UUNNHHCCRR NNoorrtthheerrnn CCaauuccaassuuss SShheelltteerr PPrrooggrraammmmeess
SSuurrvveeyy 22000000 -- 22001100
UUNNHHCCRR SSuubb--OOffffiiccee VVllaaddiikkaavvkkaazz
uuppddaattee aass oonn 3300 NNoovveemmbbeerr 22001100
![Page 2: UNHCR NC Shelter Survey 2000-2010](https://reader034.vdocuments.us/reader034/viewer/2022042906/589d235c1a28abeb478b50a3/html5/thumbnails/2.jpg)
UNHCR IP remarks
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2000-2010 prospects.11.30 total for 2010
individual houses new building: RUS48 standard house "turn-key" - - - - - - 22 54 17 14 15 122 15 122 -individual houses new building (non-standard) "self-help" - - - - - 40 - - - - - 40 - - 40 IP: DRCindividual houses new building: RUS48 standard house "self-help" - - - - - - 20 20 20 19 20 99 20 - 99 IP: DRCtemporary shelter "box tents" (prefab hut: building material set supply) "self-help" - - 11 154 218 238 114 62 - - 43 840 - - 840 IP: DRC
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2000-2010 prospects.11.30 total for 2010
individual houses new building: RUS48 standard house "turn-key" - - - - - - - - - - 5 5 5 5 -individual houses rehabilitation: "roof + 1 dry room" "self-help" 820 3968 1506 1502 750 901 113 52 - - - 9612 - - 9612 IP: PIN+DRCindividual houses new building: 48 m² individual house (non-standard) "self-help" - - - - - - - - 29 30 31 90 30 - 90 IP: DRCtemporary shelter "box tents" (prefab hut: building material set supply) "self-help" - - - 20 889 222 351 317 - 23 116 1938 130 *) - 1938 IP: DRC+VESTA
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2000-2010 prospects.11.30 total for 2010
individual houses new building (different standards & non-standard) "turn-key" 24 36 70 70 40 7 - - - - - 247 - 240 7 IP: DRCindividual houses new building: RUS48 standard house "turn-key" - - - - - - 7 - - - - 7 5 7 -individual houses new building (different standards & non-standard) "self-help" - - - - - 12 - - - - - 12 - - 12 IP: DRCindividual houses new building: RUS60/RUS63 simplified standard house "self-help" - - - - - - - - - 16 15 31 16 **) 31 IP: DRC (UNTFHS)temporary shelter "box tents" (prefab hut: building material set supply) "self-help" - - - - 2 2 22 - - - 7 33 - - 33 IP: DRC
*) 130+37 units -mainly in ChR,
in RI&
in RNOAas well
**) 16 cases - UNHCR IP type of shelterinclusive 369 279 new housesincome - 9612 roof + 1 dry room
generation - 2811 box tentsUNHCR Sub-Office Vladikavkaz René Edward Knupfer KRE - 08.02.2010
2000 - 2010
recapitulation
2000 - 2010
UNHCR Shelter NC
shelter units implementedin all 3 republics (RI, ChR, RNOA)
2000 - 2010
UNHCR shelter programmes 2000 - 2010 (update as on 30 November 2010) in North Ossetia-Alania (RNOA) RNOA# housing units implemented in North Ossetia-Alania
2000 - 2010
UNHCR shelter programmes 2000 - 2010 (update as on 30 November 2010) in Chechnya (ChR) ChR# housing units implemented in Chechnya
implementation by
area of reconstruction in NCUNHCR Shelter in North Caucasus 2000 - 2010 (update as on 30 November 2010)
RI# housing units implemented in Ingushetia
