university of pittsburgh chevron annex robert mroskey | construction option advisor: dr. chimay...

31
UNIVERSITY OF PITTSBURGH CHEVRON ANNEX ROBERT MROSKEY | CONSTRUCTION OPTION ADVISOR: DR. CHIMAY ANUMBA PENN STATE AE SENIOR CAPSTONE PROJECT

Upload: claribel-hunter

Post on 18-Dec-2015

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: UNIVERSITY OF PITTSBURGH CHEVRON ANNEX ROBERT MROSKEY | CONSTRUCTION OPTION ADVISOR: DR. CHIMAY ANUMBA PENN STATE AE SENIOR CAPSTONE PROJECT

UNIVERSITY OF PITTSBURGHCHEVRON ANNEX

ROBERT MROSKEY | CONSTRUCTION OPTIONADVISOR: DR. CHIMAY ANUMBA

PENN STATE AE SENIOR CAPSTONE PROJECT

Page 2: UNIVERSITY OF PITTSBURGH CHEVRON ANNEX ROBERT MROSKEY | CONSTRUCTION OPTION ADVISOR: DR. CHIMAY ANUMBA PENN STATE AE SENIOR CAPSTONE PROJECT

UNIVERSITY OF PITTSBURGHCHEVRON ANNEX

I. PROJECT BACKGROUNDII. ANALYSIS #1: TECHNOLOGY IN THE FIELDIII. ANALYSIS #2: FAÇADE RE-SEQUENCE IV. ANALYSIS #3: COMMISSIONING LAB SPACESV. ANALYSIS #4: GREEN ROOF ADDITIONVI. SUMMARYVII. ACKNOWLEDGEMENTSVIII.QUESTIONS

PRESENTATION OUTLINE

ROBERT MROSKEY | CONSTRUCTION OPTIONADVISOR: DR. CHIMAY ANUMBA

PENN STATE AE SENIOR CAPSTONE PROJECT

Page 3: UNIVERSITY OF PITTSBURGH CHEVRON ANNEX ROBERT MROSKEY | CONSTRUCTION OPTION ADVISOR: DR. CHIMAY ANUMBA PENN STATE AE SENIOR CAPSTONE PROJECT

OWNER & BACKGROUND INFOPRESENTATION OUTLINE

OWNER | THE UNIVERSITY OF PITTSBURGHARCHITECT | WILSON ARCHITECTSGENERAL CONTRACTOR | BURCHICK CONSTRUCTIONSTRUCTURAL ENGINEER | BARBER & HOFFMAN, INC.MEP/FP | AFFILIATED ENGINEERS, INC.CIVIL ENGINEERS | THE GATEWAY ENGINEERS, INC.

I. PROJECT BACKGROUNDI. OWNER & BACKGROUND INFOII. SITE PLAN

II. ANALYSIS #1: TECHNOLOGY IN THE FIELDIII. ANALYSIS #2: FAÇADE RE-SEQUENCE IV. ANALYSIS #3: COMMISSIONING LAB SPACESV. ANALYSIS #4: GREEN ROOF ADDITIONVI. SUMMARYVII. ACKNOWLEDGEMENTSVIII. QUESTIONS

PROJECT PARTICIPANTS

PROJECT COST | $25 MSIZE | 35,000 SFBUILDING LOCATION | PITTSBURGH, PADURATION | NOV. 2009 – SEPT. 2011PROJECT DELIVERY METHOD | DESIGN-BID-BUILD

PROJECT PARAMETERS

Page 4: UNIVERSITY OF PITTSBURGH CHEVRON ANNEX ROBERT MROSKEY | CONSTRUCTION OPTION ADVISOR: DR. CHIMAY ANUMBA PENN STATE AE SENIOR CAPSTONE PROJECT

OWNER & BACKGROUND INFOPRESENTATION OUTLINE

I. PROJECT BACKGROUNDI. OWNER & BACKGROUND INFOII. SITE PLAN

II. ANALYSIS #1: TECHNOLOGY IN THE FIELDIII. ANALYSIS #2: FAÇADE RE-SEQUENCE IV. ANALYSIS #3: COMMISSIONING LAB SPACESV. ANALYSIS #4: GREEN ROOF ADDITIONVI. SUMMARYVII. ACKNOWLEDGEMENTSVIII. QUESTIONS

CONSTRUCTION LOGISTICS 2 PHASE PROJECT – RENOVATION & VERT ADDITION

ARCITECTURE 2 CHEMICAL RESEARCH FLOORS 1 MECHANICAL PENTHOUSEFAÇADE SYSTEMS

TERRA COTTA METAL PANELS LOUVERS GLAZING

LEED GOLD

BUILDING LAYOUT

Page 5: UNIVERSITY OF PITTSBURGH CHEVRON ANNEX ROBERT MROSKEY | CONSTRUCTION OPTION ADVISOR: DR. CHIMAY ANUMBA PENN STATE AE SENIOR CAPSTONE PROJECT

