Product Work Log 20122013 Name: Sydney Solano Date: Product: Saxophone Quartet Date Time Activity Comments September 10, 2012 4:30 pm 2 hours Auditions I only had 3 people arrive for auditions. 2 of the 3 were incapable of playing at the level of the work. September 17, 2012 3:50 pm 1 hour First Interest Meeting This was also used as a makeup for auditions in case someone was still interested. No one showed up for the interest meeting. September 20, 2012 6 pm 1 hour Last meeting, last minute auditions. I was hoping that somebody would show up, but nobody did. I had to now alter the entire project. September 20, 2012 10pm First email with Senior Project Facilitator I needed to explain to her that I did not have any participants for my project. That I now had no one to perform, and I had to change the project completely. September 22, 2012 11am 6 hours Skype call with my senior project facilitator. During this time we went over possibilities for the project, and alternatives. During this time, we concluded that the product will just have

Upload: sydsolano

Post on 07-Aug-2015

67 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Untitleddocument

Product Work Log 2012­2013

Name: Sydney Solano Date:

Product: Saxophone Quartet

Date Time Activity Comments

September 10, 2012 4:30 pm2 hours

Auditions I only had 3 peoplearrive for auditions. 2of the 3 wereincapable of playingat the level of thework.

September 17, 2012 3:50 pm1 hour

First Interest Meeting This was also usedas a makeup forauditions in casesomeone was stillinterested. No oneshowed up for theinterest meeting.

September 20, 2012 6 pm1 hour

Last meeting, lastminute auditions.

I was hoping thatsomebody wouldshow up, but nobodydid. I had to now alterthe entire project.

September 20, 2012 10pm First email withSenior ProjectFacilitator

I needed to explain toher that I did not haveany participants formy project. That Inow had no one toperform, and I had tochange the projectcompletely.

September 22, 2012 11am6 hours

Skype call with mysenior projectfacilitator.

During this time wewent overpossibilities for theproject, andalternatives. Duringthis time, weconcluded that theproduct will just have

Page 2: Untitleddocument

to be the piece initself. There is no wayto make players fallout of thin air. Newproject: Composing asaxophone quartetpiece withoutperformers.

September 23, 2012 10am4 hours

Composing

September 24, 2012through October 19,2012.

Nothing Nothing This time was jampacked withmarching band. Afterschool, duringschool, andweekends wereabsorbed withMarching band, so noreal productiveamount of time wasspent composingduring this time.

October 25, 2012 4:16 pm Updated SeniorProject facilitator oncomposition.

October 27, 2012 6pm2 hours

First run through This was the firstcrucial edit to thepiece. I used theprogram “Noteflight”so that she couldview the project as itprogressed. Shechecked for errorsand told me if I couldcontinue or not.

November 3, 2012 10am4 hours

Composition This was a roughtime. I started andrestartedcompositions at least14 times.

November 10, 2012 10am4 hours

Composition

November 10, 2012 4pm 2 hours Run through Melanie told me that

Page 3: Untitleddocument

everything I waswriting was out oforder. So, at thistime, I realized that Icannot go such along time withoutcontacting her inorder to conservetime and preventgiant hiccups.

November 24, 2012 9am7 hours

Composition Skypecall with Melanie

This time was spentgoing back and forthover the CORRECTway to write. Duringthis time, I learned somuch about myselfand how to write.

November 25, 2012 5pm1 hour

Composition

November 26, 2012 6pm1 hour

Composition

November 27, 2012 11pm1 hour

Composition

November 29, 2012 9pm2 hours

Skype call runthrough

Melanie was verypleased about what Ihad, and I couldfinally move forwardconfidently.

December 3, 2012 7pm1 hour

Composition

December 4,2012­January 29,2012

Nothing This time was spentwith my church andmissions team. I lead2 praise bands, 2youth groups, a GEDclass, a youngwoman’s bible study,and I am with mymission’s team. ThisHoliday time is a timeof giving back to thecommunity. I spent ahuge amount of time

Page 4: Untitleddocument

in the communityserving and feedingthe homeless in HollySprings, caroling atthe nursing home,involved in dramas atmy church to portraythe Christmas story,and serving in allservices at thechurchinstrumentally, andvocally.

January 31, 2013 7pm3 hours

Run through Skypecall

Picked up oncomposition andtouched base withMelanie about where Iwas in my project.

February 6, 2013 8pm6 hours

Composition andfinishing touches andrun throughs withMelanie

This is the end of thecomposition process.

February 8, 2013 9pm Email Melanie explains tome that my counterAlto line is in thewrong key and I needto start over on theAlto line. I made sureto get EXACTLY whatshe wanted toprevent futuremistakes.

February 10, 2013 10am Tried to get in contactwith Melanie, noreach.

I finished thealterations, but I couldnot get in touch with

Melanie.February 11,2013­February 20,2013

Tried to get in contactwith Melanie.

I called, texted, andemailed Melaniealmost religiouslywith no response.

February 21, 2013 3:17 pm Email Melanie emails me

February 24, 2013 2:14 am Melanie passed

Page 5: Untitleddocument

away.

March 3, 2013 12:16 pm Phone call I got Robert Brown tostep in as my projectfacilitator.

March 5, 2013 7pm1 hour

Meeting with Robert All parts of thecomposition arecorrect. Projectcomplete.

March 11, 2013 8am Printed parts

March 11, 2013 7pm Laminated andframed parts