Page 1: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

1 / FLOODPLAIN MANAGEMENT

PHILADELPHIA - REGULATIONS & PROCESSES FOR DEVELOPMENT IN THESPECIAL FLOOD HAZARD AREA

JOSH LIPPERT, CFMFLOODPLAIN MANAGER

[email protected]

UPDATE: 12.2018

Page 2: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

2 / FLOODPLAIN MANAGEMENT

RESOURCES

NATIONAL FLOOD INSURANCE PROGRAM [NFIP]

FLOOD HAZARD INFORMATION

CODES + REGULATIONS

LETTER OF MAP REVISION [LOMC]

ELEVATION CERTIFICATE

Page 3: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

3 / FLOODPLAIN MANAGEMENT

Esri, HERE, DeLorme, MapmyIndia, © OpenStreetMapcontributors, and the GIS user community

Special Flood Hazard Area (SFHA)

0.2% Annual Chance Flood Hazard

Land Use Sq. Mi. %Residential Low Density 0.1 0Residential Medium Density 0.2 1%Residential High Density 0.4 1%Commercial 0.6 2%Industrial 4.9 16%

Civic/Institution 0.3 1%Transportation 5.5 18%Culture 1.3 4%Park/Open Space 3.8 12%Water 11.5 37%Vacant Land/Other 2.1 7%

Acre

s o

f la

nd in

f oodplain

PUBLIC11.35 ACRES

PRIVATE253.46

5,756 EXISTING STRUCTURES

CITY OF PHILADELPHIA FEMA FLOODPLAINS

Page 4: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

4 / FLOODPLAIN MANAGEMENT

WHAT IS A FLOODPLAIN?

Page 5: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

5 / FLOODPLAIN MANAGEMENT

CITY OF PHILADELPHIA CLIMATE CHANGE FLOODING

• Sea level rise• Severe storm

Page 6: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

6 / FLOODPLAIN MANAGEMENT

CITY OF PHILADELPHIA INFRASTRUCTURE FLOODING

• Stormwater• Sewers

Page 7: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

7 / FLOODPLAIN MANAGEMENT

BACKGROUND - NATIONAL FLOOD INSURANCE PROGRAM [NFIP]

Created by the National Flood Insurance Act of 1968 • Participation is voluntary

• Adopt and enforce regulations • Eligible for flood insurance

• Benefits of participation:• Flood insurance• Grants and loans• Disaster assistance• Federally-backed mortgages

Page 8: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

8 / FLOODPLAIN MANAGEMENT

COST OF FLOOD INSURANCE

Page 9: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

9 / FLOODPLAIN MANAGEMENT

BFE

Basement

COST OF FLOOD INSURANCE - PHILADELPHIA EXAMPLE

• Above diagram is based on a 2,500 SF townhouse in Philadelphia located in the Special Flood Hazard Area

• Buildings principally over water cannot get insurance through NFIP (IE. pier construction)

+/- $500 +/- $3,000 +/- $5,000

Page 10: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

10 / FLOODPLAIN MANAGEMENT

COST OF FLOOD INSURANCE - Losses and Insurance

Repetitive Loss Properties NFIP Policies (+/- 4,200)

Page 11: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

11 / FLOODPLAIN MANAGEMENT

NFIP ROLE:Federal and State

FEDERAL• National program oversight• Risk Identification (mapping)• Establish development/building standards• Provide insurance coverage

STATE• State program oversight• Establish development/building standards• Provide technical assistance to local

communities/agencies• Evaluate and document floodplain

Page 12: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

12 / FLOODPLAIN MANAGEMENT

NFIP ROLE:City of Philadelphia [Local]

Local Officials and Floodplain Administrators[Licenses & Inspections, Planning Commission, Floodplain Manager]

• Adopt and enforce floodplain management ordinance compliant with Federal/State laws

• Issue or deny development • Inspect development and maintain records• Make substantial damage determinations• Regulations apply to Special Flood Hazard Area (SFHA) on the

Flood Insurance Rate Map (FIRM)• Development oversight is a local responsibility our local regulations

are located in the Zoning and Building Codes

Page 13: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

13 / FLOODPLAIN MANAGEMENT

FEMA COMMUNITY ASSISTANCE VISIT [CAV]

• Audit of the last 5 years of building permits issued in the special flood hazard area (SFHA)

• Tour of all SFHA’s throughout the City for non-permitted development• Review of the City “floodplain program”

