in Million US$
PRODUCT2003-042004-052005-062006-07
LPG164.45113.07162.51178.4795320309
C2-C3106.2126.79164.47245.3613357565
NAPTHA87.42109.98177.54206.6057701045
Total358.07349.84504.52630.4466378919
Total Sales Revenue
PRODUCT2003-042004-052005-062006-07
Total358.07349.84504.52630.45
Sheet5
000
000
000
000
LPG
C2-C3
Naphtha
Year
Rvenue (Million US$)
Sales Revenue of Products
Sheet6
00
00
00
00
Total Revenue grom VAP
Year
Rvenue (Million US$)
Sheet7
Projected Revenue
2006-072007-082008-09
Qty.Amt.Qty.Amt.Qty.Amt.
Products(000MT)M US$(000MT)M US$(000MT)M US$
LPG456248.7435237.24435237.24
C2-C3515152.84510151.35510151.35
Naphtha280138.47266131.54266131.54
2006-072007-082008-09
LPG248.7237.24237.24
C2-C3152.84151.35151.35
Naphtha138.47131.54131.54
Sheet7
000
000
000
LPG
C2-C3
LAN
year
Million US$
Revenue Generation from VAP
Sheet8
Budget Utilization
HeadApprovedActual% Utilization
2005-062005-062005-06
Plan
Capital52.0350.1796.43
Non-plan
Capital0.930.6468.26
Contractual11.119.786.26
Stores2.482.0984.06
Spares6.414.3567.95
Other charges4.054.35107.47
Manpower10.8511.78108.73
Total87.8683.0994.57
HeadApprovedActual% UtilizationHeadApprovedActual% Utilization
2004-052004-052004-052006-072006-072006-07
PlanPlan
Capital4.141.9547Capital55.4352.8595.35
Non-planNon-plan
Capital0.680.3754.55Capital1.140.2421.05
Contractual9.868.9790.96Contractual13.589.9273.05
Stores1.111.19107.4Stores2.731.5356.04
Spares5.042.7755.03Spares6.362.8544.81
Other charges3.923.8397.73Other charges4.774.7599.58
Manpower9.7810.38106.18Manpower11.8115.21128.79
Total34.5329.4785.33Total95.8287.3591.16
Sheet9
Contribution to Exchequer-Indirect Taxes (in Million US$)
Excise dutySales Tax + VATTotal
2003-0436.1916.8553.04
2004-0528.1817.6345.81
2005-0628.2339.3967.62
2006-0736.4739.1075.57
2003-0453.04
2004-0545.81
2005-0667.62
2006-0775.57
Sheet9
0
0
0
0
Year
Million US$
Sheet10
Details of Fixed Assets in Million US$
YearGross BlockAccumulated DepreciationNet Book Value
2003-04168.19120.6247.56
2004-05167.52129.6037.92
2005-06187.60141.7545.85
2006-07283.51155.86127.64
YearAccumulated DepreciationNet Book Value
2003-04120.6247.56
2004-05129.637.92
2005-06141.7545.85
2006-07155.86127.64
Sheet10
00
00
00
00
Accumulated Depreciation
Net Book Value
Year
Million US$
Sheet11
Profitability (Million US$)
Product2003-042004-052005-062006-07*
LPG103.8264.57101.43154.37
C2-C328.3251.458.31165.25
Naptha67.8493.99147.47234.32
Total199.98209.96307.21553.95
* Transfer of Gas cost from Mumbai and HQ allocations awaited for 06-07
Sheet11
000
000
000
LPG
C2-C3
LAN
Year
Million US$
Profitability
Sheet12
Future ProductionPotential
LPG & Naphtha
Raw Material8-Jul9-Aug10-Sep11-Oct12-Nov
Available Gas processing capacity at UranMMSCMD11.511.511.517.2517.25
