BEDFORD PUBLIC WORKS UPDATE ON WATER SYSTEMS OPERATIONS Board of Selectmen November 21, 2016

Upload: others

Post on 25-Dec-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: UPDATE ON WATER SYSTEMS OPERATIONS

BEDFORD PUBLIC WORKS

UPDATE ON WATER SYSTEMS OPERATIONS

Board of SelectmenNovember 21, 2016

Page 2: UPDATE ON WATER SYSTEMS OPERATIONS

Agenda

• System Background• Water Quality• Water Quantity• Improvements• Issues• Questions

November 21, 2016

Page 3: UPDATE ON WATER SYSTEMS OPERATIONS

System Background

• Three municipal wells and MWRA supply• Serves approximately 4,500 customers through 92 miles of water mains

• Provides fire protection via over 800 fire hydrants

• Managed with three water standpipes (tanks) and three vaults

November 21, 2016

Page 4: UPDATE ON WATER SYSTEMS OPERATIONS

System Background

November 21, 2016

Page 5: UPDATE ON WATER SYSTEMS OPERATIONS

Water Quality

• System water is tested regularly• Test parameters

– pH and temperature (daily)– Fluoride (daily )– Chlorine residual (daily)– Total coliform (twice a month)– VOCs (quarterly)– Total trihalomethanes (quarterly)– Haloacetic acids (quarterly)– Lead (every three years)– Copper (every three years)

November 21, 2016

Page 6: UPDATE ON WATER SYSTEMS OPERATIONS

Water Quality

Year 2012 2013 2014 2015 2016

# of TC hits

164 66 34 4 7

• Total coliform hits 2012‐November 2016

• Contributing factors– Water temperature– Chlorine content– Water age

November 21, 2016

Page 7: UPDATE ON WATER SYSTEMS OPERATIONS

Water Quality

0

20

40

60

80

100

120

140

160

180

2008 2009 2010 2011 2012 2013 2014 2015 2016

TC Hits

Flushing/ Bleeding (MG)

Pipe Lining (100 LF)

• As pipe lining continues, TC hits as well as bleeding/ flushing needs have decreased

Page 8: UPDATE ON WATER SYSTEMS OPERATIONS

Water Quantity

• Up to 15% of Bedford’s water supply comes from the Shawsheen wells

• 85% comes from the MWRA through three connections with Lexington

• Average daily flow– Winter – 1.2 MGD– Summer – 2.4 MGD

November 21, 2016

Page 9: UPDATE ON WATER SYSTEMS OPERATIONS

Water Quantity

• Historic water usage

YearMetered Use 

(MG)CEMU (MG) UAW (MG)

Finished Water (MG) CEMU % UAW %

2008 433.90 5.05 14.88 453.82 1.11% 3.28%

2009 415.05 4.85 44.10 464.00 1.05% 9.50%

2010 447.24 8.32 64.30 519.86 1.60% 12.37%

2011 400.05 7.21 86.80 494.06 1.46% 17.57%

2012 437.84 66.64 12.10 516.58 12.90% 2.34%

2013 442.41 49.99 9.50 501.90 9.96% 1.89%

2014 465.76 26.37 52.40 544.53 4.84% 9.62%

2015 482.75 14.20 35.50 532.45 2.67% 6.67%

November 21, 2016

Page 10: UPDATE ON WATER SYSTEMS OPERATIONS

Water Quantity

Below 25%

0%

20%

40%

60%

80%

100%Ja

n-48

Jan-

52

Jan-

56

Jan-

60

Jan-

64

Jan-

68

Jan-

72

Jan-

76

Jan-

80

Jan-

84

Jan-

88

Jan-

92

Jan-

96

Jan-

00

Jan-

04

Jan-

08

Jan-

12

Jan-

16

Qua

bbin

-Per

cent

Full

Normal

Below Normal

Drought Emergency Stage 3

Below 38% Drought Emergency Stage 2

Below ~55% Drought Emergency Stage 1

Warning

November 21, 2016

Page 11: UPDATE ON WATER SYSTEMS OPERATIONS

Municipal Use

0

500000

1000000

1500000

2000000

2500000

3000000

3500000

Feb‐08 Jul‐09 Nov‐10 Apr‐12 Aug‐13 Dec‐14 May‐16 Sep‐17

Mun. Total

DPW‐1

DPW‐2

Fire Station

Police Station

Library

B Field (Near Library)

High School‐1

High School‐2

Football Field

Town Hall

Middle School

J Field (JH Soccer)

Davis School

Davis School

Davis School

Lane School

Lane School

Bedford Common

November 21, 2016

Page 12: UPDATE ON WATER SYSTEMS OPERATIONS

Municipal Use

0

500000

1000000

1500000

2000000

2500000

3000000

3500000

Mun. Total

B Field

Town Hall

Lane Sch

Other Irr

Other Bldgs

Page 13: UPDATE ON WATER SYSTEMS OPERATIONS

Improvements

• Water main improvements (cleaning and lining)• Meter vault rehabilitation• Middlesex Turnpike main upgrade• Meter replacements• Tank painting/ refurbishments• Tank mixers• Well field cleaning• Gate valve exercising• Leak detection• SCADA upgrades

November 21, 2016

Page 14: UPDATE ON WATER SYSTEMS OPERATIONS

Issues

• Water quality– Total coliform/ chlorine residual

• Water quantity– Bleeder lines– Municipal use– Metering– Isolated pressure issues

November 21, 2016

Page 15: UPDATE ON WATER SYSTEMS OPERATIONS

Proposed Six‐Year Capital Plan

$183,600 $39,574 $39,305 $39,574 $0 $0$246,264

$3,865,498

$1,746,641

$305,735 $250,000

$1,706,000

$1,876,931

$2,125,531

$2,268,808

$2,466,905$2,154,951

$2,106,187$871,492

$318,064

$688,340

$910,734$351,647

$761,910$2,624,516

$834,559

$0

$789,480

$973,080

$800,000

$0

$1,000,000

$2,000,000

$3,000,000

$4,000,000

$5,000,000

$6,000,000

$7,000,000

$8,000,000

$9,000,000

FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 FY 2023

Water

Veh/ Eq

Sewer

Highway

Grounds

Engineering

Agenda• Existing Project Update

• VFA Project Prioritization

• Project Questionnaires

• Proposed Six‐Year Capital Plan

• Questions

November 21, 2016