upper arlington schools€¦ · our goals for today: • present draft cost estimates associated...
TRANSCRIPT
MOODY NOLAN | PERKINS+WILL
UPPER ARLINGTON SCHOOLSBUILDING TEAM MEETING #4UPPER ARLINGTON HIGH SCHOOLMARCH 14-16, 2016
YOURVOICE MATTERS
MOODY NOLAN PERKINS+WILL HILLIARD JEANE KORDA EMH&T MKSK TURNER
2
AffirmGuiding
Principles
PresentFacilitiesAnalysis Findings
Evaluate Master Plan
Options
Evaluate RevisedMasterPlan
Options
CES 1 CES 2 CES 3 CES 4
SEPT 9+10 NOV 18+19 FEB 23+24 APR 19+20
Review Financials
CES 5
TBD 2017
BTM 1
BTM 2
BT SUMMIT
BTM 3
SEP 29–OCT 1
NOV 10-12
DEC 3
JAN 12-14
BTM 4MAR 14-16
OUR PROGRESS
BUILDING TEAM MEETINGSMARCH 14 - 16, 2016
3
AffirmGuiding
Principles
PresentFacilitiesAnalysis Findings
Evaluate Master Plan
Options
Evaluate RevisedMasterPlan
Options
CES 1 CES 2 CES 3 CES 4
SEPT 9+10 NOV 18+19 FEB 23+24 APR 19+20
Review Financials
CES 5
TBD 2017
BTM 1
BTM 2
BT SUMMIT
BTM 3
SEP 29–OCT 1
NOV 10-12
DEC 3
JAN 12-14
BTM 4MAR 14-16
OUR PROGRESS
BUILDING TEAM MEETINGSMARCH 14 - 16, 2016
BTM 5TBD 2017
OUR GOALS FOR TODAY:
• Present draft cost estimates associated with each option
• Present district-wide draft cost estimates
• Review intent of master plan and estimate development
• Review school facilities funding
• Present building team / community feedback
• Group discussions and work session feedback on options
• Next steps
BUILDING TEAM MEETINGSMARCH 14 - 16, 2016
5
Repair + $75,471,000 Renovate + $132,280,000
• 307,461 SF• 1,858 students
• 165 SF / Student• $245 / SF
• 398,177 SF• 1,858 students
• 214 SF / Student• $332 / SF
Note: Costs represent draft estimates of total project costs in 2018 dollars.
• REPAIR EXISTING SPACES PER PHYSICAL ASSESSMENT REPORT
• INCLUDES MINIMAL “RIGHT-SIZED” CLASSROOMS
INCLUDES RENOVATED / NEW AND “RIGHT-SIZED”:
• CLASSROOMS AND COLLABORATION SPACE
• ART AND MUSIC CLASSROOMS
• LEARNING CENTER
• GYMNASIUMS AND NATATORIUM
• THEATER
• CAFETERIA/ KITCHEN
• ADMINISTRATION
• FACILITY SUPPORT
UPPER ARLINGTON HIGH SCHOOL
REPAIR + OPTIONUPPER ARLINGTON HIGH SCHOOL
RENOVATE + OPTION
NOTE: WORKING DRAFT CONCEPTUAL DIAGRAMS – NOT A FINAL DESIGN PLANMARCH 14-16, 2016
6
Rebuild A $135,510,000 Rebuild B $140,584,000
• 398,177 SF• 1,858 students
• 214 SF / Student• $340 / SF
• 398,177 SF• 1,858 students
• 214 SF / Student• $353 / SF
Note: Costs represent draft estimates of total project costs in 2018 dollars.
