(SADARA) SAUDI ARAMCO APPROVED LEAD QA/QC ENGINEER/ SUPERVISOR (E&I)Number: SDL/BLDG A-SAD/ESEC-L-0949Experience in Oil & Gas/ MEP U.A.E: 6 Years K.S.A 2 Years

Offshore Experience: Das Island 2Years & Sarb North & South Artificial Islands 1 Year

TOTAL EXPERIENCE: 8+ Years (Present Location Dubai U.A.E)

Have Valid U.A.E/K.S.A Driving License (U.A.E Contact–00971-557390065)

E-mail: [email protected]

LEAD QA/QC ENGINEER/ SUPERVISOR (E&I)PERSONAL PROFILE

Father’s Name : HAJI MUHAMMAD ASHRAFDate of Birth : 09-June-1986Religion : IslamNationality : PakistaniN. I. C. No : 34202-3239962-7Passport No : CF9159622

Experience Summary :

A multidimensional professional with 8+ years experience. Adequate experience of working in Process Industries, Oil and

Gas, E.P.C, Power, M.E.P and other project management facets of engineering field. Core competence in Electrical,

Instrumentation, Mechanical/ Plumbing and Quality control/Quality assurance.

LAST EMPLOYER

Most recently I was working with Sharqawi Contractor Co. as an acting (QA/QC Manager)/ Lead Qa/Qc Engineer forSADRA SDL Building Project Package (A & B) in Jubail K.S.A (From 22-Feb-2015 to 25-Aug-2016).

OWNER: - SAUDI ARAMCO & DOW CHEMICAL AMERICA

PROJECS HISTORY

ÿ I have been worked with (AL-HASSAN ENGINEERING ABU DHBI L.L.C) as an (In-charge/Lead Engineer QA/QC E&I)Position for SATAH AL-RAZBOOT FIELD DEV. Project Offshore at the Artificial North & South Islands.

ÿ I have worked with (AL-HASSAN ENGINEERING ABU DHBI L.L.C as an (In-charge/Lead Engineer Qa/Qc E&I) Position for an EPC Gasco Client Project ( Ruwais –Surge Drum Protection and Battery limit ESD Valves) in Abu Dhabi UAE

(From 11-Sep-2013 to 20-Dec-2014)

MAIN CONTRACTOR: - PETROFAC (UAE), OWNER: - ADMA/OPCO

MAIN CONTRACTOR: - Al-Hassan Engineering Abu Dhbai L.L.C

OWNER: - GASCO UAE

ÿ I have successfully completed my responsibilities as a QA/QC ELECTRICAL & INSTRUMENTATION ENGINEER with Descon Engineering on project Integrated Gas Development

(IGD HABSHAN-5) Abu Dhabi UAE.

CLIENT: JJC Japan Gas Company, OWNER: - GASCO UAE

POSITION: - QA/QC Engineer Electrical & Instrumentation from 4th Jul, 2011 to 1st Jan, 2012.

ÿ I have also worked with Descon Engineering UAE on Project, ASU (Air Separating Unit for Nitrogen Generation) Mirfa and Elixier 2.

CLIENT: - Linde German, OWNER: - Elixier GASCO UAE.

POSITION: - Lead QA/QC Engineer E&I (From 26th Aug 2010 to 3rd July 2011).

ÿ I have worked with Descon Engineering in (OFFSHORE ASSOCIATED GASES) PKG-1 DAS ISLAND Abu Dhabi.

Page 2: Updated CV Lead QAQC Engineer Acting QaQc Manager

ÿ I have successfully completed my duties as a QA/QC Electrical Engineer with ETA Emirates Technical Associates M&E Division for the construction of UAE 1st 7 STAR HOSPITAL PROJECT which was named as CCAD CLEVELAND CLINIC ABU DHABI.

MAIN CONTRACTOR: - SAMSUNG & SIX CONSTRUCT, OWNER: - ALDAR

PROJECT MANAGER: - JACOBS PROJECT DESIGNER AECOM, PROJECT CONSULTANT

POSITION: - QA/QC Engineer Electrical, FROM 14, FEB 2012 TO 04, AUG 2013.

TRAININGS/ CERTIFICATIONS

ÿ Successfully attended and completed Lead Auditor ISO 9001: 2015 QMS (Quality Management System)training from (SGS Switzerland) held in regional office Islamabad Pakistan.

ÿ Tropical Basic Offshore Safety Induction & Emergency Training (TBOSIET – OPITO APPROVD) & Basic H2S Training

(OPITO APPROVD) from Emirates Technical & Safety Development Centre.

ÿ HSE Training from Descon Engineering Pakistan.

ÿ HSE Training from Descon Engineering U.A.E.