OWNER & BACKGROUND INFOPRESENTATION OUTLINE

I. PROJECT BACKGROUNDI. OWNER & BACKGROUND INFOII. SITE PLAN

II. ANALYSIS #1: TECHNOLOGY IN THE FIELDIII. ANALYSIS #2: FAÇADE RE-SEQUENCE IV. ANALYSIS #3: COMMISSIONING LAB SPACESV. ANALYSIS #4: GREEN ROOF ADDITIONVI. SUMMARYVII. ACKNOWLEDGEMENTSVIII. QUESTIONS

BUILDING SYSTEMS

MEP SYSTEMS ADDITION SERVICE BY 3 NEW AHU’S(3) LABORATORY EXHAUST FANS(1) 1500 kW EMERGENCY GENERATOR300 kVA TRANSFORMER1600 A MAIN SWITCHBOARD

STRUCTURAL SYSTEM STRUCTURAL STEELSTILT-LIKE STRUCTURE SUPPORTED BY PILE CAPSBRACED FRAMES TO RESIST SHEAR AND LATERAL LOADS

Page 6: UNIVERSITY OF PITTSBURGH CHEVRON ANNEX ROBERT MROSKEY | CONSTRUCTION OPTION ADVISOR: DR. CHIMAY ANUMBA PENN STATE AE SENIOR CAPSTONE PROJECT

SITE PLANPRESENTATION OUTLINE

I. PROJECT BACKGROUNDI. OWNER & BACKGROUND INFOII. SITE PLAN

II. ANALYSIS #1: TECHNOLOGY IN THE FIELDIII. ANALYSIS #2: FAÇADE RE-SEQUENCE IV. ANALYSIS #3: COMMISSIONING LAB SPACESV. ANALYSIS #4: GREEN ROOF ADDITIONVI. SUMMARYVII. ACKNOWLEDGEMENTSVIII. QUESTIONS

RED: Project Site

BLUE: Field Offices & Limited Parking

GREEN: Lay-down/Storage Areas

Page 7: UNIVERSITY OF PITTSBURGH CHEVRON ANNEX ROBERT MROSKEY | CONSTRUCTION OPTION ADVISOR: DR. CHIMAY ANUMBA PENN STATE AE SENIOR CAPSTONE PROJECT

PROBLEM IDENTIFICATIONPRESENTATION OUTLINE

I. PROJECT BACKGROUNDII. ANALYSIS #1: TECHNOLOGY IN THE FIELD

I. PROBLEM IDENTIFICATIONII. CASE STUDIES III. IMPLEMENTATION

III. ANALYSIS #2: FAÇADE RE-SEQUENCE IV. ANALYSIS #3: COMMISSIONING LAB SPACESV. ANALYSIS #4: GREEN ROOF ADDITIONVI. SUMMARYVII. ACKNOWLEDGEMENTSVIII. QUESTIONS

CONTRIBUTING FACTORS TO CONTRACTOR REWORK

RED: Project Site

BLUE: Field Offices & Limited Parking

GREEN: Lay-down/Storage Areas

Page 8: UNIVERSITY OF PITTSBURGH CHEVRON ANNEX ROBERT MROSKEY | CONSTRUCTION OPTION ADVISOR: DR. CHIMAY ANUMBA PENN STATE AE SENIOR CAPSTONE PROJECT

CASE STUDIESPRESENTATION OUTLINE

I. PROJECT BACKGROUNDII. ANALYSIS #1: TECHNOLOGY IN THE FIELD

I. PROBLEM IDENTIFICATIONII. CASE STUDIES III. IMPLEMENTATION

III. ANALYSIS #2: FAÇADE RE-SEQUENCE IV. ANALYSIS #3: COMMISSIONING LAB SPACESV. ANALYSIS #4: GREEN ROOF ADDITIONVI. SUMMARYVII. ACKNOWLEDGEMENTSVIII. QUESTIONS

BALFOUR BEATTY

SUFFOLK CONSTRUCTION

BOND BROTHERS

VELA SYSTEMSVELA WEB

ISSUES & PUNCHLISTS QA/QC SAFETY COMMISSIONING

VELA MOBILE IPAD OR SMART PHONE DOCUMENTS, CHECKLISTS, ETC.

