· - units acting test - linkage total test - adjustment & complement - final test - customer...

21
www.daehosystem.co.kr FACTORY AUTOMATION DAEHO SYSTEM CO.,LTD. Venture Business

Upload: vumien

Post on 24-May-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

www.daehosystem.co.kr

FACTORY AUTOMATION DAEHO SYSTEM CO.,LTD.

Venture Business

DAEHO SYSTEM !

F.A DAEHO SYSTEM CO.,LTD.

Trust

Responsibility

Sincerity

The FA professional enterprise which14 has an experience

The project observes the developmenttutorial which is standardized

Safety it develops the solution withfirst priority

The project accepts a customer needswith the best

The manpower which has a varied experience and the skill

Control ofCar-body Line

Control of RobotControl of

semiconductor equip’tControl of

Industrial MachineryControl of

vessel electricity

www.daehosystem.co.kr

Daeho System competitive powers

Business Strategy

www.daehosystem.co.kr

FA development enterprises of top

VISION TARGET

F.A DAEHO SYSTEM CO.,LTD.

1. Quality realization of customer satisfaction

2. Technical development and solution establishment

3. Realization of organizational culture

POLICY

Solution of DAEHO SYSTEM

QualityControl

ProductionControl

CostControl

DeliveryControl

ServiceSupport

Provides a customer satisfaction and a responsible quality

Trust

Responsibility

Sincerity

Speciality

Variety

Excellence

The solution of the top which is stable

Contents

www.daehosystem.co.kr

F.A DAEHO SYSTEM CO.,LTD.

1

2

3

4

5

Company Introduction

Success Story

Major Production

Daeho System

Outline Map

Company ProfileCompany HistoryOrganization & CapabilityMajor Facilities

Success Story

Control of Car-body LineControl of RobotControl of Semiconductor Equip’tControl of Industrial MachineryControl of Vessel Electricity

Main TechnologyBusiness ProcessQuality & After Service

DAEHO

F.A DAEHO SYSTEM CO.,LTD.

Success Story Major Production Daeho System Outline Map

1-1. Company Profile

1-2. Company History

1-3. Organization & Capability

1-4. Major Facilities

Company Introduction

F.A DAEHO SYSTEM CO.,LTD.

www.daehosystem.co.kr

1-1. Company Profile

1. Company Introduction

BusinessArea

Over

view

Daeho System Factory

Business

Ansan Digital-Park Building

Company Name : Daeho System Co.,Ltd.

CEO : Wan-Gyu, Choi

Establishment : 1997.8

Address : #4036, Ansan Digital Park, 1123,

Singil-dong, Danwon-gu, Ansan-city,

Gyeonggi-do, Korea

Web : www.daehosystem.co.kr

Capital : U$ 1 hundred thousand

Employees : 12 Persons

Annual Sales : U$ 1.7 million(2010)

Control of Car-body Line(Car-body & Engine, Press, Etc)

Control of Robot (Off Line Programming & Teaching, Calibration)

Control of Semiconductor Equipment(Feeder, Assy, Inspection)

Control of Industrial Machinery (Factory Automation)

Control of Vessel Electricity (Engine, Exchanger, Controller, ETC)

Success Story Major Production Daeho System Outline MapCompany Introduction

Venture Business

www.daehosystem.co.kr

F.A DAEHO SYSTEM CO.,LTD.

2012. 02

2011. 09

2011. 04

2004. 04

2002. 08

1998. 08

1997. 09

1997. 08

Company History Project History

Renault Motors Project(Russia)

X02A Project(Nissan India)

Slovakia KMS EL Project(Kia Motors)

Resistance-Fungus Filter Line(Korea Eag Bio)

600ton Blanking Press (Posco<Kwanyang>)

Waste-water Clean Project(Jaecheon)

CaCl Mixing Equipment(MLTL)

Vietnam Fire extinguisher Line(Shinmyung)

China Distribution FA System(Kumho Tire)

SVR LCD Line(LIG ADP)

Semiconductor Loader(Wonik IPS)

Soundproof measurement room

GV Project Hyundai Motors<Jeonjoo>)

