updated weerawat

32
CURRICULUM VITAE Weerawat RATTANAMINGMONGKOL QA/QC Manager/Project Management/Engineering Manager/Maintenance &Service Manager (Senior Welding Inspector Level III- CSWIP 3.0/3.1/3.2.2 (SWI), RI, ASNT- RT/UT/PT/MT Level II, EN473- RT Level II, ISO 9001-2000, Safety Officer for Supervisor and Management Level and Confine Space) ADDRESS 125/58 Moo 2, Rayong Modern Home Village, Sukhumvit Rd.Tam Bol Tab-Ma, Amphur Mueang, Rayong, 21000, Thailand Email Add: [email protected] Mobile: +66 868191685 (Thailand) https://th.linkedin.com/in/weerawat- rattanamingmongkol-aa54b3109 PRIVATE DATA Date of Birth : May 29, 1962 Religion : Buddhism Weight/Height : 71 kg. / 175 cm. Nationality/Race : Thai / Chinese Military Service Status : Reserved Officers Training Corps. Marriage Status : Married Health Status : Excellence EDUCATION

Upload: weerawat-rattanamingmongkol

Post on 12-Jan-2017

45 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Updated Weerawat

CURRICULUM VITAE

Weerawat RATTANAMINGMONGKOL QA/QC Manager/Project Management/Engineering

Manager/Maintenance &Service Manager

(Senior Welding Inspector Level III- CSWIP 3.0/3.1/3.2.2 (SWI), RI, ASNT- RT/UT/PT/MT Level II, EN473- RT Level II, ISO 9001-

2000, Safety Officer for Supervisor and Management Level and Confine Space)

ADDRESS

125/58 Moo 2, Rayong Modern Home Village, Sukhumvit Rd.Tam Bol Tab-Ma, Amphur Mueang, Rayong, 21000, Thailand Email Add: [email protected] Mobile: +66 868191685 (Thailand) https://th.linkedin.com/in/weerawat-rattanamingmongkol-aa54b3109

PRIVATE DATA

Date of Birth : May 29, 1962 Religion : Buddhism Weight/Height : 71 kg. / 175 cm. Nationality/Race : Thai / Chinese Military Service Status : Reserved Officers Training Corps. Marriage Status : Married Health Status : Excellence

EDUCATION

Pre University : Dalun Pittaya School , Bangkok ,1980-1982 University : King Mongkut’s Institute of Technology Thonburi,

Bangkok,Thailand (KMITT), Bachelor Degree in Production Engineering (1983-1988)

SPECIAL SKILLS AND CERTIFICATION

Page 2: Updated Weerawat

Curriculum Vitae Weerawat RATTANAMINGMONGKOL

: Languages - English, Chinese and Thai. : Computer – Microsoft Windows, Microsoft Office Package, Adobe

PhotoShop, Adobe Mage Maker, Scanning and Internet service, maintenance and repaired of the hardware of computer & compute accessories, office automations-fax serviced, etc.

: Destructive testing experiences for oil, gas and petrochemical projects: WPS/WPQR and WPQT

: Painting inspection experiences for oil, gas and petrochemical projects.: Certified of the UT level II Certification (SNT-TC-1A): Certified of the RT level II Certification (SNT-TC-1A): Certified of the RT level II Certification (EN 473 and ISO 9712): Certified of the MT/PT level II Certification (SNT-TC-1A): Certified of the ISO 9001: 2000 Certification (SGS): Certified of the CSWIP 3.0(Level I), 3.1 (Level II), Certification Scheme

for Welding and Inspection Personnel (CSWIP-TWI): Certified of the Open Water Drive Certification (PADI): Certification of Sea Survival Skills and Helicopter Underwater Escape Training (HUET): Certification of Basic Fire Fighting Training: Certificate of Advance Feng Shui : Senior Welding Inspector and Radiographic Interpreter, CSWIP 3.2+RI (CSWIP 3.2.2) (Level III): Safety Officer (Supervisory Level): BGAS CSWIP Painting Insp. 2/3: Safety Officer (Management Level): Safety Confine Space : OPRC Level I

QUALIFIED CERTIFICATIONS

Qualified of certification are shown as per below lists: Bachelor Degree Certification

- Certification No. MOE 5801.9/1865 Engineering License

- Certification No. PHO CHO 5905 Certification of Ultrasonic Testing Level II (ASNT-TC-1A) - Certification No. NDTC 009/1989 Certification of Surface Method Testing (MT&PT) Level II (ASNT-TC-1A) - Certification No. NDTC 064/1989 Certification of Radiographic Testing Level II (ASNT-TC-1A)

- Certification No. NDTC 038/1993 Certification of Radiographic Testing Level II (EN 473 and ISO 9712)

- Certification No. WIT-RT2-0046 Certification of internal auditing for ISO9001-2000 - Certification No.SGS.THSSC.QM-05.06.P.0003 Certification of welding inspector for CSWIP 3.0&3.1 (Level I & II)

- Certification No. 24100/2 (initial exam) and Renew No.68172 (initial exam) Certification of open water drive for PADI

- Certification No. 0411A10047 Certification of Sea Survival Skills and Helicopter Underwater Escape Training

(HUET)- Certification No. 08MT-0143

Certification of Basic Fire Fighting Training- Certification No. 08MT-0170

Certification of Senior Welding Inspector for CSWIP 3.2.2 (CSWIP3.2+RI) (Level III)- Certification No. 75918

Computer-MS Windows, MS office package, Adobe Photo Shop, Adobe Page Maker, etc. Workshop Training of IIF for Chevron Project (Ubon Project), Conducted by JMJ Associates Company. Safety Officer (Supervisory Level) by Siam Safety Company

- Certificate No. 13/04494 Safety Officer (Management Level) by PMC

- Certificate No. 153962

Page 2 of 23

Page 3: Updated Weerawat

Curriculum Vitae Weerawat RATTANAMINGMONGKOL

Safety Confine Space - Certificate No.CW-0111/58

OPRC Level I- Certificate of Oil Pollution Preparedness Response and Co-Operation Level I

BGAS CSWIP Painting Inspector 2/3, will attend year 2016 if any time course available.

WORK EXPERIENCES

SUMMARY:

Widely Professional International Works Experience:29 years CSWIP 3.1/3.2 Inspector/Coordinator/Expediter, QA/QC Manager, NDT/DT Manager for Project and Quality Control for Offshore and Onshore works in sector of Oil &Gas, Petrochemical, Power & Energy of Engineering, Procurement, Fabrication, Construction, Erection, Installation and Commissioning phases

WORKS EXPERIENCE:

PAE (THAILAND) PUBLIC COMPANY LIMITED: November 2015 to Present Promoted to Project Management Manager/Engineering Manager to function and responsibility; Managed of new all projects of Oil & Gas and Non-Oil & Gas Business in area are not covered by PAE Rayong, LanKabue and Songkhla Branch and Maintenance and Heavy Equipment Rental Service Manager for PAE Rayong and additional QA/QC Manger works responsibility

PAE (THAILAND) PUBLIC COMPANY LIMITED: June 2014 to Present- As QA/QC ManagerResponsibilities; Managed of all QA/QC works functions and responsibilities for PAE LanKaBue Branch Construction for PTTEP, Scope of works managed for Projects, MPF works (Mobile Production Facility) and MOD (Modification) works and Crude Storage Tank for scope of Civil works, Mechanical works and E&I works

For additional works responsibility - As QA/QC ManagerResponsibilities; Managed of all QA/QC works and functions and responsibilities for PAE SongKhla for setup of QA/QC department and drive of remaining works to Chevron (Client)- As QA/QC ManagerResponsibilities; Managed of all QA/QC works and function for PAE Rayong for many projects and clients: PTTME, PTTGC, PTTPL, etc.