VELA REPORTSFIELD BIM

Page 9: UNIVERSITY OF PITTSBURGH CHEVRON ANNEX ROBERT MROSKEY | CONSTRUCTION OPTION ADVISOR: DR. CHIMAY ANUMBA PENN STATE AE SENIOR CAPSTONE PROJECT

CASE STUDIESPRESENTATION OUTLINE

I. PROJECT BACKGROUNDII. ANALYSIS #1: TECHNOLOGY IN THE FIELD

I. PROBLEM IDENTIFICATIONII. CASE STUDIES III. IMPLEMENTATION

III. ANALYSIS #2: FAÇADE RE-SEQUENCE IV. ANALYSIS #3: COMMISSIONING LAB SPACESV. ANALYSIS #4: GREEN ROOF ADDITIONVI. SUMMARYVII. ACKNOWLEDGEMENTSVIII. QUESTIONS

BALFOUR BEATTY

VELA SYSTEMS & iPADS COMPANY-WIDEPROTECTIVE CASE LOW COST LONG BATTERY LIFEEASE-OF USE

REDUCTION IN GENERAL CONDITIONS INCREASED EFFICIENCYREDUCED RISK

Page 10: UNIVERSITY OF PITTSBURGH CHEVRON ANNEX ROBERT MROSKEY | CONSTRUCTION OPTION ADVISOR: DR. CHIMAY ANUMBA PENN STATE AE SENIOR CAPSTONE PROJECT

CASE STUDIESPRESENTATION OUTLINE

I. PROJECT BACKGROUNDII. ANALYSIS #1: TECHNOLOGY IN THE FIELD

I. PROBLEM IDENTIFICATIONII. CASE STUDIES III. IMPLEMENTATION

III. ANALYSIS #2: FAÇADE RE-SEQUENCE IV. ANALYSIS #3: COMMISSIONING LAB SPACESV. ANALYSIS #4: GREEN ROOF ADDITIONVI. SUMMARYVII. ACKNOWLEDGEMENTSVIII. QUESTIONS

SUFFOLK CONSTRUCTION

WASTED TIME COMMUNICATINGMEETING MINUTES

INCREASE IN:PERSONAL PRODUCTIVITYPROJECT ACCELERATIONRISK REDUCTIONCOST OF QUALITY

Page 11: UNIVERSITY OF PITTSBURGH CHEVRON ANNEX ROBERT MROSKEY | CONSTRUCTION OPTION ADVISOR: DR. CHIMAY ANUMBA PENN STATE AE SENIOR CAPSTONE PROJECT

CASE STUDIESPRESENTATION OUTLINE

I. PROJECT BACKGROUNDII. ANALYSIS #1: TECHNOLOGY IN THE FIELD

I. PROBLEM IDENTIFICATIONII. CASE STUDIES III. IMPLEMENTATION

III. ANALYSIS #2: FAÇADE RE-SEQUENCE IV. ANALYSIS #3: COMMISSIONING LAB SPACESV. ANALYSIS #4: GREEN ROOF ADDITIONVI. SUMMARYVII. ACKNOWLEDGEMENTSVIII. QUESTIONS

BOND BROTHERS

COMMISSIONING OF HARVARD LABELIMINATED NEED FOR PAPERTABLET PC’S:

VIEW DRAWINGSMARK UP DRAWINGSPUNCHLISTHANDOVER DOCUMENT SET

Page 12: UNIVERSITY OF PITTSBURGH CHEVRON ANNEX ROBERT MROSKEY | CONSTRUCTION OPTION ADVISOR: DR. CHIMAY ANUMBA PENN STATE AE SENIOR CAPSTONE PROJECT

IMPLEMENTATIONPRESENTATION OUTLINE

BENEFITS & SAVINGSI. PROJECT BACKGROUNDII. ANALYSIS #1: TECHNOLOGY IN THE FIELD

I. PROBLEM IDENTIFICATIONII. CASE STUDIESSIII. IMPLEMENTATION

III. ANALYSIS #2: FAÇADE RE-SEQUENCE IV. ANALYSIS #3: COMMISSIONING LAB SPACESV. ANALYSIS #4: GREEN ROOF ADDITIONVI. SUMMARYVII. ACKNOWLEDGEMENTSVIII. QUESTIONS