RESULT:• Over 150 possible violations were discovered and additional

documentation is required for full compliance with the regulations

• Violations may lead to the City being placed on Probation• $50 surcharge to policy holders (approx. 4,200 policy holders)

UPDATE:• +/- 40 still in review/mitigation• Mostly documentation requests (Elevation Certificates, cost estimates, etc)

Page 14: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

14 / FLOODPLAIN MANAGEMENT

ORDINANCE NON-COMPLIANCE

Failure to adopt a compliant ordinance by map effective date or having non-compliant ordinance = easiest way to get suspended

• Serious ramifications:• Suspension of NFIP eligibility

• No mortgages or home equity loans in floodplain areas• No renewals of existing flood insurance policies• Loss of most forms of Disaster Assistance• No federal grants or loans• Loss of subsidized insurance for Pre-FIRM structures

Page 15: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

15 / FLOODPLAIN MANAGEMENT

FLOOD HAZARD INFORMATIONFEMA FLOOD MAP SERVICE CENTER

msc.fema.gov

ADDRESS

CREATE FIRMette-8.5x11” Print of property on FIRM Map

FIRM DATE

FIRM PANEL #

Page 16: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

16 / FLOODPLAIN MANAGEMENT

FIRMettewith mapped floodway

SPECIAL FLOOD HAZARD AREA - regulated by City of Philadelphia

CROSS SECTION - w/BFE

ZONE AE - FLOODWAYZONE AE

0.2% (not regulated)

Page 17: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

17 / FLOODPLAIN MANAGEMENT

FIRMettew/o mapped floodway [Coastal Flood Hazard]

SPECIAL FLOOD HAZARD AREA - regulated by City of Philadelphia

LiMWA - limit of moderate wave action

COASTAL FLOOD HAZARD ZONE AE

0.2% (not regulated)

• areas mapped with a LiMWA, must comply with Coastal A Zone codes/regulations

Page 18: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

18 / FLOODPLAIN MANAGEMENT

FLOOD INSURANCE STUDY [FIS]Riverine flood profile to determine BFE

Page 19: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

19 / FLOODPLAIN MANAGEMENT

FEMA FLOOD MAP SERVICE CENTERPrevious FIRM maps and Flood Insurance Profiles [FIS]

msc.fema.gov

ADDRESS

“Show all products”

SEE all effective and historic maps and profiles

Page 20: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

20 / FLOODPLAIN MANAGEMENT

FIRMettePrint version (previous)

Page 21: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

21 / FLOODPLAIN MANAGEMENT

CODES + REGULATIONS

Page 22: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

22 / FLOODPLAIN MANAGEMENT

DEFINITION OF DEVELOPMENTin Special Flood Hazard Areas [SFHA]

• development located in flood hazard areas, including the subdivision of land; installation of utilities; placement and replacement of manufactured homes; new construction and repair, reconstruction, rehabilitation or additions to new construction; substantial improvement of existing buildings and structures, including restoration after damage; temporary structures and temporary or permanent storage; utility and miscellaneous buildings and structures

Page 23: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

23 / FLOODPLAIN MANAGEMENT

NFIPKey Dates

PRE-FIRM

BUILT BEFOREDECEMBER 31, 1979

or structures mapped into SFHA’s post construction, see historical

FIRM maps

POST-FIRM

BUILT AFTERDECEMBER 31, 1979

• December 31, 1979 to August 2012 = BFE+12”

• September 2012 to present = BFE+18”

Although NFIP was create in 1968 the City of Philadelphia joined on December 31,1979

MUST maintain compliance from date of initial construction and/

or substantial improvement

Regulations do not apply unless substantially improved, but mitigation is always highly suggested

Page 24: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

24 / FLOODPLAIN MANAGEMENT

BUILDING PERMITSLowest Floor

(OLDER BUILDINGS USUALLY ARE NOT ELEVATED)

(NEWER BUILDINGS ARE ELEVATED)

TOP OF THE BOTTOM FLOOR

TOP OF THE NEXT HIGHER FLOOR

BFE+18”

TOP OF THE BOTTOM FLOOR

• Lowest Floor - lowest enclosed floor including: crawl space, basement, garage.