TECHNIP ENGINEERING (THAILAND) LTD.: May, 2011 to June 2014As Senior Inspection EngineerResponsibilities; Managed/Supervised all inspectors/Performed all inspection and coordinating for procurement Department on Projects : Solvay-Dow Chemical Hydrogen Plant (Rayong), CCG HDS Thaioil Project (Chonburi), HTY Michelin Project (Songkhla), IRPC-EBSM Project (Rayong) and pearl oil (Manora project), HTY 7011 for Piping fabrication (QA/QC for piping fabrication at TET subcontractor for CS and SS ), Chevron for Ubon Project (CCP), FPSO-INPEX and some small EPC projects for :- Procurement processes and procedures to suit company or project specific requirements- Procurement schedule reporting to enable comprehensiveManagement;- Project specific procurement strategies to ensure all deliverables are meet requirements for example of project was detailed:- ICHTHYS FPSO project for inspection and expediting for fabrication, inspection and testing of WHRU 3 units at VIPCO, Inpex (Owner), Contractors (DSME/Technip Malaysia/GE/BIH/VIPCO), 3rd party for ASME certification by ABS and Classification Body of FPSO by DNV

STUDY OF FENG SHUI, FENG SHUI KNOWLEDGE CENTER (THAILAND): September, 2010 to April, 2011

Page 3 of 23

Page 4: Updated Weerawat

Curriculum Vitae Weerawat RATTANAMINGMONGKOL

Study of Feng Shui at Thailand Feng Shui knowledge center, Bangkok, Thailand

PTT EXPLORATION AND PRODUCTION PUBLISH COMPANY LIMITED (PTTEP): February, 2008 to August 2010 (2 ½ Years Contract)As Offshore/Onshore Fabrication and Installation QA/QC Responsibilities; Representative; Offshore/Onshore fabrication and installation for Arthit North development project, Arthit phase 1B project and Bongkot phase 3G/3H/4A project and Hook up works (Responsibility scope of CSR) Inspection of installation of Jacket/Deck/Sub sea pipeline installation and some hook up work were concerned below inspection scopes of work as per below• Cutting of sea fastening • Jacket, Pile and deck platform installation • Sub-sea Gas Pipeline installation including of riser installation and tie-in dog leg spools• Fabrication and Installation of dogleg pipe tie-in • Diving/ROV (Remote Operated Vehicle)• Pigging /Pressure testing of sub-sea pipeline• As Built Survey for pipeline, in charged work or scope of PTTEP Representative (CSR) position.• Bongkot Field Development well head platform WP12, in charged work scope of PTTEP’s Representative (CSR)• Bongkot Phase 3H (Onshore/Offshore Fabrication scope), WP23/WP24/WP25• Bongkot Phase 4A (Onshore/Offshore Fabrication scope), WPS1/2/3/4/5/6• Arthit North (Onshore Fabrication scope), AWP 3N• Arthit North Development AWP 3N• Pipeline installation Bongkot 3H/4A

SIEMENS LIMITED POWER GENERATION: March, 2007 – December, 2007 (10 Months Contract)As Project QA/QC Manager Responsibilities; Managed of all QA/QC function for construction project of EGAT Song-Khla Electrical Power Plant Project (Songkhla CCPP ), Thailand : EGAT - 750 MW Combined Cycle Power Plant.

CUEL LIMITED.: September, 2006 – February, 2007 (6 Months Contract)As Project QA/QC CoordinatorResponsibilities; Managed of Oversea/Local Inspection Service Department had responsibilities in the scope of project QA/QC Management, inspection of oversea and local for Wellhead Platform and Pipeline project for Pearl Oil (Thailand) Ltd. for Wellhead Platform and Pipeline for phase B, C, B2 Project and more Phases.

FOSTER WHEELER INTERNATIONAL (THAILAND) CORPORATION LTD.: November, 2004 to August, 2006 (End Project Contract)November, 2004 to January, 2006- As Senior Inspection / Expediting Coordinator Engineer Responsibilities; Managed of in the procurement and contracts engineering department was controlled all of the inspection and expediting responsibilities in EPC contract projects for oil, gas and petrochemical projects for FW Asia pacific.: February, 2006 to August, 2006- As Senior QA Engineer Responsibilities; Managed of QA Department - Audited of the internal auditing (Internal auditor) for all FW projects in the scope of ISO9001-2000 and SOX (Sarbanes Oxley) Testing Program for 6 main processes (Project Management & Control, Procurement, Disbursement, Financial, Revenue, Treasury), followed up the ISO 9001 internal audit by action needs for FW projects.

THAI OLEFINS PUBLIC COMPANY LIMITED (TOC) (PTT Global Chemical): March, 2003 to October, 2004 (20 months Contract)As QA/QC ManagerResponsibilities; Managed all of the contractors QA/QC functions for construction of fabrication, erection, installation, inspection and testing of ethylene plant expansion project, TOC (PTT Global Chemical) at Rayong.

DET NORSKE VERITAS (THAILAND) CO., LTD.: April, 2001 to Feb., 2003 (End Project Contract)As Surveyor

Page 4 of 23

Page 5: Updated Weerawat

Curriculum Vitae Weerawat RATTANAMINGMONGKOL

Responsibilities; Certified of the FPSO project (Floating production, storage and offloading) for ABB Oversea/Thailand projects for Sandje Berge Hus for water separation module project, water injection module project, sub-sea module project, Berge Helene module project - process separation module, Berge Arrow and LPG module and ships survey (Offshore) and etc.

OWN BUSINESS: October, 1997 to March, 2001As General Manager in computer business/nursery Responsibilities; Managed of the documentation, copying, nursery and stationery business

THAI NONDESTRUCTIVE CO., LTD.: October, 1996 to September, 1997 (1 Year Contract) As Branch Manager (Rayong)Responsibilities; Managed the business of the NDT/DT/Inspection/Testing/Consulting/QC Personnel supply for oil, gas and petrochemical projects and offshore project to many clients in Thailand.

EMCO SERVICE (THAILAND) LTD.: July, 1995 to September, 1996 (1 Year Contract)As Project QA/QC Engineer Responsibilities; Managed of QA/QC functions for Star Petroleum Refinery plant project (Rayong) and EGAT (FGD Plant-Fuel Gas Desulphurization project at Lam Plang Plant) and Mae Moh plant and VinyThai phase III project. (Rayong).

SAIPEM AUSTRALIAN PTY LTD.: July, 1994 to June, 1995 (1 Year Contract) As Welding InspectorResponsibilities; Responded of all project inspection works of welding, NDT, painting, wrapping for the underground pipelines (THAPP line project) from Sriracha to Saraburi.

SUMSUNG ENGINEERING CO., LTD.: July, 1993 to June, 1994 (1 Year Contract)As Tank EngineerResponsibilities; Controlled of overall constructions of fabrication, erection, installation, inspection and testing of the oil storage tanks 16 units at VIPCO fabrication shop and Bang-Pa In oil terminal site (Oil storage tank farm) for Bang Pa-In oil terminal project, Bang Chak Petroleum Co., Ltd.

BUREAU VERITAS (THAILAND) CO., LTD.: June, 1990 to May, 1993 (3 Years Contract)As Surveyor EngineerResponsibilities; Responded of Certification/Approval of the inspection, testing on behalf of certify body for the oil, gas and petrochemical projects and certification and approval of the dry cargo container manufacture, production for BV certifications.

SIWA TESTING INSPECTION & CONSULTANT CO., LTD.: May, 1987 to May, 1990 As Inspection EngineerResponsibilities; Responded of Project QA/QC Coordinator Engineer - Performed and managed inspection, testing, metallurgy in the oil, gas and petrochemical projects, project QA/QC coordinator for oil, gas and petrochemical project on behalf of STIC clients

STRENGHTSHard WorkingPersuasive Motivator and LeaderWelding, NDT, Multi Disciplines Inspection, QA/QC Control, Team Leader

LANGUAGESEnglish, StrengthThai, Strength

SKILL & EXPERTISE:All Conventional NDT(s) Level II and CSWIP Welding Inspection, QA/QC, Welding, Welding Inspection, NDT and QA/QC system

Page 5 of 23

Page 6: Updated Weerawat

Curriculum Vitae Weerawat RATTANAMINGMONGKOL

Tutor for QA/QC and Welding Inspection for International Course Exam

EDUCATION:Pre University : Dalun Pittaya School, Bangkok ,1980-1982University : King Mongkut’s Institute of Technology Thonburi, Bangkok, Thailand (KMITT), Bachelor Degree in Production Engineering (1983-1988)

INTERESTS:NDT, Welding Technology, Coaching and Tuition of Welding Inspection for Example of: Tutor for sharing:- How to read of fabrication and construction drawings- The meaning and use of welding Symbols in fabrication and construction drawings- The meaning and use of WPS/PQR and WQT- The meaning and writing of ITP

DETAIL OF WORK EXPERIENCES

June 2014 to Present

Joined with PAE (Thailand) Publish Company Limited

- All QA/QC works management for EPC and project contract services to PTTEP at S1 LanKrabue Kampangpet for scope of works PAE shop, installation and erection for S1 PTTEP, the scope of works are consisted ofProject, MPF, MOD Works- Civil Works - Mechanical Works; - Steel Structure, Piping, Equipments- E&I worksOver all Project Specification and Codes- PTTEP Project Specification- ASME- ANSI- AWS- BS/EN/ISO- ASTM- TOTAL Spec.- etc.