Worker Rate Unit Hours/DayProject Days

Total Hours Total Cost

Superintendent $ 54.03 $/hr 3.83 486

1,863.00 $ 100,661.62

Foreman $ 48.80 $/hr 1.00 486

486.00 $ 23,716.80

Accountant $ 25.00 $/hr 1.00 486

486.00 $ 12,150.00

Project Manager $ 50.00 $/hr 1.00 486

486.00 $ 24,300.00

          3,321.00 $ 160,828.42

COSTS ASSOCIATED WITHOUT TECHNOLOGY IN THE FIELD

Technology Type Cost   Quantity Total CostiPad w/ warranty &

camera $ 937.00 3.00 $ 2,811.00

OtterBox Case $ 70.00 3.00 $ 210.00

Vela Systems $ 11,064.00 1.00 $ 11,064.00

Vela Training $ 2,500.00   1.00 $ 2,500.00

Total       $ 16,585.00

Potential Savings Associated with Technology in the Field

Costs without Technology $ 160,828.42

Technology Costs $ 16,585.00

Potential Savings $ 144,243.42

POTENTIAL SAVINGSESTIMATED TECHNOLOGY COSTS

TECHNOLOGY SHOULD HAVE BEEN USED ON THE CHEVRON ANNEX AND FUTURE PROJECTS

Page 13: UNIVERSITY OF PITTSBURGH CHEVRON ANNEX ROBERT MROSKEY | CONSTRUCTION OPTION ADVISOR: DR. CHIMAY ANUMBA PENN STATE AE SENIOR CAPSTONE PROJECT

PROBLEM IDENTIFICATIONPRESENTATION OUTLINE

SEPARATE PRIME CONTRACTORSI. PROJECT BACKGROUNDII. ANALYSIS #1: TECHNOLOGY IN THE FIELDIII. ANALYSIS #2: FAÇADE RE-SEQUENCE

I. PROBLEM IDENTIFICATIONII. LAST PLANNER INTRODUCTIONIII. SWING LOCATIONSIV. PHASINGV. SUMMARY

IV. ANALYSIS #3: COMMISSIONING LAB SPACESV. ANALYSIS #4: GREEN ROOF ADDITIONVI. SUMMARYVII. ACKNOWLEDGEMENTSVIII. QUESTIONS

INTERDEPENDANCY OF FAÇADE SYSTEMS LIMITED NUMBER OF SCAFFOLDING SYSTEMS

ARHICTECTURAL EYEBROW MINIMUM SCOPE MEETINGS & PLANNING SESSIONS

Page 14: UNIVERSITY OF PITTSBURGH CHEVRON ANNEX ROBERT MROSKEY | CONSTRUCTION OPTION ADVISOR: DR. CHIMAY ANUMBA PENN STATE AE SENIOR CAPSTONE PROJECT

LAST PLANNER INTRODUCTIONPRESENTATION OUTLINE

CONCEPTI. PROJECT BACKGROUNDII. ANALYSIS #1: TECHNOLOGY IN THE FIELDIII. ANALYSIS #2: FAÇADE RE-SEQUENCE

I. PROBLEM IDENTIFICATIONII. LAST PLANNER INTRODUCTIONIII. SWING LOCATIONSIV. PHASINGV. SUMMARY

IV. ANALYSIS #3: COMMISSIONING LAB SPACESV. ANALYSIS #4: GREEN ROOF ADDITIONVI. SUMMARYVII. ACKNOWLEDGEMENTSVIII. QUESTIONS

KEY PRACTICES OF THE LAST PLANNER SYSTEM:

FLOW CHART COURTESY OF ENNOVA

MINIMIZING WORK VARIABILITY BETWEEN TASKS CREATING LOOK-AHEAD PLANS PLANNING WORK ON WEEKLY BASIS MEASURING PROGRESS AND USING WEEKLY

LEARNING TO IMPROVE WORK PRACTICES

Page 15: UNIVERSITY OF PITTSBURGH CHEVRON ANNEX ROBERT MROSKEY | CONSTRUCTION OPTION ADVISOR: DR. CHIMAY ANUMBA PENN STATE AE SENIOR CAPSTONE PROJECT

SWING LOCATIONSPRESENTATION OUTLINE

I. PROJECT BACKGROUNDII. ANALYSIS #1: TECHNOLOGY IN THE FIELDIII. ANALYSIS #2: FAÇADE RE-SEQUENCE

I. PROBLEM IDENTIFICATIONII. LAST PLANNER INTRODUCTIONIII. SWING LOCATIONSIV. PHASINGV. SUMMARY

IV. ANALYSIS #3: COMMISSIONING LAB SPACESV. ANALYSIS #4: GREEN ROOF ADDITIONVI. SUMMARYVII. ACKNOWLEDGEMENTSVIII. QUESTIONS

Page 16: UNIVERSITY OF PITTSBURGH CHEVRON ANNEX ROBERT MROSKEY | CONSTRUCTION OPTION ADVISOR: DR. CHIMAY ANUMBA PENN STATE AE SENIOR CAPSTONE PROJECT