Addl. Condensate,MMTPA-0.0630.1780.3260.322
density; 0.585MT/Day-173488893882
Product (Value Added products from Gas + Gas Eqv. condensate + Addl. Condensate)
LPGMT/Day13831430151519081880
Density: 0.54M3/day25612648280535333482
NaphthaMT/Day846933109014671445
Density: 0.667M3/day12681399163421992166
Projects Envisaged during 2006-07
S.N.PROJECTS/WORKSBLOCK OF ESTIMATE PROJECT COST
Rs. (Cr.)Million US$
1ADDITIONAL CRUDE OIL STORAGE TANK OF CAPACITY 60,000 M34510.1
2FIRE WATER REVAMPING WORK204.5
3REPLACEMENT OF AIR COMPRESSORS102.2
4REPLACEMENT OF VARIOUS PIPE LINES.122.7
5MISCELLANEOUS STUDY INCLUDING FEASIBILITY & HEALTH CHECKUP102.2
6REPLACEMENT OF DG SETS122.7
7AUTO SPRINKLER SYSTEM FOR TRANSFORMERS, CABLE VAULTS & REACTORS4.51
8AIR INTAKE FILTRATION SYSTEM143.1
9REPAIR OF TANK 202 C, D & E8.82
10CUSTODY TRANSFER METERING STATION AT HPCL & BPCL4911
TOTAL185.341.5
-
DETAILS OF FIXED ASSETS
Chart4
120.6247.56
129.637.92
141.7545.85
155.86127.64
Accumulated Depreciation
Net Book Value
Year
Million US$
Sheet1
XI Plan Projections
CONDENSATE2007-082008-092009-102010-112011-12Total
11th Plan
Receipt at Uran0.260.3330.4780.6010.5922.264
(MMT)
GAS2007-082008-092009-102010-112011-12TOTAL
Gas to UranBCM13.12613.30614.70714.59414.36925.615
(MMSCMD)BCF463.5469.9519.4515.4507.4904.6
Gas Sales From UranBCM3500350040004000390018.9
Assets + NMFD
(MMSCM)BCF123.6123.6141.3141.3137.7667.4
Sheet2
XI Plan Projections
Value added products (000, T)2007-082008-092009-102010-112011-12Total
11th Plan
LPG4354354354354352175
NAPHTHA2662662662662661330
C2-C35105105105105102550
Total Uran121112111211121112116055
Financial outlay205 (46)647 (145)710 (159)462 (103)68 (15)2093 (469)
Rs in Crore (Million US $)
Sheet3
Cash Outlays in XI plan
TOTAL2007-082008-092009-102010-112011-12Total
Rs. In Crores205647710462682092
Million US$4614515910315469
Sheet3
0
0
0
0
0
Year
Rs. in crores
Cash Outlays in XI Plan
Sheet4
Product Sales
Product2003-042004-052005-062006-072007-08
(TMT)
LPG501448444482478
C2-C3533527535548549VAP Sales
Naphtha Domestic57------------
Naphtha Export244285378425423
* Including Naphtha from Hazira
Sheet4
000
000
000
000
000
LPG
C2-C3
Naphtha Export
Year
Quantity (TMT)
Sheet5
Sales Revenue in Million US$
PRODUCT2003-042004-052005-062006-07
LPG164.45113.07162.51178.4795320309
C2-C3106.2126.79164.47245.3613357565
NAPTHA87.42109.98177.54206.6057701045
Total358.07349.84504.52630.4466378919
Total Sales Revenue
PRODUCT2003-042004-052005-062006-07
Total358.07349.84504.52630.45
Sheet5
000
000
000
000
LPG
C2-C3
Naphtha
Year
Rvenue (Million US$)
Sales Revenue of Products
Sheet6
00
00
00
00
Total Revenue grom VAP
Year
Rvenue (Million US$)
Sheet7
Projected Revenue
2006-072007-082008-09
Qty.Amt.Qty.Amt.Qty.Amt.