Page 25: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

25 / FLOODPLAIN MANAGEMENT

• Prohibited - Hospitals, group living uses housing the elderly or disabled persons with limited mobility, detention or correctional facilities, new or substantially improved manufactured homes

• Floodway – development prohibited, unless dock, trail, roadway & bridges

• Residential vs. non-residential

• Placement of Fill

• Changes to Special Flood Hazard

ZONINGCodes

Page 26: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

26 / FLOODPLAIN MANAGEMENT

DEFINITIONSZoning Code vs. ASCE 24-14

• RESIDENTIAL - building or structures and portions thereof where people live or that are used for sleeping purposes on a transient or non-transient basis - including but not limit to 1-family, 2-family, townhouses, condominiums, multifamily dwellings, apartments, congregate residences, boarding houses, lodging houses, rooming houses, hotels, motels, convents, monasteries, dormitories, fraternity houses, sorority houses, vacation time-share properties and institutional facilities: halfway houses, social rehabilitation facilities, alcohol and drug centers, detoxification facilities (ASCE 24-14)

• NON-RESIDENTIAL – not mentioned above

• NON-RESIDENTIAL (required to have 24” freeboard) - Generally structures needed in emergency events (see ASCE 24-14 for full list)

Page 27: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

27 / FLOODPLAIN MANAGEMENT

ZONING APPLICATIONProcess

1. Complete Flood Protection Form - ZONING2. Site Plan w/ Special Flood Hazard Area

Refusals issued for:• Prohibited uses• Floodway development• Placement of fill• Changes to the Special Flood Hazard

Area

NOTE:Although you may receive Zoning Approval for a project located in the Special Flood Hazard Area, Building Permits will require further compliance based on building codes/regulations.

Page 28: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

28 / FLOODPLAIN MANAGEMENT

• means any reconstruction, rehabilitation, addition, or other improvement of a structure, the cost of which equals or exceeds 50 percent of the market value of the structure (or smaller percentage if established by the community) before the “start of construction” of the improvement. This term includes structures that have incurred “substantial damage,” regardless of the actual repair work performed

EXISTING STRUCTURESSubstantial Improvements

Pre-FIRM house Pre-FIRM house, with substantial improvement determination

Page 29: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

29 / FLOODPLAIN MANAGEMENT

EXISTING STRUCTURESSubstantial Improvements - Process

City of Philadelphia

F

lood Protection Form – EXISTING BUILDINGS (FP-EX)

Page 1 of 6

Development Services Division

Municipal Services Building - Concourse Level

1401 John F. Kennedy Boulevard

Philadelphia, Pennsylvania 19102

FLOOD PROTECTION FORM – EXISTING BUILDINGS (FP-EX)

The form is for an existing building(s) in the Special Flood Hazard Area (SFHA) being renovated/altered and/or an addition being constructed. The

form serves to determine whether the development will constitute a substantial improvement, as well as establish which floodplain regulations

(Philadelphia Zoning Code, IRC 2015, IBC 2018, Administrative Codes, ASCE 24, and Appendix G) apply. The Flood Protection Form – EXISTING

BUILDINGS (FP-EX) is to be completed by the Owner, Agent, and/or Design Professional when an existing building in the Special Flood Hazard

Area (SFHA). If Zoning is required for the project, then the Flood Protection Acknowledgement Form – ZONING (FP-Z), must be completed.

Where you see Proceed to: Flood Protection Form – GENERAL (FP-G), complete that form in conjunction with this form (FP-EX).

For Interior Alterations to Single-Family Dwellings – see Flood Protection Form - EZ PERMITS (FP-EZ)

For full floodplain codes/regulations please visit the Floodplain Management webpage at

http://www.phila.gov/li/Pages/FloodplainManagement.aspx for more information.

For Submissions: The Philadelphia Department of Licenses and Inspections is located at:

1401 John F. Kennedy Boulevard -Concourse Level

Philadelphia, PA 19102

Counter Hours: Monday – Friday, 8:00am – 3:30pm (*closes at 12:00pm/noon last Wednesday of every month)