- All QA/QC works management for EPC and project contract services to many projects and clients for example of PTTME, PTTPL, PTTGC and etc. for scope of works PAE shop, installation and erection

- All project management and maintenance and heavy equipment rental services

May, 2011 to May 2014

Joined with Technip Engineering (Thailand), Ltd. as Senior Inspection Engineer

Responsibilities:

All inspection and coordinating for procurement department on all projects : Solvay-Dow Chemical Hydrogen Plant (Rayong) , CCG HDS Thaioil Project (Chonburi), HTY Michelin Project (Songkhla), IRPC-EBSM Project (Rayong, PEARL Oil, etc and are details as:

Managed all inspection in procurement projects, supervise all inspection engineers for their inspection and coordinating for procurement department for TET overall EPC/M projects : Solvay-Dow Chemical Hydrogen Plant (Rayong) , CCG HDS Thaioil Project (Chonburi), HTY Michelin Project (Songkhla), IRPC-EBSM Project (Rayong), PEARL Oil, etc. and include of perform inspection and coordination for biggest project in procurement and 4 ½ months for extra responsibility for construction phase HTY project, QA/QC control and manage of piping pipe support fabrication at TET piping subcontractor at Rayong shop

OBJECTIVES:

Page 6 of 23

Page 7: Updated Weerawat

Curriculum Vitae Weerawat RATTANAMINGMONGKOL

• Primary responsibility is to Inspection , Supervise and Coordinate the implementation of Procurement specific QMS to overall procurement projects• Assure the required safety, quality and productivity for a given project is achieved in accordance with the Company GO-HES guidelines, specifications, international standards and inspection procurement project goals & KPI’s. • Ensure all equipment and associated components are produced and or fabricated in accordance with Company project requirements, approved design, procedures, standards and specifications; by monitoring and witnessing given activities, so that the projects are delivered successfully in HES, Quality and Schedule aspects at the most cost effective.

RELATIONSHIPS:

• FUNCTIONAL: Interact with Client (Owner)/Company/Vendor , engineering, and technical services, Procurement, , Asset Teams, Internal Group, Logistics and HES groups and or include Technip group and or #rd party company for any inspection in local and oversea countries

• EXTERNAL: Technip Group and or 3rd Party Company regarding technical/quality information, queries and services.

MAJOR RESPONSIBILITIES AND DUTIES:

1) Safety:

• Follow Company QHES Policies and ensure Vendor adhere to QHES Plan as required by the contract.

• Promptly report Injuries, Incidents happened in vendor shop and liaise with QHES Officer/Specialist.

• Proactively Lead and Participate in QHES Activities • Ensure adherence to Company, Department and Project QHES requirements.• Report to Project Manager any non-compliance for may occur during fabrication.

Deliverables • Coordinating and cooperate of deliverables of equipment to vendor and TET expeditors

2) Quality / Inspections:

• Follow Company Quality Procedures and Specifications as required for the Projects.• Attend Inspection meeting and report/document any quality issues together with

recommendations for both corrective action/s and preventative action/s with vendor/procurement/engineering/project team

• Provide early warning signs of potential quality problems.• Participate in periodic audits of the contractor’s Inspection system.• Ensure all records of quality issues are documented correctly and closed out in a timely

manner.• Liaise with Vendor Quality Department to improve quality process.• Ensure Vendor Quality Team adheres to approved Quality Plan as required by contract.• Verify required documentation such as traceability and weld history sheets, Inspection

verifications (as per ITP), review of NDT reports/graphs, Inspection Assignments, Punch-lists etc.

• Ensure that approved ITP's and procedure are complied with for all aspects of the project requirements.

• Ensure adherence to Company and Project Quality Requirements.• Verification of material certification and compliance.• Regular infield verification of Welding Procedure Specification application.• Identify any incomplete items for punch listing (OWL).

Deliverables :

• Weekly summary of inspection concerns raised.• Advise weekly on status of vendor issues and NCR’s.• Raising, reporting and follow up to closure of all Company NCR’s.• Complete actions identified for Company personnel at the Inspection Meetings.

3) Productivity:

Page 7 of 23

Page 8: Updated Weerawat

Curriculum Vitae Weerawat RATTANAMINGMONGKOL

• Coordination and cooperation to vendor and TET Expeditors for equipment schedule are maintained and achieved target completion date

• Coordination and cooperation to vendor and TET Expeditors for progress report (Baseline, Actual & Forecast) are accurate and provide concern/recommendation for problems in advance. Verify reported progress each week by spot check of scheduled activities, i.e., if 80% of piping spool reported complete, verify on project.

• Liaise with Company Procurement, Engineering, and Asset Teams when assessing impact of Change(s).

• Monitor vendor performance and collaborate work to improve productivity.

Deliverables :

• Inspection report highlighting projects reported progress, OWLs/NCRs, major activities completed or in progress, Incidents/Injuries for that period (if any) and any concerns.

• Verification of disciplined activities on Technip Group and or 3rd party company timesheets for Inspection visit issued by Company.

• Ensure non-conformances are identified, tracked and closed out prior to acceptance of work.

4) Management & Communication:

• Provide leadership/expertise in for the overall project relative to Inspection in order to resolve and prevent quality problems..

• Ensure effective communication both within Inspection engineer team and vendor/Technip group/3rd party company.

• Build integrated team relationship with Inspection Engineer and related parties • Lead, Coach and Evaluate Inspection engineer to improve both inspection technical

knowledge and reporting skill, etc• Liaise with Procurement, Engineering and Asset teams to achieve Project Goals.• Ensure Department and Project Goals are communicated and develop plan for inspection

Engineers to support.• Perform duties in accordance with the requirements of the Company Compliance Policies.• Report and communicate to all parties any non-compliance to Company Policies

February, 2008 – September, 2010:Joined with PTT Exploration and Production Publish Company Limited as Offshore/Onshore Fabrication and Installation QA/QC RepresentativeProject: Northern Arthit Development Project, Arthit Phase 1B Project and Bongkot Phase 3G project (Arthit and Bongkot Field in Gulf of Thailand), Bongkot 3H/4A Projects, Some hook up work for Bongkot and Arthit for development field projects and Onshore fabrication inspection of WHP at TNS Bangpakong/Amara yard siteThird Party’s : Steel structure by ABS Consultant Company, Marine warranty by Global Marine CompanyMain Contractor : Nippon Steel Engineering Co.,Ltd., Thai Nippon Steel Engineering Co.,Ltd. And NSEC’s Sub-contractors On board K1 Barge, K2 Barge NSC Subcontractors : Survey work (Leveling, ROV,SSS, Survey) by FUGRO Subsea Services Pte., Ltd., Diver and Saturated diving by OWA company and NDT by OPI and OTI, Coating by OJS, Pile driving by SMG(Menck) and As built survey by( NSC) Setouchi surveyor vessel and etc.Position: Offshore Installation Inspector Scope of Responsibilities: Inspection of installation of below scope

Well Head Platform AWP-1N (Arthit North Project)

- Installation of Jacket type 4 legs Ø 42" with through leg pile, dimension 76.20M x76.20 M.x491.38 Tons

- Installation of Pile type Pipe size Ø 36 "- Installation of Deck Platform type 4 legs Ø 36"x 540.52 Tons- QA/QC audit :

QA/QC personnel, QA/QC specification and procedure including of QA/QC documentationWPS/WPQR/WPQT, Welding equipment and facilitiesNDT specification and procedure including of personnel and equipment

Page 8 of 23

Page 9: Updated Weerawat

Curriculum Vitae Weerawat RATTANAMINGMONGKOL

Painting specification and procedure including of personnel and equipment and procedure including of personnel and equipment and including of ROV survey under the sea (Jacket anode survey and bed sea condition

Gas Exporting pipeline, EGP (Arthit North Project)

- Installation of gas export pipelines (sub sea) API 5L-X65 Ø 18"x 12.7 mm. thickness X concrete and FBE coating (FPSO Inlet(Export) PLEM to Arthit PLEM) 38.055 Km at (pipeline end manifold point )

- QA/QC audit :QA/QC personnel, QA/QC specification and procedure including of QA/QC documentationWPS/WPQR/WPQT, Welding equipment and facilitiesNDT specification and procedure including of personnel and equipmentPainting specification and procedure including of personnel and equipment by Heat Shrink SleevePigging, Chemical treatment, Hydrostatic test specification and procedure including of personnel and equipment including of ROV survey under the sea for survey of pipe profile including of condition of the bed sea and positioning of existing of pipeline and cable for installation of temporary protector for across the existing pipeline, existing cable line

Well Head Platform AWP7 (Arthit 1B Project)

- Installation of Jacket type 4 legs Ø 42" with through leg pile, dimension 76.20M x76.20 M.x491.38 Tons

- Installation of Pile type Pipe size Ø 36 "- Installation of Deck Platform type 4 legs Ø 36"x 540.52 Tons- QA/QC audit :

