Web Job Order | October 30 th , 2012 Requirements Design PLM DCC WJO Procuremen t Fabricatio n Delivery Assembly Installati on UNIVERSITY OF CALIFORNIA

Upload: geraldine-newman

Post on 18-Dec-2015

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: UNIVERSITY OF CALIFORNIA. Web Job Order Samantha Brown Co-developed with Jennifer Fish February 2014

Requirements Design PLM DCC WJO Procurement Fabrication Delivery Assembly Installation

UNIVERSITY OFCALIFORNIA

Page 2: UNIVERSITY OF CALIFORNIA. Web Job Order Samantha Brown Co-developed with Jennifer Fish February 2014

Requirements Design PLM DCC WJO Procurement Fabrication Delivery Assembly Installation

Web Job Order

Samantha Brown

Co-developed with Jennifer Fish

February 2014

Page 3: UNIVERSITY OF CALIFORNIA. Web Job Order Samantha Brown Co-developed with Jennifer Fish February 2014

Web Job Order | October 30th, 2012Requirements Design PLM DCC WJO Procurement Fabrication Delivery Assembly Installation

WJO - Introduction

The WJO is an integral part of the Engineering process flow as it bridges the gap between the design phases and the actual installation of components.

It requires integration with the Document Control Center upstream and procurement downstream. This tool allows engineers and designers a way of realizing their designs.

Page 4: UNIVERSITY OF CALIFORNIA. Web Job Order Samantha Brown Co-developed with Jennifer Fish February 2014

Web Job Order | October 30th, 2012Requirements Design PLM DCC WJO Procurement Fabrication Delivery Assembly Installation

WJO - Brief History

The precursor to the Web Job Order stems from a paper based form that engineers/designers would fill out prior to handing off to a procurement liaison.

Back in the late 1990s, an effort was made to convert the process to the digital realm by our centralized IT staff. This system, as it exists today, closely mimics the original paper form.

Page 5: UNIVERSITY OF CALIFORNIA. Web Job Order Samantha Brown Co-developed with Jennifer Fish February 2014

Web Job Order | October 30th, 2012Requirements Design PLM DCC WJO Procurement Fabrication Delivery Assembly Installation

WJO – Redevelop Decision

Core users identified need to replace existing interface

Cited reasons for upgrade:

• User interface dated and input mechanisms were tedious

• Attachments were prone to transfer failures• Document Control integration was wanting• Enables better tracking for projects, procurements,

fabrication, assembly, and installation• Better support since original development team in IT

dissolved• Opportunity to integrate the process better with our

workflow

Page 6: UNIVERSITY OF CALIFORNIA. Web Job Order Samantha Brown Co-developed with Jennifer Fish February 2014

Web Job Order | October 30th, 2012Requirements Design PLM DCC WJO Procurement Fabrication Delivery Assembly Installation

WJO – Unique Capabilities

• Tight integration with WBS of Engineering Fabrication projects through category codes

• Capture all labor and PO/Pcard costs under a single account number

• Enables better project accounting• Future project estimations generated from

WJO data• Utilize one interface for onsite or offsite fabrication• Extensive integration with Engineering’s Document

Control Center (a CAD neutral release repository) in addition to being an important hub in the design process

Page 7: UNIVERSITY OF CALIFORNIA. Web Job Order Samantha Brown Co-developed with Jennifer Fish February 2014

Web Job Order | October 30th, 2012Requirements Design PLM DCC WJO Procurement Fabrication Delivery Assembly Installation

WJO – Logistics

Both systems (the old & new interface) are currently live and running in parallel

Page 8: UNIVERSITY OF CALIFORNIA. Web Job Order Samantha Brown Co-developed with Jennifer Fish February 2014

Web Job Order | October 30th, 2012Requirements Design PLM DCC WJO Procurement Fabrication Delivery Assembly Installation

WJO - Demo

Live DemonstrationOf new WJO interface

Page 9: UNIVERSITY OF CALIFORNIA. Web Job Order Samantha Brown Co-developed with Jennifer Fish February 2014

Web Job Order | October 30th, 2012Requirements Design PLM DCC WJO Procurement Fabrication Delivery Assembly Installation

WJO – Current Status

• The new WJO is accessible at wjo2.lbl.gov• Both systems will continue to run in parallel for the

next month• Any JO started on either system requires completion

in the same system

• Beginning in October this year, the new WJO and all of the lab’s financial infrastructure will have significant changes (known as F$M)

Old WJO New WJO

UC12xxx UC20xxx

Page 10: UNIVERSITY OF CALIFORNIA. Web Job Order Samantha Brown Co-developed with Jennifer Fish February 2014

Web Job Order | October 30th, 2012Requirements Design PLM DCC WJO Procurement Fabrication Delivery Assembly Installation

WJO – Yet to be implemented

• Short Term Deliverables• Date Promised By (from Procurement)• RFQs• Clone JO

• Long Term Direction• Deeper integration with JobBOSS via the

B77 Shops• Management of QA documentation• Possible tie in with LBNL’s delivery

tracking system

Page 11: UNIVERSITY OF CALIFORNIA. Web Job Order Samantha Brown Co-developed with Jennifer Fish February 2014

Web Job Order | October 30th, 2012Requirements Design PLM DCC WJO Procurement Fabrication Delivery Assembly Installation

WJO – Q & A Session

Questions

old interface: wjo.lbl.govnew interface: wjo2.lbl.gov

Samantha Brown (x5640)Jennifer Fish (x2320)