A. PROJECT INFORMATION

1. Address of proposed work

2. Owner of property

3. Owner address

4. Phone #

5. Agent of Owner

6. Company

7. Agent Address

8. Phone

FLOOD HAZARD INFORMATION – confirm that existing building is in the SFHA

1. Flood Risk Zone (existing building and/or addition that touches any of these Zones) – select all that apply

FEMA Mapped SFHA - A Zone – Complete Form

FEMA Mapped SFHA - AE Zone – Complete Form

FEMA Mapped – AE/Floodway – Complete Form

FEMA Mapped 0.02% or X - Proceed to section C, development

not regulated for floodplain codes/regulations - Attach a FIRMette,

if the building is outside the SFHA https://msc.fema.gov/portal/home

B. EXISTING BUILDING INFORMATION

For Historic Structures – see FP-G E4. Prior to completing this form

1. Year Constructed

1978 or before 1979 or after Unknown

2. Elevation Certificate

Yes - Attach to Application No

N/A

3. Scope of work over $25,000

Yes - Design Professional

Required

No N/A

4. Existing Building Value: “Taxable Improvement” value +

“Exempt Improvement” value (https://property.phila.gov/)

$______________________ No

5. Is B3 is “No”? AND Is B4 over $100,000?

Yes No

N/A

6. If B5 is “Yes,” and constructed before 1978 Proceed to section C, development

not regulated for floodplain codes/regulations as it is

not a substantial improvement

N/A

7. If B5 is “Yes,” and constructed after 1979 Proceed to section C, work shall not be allowed to

make the building non-compliant with any aspect of

the building that was required for compliance

N/A

8. If B3 is “Yes,” then - Detailed Cost Estimate or

Signed Contract is required

Yes - Attach to Application, see instructions for

details

No

FLOOD PROTECTION

FORM – EXISTING BUILDINGS

(FP-EX) 2018 Edition

Expires January 1, 2019

SUBMIT WITH BUILDING PERMIT APPLICATION

1. Complete Flood Protection Form - EXISTING BUILDINGS [FP-EX]

2. Attach Cost Estimate

ESTIMATED COST

• Materials and labor, including the estimated value of donated or discounted materials and owner or volunteer labor, plus sales tax

• Site preparation related to the improvement or repair (e.g., foundation excavation or filling in basements)

• Demolition and construction debris disposal

• Construction management and supervision

• Structural elements and exterior/interior finishes

• Utility and service equipment

Items that can be excluded:

• Costs to obtain or prepare plans and specifications

• Land survey costs

• Permit fees and inspection fees

• Outside improvements, including landscaping, irrigation, sidewalks, driveways, fences, yard lights, swimming pools, pool enclosures, and detached accessory structures (e.g., garages, sheds, and gazebos)

• Costs required for the minimum necessary work to correct existing violations of health, safety, and sanitary codes

3. Substantial Improvement Calculation

MARKET VALUEIMPROVEMENT VALUE

PERCENTAGE OF IMPROVEMENT

Page 30: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

30 / FLOODPLAIN MANAGEMENT

EXISTING STRUCTURESSubstantial Improvements - MARKET VALUE

INSERT ADDRESS

ADD TO GET MARKET VALUE

WWW.ATLAS.PHILA.GOV

Page 31: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

31 / FLOODPLAIN MANAGEMENT

EXISTING STRUCTURESSubstantial Improvements - MARKET VALUE

IF 1 PARCEL & MULTIPLE STRUCTURES, THEN:

2018 MARKET VALUE OF TAXABLE IMPROVEMENT(STRUCTURE/BUILDING ONLY)

IMPROVEMENT AREA (SQFT) PRICE PER SQFT

THEN:

PRICE PER SQFT EACH STRUCTURE/BUILDING SQFT

EXISTING MARKET VALUE

DETERMINING EXISTING MARKET VALUE (CONDO)

ADD ALL UNITS’ MARKET VALUE TOGETHER FOR EXISTING MARKET VALUE OF STRUCTURE/BUILDING

TO CHALLENGE THE MARKET VALUE: CERTIFIED APPRAISAL

• Licensed Appraiser in Pennsylvania

• Report

• Identify intended user (including property owner)

• Completed less than 1 year before floodplain application

• “Market Approach” is preferred - for structure only, land must be broken out (NOTE: to separate the market value of a structure from the value of the land on which it is located, appraisers may need to do more research than is normally undertaken in order to reasonably allocate the total value between the structure and the land) - for multiple buildings on one parcel, each must be assessed for existing market value

• “Income Capitalization Approached” is not acceptable

• All values must be for existing conditions, without any proposed improvements

Page 32: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

32 / FLOODPLAIN MANAGEMENT

EXISTING STRUCTURESEZ Permits

When in a Special Flood Hazard Area:• One or multiple EZ Permits could constitute “substantial improvement”• The department, at its discretion, will ensure that phased improvements

do not circumvent the substantial improvement requirements

Specific EZ Permits:• Pools & Spas - ineligible for EZ Permit• For Interior Alterations, Porch Enclosures, and Ductwork & Warm-air

Appliances:• Additional documents are required. See the Flood Protection

Form - EZ PERMITS (FP-EZ) for more information. These EZ Permits may only be submitted at Permit Services at 1401 JFK.