Mexico GM Magna Motors Project

Engine Line(Ssangyong Motors)

Nama Project(China Nama Motors)

P-450 Project(Iran Khodro)

T-Car Project(Kia Motors<Whasung>)

V-200 Project(Daewoo Motors)

Canada Project(Japan Honda Motors)

DA

EH

O S

YS

TE

M H

IST

OR

Y

Success Story Major Production Daeho System Outline MapCompany Introduction

1-2. Company History

1. Company Introduction

Certification(Venture Business)

Change of Marketing Strategy

Business Diversification

Incorporate a Firm

Business Start with ABB Korea

Business Start with Daewoo Motors

Business Start with Wooshin systems

Found Daeho System

www.daehosystem.co.kr

F.A DAEHO SYSTEM CO.,LTD.

Sales Dep’tProduction

Dep’t

Development Dep’t

C E O

Advisor

• Task ofelectrical system

• Skilled Manpower• Expert skill Insurance• Stabilized Employment• Cooperation of Capital and Labor• Intimate Collaboration

DaehoSystem

CooperationCompany

Management : 3persons(Career : 3∼30Years )

Development : 5persons(Career : 5∼15Years)

Production : 20persons(Career : 1 ∼15years)

• Software Development

S/W Team

• Marketing

• Control Design & Management• Customer Mng

• PLC Program Development• Management

• Database & Standard Management

<Including Cooperation Company>

• Task ofinstallation & Trial

Robot Dep’t

• Industry RobotTeaching

• Industry RobotControl

H/W Team Ctrl Team

Success Story Major Production Daeho System Outline MapCompany Introduction

1-3. Organization & Capability

1. Company Introduction

www.daehosystem.co.kr

F.A DAEHO SYSTEM CO.,LTD.

NO Name Spec Set Maker Remark

1 Lab View Tools Network Windows 2 Developer

2 Industrial Computer Systems IEC Series 3 Touch LCD

3 Oscilloscope 6810C 2 Real time

Level Measurement GTN-105N 1 Laser Type

4 Ground Resistance Tester 4,200 2

Power meter Pro-3000 1 AC

5 Tesla Meter TM-702 1 0-1,500mt

Digital Tester Fluke-289 2 Fluke

6 Insulation Resistance Instrument 3007A 1

Clamp Tester CL-360 1 D60

7 Tube Numbering M-1Pro3K 2 Brother

Electric Tools Japan/China 12

8 OrCad System 10.5 2

AutoCad System 2008 2

9 Networking System 100Mbps 1

Output Equipment HP-A4/A3 2

Success Story Major Production Daeho System Outline MapCompany Introduction

1-4. Major Facilities

1. Company Introduction

F.A DAEHO SYSTEM CO.,LTD.

Success Story Major Production Daeho System Outline MapCompany Introduction

www.daehosystem.co.kr

F.A DAEHO SYSTEM CO.,LTD.

Project Name Customer Remark

L38 / B32 Body Side Project R-Motors (Russia)

Panorama Sun-roof Line IA-Korea

Cylinder Head Block Assembly Line S-Motors(Engine Dep’t)

X02A Body Side Ass’y Line Nissan (India)

KMS Plant EL Project K-Motors (Slovakia)

WT Under Body & Main Line Project T-Daewoo

JB Laser Brazing LIne K-Motors

L38 Moving Line Nissan (Turkey)

HDC Car-Body Line H-Motors (Czech)

KJ & Fj Door/Hood Line S-Motors

DYK2 B/C Line DF Motors (China)

HM BB Line K-Motors

GV Project(Roof, Floor, Back-Comp, Main) H-Motors (Jeonjoo)

RIO CTR & FRT Floor Line Iran Saipa

Floor & Door Line NH-Motors (Canada)

Section of Car-body Line

Success Story Major Production Daeho System Outline MapCompany Introduction

2. Success Story (1/2)

www.daehosystem.co.kr

F.A DAEHO SYSTEM CO.,LTD.

