update on tbl status ctf3 committee 17.09.2009
DESCRIPTION
Update on TBL status CTF3 committee 17.09.2009. Several runs with beam, slowly increasing the current Arrived at 10 A beam current and 20 MW 12 GHz power extracted Got experience with beam optics and handling for TBL - PowerPoint PPT PresentationTRANSCRIPT
Update on TBL statusCTF3 committee 17.09.2009
• Several runs with beam, slowly increasing the current Arrived at 10 A beam current and 20 MW 12 GHz power extracted
• Got experience with beam optics and handling for TBL
• Commissioning of instrumentation, BPM’s, BPS’s, RF-diagnostics for amplitude and phase, movers
Conclusion so far:• 12 GHz production in good agreement with theoretical predictions PETS is well behaved so far, transmission, vacuum• Beam handling rather simple• Some problems with BPM electronics
0 100 200 300 400 500 600-10
-8
-6
-4
-2
0
2
Time (ns)
Bea
m c
urre
nt (
A)
BPM0150
BPS0210
BPS0250BPS0310
BPM0310
-100 0 100 200 300 400 5000
1
2
3
4
5
6
Time (ns)
RF
pow
er (
MW
)
Pout left
Pout right
Pref leftPref right
P predict
TBL run with 7 A but long bunches suspected
-100 0 100 200 300 400 5000
1
2
3
4
5
6
Time (ns)
RF
pow
er (
MW
)
Pout left
Pout right
Pref leftPref right
P predict
BPM 150 to predict
BPM 310 to predict
0 100 200 300 400 500 6000
0.2
0.4
0.6
0.8
1
1.2
1.4
Time (ns)
RF
pow
er (
MW
)
Pout left
Pout right
Pref left
Pref right
P predict
0 100 200 300 400 500 600-5
-4
-3
-2
-1
0
1
Time (ns)
Bea
m c
urre
nt (
A)
BPM0150
BPS0210
BPS0250BPS0310
BPM0310
BPS 210 to predict
TBL run with 4 A and good agreement
TBL run 15.9. with 10 A into the PETSForm factor 0.9
0 50 100 150 200 250 300 350 400 450 500-100
-80
-60
-40
-20
0
20
40
60
80
100
Time (ns)
RF
pha
ses
(deg
)
Pout left
Pout right
0 100 200 300 400 500 600-16
-14
-12
-10
-8
-6
-4
-2
0
2
Time (ns)
Bea
m c
urre
nt (
A)
BPM0150
BPS0210
BPS0250BPS0310
BPM0310
-100 0 100 200 300 400 500-1
0
1
2
3
4
5
6
7
8
9
Time (ns)
RF
pow
er (
MW
)
Pout left
Pout right
Pref leftPref right
P predict
Good transmission but noisy signals from the BPS’s
-100 0 100 200 300 400 5000
2
4
6
8
10
12
14
Time (ns)
RF
pow
er (
MW
)
Pout left
Pout right
Pref leftPref right
P predict
0 50 100 150 200 250 300 350 400 450 500-150
-100
-50
0
50
100
150
Time (ns)
RF
pha
ses
(deg
)
Pout left
Pout right
TBL run 15.9. with 10 A into the PETSOptimized for peak power, Form factor
= 1
0 100 200 300 400 500 600-25
-20
-15
-10
-5
0
5
10
Time (ns)
Bea
m c
urre
nt (
A)
BPM0150
BPS0210
BPS0250BPS0310
BPM0310
Next steps
Commissioning:• Higher current : 20 A, 100 MW (delay loop needed)• Better BPS performance to measure resolution and to play alignment games with the movers
Finishing TBL:• Finishing the beam line in the next shutdown 21.9 – 16.10 (all Quads, BPS, vacuum system and spectrometer)• Series production of tanks launched ( Two tanks expected to be installed during the winter shutdown )• Norwegian collaborators expected to work on TBL commissioning in 2010
Status on BPS’s from IFIC ValenciaAngeles Faus-Golfe
Status:• BPS finished, calibration measurements ongoing• Electronic droop compensation by Gabriel Montero next week (week 39)• Juanjo will come to CERN week 41 and 42 to help with the installation