QA/QC personnel, QA/QC specification and procedure including of QA/QC documentationWPS/WPQR/WPQT, Welding equipment and facilitiesNDT specification and procedure including of personnel and equipmentPainting specification and procedure including of personnel and equipment and procedure including of personnel and equipment and including of ROV survey under the sea (Jacket anode survey and bed sea condition

Gas Pipeline (Arthit Phase 1B Project)

- Installation of gas pipelines (sub sea) API 5L-X52 Ø 16"x 15.9 mm. thickness X concrete coating and FBE coating, GL 10 (From AWP 4 to AWP 10 at pipeline end manifold point) length 6.5 Km

- QA/QC audit :QA/QC personnel, QA/QC specification and procedure including of QA/QC documentationWPS/WPQR/WPQT, Welding equipment and facilitiesNDT specification and procedure including of personnel and equipmentPainting specification and procedure including of personnel and equipment by Heat Shrink SleevePigging, Chemical treatment, Hydrostatic test specification and procedure including of personnel and equipment including of ROV survey under the sea for survey of pipe profile including of condition of the bed sea and positioning of existing of pipeline and cable for installation of temporary protector for across the existing pipeline, existing cable line

Well Head Platform AWP-2N (Arthit North Project)

- Installation of Jacket - Installation of Pile - Installation of Deck Platform 4 legs- QA/QC audit :

QA/QC personnel, QA/QC specification and procedure including of QA/QC documentationWPS/WPQR/WPQT, Welding equipment and facilitiesNDT specification and procedure including of personnel and equipmentPainting specification and procedure including of personnel and equipment and procedure including of personnel and equipment and including of ROV survey under the sea (Jacket anode survey and bed sea condition

Page 9 of 23

Page 10: Updated Weerawat

Curriculum Vitae Weerawat RATTANAMINGMONGKOL

Riser Pipe Ф16 ² installation for AWP5 (Arthit North Project)

- Installation of riser pipe at the AWP 5- QA/QC audit :

QA/QC personnel, QA/QC specification and procedure including of QA/QC documentationWPS/WPQR/WPQT, Welding equipment and facilitiesNDT specification and procedure including of personnel and equipmentPainting specification and procedure including of personnel and equipment and procedure including of personnel and equipment and including of ROV survey under the sea (Jacket anode survey and bed sea condition

Gas Pipeline Ф16 ² GL 1N (from AWP1N to AWP5) (Arthit North Project)

- Installation of gas pipelines (sub sea) API 5L-X52 Ø 16"x 15.9 mm. thickness X concrete coating and FBE coating (from AWP 5 to AWP 1N at pipeline end manifold point) length 13.35 Km

- QA/QC audit :QA/QC personnel, QA/QC specification and procedure including of QA/QC documentationWPS/WPQR/WPQT, Welding equipment and facilitiesNDT specification and procedure including of personnel and equipmentPainting specification and procedure including of personnel and equipment by Heat Shrink SleevePigging, Chemical treatment, Hydrostatic test specification and procedure including of personnel and equipment including of ROV survey under the sea for survey of pipe profile including of condition of the bed sea and positioning of existing of pipeline and cable for installation of temporary protector for across the existing pipeline, existing cable line

Gas Pipeline Ф16 ² (Bongkot 3G Project))

- Installation of gas pipelines (Severe Sour Sub Sea Line) API 5L-X52 Ø 16"x 15.9 mm. thickness X concrete coating and FBE coating and 3LPP (From SPP to BWP 22 by tie off wire method) length 14.50 Km by Tie off wire method lay

- QA/QC audit :QA/QC personnel, QA/QC specification and procedure including of QA/QC documentationWPS/WPQR/WPQT, Welding equipment and facilitiesNDT specification and procedure including of personnel and equipmentPainting specification and procedure including of personnel and equipment by Heat Shrink SleevePigging, Chemical treatment, Hydrostatic test specification and procedure including of personnel and equipment including of ROV survey under the sea for survey of pipe profile including of condition of the bed sea and positioning of existing of pipeline and cable for installation of temporary protector for across the existing pipeline, existing cable line

Well Head Platform WP22 (Bongkot 3G Project)

- Installation of Jacket 48 ² total weight 605 MT- Installation of Pile 42 ²- Installation of Deck Platform 4 legs total weight 615 MT- QA/QC audit :

QA/QC personnel, QA/QC specification and procedure including of QA/QC documentationWPS/WPQR/WPQT, Welding equipment and facilitiesNDT specification and procedure including of personnel and equipmentPainting specification and procedure including of personnel and equipment and procedure including of personnel and equipment and including of ROV survey under the sea (Jacket anode survey and bed sea condition

Gas Pipeline 16 ² tie in dog leg (Bongkot 3G Project)

- Fabrication and Installation of tie in dogleg at B3G-WP 22 and B3G-SPP Risers- Pigging and hydrotest

Gas Pipeline (Arthit Phase 1B Project)

Page 10 of 23

Page 11: Updated Weerawat

Curriculum Vitae Weerawat RATTANAMINGMONGKOL

- Installation of gas pipelines (sub sea) API 5L-X52 Ø 16"x 15.9 mm. thickness X concrete coating and FBE coating (GL 9 PL, from AWP 9(not yet installation) to AWP 6), Pipe length 10.4 Km

- QA/QC audit :QA/QC personnel, QA/QC specification and procedure including of QA/QC documentationWPS/WPQR/WPQT, Welding equipment and facilitiesNDT specification and procedure including of personnel and equipmentPainting specification and procedure including of personnel and equipment by Heat Shrink SleevePigging, Chemical treatment, Hydrostatic test specification and procedure including of personnel and equipment including of ROV survey under the sea for survey of pipe profile including of condition of the bed sea and positioning of existing of pipeline and cable for installation of temporary protector for across the existing pipeline, existing cable line

Riser Pipe Ф16 ² installation at APP Platform (Arthit 1B Project)

- Installation of riser pipe at the APP- QA/QC audit :

QA/QC personnel, QA/QC specification and procedure including of QA/QC documentationWPS/WPQR/WPQT, Welding equipment and facilitiesNDT specification and procedure including of personnel and equipmentPainting specification and procedure including of personnel and equipment and procedure including of personnel and equipment and including of ROV survey under the sea (Jacket anode survey and bed sea condition

Gas Pipeline (Arthit Phase 1B Project)

- Installation of gas pipelines (sub sea) API 5L-X52 Ø 16"x 15.9 mm. thickness X concrete coating and FBE coating (GL 7 PL, from APP(not yet installation) to AWP 7), Pipe length 3.7 Km

- QA/QC audit :QA/QC personnel, QA/QC specification and procedure including of QA/QC documentationWPS/WPQR/WPQT, Welding equipment and facilitiesNDT specification and procedure including of personnel and equipmentPainting specification and procedure including of personnel and equipment by Heat Shrink SleevePigging, Chemical treatment, Hydrostatic test specification and procedure including of personnel and equipment including of ROV survey under the sea for survey of pipe profile including of condition of the bed sea and positioning of existing of pipeline and cable for installation of temporary protector for across the existing pipeline, existing cable line

Well Head Platform AWP 9 (Arthit 1B Project)

- Installation of Jacket 48 ² total weight 483 MT- Installation of Pile 42 ²- Installation of Deck Platform 4 legs total weight 506 MT- Fabrication and installation of dog leg spool pipes - QA/QC audit :

QA/QC personnel, QA/QC specification and procedure including of QA/QC documentationWPS/WPQR/WPQT, Welding equipment and facilitiesNDT specification and procedure including of personnel and equipmentPainting specification and procedure including of personnel and equipment and procedure including of personnel and equipment and including of ROV survey under the sea (Jacket anode survey and bed sea condition

Gas Pipeline 16 ² tie in dog leg spools and tie in to APP riser and AWP 7 riser (Arthit 1B Project)

- Fabrication and Installation of tie in dogleg at APP platform risers- Pigging and hydrotest( APP-AWP7)

Subsea Gas Pipeline As Built Survey

As built sea line survey by Setouchi Surveyor ROV (by FUGRO Survey Ltd.) (by USBL and DGPS system)

Page 11 of 23

Page 12: Updated Weerawat

Curriculum Vitae Weerawat RATTANAMINGMONGKOL

Scope of inspection of as built survey, Worked for scope of PTTEP Representative (CSR) on board Setouchi Surveyor Vessel, scope of owner responsibilities:

- Survey of the location of the pipeline and anodes- Survey of the damaged to the pipeline, i.e. coating and anodes- Survey of the location and dimensions of the free span- Survey of the location and identification of any debris- Survey of the Cathodic Potential survey for Cathodic protection (CP) of the anode if applied