Page 33: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

33 / FLOODPLAIN MANAGEMENT

BUILDING PERMITSFloodway

• New development is prohibited, unless dock, trail, roadway & bridges• Docks, trails, roads & bridges must show a No Rise study must be

completed• Other local, state, and federal permits apply (DEP, USACE, Submerged Lands License)

Page 34: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

34 / FLOODPLAIN MANAGEMENT

BUILDING PERMITSA Zones

• FEMA uses existing information - not engineering studies - to draw Approximate Zone A boundaries. Information may have been provided by the USACE, other federal agencies, State and local agencies, and historic records.

• For existing single family residential and accessory structures, the City may specify the BFE through contour interpolation, for all other development a Hydrologic and Hydraulic Study must be completed to determine a BFE

Page 35: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

35 / FLOODPLAIN MANAGEMENT

BUILDING PERMITSResidential

• Lowest “livable” floor must be BFE+18” • Living room, office, bedrooms, bathrooms, etc.

• If spaces below BFE+18”, can only be used for: parking, building access, and incidental storage.

• Fully enclosed spaces must be “wet-floodproofed” - allow the automatic entry and exit of floodwater, through Flood Vents

• No bathrooms, offices, bedrooms, furniture, etc. • No basements or crawl spaces that are below-grade on all

sides• Non-conversion clause on Certificate of Occupancy for

space(s) below BFE+18”• Space can never be converted to “livable” space• Future underpinning is prohibited

• Use of Flood Damage Resistant Materials

Page 36: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

36 / FLOODPLAIN MANAGEMENT

BUILDING PERMITSResidential - w/ enclosures

Page 37: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

37 / FLOODPLAIN MANAGEMENT

BUILDING PERMITSResidential - townhouses w/ flood vents

• Townhouses/row-homes must be structurally independent• Bottom of vent no higher than 12” above adjacent grade • Vents on at least 2 sides of a structure• 2 vents per enclosed space• 1sq/in for every 1sq/ft of enclosed space• Only vent openings below BFE count

Page 38: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

38 / FLOODPLAIN MANAGEMENT

BUILDING PERMITSFlood Vents - crawl space

Page 39: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

39 / FLOODPLAIN MANAGEMENT

BUILDING PERMITSFlood Vents - Elevation Certificate

• See A8 and A9 on Elevation Certificate• Air vents and/or manually operated vents

are not allowed

Page 40: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

40 / FLOODPLAIN MANAGEMENT

BUILDING PERMITSFlood Damage Resistant Materials

• any building product [material, component or system] capable of withstanding direct and prolonged (at least 72 hours) contact with floodwaters without sustaining significant damage

• See Table 2 in FEMA Technical Bulletin “Flood Damage-Resistant Material Requirements”

fema.gov/media-library-data/20130726-1502-20490-4764/fema_tb_2_rev1.pdf

Page 41: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

41 / FLOODPLAIN MANAGEMENT

BUILDING PERMITSNon-Residential

• Option: Wet-floodproofed or Dry-floodproofed• If Wet-floodproofed, then spaces below BFE+18”, can only be used

for: parking, building access, and incidental storage.• Fully enclosed spaces must be “wet floodproofed” - allow the

automatic entry and exit of floodwater, through Flood Vents• Non-conversion clause on Certificate of Occupancy for

space(s) below BFE+18”• Use of Flood Damage Resistant Materials

• If Dry-floodproofed, below BFE+18”• structure, including utilities and equipment, being watertight

with all elements substantially impermeable to the entrance of floodwater and with structural components having the capacity to resist flood loads.