Project Name Customer Remark

Resistance-Fungus File Line(Installation) Korea-EB

TF Driven & Drive Gear Processing Line Hyundai-PT

Press & Laser Cutting M/C(Installation & T/O) TPI

Robot Welding Line Teaching & T/O TPI(china)

600ton Blanking Press T/O P(Kwangyang Iron Mill)

HF-7 ABB Robot(Manufacture & Installation) H-Motors(China)

Waste-water Clean Project JC

CaCl Mixing Equipment Project MLTL

Fire Extinguisher Line S-DP (Vietnam)

Black Carbon Equipment(CCS Rework) D-Chemical(Pohang Plant)

Distribution & Conveyor FA System K-Tire(China Plant)

SVR LCD Line(Joining System Design) L-ADP

Semiconductor Loader(Installation & T/O) W-IPS

Soundproof Measuring Room

Section of Robot / Semiconductor / Industry Machinery / Vessel Electricity

Success Story Major Production Daeho System Outline MapCompany Introduction

2. Success Story (2/2)

F.A DAEHO SYSTEM CO.,LTD.

Success Story Major Production Daeho System Outline MapCompany Introduction

3-1. Control of Car-body Line

3-2. Control of Robot

3-3. Control of Semiconductor Equip’t

3-4. Control of Industry Machinery

3-5. Control of Vessel Electricity

www.daehosystem.co.kr

3. 주요 사업

F.A DAEHO SYSTEM CO.,LTD.

3-1. Control of Car-body Line

3-2. Control of Robot

Main Body Line | Side Body Line | Moving LineSub Line | Equipments | Car-Parts Assembly LineUnder & Upper Body Complete / Roof, Cowl & Dash / Package TraySide Frame L/R / Door Assembly & Sealing, Welding, FinishingMain Buck(Shift & Swing Type, 2-4Face) / Shuttle(Truck, Shuttle, Lifter)A.F.M / E.M.S(Link, Cylinder Type)Hemming System(Table Top, Die Change)Engine & Cylinder Assembly LinePanorama Sun-roof Line / Paint Line & ETC

Robot & Control Systems

- Handling Control- Welding Control- Sealing Control- Setting Control

(1/2)

Car Manufacturing Automation System

OLP / OLT

Success Story Major Production Daeho System Outline MapCompany Introduction

www.daehosystem.co.kr

3. 주요 사업

F.A DAEHO SYSTEM CO.,LTD.

3-3. Control of Semiconductor Equip’t 3-4. Control of Industry Machinery

3-5. Control of Vessel Electricity

- Conveyor System

- Distribution Warehouse

- Welding Equipment

- Assembly M/C

- ETC(F.A Facilities)

- FPD Evaporation System

- FPD Sputter Positioner

- ETC

- Vertical Conveyor System

- Main Switch Console

- Engine Control Console

- Bridge Control Console

- ETC

• Loading Equipment

• Transfer System

• Unite Equipment

• Vacuum Joining M/C

• Thermal Process

• Inspection Facilities

• Feeding & Loading

• Welding & Cutting

• Assembly

• Inspection

FactoryAutomationSystems

Ship Building Equipment

(2/2)

Semiconductor & FPD Equipment

Success Story Major Production Daeho System Outline MapCompany Introduction

F.A DAEHO SYSTEM CO.,LTD.

4-1. Main Technology

4-2. Business Process

4-3. Quality & After Service

Success Story Major Production Daeho System Outline MapCompany Introduction

www.daehosystem.co.kr

4. Daeho System

F.A DAEHO SYSTEM CO.,LTD.

4-1. Main Technology

Simulation & Revision

Robot System Control

BOM & Sheets

Multi-Programming

Design & Manufacturing

• Control Box & Switchboard

• Wiring & Piping, Etc

- Reflection of 3D data simulations

- Robot System Control

- Off-Line Programming

- Before Producing, Operation Test

- Adjustment and complement

of design(Prevention of Error)

- Draw up a Bill of Material

- Manages the Supply and

Demand of the Parts

- Check Sheets

Technology Skills

Know-How

Great Experience

Best Engineers

OLP / OLT / Calibration

- Composite Language

- Distributed Development

- PLC Control

- Industrial PC Control

- Measuring Control- CAD/CAM Design

- Configuration and Sequence

of Intuitional Screen

- Design Which Considers

a Mass Production

[Technical Competitiveness]

ABB | Kawasaki

Fanac | Nachi

Yaskawa | ETC…

Siemens | AB

Mitsubishi | Fuji

PLC Control

Robot Control

DA

EH

O S

YS

TE

M T

EC

HN

OL

OG

Y

Success Story Major Production Daeho System Outline MapCompany Introduction

www.daehosystem.co.kr

F.A DAEHO SYSTEM CO.,LTD.