The pipe line were performed inspection of as built survey as per lines below- Arthit North, Gas Export Pipeline (Arthit PLEM to FPSO PLEM), 18² X 38.05 Km- Arthit 1B, GL9 Pipeline (AWP9 to AWP6), 16² X 10.4 Km- Arthit 1B, GL10 Pipeline (AWP4 to AWP10), 16² X 6.4 Km- Arthit North, GL1N Pipeline (AWP1N to AWP5), 16² X ,13.35 Km- Arthit 1B, GL7 Pipeline (APP to AWP7), 16² X 3.7Km- Bongkot 3G, SL22 Pipeline (SPP to WP22), 16² X 14.5 Km-

Bongkot Field Development Project Phase 3G

Installation of Offshore development of pig trap for WP 12, Worked for scope of PTTEP Representative (CSR) on board for WP12 project, scope of work responsibilities

- Installation of new extension deck on East and North side for supporting of Pig receiver system, piping, ESDV and access way

- Installation of extension piping, Pig receiver piping system and associated piping facilities - Installation of extension E&I- Inspection and testing of all scope of works

Gas Pipeline (Arthit North Project)

- Installation of gas pipelines (sub sea) API 5L-X52 Ø 12"x 13.5 mm. thickness X concrete coating and FBE, field joint coated by WPC100/LPP coating, field joint coated by PPS 120 M(GL 2N, from AWP 2N to AWP 1N), Pipe length 6.38 Km

- QA/QC audit :QA/QC personnel, QA/QC specification and procedure including of QA/QC documentationWPS/WPQR/WPQT, Welding equipment and facilitiesNDT specification and procedure including of personnel and equipmentPainting specification and procedure including of personnel and equipment by Heat Shrink SleevePigging, Chemical treatment, Hydrostatic test specification and procedure including of personnel and equipment including of ROV survey under the sea for survey of pipe profile including of condition of the bed sea and positioning of existing of pipeline and cable for installation of temporary protector for across the existing pipeline, existing cable line

Well Head Platform AWP 10 (Arthit 1B Project)

- Installation of Jacket 42 ² total weight 480 MT- Installation of Pile 36 ²- Installation of Deck Platform 4 legs total weight 506 MT- Fabrication and installation of dog leg spool pipes - QA/QC audit :

QA/QC personnel, QA/QC specification and procedure including of QA/QC documentationWPS/WPQR/WPQT, Welding equipment and facilitiesNDT specification and procedure including of personnel and equipmentPainting specification and procedure including of personnel and equipment and procedure including of personnel and equipment and including of ROV survey under the sea (Jacket anode survey and bed sea condition

Gas Pipeline 16 ² tie in dog leg spools and tie in to AWP4 riser and AWP 10 riser (Arthit 1B Project)

Page 12 of 23

Page 13: Updated Weerawat

Curriculum Vitae Weerawat RATTANAMINGMONGKOL

- Installation of Riser 16² at the AWP 4/AWP10- Fabrication and Installation of tie in dogleg at AWP4/AWP10 platform risers- Swabbing and hydrotest dogleg at AWP4/AWP10

Gas Pipeline (Bongkot 3G Project)

- Installation of gas pipelines (Severe Sour Sub Sea Line) API 5L-X42 Ø 12"x 13.5 mm. thickness X concrete coating and FBE, field joint coated by WPC100/LPP coating, field joint coated by PPS 120 M(GL 21, from BWP 21 to BWP 12), Pipe length 14.38 Km ., Offshore site installation of anode and coating by liquid epoxy and Spatula

- QA/QC audit :QA/QC personnel, QA/QC specification and procedure including of QA/QC documentationWPS/WPQR/WPQT, Welding equipment and facilitiesNDT specification and procedure including of personnel and equipmentPainting specification and procedure including of personnel and equipment by Heat Shrink SleevePigging, Chemical treatment, Hydrostatic test specification and procedure including of personnel and equipment including of ROV survey under the sea for survey of pipe profile including of condition of the bed sea and positioning of existing of pipeline and cable for installation of temporary protector for across the existing pipeline, existing cable line

Well Head Platform WP 21 (Bongkot 3G Project)

- Installation of Jacket 48 ² total weight 677MT- Installation of Pile 42 ²- Installation of Deck Platform 4 legs total weight 670 MT- Fabrication and installation of dog leg spool pipes - QA/QC audit :

QA/QC personnel, QA/QC specification and procedure including of QA/QC documentationWPS/WPQR/WPQT, Welding equipment and facilitiesNDT specification and procedure including of personnel and equipmentPainting specification and procedure including of personnel and equipment and procedure including of personnel and equipment and including of ROV survey under the sea (Jacket anode survey and bed sea condition

Gas Pipeline 12 ² (Bongkot 3G Project)

Fabrication and installation of tie in dog leg spools and tie in to WP 21 riser and WP 12 riser and Installation of riser 12 ² at WP 12 (Bongkot 3G Project) - Installation of riser 12 ² at WP 12- Fabrication and installation of tie in dogleg at WP21/WP12 - Pigging and hydrotest of pipeline from WP 12 to WP21- Installation of gas pipelines (Severe Sour Sub Sea Line) API 5L-X52Ø 16"x 13.5 mm. thickness X

concrete coating and FBE, field joint coated by WPC100/LPP coating, (GL 8, from AWP 5 to AWP 8), Pipe length 2.8 Km ., Offshore site installation of anode and coating by liquid epoxy and Spatula

- QA/QC audit :QA/QC personnel, QA/QC specification and procedure including of QA/QC documentationWPS/WPQR/WPQT, Welding equipment and facilitiesNDT specification and procedure including of personnel and equipmentPainting specification and procedure including of personnel and equipment by Heat Shrink SleevePigging, Chemical treatment, Hydrostatic test specification and procedure including of personnel and equipment including of ROV survey under the sea for survey of pipe profile including of condition of the bed sea and positioning of existing of pipeline and cable for installation of temporary protector for across the existing pipeline, existing cable line

Well Head Platform AWP 8 (Arthit 1B Project)

- Installation of Jacket 42 ² total weight 510 MT- Installation of Pile 36 ²- Installation of Deck Platform total weight 549 MT

Page 13 of 23

Page 14: Updated Weerawat

Curriculum Vitae Weerawat RATTANAMINGMONGKOL

- Fabrication and installation of dog leg spool pipes - QA/QC audit :

QA/QC personnel, QA/QC specification and procedure including of QA/QC documentationWPS/WPQR/WPQT, Welding equipment and facilitiesNDT specification and procedure including of personnel and equipmentPainting specification and procedure including of personnel and equipment and procedure including of personnel and equipment and including of ROV survey under the sea (Jacket anode survey and bed sea condition

Gas Pipeline Dog Legs 16 ² (Arthit 1B Project)

Fabrication and installation of tie in dog leg spools and tie in to AWP 8 - Installation of riser 16 ² - Fabrication and installation of tie in dogleg at AWP5/AWP 8 - Pigging and hydrotest of pipeline from AWP 8 to end of pipe line at AWP PLEM( no tie-in to AWP

PLEM)

Onshore Fabrication for Bongkot Phase 3H/4A and Arthit North

Inspection for onshore fabrication Deck and platform for Bongkot Phase 3H/4A: AWPS1, WPS2, WPS3, WPS4, WPS5, WPS6 and AWP 3N

Gas Pipeline installation for Arthit North and Bongkot 3H/4A (K2)

- Installation of gas pipelines (Severe Sour Sub Sea Line) API 5L- QA/QC audit :

QA/QC personnel, QA/QC specification and procedure including of QA/QC documentationWPS/WPQR/WPQT, Welding equipment and facilitiesNDT specification and procedure including of personnel and equipmentPainting specification and procedure including of personnel and equipment by Heat Shrink SleevePigging, Chemical treatment, Hydrostatic test specification and procedure including of personnel and equipment including of ROV survey under the sea for survey of pipe profile including of condition of the bed sea and positioning of existing of pipeline and cable for installation of temporary protector for across the existing pipeline, existing cable line : Gas pipeline Installation by K2 for

- 12 ² GL3N (4.3 Km), AWP3N to AWP5 PLEM- 22 ² SL03 (35.9 Km), PPS to WPS3- 18 ² SL06 (3.7 Km), WPS3 to WPS6- 18 ² SL04 (14.6 Km), WPS4 to PPS- 18 ² SL02 (16.7 Km), PPS to WPS2

Year 2010 activitiesK1

- Arthit GL5 PLEM installation (Arthit North Project)- Arthit GL5 PLEM Tie-in pipe pools at GL5 PLEM(Arthit North) : GL 8(16”), GL 5(North)(16’),

GL3N(12”), GL5PLEM(South)(16’) - Bongkot 3H Project : Pipeline GL-SL23(WP7 to WP23), 16”x19.1 mm., API 5L X65, 3LPP-Length