PHASINGPRESENTATION OUTLINE

SOUTH ELEVATIONI. PROJECT BACKGROUNDII. ANALYSIS #1: TECHNOLOGY IN THE FIELDIII. ANALYSIS #2: FAÇADE RE-SEQUENCE

I. PROBLEM IDENTIFICATIONII. LAST PLANNER INTRODUCTIONIII. SWING LOCATIONSIV. PHASINGV. SUMMARY

IV. ANALYSIS #3: COMMISSIONING LAB SPACESV. ANALYSIS #4: GREEN ROOF ADDITIONVI. SUMMARYVII. ACKNOWLEDGEMENTSVIII. QUESTIONS

EAST ELEVATION

Page 17: UNIVERSITY OF PITTSBURGH CHEVRON ANNEX ROBERT MROSKEY | CONSTRUCTION OPTION ADVISOR: DR. CHIMAY ANUMBA PENN STATE AE SENIOR CAPSTONE PROJECT

PHASINGPRESENTATION OUTLINE

NORTH ELEVATIONI. PROJECT BACKGROUNDII. ANALYSIS #1: TECHNOLOGY IN THE FIELDIII. ANALYSIS #2: FAÇADE RE-SEQUENCE

I. PROBLEM IDENTIFICATIONII. LAST PLANNER INTRODUCTIONIII. SWING LOCATIONSIV. PHASINGV. SUMMARY

IV. ANALYSIS #3: COMMISSIONING LAB SPACESV. ANALYSIS #4: GREEN ROOF ADDITIONVI. SUMMARYVII. ACKNOWLEDGEMENTSVIII. QUESTIONS

WEST ELEVATION

Page 18: UNIVERSITY OF PITTSBURGH CHEVRON ANNEX ROBERT MROSKEY | CONSTRUCTION OPTION ADVISOR: DR. CHIMAY ANUMBA PENN STATE AE SENIOR CAPSTONE PROJECT

SUMMARYPRESENTATION OUTLINE

ON-SITE KNOWLEDGE TO DETERMINE ACTIVITY DURATIONS

I. PROJECT BACKGROUNDII. ANALYSIS #1: TECHNOLOGY IN THE FIELDIII. ANALYSIS #2: FAÇADE RE-SEQUENCE

I. PROBLEM IDENTIFICATIONII. LAST PLANNER INTRODUCTIONIII. SWING LOCATIONSIV. PHASINGV. SUMMARY

IV. ANALYSIS #3: COMMISSIONING LAB SPACESV. ANALYSIS #4: GREEN ROOF ADDITIONVI. SUMMARYVII. ACKNOWLEDGEMENTSVIII. QUESTIONS

KNOW HOW A SYSTEM IS INSTALLED BEFORE PROJECT BEGINS

SEPARATE PRIMES ADD ADDITIONAL COORDINATION CONCERNS MULTIPLE COORDINATION AND SCOPE REVIEW

MEETINGS GET ALL PARTIES INVOLVED IN CREATING THE

SCHEDULE

THOROUGH SCOPE PROPER PLANNING IS ESSENTIAL

Page 19: UNIVERSITY OF PITTSBURGH CHEVRON ANNEX ROBERT MROSKEY | CONSTRUCTION OPTION ADVISOR: DR. CHIMAY ANUMBA PENN STATE AE SENIOR CAPSTONE PROJECT

PROBLEM IDENTIFICATIONPRESENTATION OUTLINE

COMMISSIONING AGENT WAS CONTRACTED DIRECTLY WITH THE OWNER

I. PROJECT BACKGROUNDII. ANALYSIS #1: TECHNOLOGY IN THE FIELDIII. ANALYSIS #2: FAÇADE RE-SEQUENCEIV. ANALYSIS #3: COMMISSIONING LAB SPACES

I. PROBLEM IDENTIFICATIONII. LAST PLANNER & NEW SCHEDULEIII. KEY DIFFERENCESIV. POSSIBLE SOLUTIIONS

V. ANALYSIS #4: GREEN ROOF ADDITIONVI. SUMMARYVII. ACKNOWLEDGEMENTSVIII. QUESTIONS

CHEVRON TOWER WAS IN NEGATIVE AIR CONDITION, SUCKING DIRT FROM THE PROJECT INTO THE EXISTING BUILDING

LABS HAD TO BE “DUST-FREE” BEFORE TAB COULD BEGIN

Page 20: UNIVERSITY OF PITTSBURGH CHEVRON ANNEX ROBERT MROSKEY | CONSTRUCTION OPTION ADVISOR: DR. CHIMAY ANUMBA PENN STATE AE SENIOR CAPSTONE PROJECT