ÿ HSE Training (Work on Height, Confined Space Work) from Descon Engineering Das Island (U.A.E).

ÿ HSE Training To Work At Height, Confined Space, Hydrogen Sulphide Environment

From Mepi Technip (U.A.E)

ÿ HSE Training To Work At Height, Confined Space, H2s Hydrogen Sulphide Environment

ÿ From ADGAS Das Island (U.A.E).

ÿ HSE Training of IIF (Incident and injury Free) from Descon Engineering and JGC on IGD-5 Process Plant Habshan Abu

Dhabi UAE.

KEY RESPOSIBILITIES

ÿ Responsible for submission of all MEP & E&I MS (Method Statements) ITP’S Inspection Test Plan as per Project specification and relevant international codes/ Standards up to final approval/code.

ÿ Responsible for attending Weekly/Monthly Progress meetings in order to discuss and agreeing to resolve Qa/Qc & Construction issues for better project progress and positive outcomes.

ÿ Responsible to maintain Qa/Qc weekly/ Monthly progress report, NCR, Surveillance, MS, ITP Logs.

ÿ Deliver technical support/guidance to inspectors for filed inspections, NCR, Surveillance and punch list closure activities.

ÿ Interacted with Sub-contractor /client/QC dept. on any start of new activities for prior approval to move forward.

ÿ Responsible for the Completion of Construction (E&I & MEP) QVD’S Check Sheets “A” and assist Pre-Commissioning team for Check Sheets-B closeout further to review and submission of M/C dossier/ MCPN.

ÿ Achieved targets and milestones in time by commissioning substation and process plant.

ÿ Responsible for developing PQP and QIP/ ITP from specification to meet project quality inspection requirements.

ÿ Responsible for raising and closing TQ, NCR, CAR and Proactive / Surveillance

ÿ Responsible for daily monitoring of site activity along area supervisors with safety analyses measure.

ÿ Assisting pre-commissioning and commissioning team with vendor for any technical/manpower Issues.

ÿ Sufficient conception and working knowledge of ISO and Quality Management System.

ÿ Responsible for raising and closing TQ, NCR, CAR and Proactive / Surveillance.

ÿ Responsible for reviewing all MEP & E&I Material Approval Requests (MAR), also responsible for all E&I Material Inspections FAT & SAT as per Project Specification and client requirement before Material Dispatching.

ÿ Responsible to review As Built/Red Mark Drawings as per site Modifications.

ÿ Responsible for Successful preparation of Mechanical Test Packages and Instrument Loop folders preparation and Loop testing.

ÿ Responsible for all stage inspections with related to approved ITP’s and following up to clear punch points.

ÿ Managing people, equipment resources and organizing crew changes.

Page 3: Updated CV Lead QAQC Engineer Acting QaQc Manager

ÿ Having good understanding and Professional working knowledge of NEC, IEEE, ANSI and NEMA in various Oil and Gas as well as in MEP.

ÿ Good understanding of Saudi Aramco Engineering Standards in order to enactment on site work.

ÿ Responsible to conduct internal company Audit in order to measure the implementation of ISO requirements and accordingly made preparation for Client and third-party Audit for better Quality outputs.

ÿ Responsible for generating and getting approval of all Project Field Design Change, RFC & RFV requests as per site design requirement.

ÿ Responsible for all project area job closure as per priority and client requirement.

ÿ Responsible to attend Weekly Progress all area walkthrough along with Client/ Contractor PM, CM, Site engineers and area in charges.

PROFESSIONAL & HAND EXPERIENCE SUMMARY IN ELECTRICAL:

Handling Fiber optical cable testing using OTDR, splicing/jointing of FO cables.

Responsible for Cable laying, dressing and tagging inspections of LV, MV and HV cables as per AFC Cable Route Index and cable schedule.

Responsible for the Inspection of complete Electrical and Instrument Earthing System, Earthing cable Installation, Cad welds and Testing.

Responsible for the Inspection and testing of Lighting and small power and Lighting Pole installation works.

Installation inspection and Insulation Resistance IR/Continuity testing of three phase Motor winding.

Responsible for the Installation and final Inspection of LVDB’S installation.

Responsible for Cable Tray/Ladder inspections prior to cable Installation.

Responsible for the Inspection of LV, MV and HV cable testing, like Insulation Resistance test, Continuity test and HIPOT test before and after cable termination.

Responsible for the Installation Inspection of 132 kV, 22 kV, 11kV & 415V Distribution Network.

Installation inspections and testing of LV and MV Bus Bars with micro ohm meter.

Installation Inspection of LV and MV Transformers.

Installation Inspection of 33kv single bus bar and double bus bar SF-6 insulated Switchgears and Bus Bar testing using PROGRAMA 600A.