INCLUDES NEW AND “RIGHT-SIZED”:
• CLASSROOMS AND COLLABORATION SPACE
• ART AND MUSIC CLASSROOMS
• LEARNING CENTER
• GYMNASIUMS AND NATATORIUM
• THEATER
• CAFETERIA/ KITCHEN
• ADMINISTRATION
• FACILITY SUPPORT
INCLUDES NEW AND “RIGHT-SIZED”:
• CLASSROOMS AND COLLABORATION SPACE
• ART AND MUSIC CLASSROOMS
• LEARNING CENTER
• GYMNASIUMS AND NATATORIUM
• THEATER
• CAFETERIA/ KITCHEN
• ADMINISTRATION
• FACILITY SUPPORT
NEW BLEACHERS
NOTE: WORKING DRAFT CONCEPTUAL DIAGRAMS – NOT A FINAL DESIGN PLANMARCH 14-16, 2016
SCHOOL / OPTION REPAIR + RENOVATE + A RENOVATE + B REBUILD A REBUILD B
BURBANK
BARRINGTON
GREENSVIEW
TREMONT
WICKLIFFE
WINDERMERE
HASTINGS
JONES
UAHS
COMMUNITY ENGAGEMENT SESSION #3 FEEDBACK SUMMARYFeedback Received Prior to Draft Cost Estimates
BUILDING TEAM MEETINGSMARCH 14 - 16, 2016
SCHOOL/OPTION REPAIR + RENOVATE + A RENOVATE + B REBUILD A REBUILD B
BURBANK $ 7,293,000 $ 12,657,000 $ 14,807,000
BARRINGTON $ 17,823,000 $ 32,101,000 $31,024,000* $ 32,346,000
GREENSVIEW $ 11,627,000 $ 21,671,000 $ 22,636,000
TREMONT $ 9,507,000 $ 14,906,000 $ 17,467,000
WICKLIFFE $ 11,347,000 $ 23,825,000 $ 23,848,000
WINDERMERE $ 13,283,000 $ 27,514,000 $ 22,181,000 $22,181,000
HASTINGS $ 27,677,000 $ 45,198,000 $ 52,354,000
JONES $ 18,208,000 $ 46,841,000
UAHS $ 75,471,000 $132,280,000 $135,510,000 $140,584,000
BUILDING TEAM MEETINGSMARCH 14 - 16, 2016
* Barrington Renovate + Option B added after feedback from Community Engagement Session #3
DRAFT COST SUMMARY
SCHOOL/OPTION REPAIR + RENOVATE + A RENOVATE + B REBUILD A REBUILD B
BURBANK $ 7,293,000 $ 12,657,000 $ 14,807,000
BARRINGTON $ 17,823,000 $ 32,101,000 $31,024,000* $ 32,346,000
GREENSVIEW $ 11,627,000 $ 21,671,000 $ 22,636,000
TREMONT $ 9,507,000 $ 14,906,000 $ 17,467,000
WICKLIFFE $ 11,347,000 $ 23,825,000 $ 23,848,000
WINDERMERE $ 13,283,000 $ 27,514,000 $ 22,181,000 $22,181,000
HASTINGS $ 27,677,000 $ 45,198,000 $ 52,354,000
JONES $ 18,208,000 $ 46,841,000
UAHS $ 75,471,000 $132,280,000 $135,510,000 $140,584,000
BUILDING TEAM MEETINGSMARCH 14 - 16, 2016
* Barrington Renovate + Option B added after feedback from Community Engagement Session #3
COMMUNITY ENGAGEMENT SESSION #3 FEEDBACK SUMMARYFeedback Received Prior to Draft Cost Estimates
DRAFT COST SUMMARY INCLUDING
WHAT IS A FACILITIES MASTER PLAN?Master Planning Process
PHYSICALASSESSMENT
What physical assets are in need of repair
or replacement?
EDUCATIONALASSESSMENT
How do our facilities support the educational
focus of the District?
FINANCIALASSESSMENT
What are the priorities and
associated costs?
BUILDING TEAM MEETINGSMARCH 14 - 16, 2016
WHAT IS A FACILITIES MASTER PLAN?Master Planning Process
PHYSICALASSESSMENT
What physical assets are in need of repair
or replacement?