LAST PLANNER & NEW SCHEDULEPRESENTATION OUTLINE

KEY MILESTONESI. PROJECT BACKGROUNDII. ANALYSIS #1: TECHNOLOGY IN THE FIELDIII. ANALYSIS #2: FAÇADE RE-SEQUENCEIV. ANALYSIS #3: COMMISSIONING LAB SPACES

I. PROBLEM IDENTIFICATIONII. LAST PLANNER & NEW SCHEDULEIII. KEY DIFFERENCESIV. POSSIBLE SOLUTIIONS

V. ANALYSIS #4: GREEN ROOF ADDITIONVI. SUMMARYVII. ACKNOWLEDGEMENTSVIII. QUESTIONS

AHU DELIVERY DATESTROBIC FAN START-UP L&I INSPECTIONSABOVE CEILING WORKTESTING AND BALANCING

Page 21: UNIVERSITY OF PITTSBURGH CHEVRON ANNEX ROBERT MROSKEY | CONSTRUCTION OPTION ADVISOR: DR. CHIMAY ANUMBA PENN STATE AE SENIOR CAPSTONE PROJECT

KEY DIFFERENCESPRESENTATION OUTLINE

LABORATORY CASEWORK

I. PROJECT BACKGROUNDII. ANALYSIS #1: TECHNOLOGY IN THE FIELDIII. ANALYSIS #2: FAÇADE RE-SEQUENCEIV. ANALYSIS #3: COMMISSIONING LAB SPACES

I. PROBLEM IDENTIFICATIONII. LAST PLANNER & NEW SCHEDULEIII. KEY DIFFERENCESIV. POSSIBLE SOLUTIIONS

V. ANALYSIS #4: GREEN ROOF ADDITIONVI. SUMMARYVII. ACKNOWLEDGEMENTSVIII. QUESTIONS

ABOVE CEILING WORK

ARCHITECTURAL MILLWORK & DUST-FREE ACTIVITIES STROBIC FAN START-UP NIPPLE PLENUMS FOOTBALL SHROUDS AT FUME HOODS AHU DELIVERY LATER THAN EXPECTED

Page 22: UNIVERSITY OF PITTSBURGH CHEVRON ANNEX ROBERT MROSKEY | CONSTRUCTION OPTION ADVISOR: DR. CHIMAY ANUMBA PENN STATE AE SENIOR CAPSTONE PROJECT

POSSIBLE SOLUTIONSPRESENTATION OUTLINE

COMMISSIONING AGENT

I. PROJECT BACKGROUNDII. ANALYSIS #1: TECHNOLOGY IN THE FIELDIII. ANALYSIS #2: FAÇADE RE-SEQUENCEIV. ANALYSIS #3: COMMISSIONING LAB SPACES

I. PROBLEM IDENTIFICATIONII. LAST PLANNER & NEW SCHEDULEIII. KEY DIFFERENCESIV. POSSIBLE SOLUTIIONS

V. ANALYSIS #4: GREEN ROOF ADDITIONVI. SUMMARYVII. ACKNOWLEDGEMENTSVIII. QUESTIONS

GET INVOLVED IN THE PROJECT DURING THE DESIGN PHASE

REQUIRE TO MAKE VISITS TO THE PROJECT SITE ROUTINELY

SAME CX AGENT PERFORMING: SUBMITTAL & RFI REVIEWS TESTING & BALANCING

TECHNOLOGY IN THE FIELDADEQUATE SCOPE INFORMATIONPREFABRICATION LETTER TO THE OWNER

Page 23: UNIVERSITY OF PITTSBURGH CHEVRON ANNEX ROBERT MROSKEY | CONSTRUCTION OPTION ADVISOR: DR. CHIMAY ANUMBA PENN STATE AE SENIOR CAPSTONE PROJECT

GREEN ROOF TYPES & COMPONENTSPRESENTATION OUTLINE

I. PROJECT BACKGROUNDII. ANALYSIS #1: TECHNOLOGY IN THE FIELDIII. ANALYSIS #2: FAÇADE RE-SEQUENCE IV. ANALYSIS #3: COMMISSIONING LAB SPACESV. ANALYSIS #4: GREEN ROOF ADDITION

I. GREEN ROOF TYPES & COMPONENTSII. STRUCTURAL BREADTH

VI. SUMMARYVII. ACKNOWLEDGEMENTSVIII. QUESTIONS

EXTENSIVE - LIGHTER & LESS EXPENSIVE NOT FOR HUMAN USE

INTENSIVE - HUMAN USE

INTENSIVE GREEN ROOF SECTION

Page 24: UNIVERSITY OF PITTSBURGH CHEVRON ANNEX ROBERT MROSKEY | CONSTRUCTION OPTION ADVISOR: DR. CHIMAY ANUMBA PENN STATE AE SENIOR CAPSTONE PROJECT