• typical use up to 3 feet• Not allowed in Coastal A Zones (along Delaware River)

Page 42: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

42 / FLOODPLAIN MANAGEMENT

BUILDING PERMITSMixed-Use Structures

Considerations:• Commercial portions:

• Wet-floodproofed, spaces below BFE+18”, use only as parking, building access, and incidental storage

or• Dry-floodproofed, commercial spaces below BFE+18”

• Residential portions: must be elevated BFE+18”, including lobbies with furniture, desk attendants, mailboxes, trash receptacles, and resident only facilities (gyms, game rooms, amenity spaces, etc)

• Wet-floodproofed, spaces below BFE+18”, use only as parking, building access, and incidental storage

• bicycle parking, stairwell enclosure, elevator vestibule, etc.

Page 43: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

43 / FLOODPLAIN MANAGEMENT

BUILDING PERMITSDry-floodproofing Certificate & considerations

• Dry-floodproofed considerations:• Building strength• Warning time• Level of protection• Operational

• Inspection/maintenance plans• Flood Emergency Operation

Plan, see FEMA technical bulletin “Floodproofing Non-Residential Buildings”

• Seepage• Sump pumps• Back-flow preventers

• Floodproofing Certificate• Must be submitted for Certificate of Occupancy

Page 44: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

44 / FLOODPLAIN MANAGEMENT

BUILDING PERMITSDry-floodproofing - examples

Page 45: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

45 / FLOODPLAIN MANAGEMENT

BUILDING PERMITSBelow-Grade Parking

• Must be Dry-floodproofed, to BFE+18”• Not allowed in Coastal A Zones (along Delaware River)• Not allowed in fully residential structures (IE. condominium and

apartment buildings)

Page 46: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

46 / FLOODPLAIN MANAGEMENT

BUILDING PERMITSMachinery/Equipment

• Mechanical• Fuel Systems• Electrical• Water supply• Elevator/escalators• Plumbing• Transformers• Generators• BFE + 18” unless

designed to submersible/dry floodproofed/waterproof

• Systems and components emerging from underground shall be designed to be anchored to resist flood loads and debris impact

Page 47: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

47 / FLOODPLAIN MANAGEMENT

BUILDING PERMITSMachinery/Equipment

Page 48: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

48 / FLOODPLAIN MANAGEMENT

BUILDING PERMITSMachinery/Equipment

Page 49: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

49 / FLOODPLAIN MANAGEMENT

BUILDING PERMITSElevators

Shafts below BFE+18”• Flood vents no

required in enclosed shafts

• All mechanicals elevated to BFE+18”

• Float switch• Programed for cab

to rest on the floor above BFE+18”

Page 50: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

50 / FLOODPLAIN MANAGEMENT

BUILDING PERMITSAccessory Structures

Page 51: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

51 / FLOODPLAIN MANAGEMENT

BUILDING PERMITSVehicles/Trailers

Page 52: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

52 / FLOODPLAIN MANAGEMENT

BUILDING PERMITSSeasonal/Temporary Structures

Non-enclosed• Anchored to withstand the hydrostatic & hydrodynamic loads as well

as not become buoyant• Examples: event tents, pergolas, ice rinks, event stage, etc.

Enclosed• Anchored to withstand the hydrostatic & hydrodynamic loads as well

as not become buoyant• Parking and Incidental storage use

• Flood vents• Use other than parking and incidental

storage uses• See residential or non-

residential standards

Page 53: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

53 / FLOODPLAIN MANAGEMENT

BUILDING PERMITSStorage

Prohibited, unless:• designed to be easily movable (no equipment required for

removing), in the event of a flood (IE. outdoor furniture, items on wheels, etc.),

• anchored to withstand the hydrostatic & hydrodynamic loads as well as not become buoyant

• elevated above BFE+18”

Page 54: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

54 / FLOODPLAIN MANAGEMENT

BUILDING PERMITSConstruction Storage/Trailers

Licensed and Road-ready• On site less than 180 days• Must be on wheels/chassis• No connected mechanicals (electric service, plumbing, etc)

More than 180 days and/or connected to mechanicals and/or not on wheels/chassis

• Anchored to withstand the hydrostatic & hydrodynamic loads as well as not become buoyant

• Elevated to BFE+18”

Page 55: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

55 / FLOODPLAIN MANAGEMENT

BUILDING PERMITSFill

• If less than 12”, in-place dry density is not less than 90% of the max. dry density at optimum moisture content determined in accordance with ASTM D 1557Less than 180 days

• If over 12”, then GEO-TECHNICAL REPORT (Section 1803 of IBC) • Requires Special Inspections

• Requires a Zoning Permit, and a Building Permit if over 5,000 SF• Requires a Letter of Map Change [LOMC] if a Hydrologic and