EDUCATIONALASSESSMENT
How do our facilities support the educational
focus of the District?
FINANCIALASSESSMENT
What are the priorities and
associated costs?
How can we improve our
physical assets….
FACILITIES MASTER PLAN
….and advance our relentless
focus on learning
….while remaining fiscally
responsible?
BUILDING TEAM MEETINGSMARCH 14 - 16, 2016
What?A long-term strategyA living document
Why?As stewards of Upper Arlington Schools educational and financial resources this process allows you to:
Improve education / educational environmentsReflect what the community valuesPlan for the futureSpend money wisely
WHAT IS A FACILITIES MASTER PLAN?(….and why do it??)
BUILDING TEAM MEETINGSMARCH 14 - 16, 2016
WHAT IS A FACILITIES MASTER PLAN?Guiding Principles
LENS EVALUATION FACILITIESINPUTS
GUIDINGPRINCIPLES
BUILDING TEAM MEETINGSMARCH 14 - 16, 2016
WHAT IS A FACILITIES MASTER PLAN?Guiding Principles
Our district’s educational environments . . .
1) Will champion uniquely accomplished learners
2) Will be fiscally responsible and community responsive
3) Will foster and engage relationships
4) Will bolster collaboration and creativity
5) Will recognize the need to create a safe place to learn and work
BUILDING TEAM MEETINGSMARCH 14 - 16, 2016
Infrastructure: Maintain/update to working order Change uses of existing structure and/or expand to allow better use
New and optimized
Program: Limited or no change Alteration of deficiencies possible Addresses deficiencies
Physical Appearance:
No significant change Change mostly limited to interiors and/or expansion
Completely new
# of Teaching Spaces:
Right-sized spaces added to accommodate year 6 enrollment projection
Right-sized spaces added to accommodate year 6 enrollment projection
Right-sized spaces included to accommodate year 6 enrollment projection
Classroom Loading:
Assumes 25 students per classroom Assumes 25 students per classroom Assumes 25 students per classroom
Core Spaces: Cafeteria/Multi-Purpose Room: Sized to year 10 enrollment projection w/minimum time for lunch (max: three lunches)
Cafeteria/Multi-Purpose Room: Sized to year 10 enrollment projection (two lunches), bleacher seating added to exhibition gym, current 1550 seat theater to be renovated
Cafeteria/Multi-Purpose Room: sized to year 10 enrollment projection (two lunches), 2,500 seat exhibition gym, 3-court practice gym, natatorium, 1550 seat theater
OPTION CATEGORIES (HIGH SCHOOL)
Definitions: Infrastructure: Systems within the building such as power, HVAC, and data network that support the functions of the building.
Program: The size and function of individual spaces throughout the building such as classrooms, faculty offices, gymnasiums, etc.
Right-sized: Individual spaces sized appropriately for the function for which they are intended to perform.
REPAIR + RENOVATE + REBUILD
BUILDING TEAM MEETINGSMARCH 14 - 16, 2016
WHAT IS IN THE TOTAL
COST?
Project Contingencies
Swing Space/Phasing/Safety/Temp. Const.
Project Costs (Construction Costs and Soft Costs)
TOTAL PROJECT COSTS
BUILDING TEAM MEETINGSMARCH 14 - 16, 2016
Infla
tion
18
• Common practice throughout Ohio is issuing bonds
• District has issued bonds in the past – last issuance approximately 20 years ago
• Bonds are similar to home mortgages
• Allows district to spread cost over a period of years
How are facilities projects funded?