ADDITIONAL LOADSPRESENTATION OUTLINE

I. PROJECT BACKGROUNDII. ANALYSIS #1: TECHNOLOGY IN THE FIELDIII. ANALYSIS #2: FAÇADE RE-SEQUENCE IV. ANALYSIS #3: COMMISSIONING LAB SPACESV. ANALYSIS #4: GREEN ROOF ADDITION

I. GREEN ROOF TYPES & COMPONENTSII. STRUCTURAL BREADTH

I. ADDITIONAL LOADSII. CALCS OF STRUCTURAL MEMBERSIII. CONCLUSIONS

VI. SUMMARYVII. ACKNOWLEDGEMENTSVIII. QUESTIONS

STRUCTURAL BREADTH

REQUIREMENTSADDITIONAL LOADINGSCOLUMN LOAD CHECKSBEAM LOAD CHECKSGIRDER LOAD CHECKS

ORIGINAL LOADINGSROOF DEAD LOAD – 30 PSF ROOF LIVE LOAD – 30 PSF

NEW LOADINGSROOF DEAD LOAD – 90 PSF ROOF LIVE LOAD – 100 PSF

Page 25: UNIVERSITY OF PITTSBURGH CHEVRON ANNEX ROBERT MROSKEY | CONSTRUCTION OPTION ADVISOR: DR. CHIMAY ANUMBA PENN STATE AE SENIOR CAPSTONE PROJECT

CALCS OF STRUCTURAL MEMBERSPRESENTATION OUTLINE

I. PROJECT BACKGROUNDII. ANALYSIS #1: TECHNOLOGY IN THE FIELDIII. ANALYSIS #2: FAÇADE RE-SEQUENCE IV. ANALYSIS #3: COMMISSIONING LAB SPACESV. ANALYSIS #4: GREEN ROOF ADDITION

I. GREEN ROOF TYPES & COMPONENTSII. STRUCTURAL BREADTH

I. ADDITIONAL LOADSII. CALCS OF STRUCTURAL MEMBERSIII. CONCLUSIONS

VI. SUMMARYVII. ACKNOWLEDGEMENTSVIII. QUESTIONS

6 COLUMNS TESTED

1 REQUIRED RE-SIZINGE.8-2.8

ORIGINAL SIZE: W10 x 60 ADJUSTED SIZE: W10 x 88

Page 26: UNIVERSITY OF PITTSBURGH CHEVRON ANNEX ROBERT MROSKEY | CONSTRUCTION OPTION ADVISOR: DR. CHIMAY ANUMBA PENN STATE AE SENIOR CAPSTONE PROJECT

CALCS OF STRUCTURAL MEMBERSPRESENTATION OUTLINE

I. PROJECT BACKGROUNDII. ANALYSIS #1: TECHNOLOGY IN THE FIELDIII. ANALYSIS #2: FAÇADE RE-SEQUENCE IV. ANALYSIS #3: COMMISSIONING LAB SPACESV. ANALYSIS #4: GREEN ROOF ADDITION

I. GREEN ROOF TYPES & COMPONENTSII. STRUCTURAL BREADTH

I. ADDITIONAL LOADSII. CALCS OF STRUCTURAL MEMBERSIII. CONCLUSIONS

VI. SUMMARYVII. ACKNOWLEDGEMENTSVIII. QUESTIONS

3 TYPICAL BAYS

NO BEAM RE-SIZING NECESSARYBAY 1

BAY 2

BAY 3

Page 27: UNIVERSITY OF PITTSBURGH CHEVRON ANNEX ROBERT MROSKEY | CONSTRUCTION OPTION ADVISOR: DR. CHIMAY ANUMBA PENN STATE AE SENIOR CAPSTONE PROJECT

CALCS OF STRUCTURAL MEMBERSPRESENTATION OUTLINE

I. PROJECT BACKGROUNDII. ANALYSIS #1: TECHNOLOGY IN THE FIELDIII. ANALYSIS #2: FAÇADE RE-SEQUENCE IV. ANALYSIS #3: COMMISSIONING LAB SPACESV. ANALYSIS #4: GREEN ROOF ADDITION