11.3 Km- Bongkot 3H Project : Pipeline-GL-SL24(WP24 to WP22), 12”x15.9 mm., API 5L X65, 3LPP-

Length 4.8 Km- Bongkot 4A Project : Installation of well head platform WPS1:

- Installation of Jacket 48 ² x 4 legs total weight 564 MT- Installation of 42 ² Piles - Installation of Deck Platform total 4 legs of 42 ² and weight 637 MT- Installation of 26 ² of Conductor piles- Fabrication, installation of dog leg spool pipes

- Bongkot 3H Project : Installation of well head platform WP23-24-25- Installation of Jacket 42 ² x 4 legs total weight 514 MT- Installation of 36 ² Piles - Installation of Deck Platform total 4 legs of 36² and weight 617 MT

Page 14 of 23

Page 15: Updated Weerawat

Curriculum Vitae Weerawat RATTANAMINGMONGKOL

- Fabrication, installation of dog leg spool pipes for SL 23(16²) (WP7 to WP 23), SL24 (12²) (WP22 to WP 24), SL25 12²) (WP11 to WP25)

- Bongkot 4A Project : Installation of well head platform WPS6, WPS5:- Installation of Jacket 48 ² x 4 legs total weight 564 MT- Installation of 42 ² Piles - Installation of Deck Platform total 4 legs of 42 ² and weight 637 MT

- Bongkot 4A Project : Pipeline-GL-CEP(PPS to FSO2), 8”x9.5 mm., API 5L X65, 3LPP-Length 83.5 Km

Page 15 of 23

Page 16: Updated Weerawat

Curriculum Vitae Weerawat RATTANAMINGMONGKOL

March, 2007 – January, 2008:

Joined with SEMENS Limited Power Generation as Project QA/QC ManagerThe project QA/QC Manager are responsibilities overall site management in the quality management and quality control applied to on site erection and commissioning activities The main duties and responsibilities of project QA/QC Manager are more the following essentiallyScope of Responsibilities:

The specific responsibilities of the project QA/QC Manager Advising overall site manager as well as site managers of consortium member’s

and on demand of overall site Manager supports to achieve. Realization of agreed quality management system on site (planning and

performance of audits of consortium member) at project site including tracking of deviations/nonconformance detected as well) and providing support for internal audits.

Administration of corrective action reports(CAR) and Nonconformance report (NCR), monitoring (Advising) sub-suppliers and consortium members for compliance with quality management systems requirements, quality controls shall be carried out corresponding with released project specific field quality plans as well as dates for execution given by the relevant site Manager, one area of emphasis shall be the performance and inspection of welding, ensure information and experience feed back covering the QA/QC scope of responsibilities

Reporting on QA/QC activities within the frame work of weekly and monthly reports by sit management.

Monitoring performance of welding inspection and nondestructive examinations corresponding with released project specific field quality plans and performance of future QC activities coordinated and agreed with overall site management

Ensuring compliance with the requirements, regulations and procedures governing occupational health & safety and environmental protection

Coordinating and driving compilation of technical site documentation Coordinating and monitoring document controlling of design documentation at the

project site as well as set up and management of a site archive. Maintaining direct contact with the customer’s designates representative at the

project site for the purpose of achieving immediate and non-bureaucratic clarification of general on site problems of quality management

Coordination with third party organization in acceptance testing. Coordination with respect to QA/QC of consortium members at the project site.

September, 2006 - February, 2007:

Joined with CUEL Limited as Project QA/QC Coordinator, Attend and coordinated of all inspections for CUEL clients for offshore project in oversea and local Pearl Oil (Thailand) Ltd.

Scope of Responsibilities:The project QA/QC coordinator reports directly to the project manager and QA/QC Inspection

services manager. He is assigned to the project team to oversee the implementation of this project quality plan, shall be responsible for directing, implementing, improving and verifying effectiveness of quality systems and control verification during the project.

The specific responsibilities of the project QA/QC coordinator:

Ensure implementation of project quality plan for the project to ensure quality compliance.

Initiate quality awareness within the project team.

Review and comment on company and subcontractors project procedural documents addressing the control and verification methods which may affect quality conformance to specification requirements.

Analyze and advise on quality requirements for the project.

Page 16 of 23

Page 17: Updated Weerawat

Curriculum Vitae Weerawat RATTANAMINGMONGKOL

Ensure all necessary document preparation is completed by all concerned prior to work execution (as required).

Oversee QA/Inspection services functions for the project to ensure efficient control is implemented and maintained within the Project.

Prepare and submit project data book (PDB) index to the client for approval.

Report and update the progress status of corrective actions required as identified by PRNCA’s raised also verify PRNCA completion to QA Engineer.

Report any client complaints, in regards to quality, to the project Manager through meetings or by e-mail, in order to ensure the appropriate action or improvement is implemented in an effective manner.

Expedite project specific procedural documents and report the submission and approval status to project Team.

Organize with QA engineer for project quality audit program and compile audit reports for submission to the project manager and client.

Ensure client specifications and project specific specifications are kept up to date in the CUEL project drive.

Ensure project specific documentation is updated as required in CUEL project internal drive location for the project.

November, 2004 – August, 2006:

Joined with Foster Wheeler International Corporation, Thailand branch as Senior Inspection / Expediting Coordinator Engineer, Attend and coordinated of all inspections and expediting for all EPC projects in the procurement & contracts engineering department for the Oil Gas Petrochemical Industry plants.

: As Senior Inspection & Expediting Coordinator Engineer Liaoyang Petrochemical Company, LYPC530KMT/A PTA project (EPC) in China: As Senior Inspection & Expediting Coordinator Engineer Oriental Petrochemical (Shanghai) Corp. PTA plant, OPC PTA project

in China: As Senior Inspection & Expediting Coordinator Engineer PTT GSP-1, Ethane recovery improvement project (EPC), Rayong in Thailand: As Senior Inspection & Expediting Coordinator Engineer Indorama Petrochemical Limited, Indorama PTA plant project (EPC),

Rayong in Thailand : As Senior Inspection & Expediting Coordinator Engineer

EPC projects in future.: As Senior QA Engineer In the QA Department for - Internal audited (Internal auditor) of ISO9001-2000 for PDS Modelling

service for Ju'aymah gas plant expansion project in Saudi Arabia.- Internal audited of Sarbanes Oxley year 2006 at FW Thailand in 6 main

processes (Project Management & Control, Procurement, Disbursement, Financial, Revenue, Treasury)

- Followed up the ISO 9001 internal audit by action needs for FW as EPC/PMC/FEED projects.

Scope of Responsibilities: Prepared/Coordinated of all related inspection and expediting

documentations (specifications and relevant documentations) for all inspections and expediting to inspections and expediting agency/FW reading to carry out the inspection and expediting to FW supplier

Page 17 of 23

Page 18: Updated Weerawat

Curriculum Vitae Weerawat RATTANAMINGMONGKOL

fabrication shop for all scope of inspections and expediting by each purchase order

Reviewed the inspection and expediting reports before distribute to concerned buyer and engineering disciplines and owner for

approval. Revised and approved the invoices for inspections and expediting from FW/inspection agencies Prepared of the ISO 9001-200 for internal auditing schedule, internal

auditing check list and attend the internal auditing/complete reporting for the FW projects

etc.Contractors:

Moody International in around the world authorizations. FW Reading at UK FW suppliers and venders in around the world.

Specifications: ASME, AWS, API, ANSI, BS, BS-EN, BS-PD, ISO, SSPC, FW spec, Client's spec, Project spec and etc.

Others: Certified in the internal auditing of ISO 9001-2000 , Certification from

SGS. Certified in the welding inspection certification of CSWIP 3.1(Level II),

Certification Scheme for Welding and Inspection Personnel (CSWIP 3.1 from Mermaid Maritime Ltd.)

Certified in the radiographic testing level II (EN 473 and ISO9712), Certification from Welding Institute of KMITNB Thai – French.

Plan to certify of Certification Scheme for Welding and Inspection Personnel (Senior CSWIP 3.2 from Mermaid Maritime Ltd.)

March, 2003 – October, 2004:

Joined with Thai Olefins Public Company Limited. as Project QA/QC Manager, Controlled the overall of construction project quality for olefins expansion plant project :

Project : Thai Olefins Ethylene expansion plant projectOwner’s : Thai Olefins Public Company Limited

Main Contractors of Project: Consortium of Chiyoda Corporation Limited and Halliburton Energy

Service, Inc.