Hydraulic study shows any rise in the BFE

Page 56: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

56 / FLOODPLAIN MANAGEMENT

BUILDING PERMITSHistoric Structures

• Analysis that elevating and/or floodproofing would remove it from historic designation

• Singed and seal analysis from an Architect• Variance required through Board of Building Standards• Mechanicals should

be elevated to BFE+18”

• Flood damage resistant materials should be used in areas below BFE+18”

Page 57: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

57 / FLOODPLAIN MANAGEMENT

REQUIRED 3 times:(see section C on Elevation Certificate)

• Building Permit submission• During Construction

• Lowest Floor installation• No vertical work can

occur until submitted• Final completion, prior to

Certificate of Occupancy

ELEVATION CERTIFICATERequirements

Page 58: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

58 / FLOODPLAIN MANAGEMENT

General:• All lines shall be completed, and when not applicable an “N/A” should

be entered• Should be signed and sealed by a licensed surveyor/architect/

engineer• A8-9: Flood Vents

• Complete fully per design plans• B9: Base Flood Elevation

• Always in NGVD 29 datum• Rounded to nearest tenth degree, no whole numbers• Should be based from Flood Insurance Study [FIS] when cross

sections are available. If, no cross section, then use the Flood Insurance Rate Map [FIRM]

ELEVATION CERTIFICATEHow to complete fully and correctly

Page 59: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

59 / FLOODPLAIN MANAGEMENT

• C2.a-h: Structure design elevations (must be in NGVD 29)• C2.a lowest floor elevation of lowest enclosed space (IE.

crawlspace (rat slab), basement slab, garage slab (if attached - townhouse/rowhouse)

• C2.c is N/A in Philadelphia (No velocity or wave action zones)• C2.e Lowest machinery/equipment should be identified

• In “Comments” section at bottom of PG2, list lowest elevations of these mechanicals/equipment if applicable: HVAC, electrical, gas, plumbing, elevators, transformer pad, generator, etc.

Any site plans illustrating flood elevations shall be in datum NGVD 29, if your converting City Datum to NGVD 29 - see conversion table as there are 7 survey districts with varying conversion factors. A note of which conversion factor must be placed on the plans.

ELEVATION CERTIFICATEHow to complete fully and correctly

Page 60: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

60 / FLOODPLAIN MANAGEMENT

ELEVATION CERTIFICATEDATUM

• FEMA FIRM maps: NGVD 29• US standard: NAVD 88• City Philadelphia standard:

City Datum

Since FEMA FIRM’s are in NGVD 29, then Elevation Certificates should be completed in NGVD 29. If surveying in City Datum, use chart to convert to NGVD 29. Plan drawings should clearly show datum used, and conversion factors used.

Page 61: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

61 / FLOODPLAIN MANAGEMENT

LETTER OF MAP REVISION [LOMC]General

Common Reasons:• Remove the mandatory flood insurance requirement• To adjust flood insurance rate information• To better understand the flood risk associated with a structure or

property

Time-frames (estimated):• LOMA’s, LOMR-F’s, CLOMA’s and CLOMR-F’s

• FEMA - 60 days of receiving all required date• If additional data is requested, applicant has 90 days, before

case is suspended• LOMR’s and CLOMR’s

• FEMA- 90 days of receiving all required data• LOMR’s require 4-6 month adoption period before becoming

effective maps

Page 62: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

62 / FLOODPLAIN MANAGEMENT

LETTER OF MAP REVISION [LOMC]General

LOMC CITY FEMA DEFINITION PROCESSCONDITIONAL LETTER OF MAP AMENDMENT

[CLOMA]

Noletter from FEMA stating a proposed structure that is not to be elevated by fill (natural grade) would not be inundated by the base flood if built as proposed

Submit Application to FEMA

LETTER OF MAP AMENDMENT

[LOMA]No

issued when the scale of the FIRM does not allow for small areas of natural high ground to be shown outside the SFHA

Submit Application to FEMA

CONDITIONAL LETTER OF MAP REVISION - FILL

[CLOMR-F]

Yes

letter from FEMA stating a parcel of land or proposed structure that will be elevated by fill would not be inundated by the base flood if fill is placed on the parcel as proposed or the structure is built as proposed

1. CLOMR-F application submitted to FEMA2. “Community Official” portion of the application may be filled out by

the City of Philadelphia’s Floodplain Administrator3. FEMA determination4. If approved, Zoning/Building Permits to place fill.5. Placement of fill, then continue to LOMR-F

LETTER OF MAP REVISION - FILL

[LOMR-F]Yes

similar to a LOMA, but instead of being based on natural ground elevations, the property or structure has been elevated by fill in order to elevate it above the flood elevation

1. LOMR-F application submitted to FEMA2. “Community Official” portion of the application may be filled out by

the City of Philadelphia’s Floodplain Administrator3. FEMA determination4. If approved, City’s Flood Insurance Rate Maps are changed and

development can be permitted based on the new effective maps.