Products(000MT)M US$(000MT)M US$(000MT)M US$
LPG456248.7435237.24435237.24
C2-C3515152.84510151.35510151.35
Naphtha280138.47266131.54266131.54
2006-072007-082008-09
LPG248.7237.24237.24
C2-C3152.84151.35151.35
Naphtha138.47131.54131.54
Sheet7
000
000
000
LPG
C2-C3
LAN
year
Million US$
Revenue Generation from VAP
Sheet8
Budget Utilization
HeadApprovedActual% Utilization
2005-062005-062005-06
Plan
Capital52.0350.1796.43
Non-plan
Capital0.930.6468.26
Contractual11.119.786.26
Stores2.482.0984.06
Spares6.414.3567.95
Other charges4.054.35107.47
Manpower10.8511.78108.73
Total87.8683.0994.57
HeadApprovedActual% UtilizationHeadApprovedActual% Utilization
2004-052004-052004-052006-072006-072006-07
PlanPlan
Capital4.141.9547Capital55.4352.8595.35
Non-planNon-plan
Capital0.680.3754.55Capital1.140.2421.05
Contractual9.868.9790.96Contractual13.589.9273.05
Stores1.111.19107.4Stores2.731.5356.04
Spares5.042.7755.03Spares6.362.8544.81
Other charges3.923.8397.73Other charges4.774.7599.58
Manpower9.7810.38106.18Manpower11.8115.21128.79
Total34.5329.4785.33Total95.8287.3591.16
Sheet9
Contribution to Exchequer-Indirect Taxes (in Million US$)
Excise dutySales Tax + VATTotal
2003-0436.1916.8553.04
2004-0528.1817.6345.81
2005-0628.2339.3967.62
2006-0736.4739.1075.57
2003-0453.04
2004-0545.81
2005-0667.62
2006-0775.57
Sheet9
0
0
0
0
Year
Million US$
Sheet10
Details of Fixed Assets in Million US$
YearGross BlockAccumulated DepreciationNet Book Value
2003-04168.19120.6247.56
2004-05167.52129.6037.92
2005-06187.60141.7545.85
2006-07283.51155.86127.64
YearAccumulated DepreciationNet Book Value
2003-04120.6247.56
2004-05129.637.92
2005-06141.7545.85
2006-07155.86127.64
Sheet10
00
00
00
00
Accumulated Depreciation
Net Book Value
Year
Million US$
Sheet11
Profitability (Million US$)
Product2003-042004-052005-062006-07*
LPG103.8264.57101.43154.37
C2-C328.3251.458.31165.25
Naptha67.8493.99147.47234.32
Total199.98209.96307.21553.95
* Transfer of Gas cost from Mumbai and HQ allocations awaited for 06-07
Sheet11
000
000
000
LPG
C2-C3
LAN
Year
Million US$
Profitability
Sheet12
Future ProductionPotential
LPG & Naphtha
Raw Material8-Jul9-Aug10-Sep11-Oct12-Nov
Available Gas processing capacity at UranMMSCMD11.511.511.517.2517.25
Addl. Condensate,MMTPA-0.0630.1780.3260.322
density; 0.585MT/Day-173488893882
Product (Value Added products from Gas + Gas Eqv. condensate + Addl. Condensate)
LPGMT/Day13831430151519081880
Density: 0.54M3/day25612648280535333482
NaphthaMT/Day846933109014671445
Density: 0.667M3/day12681399163421992166
Projects Envisaged during 2006-07
S.N.PROJECTS/WORKSBLOCK OF ESTIMATE PROJECT COST
Rs. (Cr.)Million US$
1ADDITIONAL CRUDE OIL STORAGE TANK OF CAPACITY 60,000 M34510.1
2FIRE WATER REVAMPING WORK204.5
3REPLACEMENT OF AIR COMPRESSORS102.2
4REPLACEMENT OF VARIOUS PIPE LINES.122.7
5MISCELLANEOUS STUDY INCLUDING FEASIBILITY & HEALTH CHECKUP102.2
6REPLACEMENT OF DG SETS122.7
7AUTO SPRINKLER SYSTEM FOR TRANSFORMERS, CABLE VAULTS & REACTORS4.51
8AIR INTAKE FILTRATION SYSTEM143.1
9REPAIR OF TANK 202 C, D & E8.82
10CUSTODY TRANSFER METERING STATION AT HPCL & BPCL4911
TOTAL185.341.5
-
PROJECTS ENVISAGEDDURING 2007-09
PROJECTS/WORKSBLOCK OF ESTIMATE PROJECT COSTRs. (Cr.)Million US$ADDITIONAL PROCESS UNIT(GSU, LPG & CFU)1110249.1REPLACEMENT OF PROPANE GAS COMPRESSOR OF LPG-I & LPG-II12026.9ADDITIONAL LEAN GAS COMPRESSOR12026.9VAP STORAGE SYSTEM AT NAVGARH7015.7SULPHUR RECOVERY UNIT235.2TOTAL1443323.8
-
HSE MEASURES
Audio-visual safety film for visitors & new employees has been introduced
New on-line near-miss reporting system established and encouraged Hazardous solid waste Disposal through Mumbai Waste Management Limited at Taloja.
Monthly Loss Control Tour carried out by Head Uran Plant.
All the emissions are well within the stipulated limits of statutory agencies.
-
1SeriousOr MajorInjury10Minor Injury30Property DamageAccidents600Incidents with no VisibleInjury or DamageINCIDENTSACCIDENTSSAFETY PYRAMID
-
FIRE FIGHTING SYSTEMWater sprinkler systemDrencher systemFoam systemRim seal fire protectionHigh Volume water monitor for Gas Processing Area.High Volume Long Range water cum foam monitors for Tank Farm AreaHALON system CO2 flooding systemFire alarm systemHydrants and monitorsFirst Aid fire fighting system
*