Sub Contractor of Project: STECON (Sino Thai Engineering and Construction) Co., Ltd. f or piping and steel structure scopes. Unimit Engineering Co.,Ltd. for fabrication of pressure vessel 31 units Nippon Express Co., Ltd. for erection of construction scopes. Slot Nankai Company Limited for fabrication of convection modules Unithai Shipyard Co., Ltd. for fabrication of radiant modules EMCO (Thailand) Co., Ltd. for fabrication of module for radiant

modules Thai Rotary Co., Ltd. for fabrication of equipment platform And etc.

Scope of Responsibilities: : Managed and controlled the overall quality of the fabrication, construction

and erection of project as QA/QC ManagerSpecifications

: ASME sec I, II , V , VIII and sec IX AWS D1.1

AISC

Page 18 of 23

Page 19: Updated Weerawat

Curriculum Vitae Weerawat RATTANAMINGMONGKOL

ASME/ANSI B31.1/B31.3/B16.5 TOC and Chiyoda specifications and etc.

April, 2001 – February, 2003:

Joined with Det Norske Veritas (Thailand) Co.,Ltd. as Surveyor Engineer, Controlled of the oversea project for clients by following job responsibilities :

- April, 2001 - September, 2001:Project Scope:

Sandje Berge Hus water injection module project M50,M25-26 Sandje Berge Hus water separation module project M11, M27-29 Sandje Berge Hus modified module project M10, M21-24(Inlet manifold

module),M30(Flare module ) Sandje Berge Hus sub sea module project M70 (Facility module)

Consulting and Approval Agency: DNV OS (Norway) + DNV (Thailand)

Owner’s : Triton Energy Ltd.(Norway)Main Contractor of Project:

ABB Offshore System AS + ABB THSub Contractors of Project:

STP&I Co., Ltd. for pressure vessel , piping ,module platform steel structure ABB limited for E&I scopes ST Contemp Co., Ltd. for control room units

Scope of Responsibilities:: Supervised the project as consulting and Approval for owner’s

Specifications : ASME sec V , sec VIII , sec IX BS 5500(PD 5500) EN 287, EN288

NORSOK (Norwegian spec.) ASME/ANSI B31.1/31.3

DNV offshore specificationScope of Project

: Pressure vessels, piping, equipments and E&I of oil ship exploration on platform (offshore project)(FPSO-Floating Production, Storage and Offloading)

Scope of Responsibilities:: Supervised the Project to ABBOS + ABB TH on STP&I and another subcontractor at Bangpakong factory, Rayong factory, Nakorn

Patom Factory, Bangpu and Sattahip site erection.

- October, 2001 - February, 2003:

Project : Berge Helene module M10(Process separation module), M21-24(Inlet manifold module), M30(Flare module)

Consulting and Approval Agency: DNV OS (Norway) + DNV (Thailand)

Owner’s : Triton Energy Ltd.(Norway)Main Contractor of Project

: ABB Offshore System AS + ABB THSub Contractor of Project

Unimit Engineering Co., Ltd. For Pressure Vessel, Module Platform ABB Limited for E&I work ST Contemp Co., Ltd. for control room unit Ultimate Technology Service Ltd and Deeline Ltd. for piping work.

Page 19 of 23

Page 20: Updated Weerawat

Curriculum Vitae Weerawat RATTANAMINGMONGKOL

Scope of Responsibilities:: Supervised the project as consulting and approval for owner’s

Specifications: ASME sec V ,sec VIII ,sec IX BS 5500(PD5500 - Published document) EN 287, EN288

NORSOK (Norwegian spec.) ASME/ANSI B31.1/31.3

DNV specificationsScope of Project : Pressure vessels, Piping, Equipments and E&I of oil ship exploration on

modules (FPSO)

Scope of Responsibilities: Supervised the project to ABBOS + ABB TH on STP&I and another subcontractor at Bang Pakong factory, Rayong factory,Nakornpatom, Bangpu and Map Taput Industrial port site erection, Rayong.

Others: Ship survey - Star Cruise, witness of boiler repairing - Han Hai :- Hatch covers survey - Grand View: - Hatch covers survey - Star Inventary :- Anchor replacement survey Annual certification tested of welding approval for marine welding electrodes for Kobe Steel Ltd.

Annual certification tested of welding approval for marine welding electrodes for Thanyanoraseth Co., Ltd.

Certified Thai welder 50 welders for BP NAM CON SON Gas project in

Vietnam. Supervised the lead auditor to audit ISO 9002 to client (Neumann & Esser South East Asia Ltd.) as Mechanical specialist. Witness random sampling of carpet to testing for re-certification for Carpet International Thailand Ltd.

Specifications : ASME sec V ,sec VIII and sec IX BS 5500(PD5500 - Published document) EN 287, EN 288

NORSOK (Norwegian spec.) ASME/ANSI B31.1/B31.3/B16.5

DNV specificationsOctoberr, 1997 – March, 2001:

Private Business: Computer service, Photo copying service, Stationery and Nursery (Nudee Computer and Nudee Nursery) as General Manager Computer Service: MS. Windows, MicroSoft Office Package, Adobe PhotoShop, Adobe Page Maker provided teaching soft ware for individual clients, provided typing of the documents for clients by computer, provided maintenance and repaired of computer/computer accessories, designed the graphic design, serviced the Internet and etc.

Computer service : Serviced of the documentation by computer/Internet serviceCopying service : Serviced all photocopy Nursery service : Serviced nursery for child age between 1-3 year Total staffs : 15 persons

October, 1996 – September, 1997:

Joined with THAI NONDESTRUCTIVE TESTING CO., LTD. as Branch Manager (Rayong), Managed the business for many clients by following projects:

- Thai Plastic Industrial Co., Ltd. Ethylene Plant Project

Project : Ethylene plantResponsibilities : NDT provided -RT, MT, PT, UT, UTM ,QC inspector for

Page 20 of 23

Page 21: Updated Weerawat

Curriculum Vitae Weerawat RATTANAMINGMONGKOL

Samsung Engineering Co.,Ltd.- Thai Rayong Refinery Co., Ltd. Project

Project : TRC projectResponsibilities : NDT provided for tanks and piping for Thai Poong Lim Ltd.

- TESCO Engineering Co., Ltd.Project : Tower for TPI plantResponsibilities : Provided RT ,UT

- Asian Steel Product Co., Ltd. Project : Plant constructionResponsibilities : Qualified of WPS/PQR,WPQT

- Chanon General Construction Co., Ltd.Project : Plant constructionResponsibilities : Provided RT , PT for piping in PTT plant

- EMCO (Thailand) Ltd.Project : Pipeline in Applied Machinery Co.,Ltd. plantResponsibilities : Provided MT

- Meisei International Co., Ltd. Project : Tank in TPIResponsibilities : Provided NDT

- Rayong Gas Tech Co., Ltd.Project : Tank in TPI

Responsibilities : Provided RT- STB Engineering Co., Ltd.

Project : TPC(Thai Plastic Chemical Co.,Ltd.) Responsibilities : Qualified of WPQT

- KSS Construction Co., Ltd.Project : PTT plant

Responsibilities : Provided RT, qualified of WPQT for PTT pipeline - Tuntex Petrochemical Co., Ltd.

Project : Plant shut down Responsibilities : Provided RT, qualified of WPQT for shut down.

- Vattanaphaisal Engineering Co., Ltd.Project : Plant constructionResponsibilities : Provided RT and RT Interpreter responsibility for plant construction

- ABB Industry Ltd.Project : CoCo plant Responsibilities : Provided MT for plant boiler installation.

- IQI International Co.,Ltd.Project : Total Exploration & Production (Song Khla)Responsibilities : Provided MT , UT for Total Exploration.Scope of specifications:

ASME sec V, sec.VIII, sec.IX API 1104, API 650 ASME/ANSI B31.1 and B31.3 AWS D1.1 and etc.

July, 1995 – September, 1996:

Joined with EMCO (Thailand) LTD. as Project QA/QC Engineer and has carries out of following jobs:- Star Petroleum Refinery Project.

Project : Steel erection for refinery plantOwner : Star Petroleum Refinery Ltd.Main contractor : JGC corporation (Japan) Ltd.Responsibilities : WPS/PQR,WPQT,QC in site erection

- Electricity Generating Authority of Thailand : Fuel Gas Desulphurization project Mae Moh, Lampang

- Viny Thai Phase III Project.Project : VCM /UEM Viny Thai plantOwner’s : Viny Thai Co., Ltd.Responsibilities : QA/QC documentation control.

Page 21 of 23

Page 22: Updated Weerawat

Curriculum Vitae Weerawat RATTANAMINGMONGKOL

Specification : API 650 ,ASME V ,ASME VIII, ASME IX,B31.1, B31.3, AWS D1.1,CTCI spec.and etc.