CONDITIONALLETTER OF

MAP REVISION [CLOMR]

Yes

letter from FEMA’s stating a proposed project that would, upon construction, affect the hydrologic or hydraulic characteristics of a flooding source and thus result in the modification of the existing regulatory floodway, the effective BFE or SFHA

1. CLOMR application submitted to FEMA2. FEMA determination3. If approved, Zoning/Building Permits to develop site4. Development construction, then continue to LOMR

LETTER OF MAP REVISION

[LOMR]Yes

official revision to an effective FIRM map that may change flood insurance risk zones, floodplain and/or floodway boundary delineations, plain metric features, and/or BFE. Unlike LOMAs and LOMR-Fs, a LOMR usually results in reprinting a portion of a FIRM

1. LOMR application submitted to FEMA2. “Community Official” portion of the application may be filled out by

the City of Philadelphia’s Floodplain Administrator3. FEMA determination 4. If approved, City’s Flood Insurance Rate Maps are changed and

development can be permitted based on the new effective maps.

Page 63: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

63 / FLOODPLAIN MANAGEMENT

LETTER OF MAP REVISION [LOMC]Conditional Letter of Map Amendment [CLOMA]

• letter from FEMA stating a proposed structure that is not to be elevated by fill (natural grade) would not be inundated by the base flood if built as proposed

Page 64: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

64 / FLOODPLAIN MANAGEMENT

LETTER OF MAP REVISION [LOMC]Letter of Map Amendment [LOMA]

• issued when the scale of the FIRM does not allow for small areas of natural high ground to be shown outside the SFHA

Page 65: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

65 / FLOODPLAIN MANAGEMENT

• letter from FEMA stating a parcel of land or proposed structure that will be elevated by fill would not be inundated by the base flood if fill is placed on the parcel as proposed or the structure is built as proposed

LETTER OF MAP REVISION [LOMC]Conditional Letter of Map Revision - Fill [CLOMR-F]

Page 66: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

66 / FLOODPLAIN MANAGEMENT

LETTER OF MAP REVISION [LOMC]Letter of Map Revision - Fill [LOMR-F]

• similar to a LOMA, but instead of being based on natural ground elevations, the property or structure has been elevated by fill in order to elevate it above the flood elevation

Page 67: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

67 / FLOODPLAIN MANAGEMENT

LETTER OF MAP REVISION [LOMC]Conditional Letter of Map Revision [CLOMR]

• letter from FEMA’s stating a proposed project that would, upon construction, affect the hydrologic or hydraulic characteristics of a flooding source and thus result in the modification of the existing regulatory floodway, the effective BFE or SFHA

Page 68: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

68 / FLOODPLAIN MANAGEMENT

LETTER OF MAP REVISION [LOMC]Letter of Map Revision [LOMR]

• official revision to an effective FIRM map that may change flood insurance risk zones, floodplain and/or floodway boundary delineations, plain metric features, and/or BFE. Unlike LOMAs and LOMR-Fs, a LOMR usually results in reprinting a portion of a FIRM

Page 69: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

69 / FLOODPLAIN MANAGEMENT

RESOURCESLicenses + Inspections Website

www.phila.gov/li/Pages/FloodplainManagement.aspx

Page 70: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

70 / FLOODPLAIN MANAGEMENT

RESOURCESFEMA Technical Bulletins

www.fema.gov/nfip-technical-bulletins

Page 71: UPDATE: 12.2018 PHILADELPHIA · 2019-12-04 · 1 / floodplain management philadelphia - regulations & processes for development in the. special flood hazard area. josh lippert, cfm

71 / FLOODPLAIN MANAGEMENT

Questions and/or comments?

JOSH LIPPERT, CFMFLOODPLAIN MANAGER

[email protected]

THANK-YOU!