- Trouble and Shooting(Daeho System AS System)

- Management of ASContents

- Feedback(Next Project)

- Units Acting Test- Linkage Total Test- Adjustment & complement- Final Test - Customer Approval

- Control Box, Switchboard- Duct & Pipe, Etc- Wiring & Piping- Joining & Assembly- Check of Installation

- Order and Receipt of Parts(standard, Manufactured)

- Input of Program- Manufacturing(Hardware)- Outsourcing Managing

- Check of Customer Spec- Collecting the Customer‘sNeeds

- Decision of Production Concept

- Making of Production Aim- Drawing up the Schedule- Decision of Order and Outsourcing

- Customer Approval

- Programming- Design(Control Box, …. )- Simulation & Adjustment- B.O.M & Check Sheets- Distributed Development

- Program Approval- Design Approval- Simulation Check

Schedule Control Quality Control

1SpecCheck 2

PlanningApproval

3ProgramDesign

4Design

Approval5

Production

6Installation

7T/O

(Finish)

8After

Service

DAEHO

Process

Daeho Total Management

Success Story Major Production Daeho System Outline MapCompany Introduction

4. Daeho System

4-2. Business Process

AS Database

www.daehosystem.co.kr

F.A DAEHO SYSTEM CO.,LTD.

Quality Improvement

After Service

EffectAnalysis

Countermeasureconsideration

ProblemCheck

Defectiveness Analysis

priorityAction

Standard(registration)

ImprovementAction

ASRequest

ASReceipt

ASFinishing

ASPlanning

AS (Action)

ASRecording

T/SManagement

ImprovementAS ResultRegistration

T/S : Trouble Shooting

Customer Daeho System Customer

Problem Recording

-Name, Quan’y, Process

-Date, Worker

Cause Recording

-Worker, Material

-Mechanism, Method

Priority Action

-Heavy: Stop Task

-Light: Partial Task

Removes a Cause

-Plan Consideration

-Schedule & personnel

Improvement Execution

-Real Improvement

-Data, Person in Charge

Result Analysis

-Defective Fact

-Inspection

Confirmation Technique

-Effective Confirmation

-Apply Feedback

Cycling

Flow

Success Story Major Production Daeho System Outline MapCompany Introduction

4. Daeho System

4-3. Quality & After Service

www.daehosystem.co.kr

F.A DAEHO SYSTEM CO.,LTD.

Address : #4036, Ansan Digital Park, 1123, Singil-dong, Danwon-gu, Ansan-city, Gyeonggi-do, Korea

Tel : +82-31-310-1834/1835 | Fax : +82-31-310-1836 | Web : www.daehosystem.co.kr

Success Story Major Production Daeho System Outline MapCompany Introduction

5. Outline Map

Daeho system Co.,Ltd.

AnsanDigital Park

Banwal

Industrial Complex

Shiwha

Industrial Complex

Jeongwang

Station

Ansan Station

Seo-Ansan

TollGate Yeongdog

Highway

Gongdan Station

Seo-Ansan

Interchage

Shiheung

City hall

Ansan

Distributer

Doil

Crossroad

Suwon

Sunbu-dong

Ink-Tech

Substation

Dongsea Food

Ilsung

Boryeng

Osram

Daesung

Electric

Doil

Walgot/Incheon

Incheon/Ilsan

Sunbu-dong신갈/용인/강릉

Shingal/Yongin/Kangreung

Thank You

FACTORY AUTOMATION DAEHO SYSTEM CO.,LTD.

www.daehosystem.co.kr

Venture Business