July, 1994 – June, 1995:

Joined with SAIPEM AUSTRALIAN PTY LTD. as Pipeline Welding Inspector has carried out of following jobs:

Periods : May, 1993 – December, 1993Position : Welding InspectorProject : Sriracha to Saraburi multi products pipeline(underground pipelines)Scope of Project : The pipeline from Sriracha to Lumlukkra carrying

multi products including availing fuels, 24 inch Lumlukkra to BAFS depot carrying availing fuels

, 10 inch, from Lumlukkra to Sriracha carrying petroleum multi products 18 inch

Scope of Responsibilities:: Under take and inspection activity in according with Pipe dump Stringing Field bending Visual welding inspection - Front end welding - Back end welding - Tie in welding - Repair welding MT of welding UT of welding RT of welding Coating inspection Lower lay Wrapping inspection Back fill inspection

Owner’s Project : Thai Petroleum Pipeline Co., Ltd.(THAPP LINE)Contractor : John Brown International Co., Ltd.Project’s Specification:

API 1104 (Pipeline)ASTM 747 BS 5750 part II Local Specification (THAPP)ASME sec. V, sec IX

July, 1993 – June, 1994:

Joined with SUMSUNG ENGINEERING AND CONSTRUCTION CO., LTD. as Project Mechanical Engineer and has carried out of following jobs.

Periods : July, 1992 – May, 1993Position : Tank Mechanical EngineerProject : Oil storage terminal ( =15.17, 19.47, 27.53 M.(16 units))

Bang Pa In, AyuttayaProject Owner : Bangchak Petroleum Co.,Ltd.

Scope of Responsibilities: : Controlled of the overall of the construction of the fabrication/erection of the oil storage tank 16 units including of the inspection /testing of the oil storage tanks

Controlled the raw material from Korea Controlled the WPS/PQR/WPQT

Page 22 of 23

Page 23: Updated Weerawat

Curriculum Vitae Weerawat RATTANAMINGMONGKOL

Controlled the tank fabrication/inspection/testing in fabrication shop at VIPCO( VITSAVAKIT PATTANA CO.,LTD.)

Controlled the tank erection at site Controlled of the overall inspection and testing for all storage tanks at

site. Specification’s : ASME sec.V, sec.VIII, sec.IX, B31.3 and API 650

June, 1990 – May, 1993:

Joined with BUREAU VERITAS (Thailand) CO.,LTD. as Surveyor Engineer and has carried out the following jobs :

- Hydro Compact (Thailand) Ltd. Period : June, 1990 – August, 1990

Project : Seawater Reverse Osmosis Desalination project in Fujirah Emirate ,United Arab Emirate, Dubai

Item Inspection : 9 units of sea water resistant high pressure filter tank Project Owner : Ministry of Electricity & Water, United Arab Emirate Position : Surveyor

Scope of Responsibilities: Reviewed the raw material certification for fabrication WPS/PQR and WPQT Witness of all scope of fabrication inspections Witness of fabrication processes Sandblasting, Painting, Rubber lining inspection

- Spie Batignolles (PTT) Periods : August, 1990 – December, 1990 Project : Pra-Ka-Nong Oil Depot Improvement project (PTT) Project Owner : Petroleum Authority of Thailand Co., Ltd. (PTT) Position : Engineer Responsibilities:

Performed pipe line checking according to the approved pipelines Witness the PQR/welder test (WPQT) Witness the hydrostatic test loop on the piping systems Witness/reviewed of the RT ,PT ,MT for the piping testing Witness the hydrostatic test on the pipelines.

- Bangkok Container Industry Co., Ltd. Periods : January, 1991 – April, 1991 Position : Surveyor Responsibilities : Inspected of the mass production of dry fright steel cargo container of

20 and 40 feet size, witness prototype test, batch test ,welding inspection and quality auditing.

- Ansell (Thailand) Ltd. Periods : April, 1991 – May, 1991 Position : Engineer Responsibilities : Inspected of the fabrication of 10 MW of hot water

boilers.Max. model 10 dh/1050, WPS/PQR/WPQT, fabrication and inspection- Peroxy Thai Ltd.

Periods : June, 1991 – September, 1991 Position : Inspection Engineer

Responsibilities : Inspected of the repairing of the gas process boiler E-103 and inspected of the modified piping at plant, Rayong

- The joint venture of SDEM, ITI and ITD. Periods : October, 1991 – December, 1991 Position : Engineer

Responsibilities : Witness PQR and WPQT(Welder test) in material P1 ,P3 ,P5 and P8 for Rayong Combined Cycle Block I ,II and Block III (Rayong electrical power plant)

- Siam Union Container Co., Ltd.

Page 23 of 23

Page 24: Updated Weerawat

Curriculum Vitae Weerawat RATTANAMINGMONGKOL

Periods : January, 1992 – June, 1992 Position : Engineer Responsibilities : Approved the start up the container factory

(Pre-production qualified) at Bang Pakong industrial estate, Chonburi, certified quality of the mass production of containers

- Peroxy Thai Ltd.: Witness of 5 year periodic inspection of H2O2 container tanks, Rayong.

May, 1987 – May, 1990:

Joined with SIWA TESTING INSPECTION & CONSULTANT CO., LTD. as Inspection Engineer & Project QC Coordinator Engineer and has carried out the following jobs :

- Ultrasonic Flaw Detection (UT) :

Inspected of 2 units of 23.7 m. spherical tank at NPC tank jetty, Rayong for Vattana Phaisal Engineering Co., Ltd.

Inspected of piping in additional hot tap project at PTT gas separation plant, Rayong for PLT Pipetect Co., Ltd.

Inspected of Idle and driver and heat exchanger at Pah Deang Industry Co., Ltd. at Tak

Inspected of casting steel, shell plate, work pieces for Ital Thai Marine Co., Ltd. at Phapadeang ship yard, Samutphakarn

Inspected of shell plate of boiler for Vattana Phaisal Engineering Co., Ltd. at Rayong. Inspected of ladle lifting lug for Bangkok Steel Industry Co., Ltd. at Samutpakarn. Inspected of shaft for Prachuap Sugar Industry Co., Ltd. at Samutpakarn

- Magnetic Particle Test and Liquid Penetrant Test (UT/PT) :

Inspected of pipes and equipments at NPC olefins plant, Rayong for Toyo Engineering Corporation Co., Ltd.

Inspected of cutter blades for Pacific Plastics (Thailand) Co., Ltd. at Pitsanulok - Mechanical and Chemical Test :

Qualified of tension test, bending test, impact test for PQR of the production test plate in the construction project of spherical tank of Thai Plastics & Chemical Co., Ltd. at Rayong

Qualified of chemical test of vessels for Platakollakarn Co., Ltd. Qualified of PQR and Welder test (WPQT) test pieces in Laem Chabang –Sriracha Gas

Pipeline project for McConnell Dowell Instructors (Aust.) Pty. Ltd. Qualified of PQR test pieces for Thai Petrochemical Industry Co., Ltd. plant construction

project for UHDE at Rayong- Metallurgy Testing :

Performed metallographic test by means of replicating techniqued to analyze the material condition of 4 units of reactor for Bangchak Petroleum Co., Ltd.

Performed metallographic test by means of replicating techniqued to determine the pipe material at Petrochemical plant, Rayong

Performed metallographic test by means of replicating techniqued to determine the pipe material at HMC plant construction, Rayong

Performed metallographic test by means of replicating techniqued to analyze the cracks of milk storage tank in Meuklak Milk for Pattanakollakarn Co.,Ltd.,Saraburi

Performed metallographic test by means of replicating techniqued to analyze the crack of hydraulic cylinder for Siam Aluminum Co., Ltd.

- Others:

Responsibilities as inspection engineer for the vessel construction project of Terada Iron Work Co., Ltd. at Bangkok Steel Industry Co., Ltd.

Responsibilities as QC coordinator engineer for scopes of ethylene tank repairing for Mannesmann Anlagenbau at NPC jetty, Rayong

Page 24 of 23

Page 25: Updated Weerawat

Curriculum Vitae Weerawat RATTANAMINGMONGKOL

Investigated/analysis of the cause of damage of flange for Pencol Engineering and Consultant Co., Ltd.

Certified in ultrasonic testing level II from the Office of Atomic Energy for Peace of Thailand-KMIT NB by SNT-TC-1A standard

Certified in radiographic testing level II from the Office of Atomic Energy for Peace of Thailand-KMIT NB by SNT-TC-1A standard

Certified in surface method testing (PT, MT) level II from the Office of Atomic Energy for Peace of Thailand-KMIT NB by SNT-TC-1A standard

Provided and lectured of course workshop for ultrasonic testing for engineering student at King Mongkut’s institute of Technology, Thonburi (KMIT-T) as a course professor.

Inspected of sandblasting and painting of pipelines

See Attachment Certifications

Page 25 of 23