BUILDING TEAM MEETINGSMARCH 14 - 16, 2016
19
Bond issue
• Requires approval (vote) of tax payers
• Pay-back period up to 38 years
• Interest rate impacted by bond rating
• Bond rating similar to credit rating• UA Schools’ Standard and Poor’s (S&P) AAA rating – best
possible• Key factors: community support and financial planning
BUILDING TEAM MEETINGSMARCH 14 - 16, 2016
20
Bond example
A district issues bonds in the amount of $100,000,000 for a facilities project and plans to pay them off over 38 years with level principal payments at a 5% interest rate:
Using our current property valuation, with the above variables:• Approximate millage for project would be 3 mills (not 100
mills as some may assume)• 1 mil = $140/yr per $400,000 of auditor’s market
valuation, therefore, 3 mils would equal $420/yrThis is an example to illustrate millage related to bonds. Amounts were chosen for simplicity and are not related to any specific project. Millage is impacted by valuation changes, interest rate at time of issuance and duration of pay-back period. BUILDING TEAM MEETINGS
MARCH 14 - 16, 2016
21
Repair + $75,471,000 Renovate $132,280,000
2.28 Mills / $319.20 per yr. 4 Mills / $560.00 per yr.
Assumptions: • Based upon auditor appraised home value of $400,000• Bonds financed over 38 years at 5% interest with level principal payment structure• No change in district’s total property valuation for 38 years.
Note: Costs represent draft estimates of total project costs in 2018 dollars.
UPPER ARLINGTON HIGH SCHOOL
REPAIR + OPTIONUPPER ARLINGTON HIGH SCHOOL
RENOVATE + OPTION
NOTE: WORKING DRAFT CONCEPTUAL DIAGRAMS –NOT A FINAL DESIGN PLAN
MARCH 14-16, 2016
22
Rebuild A $135,510,000 Rebuild B $140,584,0004.10 Mills / $574.00 per yr. 4.25 Mills / $595.00 per yr.
Assumptions: • Based upon auditor appraised home value of $400,000• Bonds financed over 38 years at 5% interest with level principal payment structure• No change in district’s total property valuation for 38 years.
NEW BLEACHERS
Note: Costs represent draft estimates of total project costs in 2018 dollars.
NOTE: WORKING DRAFT CONCEPTUAL DIAGRAMS –NOT A FINAL DESIGN PLAN
MARCH 14-16, 2016
23
Renovate + $132,280,000
4 Mills / $560.00 per yr.
Repair + $75,471,000
2.28 Mills / $319.20 per yr.Rebuild A $135,510,0004.10 Mills / $574.00 per yr.
Rebuild B $140,584,000
4.25 Mills / $595.00 per yr.
Note: Costs represent draft estimates of total project costs in 2018 dollars.
UPPER ARLINGTON HIGH SCHOOL
REPAIR + OPTION
UPPER ARLINGTON HIGH SCHOOL
RENOVATE + OPTION
UPPER ARLINGTON HIGH SCHOOL
REBUILD OPTION A
UPPER ARLINGTON HIGH SCHOOL
REBUILD OPTION B
Assumptions: • Based upon auditor appraised home value of $400,000• Bonds financed over 38 years at 5% interest with level principal payment structure• No change in district’s total property valuation for 38 years.
BUILDING TEAM MEETINGSMARCH 14 - 16, 2016
1. What is your reaction to the financial information?
2. Considering the student and staff experience for our school, what building elements should drive our decision making?
3. For our school community, what option (or options) makes the most sense?
4. Considering a district-wide experience for our students and staff, what should drive our decision making?
BUILDING TEAM #4 WORK SESSION
BUILDING TEAM MEETINGSMARCH 14 - 16, 2016
25
Next steps• Building Team feedback used to refine options for Community Engagement
Sessions
• Community Engagement Sessions:Tuesday, April 19 at 7 p.m. at UAHSWednesday, April 20 at 8:30 a.m. at Mountview Christian Church
• Web survey
• Scientific phone survey
• Recommendation to the Board of Education in Fall of 2016
• Additional Building Team Meeting and Community Engagement Session during Decisions Phase
• Ballot issue – November 2017