I. GREEN ROOF TYPES & COMPONENTSII. STRUCTURAL BREADTH

I. ADDITIONAL LOADSII. CALCS OF STRUCTURAL MEMBERSIII. CONCLUSIONS

VI. SUMMARYVII. ACKNOWLEDGEMENTSVIII. QUESTIONS

3 GIRDERS TESTED

2 REQUIRED RE-SIZING<7.2-8.9>, <E.8>

ORIGINAL SIZE: W18 x 46 ADJUSTED SIZE: W24x 62

<0.2-2.8>, <C.3> ORIGINAL SIZE: W18 x 35 ADJUSTED SIZE: W21 x 44

Page 28: UNIVERSITY OF PITTSBURGH CHEVRON ANNEX ROBERT MROSKEY | CONSTRUCTION OPTION ADVISOR: DR. CHIMAY ANUMBA PENN STATE AE SENIOR CAPSTONE PROJECT

CONCLUSIONS OF STRUCTURAL BREADTHPRESENTATION OUTLINE

GREEN ROOFS REQUIRE ADDITIONAL STRUCTURAL REINFORCEMENT

I. PROJECT BACKGROUNDII. ANALYSIS #1: TECHNOLOGY IN THE FIELDIII. ANALYSIS #2: FAÇADE RE-SEQUENCE IV. ANALYSIS #3: COMMISSIONING LAB SPACESV. ANALYSIS #4: GREEN ROOF ADDITION

I. GREEN ROOF TYPES & COMPONENTSII. STRUCTURAL BREADTH

I. ADDITIONAL LOADSII. CALCS OF STRUCTURAL MEMBERSIII. CONCLUSIONS

VI. SUMMARYVII. ACKNOWLEDGEMENTSVIII. QUESTIONS

GREEN ROOFS ADD A SIGNIFICANT AMOUNT OF LOAD TO THE STRUCTURE

Page 29: UNIVERSITY OF PITTSBURGH CHEVRON ANNEX ROBERT MROSKEY | CONSTRUCTION OPTION ADVISOR: DR. CHIMAY ANUMBA PENN STATE AE SENIOR CAPSTONE PROJECT

SUMMARYPRESENTATION OUTLINE

ANALYSIS 1I. PROJECT BACKGROUNDII. ANALYSIS #1: TECHNOLOGY IN THE FIELDIII. ANALYSIS #2: FAÇADE RE-SEQUENCE IV. ANALYSIS #3: COMMISSIONING LAB SPACESV. ANALYSIS #4: GREEN ROOF ADDITIONVI. SUMMARYVII. ACKNOWLEDGEMENTSVIII. QUESTIONS

ANALYSIS 3

ANALYSIS 4ANALYSIS 2

TECHNOLOGY SHOULD BE IMPLEMENTED ON THE CHEVRON ANNEX AND FUTURE PROJECTS

PROPER PLANNING CAN LEAD TO AN EFFICIENT INSTALLATION PROCESS

COMMISSIONING IS AFFECTED BY ALL TRADES

ADDING A GREEN ROOF SHOULD BE A DECISION MADE BY THE OWNER

Page 30: UNIVERSITY OF PITTSBURGH CHEVRON ANNEX ROBERT MROSKEY | CONSTRUCTION OPTION ADVISOR: DR. CHIMAY ANUMBA PENN STATE AE SENIOR CAPSTONE PROJECT

ACKNOWLEDGEMENTSPRESENTATION OUTLINE

BURCHICK CONSTRUCTION

I. PROJECT BACKGROUNDII. ANALYSIS #1: TECHNOLOGY IN THE FIELDIII. ANALYSIS #2: FAÇADE RE-SEQUENCE IV. ANALYSIS #3: COMMISSIONING LAB SPACESV. ANALYSIS #4: GREEN ROOF ADDITIONVI. SUMMARYVII. ACKNOWLEDGEMENTSVIII. QUESTIONS

SPECIAL THANKS

ACADEMIC

BURCHICK CONSTRUCTIONFAMILY & FRIENDS

DR. CHIMAY ANUMBA: ADVISORPENN STATE FACULTY & STAFF

DAVE MEUSCHKEJOE SCARAMUZZOAMANDA MYERS

Page 31: UNIVERSITY OF PITTSBURGH CHEVRON ANNEX ROBERT MROSKEY | CONSTRUCTION OPTION ADVISOR: DR. CHIMAY ANUMBA PENN STATE AE SENIOR CAPSTONE PROJECT

PRESENTATION OUTLINE

QUESTIONS?

I. PROJECT BACKGROUNDII. ANALYSIS #1: TECHNOLOGY IN THE FIELDIII. ANALYSIS #2: FAÇADE RE-SEQUENCE IV. ANALYSIS #3: COMMISSIONING LAB SPACESV. ANALYSIS #4: GREEN ROOF ADDITIONVI. SUMMARYVII. ACKNOWLEDGEMENTSVIII. QUESTIONS