PROFESSIONAL & HAND EXPERIENCE SUMMARY (INSTRUMENTATION):

Responsible for calibration and Final installation inspections of all field instruments like Temperature transmitter, Pressure transmitter, level transmitter, Flow transmitter, Delta pilot level transmitter, magnetic flow transmitter pressure indicator temperature transmitter, anti-surge valve, solenoid valve, Control valve and Resistance Temperature Detectors (RTD’S).

Handling Fiber optical cable testing by using OTDR, splicing/jointing of single mode and multi-mode FO cables.

Responsible for the Inspection of all type process Instrument like FT, PT, LT, TT, PDT, Control Valve, On-Off valve, Solenoid Valve, PSV’, SRV’s and others.

Insulation resistance (IR) and Continuity testing of all type of instrument cables.

Final Installation Inspection of analyzer container, equipment container.

Responsible for troubleshooting and maintenance of all field instruments in commissioning phase.

Cause and effect inspection of fire and gas detectors like H2, O2,SD,HD,VESDA PANNELS, GDS, GDT, GDR BGU’S and FD’S.

Responsible for the Installation Inspection of Process & Security CCTV System, Public Address General Alarm System, Telephony System and LAN/WAN network System.

Installation inspection of perforated, GRP and ladder cable trays.

Material approval from Clint and incoming material inspection as per project specification and approval.

Inspection for cable laying of fiber optic cables, instrument cables and electrical cables.

Check and maintain E&I work Status record of all site Mech. Elec. & Instr. activities.

Verification and Pre inspection of RFI’s and also preparation of weekly/monthly QC reports.

Page 4: Updated CV Lead QAQC Engineer Acting QaQc Manager

ÿ EXPERIENCE IN MEP (Hospital/ Commercial Building/ Where houses/ Power Hub Buildings

1) ASU (Air Separating Unit for Nitrogen Generation) Mirfa 1 and Elixier 2.

2) CCAD CLEVELAND CLINIC ABU DHABI UAE 1st 7 STAR HOSPITAL PROJECT

3) SDL BUILDING SADARA PROJECT JUBAIL K.S.A

ÿ Responsibilities as Acting Qa/Qc Manager

(QC Team, 12 Nos. MEP Inspectors)

Electrical:

Overall responsible for Electrical, Instrumentation and Mechanical QC Team to conduct inspections for following executionactivities:

Electrical cables, installation, Glanding, Termination, IR/Continuity and HIPOT testing.

Installation inspection of DB’S, CAPCITOR BANK AND INVERTOR PANELS.

Installation inspection of telecom rack, cat-3 cat-6 cable.

Installation inspection and testing of NOVEC system for LV, HV and Transformer rooms.

Inspection for all Electrical and ELV services like Power, EMCS, PMCS FIRE & ALRM and TELECOM prior to gypsum wall closure.

Installation inspection of all types containments like trunking, cable Ladder /Tray.

Installation inspection of normal lighting emergency lighting systems.

Installation inspection and testing of EARTHING PIT’S (Individual Earth Rod & with Earthling Networks).

DG’S, LV Switchgear’s and MCC Cable Torquing & Termination.

Responsible for the installation and final cause and effect testing of Complete Fire and Alarm system.

Responsible for the installation and final Inspections of Complete Telecom and Antenna Control system.

Mechanical:

Overall responsible for Mechanical QC Team to conduct following Piping, HVAC, WELDING and PAINTING inspections for all Mechanical site execution activities:

Fit-Up, welding and Hydro testing Inspection of Chilled Water, Portable water and Fire water piping.

Chilled water Piping Supply and (Return) Punch List Prior to Hydro.

Chilled Water Piping (Supply) Review of Test Pack.

Installation inspection for fire dampers.

Installation inspection for supply and return air duct.

Duct Light Testing/Leak Test for Supply and return Ducts.

Welding inspection of SS spool battery limit interface spool and fire hydrant SS spool.

Welding inspection of SS Spool SS-PIV Tiser spool.

Primer Coat Inspection for Chilled Water Line.

Third Party (Sigma) Testing for Painting of Above Ground Chilled Water Piping System.

v PROFESSIONAL EDUCATION

Bachelor of Technology (Electronics): (Attested from Saudi Culture and Embassy)Preston Kohat University Islamabad Campus Pak in 2008.

QUALIFICATION IN IT

ÿ Project Control System (PROCeSs) Certificate from Descon Engineering in 2008 (2 weeks).

ÿ Diploma in computer hardware and networking from Nice-World College of information and technology (3 months).

ÿ Diploma in office automation from Apex College of information and technology in 2006 (3 months).

ÿ Diploma in English language from Apex College of information and technology in 2006 (3 months).

LANGUAGE SKILLS:

ENGLISH, URDU, PUNJABI & BASIC ARABIC