UNHCR shelter programmes 2000 - 2010 (update as on 30 November 2010) in Ingushetia (RI)by the 3 republics (RI, ChR, RNOA)
detailed breakdown
![Page 3: UNHCR NC Shelter Survey 2000-2010](https://reader034.vdocuments.us/reader034/viewer/2022042906/589d235c1a28abeb478b50a3/html5/thumbnails/3.jpg)
Agency :Update (dd/mm/yyyy) : 30/11/2010 by (first name, surname, function) :
Name Location Number Completionof programme/project of programme/project of objects rate
(last update)
indi
vidua
l hou
sing
socia
l hou
sing
com
plet
e (re
)con
stru
ctio
n
exte
nsive
reha
bilit
atio
n
repa
ir
"self
-help
" (m
ater
ial su
pply)
"turn
-key
" (co
ntra
cted
wor
k)
# (ho
uses
)
# (fa
milie
s)
= # (
indi
vidua
ls)
dire
ct
by IP
for d
onor
by IP
/ for
don
or :
agen
cy
% o
n 31
/01/20
10 (b
ooks
clos
ed)
UNHCR-RI'09 "turn-key" RUS48 Standard Houses Troitskaya, Karabulak, Yandare, Barsuki, Ekazhevo, Gamurzievo, x x x 14 14 62 x 97(2nd complete assessment; 29/10/'09) Altievo, Nazran, Nasyr-Kort, Kantyshevo, Dolakovo
DRC-RI'09 "self-help" RUS48 Standard Houses Karabulak, Plievo, Barsuki, Gamurzievo, (Surkhakhi), (Ali-Yurt), x x x 16 (19) 1) 16 (19) 88 (107) x by DRC 92(7th complete assessment; 19&25/01/'10) Kantyshevo, Dolakovo, Novy Redant, Zyazykov-Yurt,
Sagopshi, MalgobekDRC-NC'09/'10 "box tents" (improved standard) production line in Troitskaya x x x 160 x by DRC 100
elements production (sets) (workshop assessment; 19/01/'10) (160 sets)
Name Location Number Completionof programme/project of programme/project of objects rate
(last update)
indi
vidua
l hou
sing
socia
l hou
sing
com
plet
e (re
)con
stru
ctio
n
exte
nsive
reha
bilit
atio
n
repa
ir
"self
-help
" (m
ater
ial su
pply)
"turn
-key
" (co
ntra
cted
wor
k)
# (ho
uses
)
# (fa
milie
s)
= # (
indi
vidua
ls)
dire
ct
by IP
for d
onor
by IP
/ for
don
or :
agen
cy
% o
n th
e day
of t
he la
test
asse
ssm
ent
UNHCR-RI'10 "turn-key" RUS48 Standard Houses Karabulak, Plievo, Yandare, Ekazhevo, Nasyr-Kort, Nazran, Kantyshevo, x x x 15 15 84 x 28(1st complete assessment; 28/09/'10) Zyazykov-Yurt, Sagopshi, Malgobek
DRC-RI'10 "self-help" RUS48 Standard Houses Karabulak, Plievo, Troitskaya, Sleptsovskaya, Nasyr-Kort, Kantyshevo, x x x 20 20 94 x by DRC 51(2nd complete assessment; 21/10/'10) Dolakovo, Novy Redant, Zyazykov-Yurt, Yuzhny, Malgobek
DRC-RI'10 "box tents" (improved standard) Karabulak, Sleptsovskaya, Nasyr-Kort, Dolakovo, Zyazykov-Yurt, x x x 43 37 174 x by DRC/Vesta 83 2)housing units assembling Sagopshi, Malgobek, Plievo, Altievo, Nazran, Troitskaya 166 of 163+37=200 units:
43 in RI, 116 in ChR, 7 in RNOA UNHCR Sub-Office Vladikavkaz René Edward Knupfer KRE - 19.02.2010 1) 3 objects inaccessible due to security reasons (in Ali-Yurt & Surkhakhi) 2) as on 30/11/2010
Typeof programme/project of reconstruction approach of beneficiaries
Review 2009Implementation Implementation
Plans 2010
Type Type Number
Type Implementation ImplementationNumber modus
Shelter Programmes/Projects in North Caucasus 2009/2010UNHCR
René Edward Knupfer, Technical Coordinator
Shelter Programmes/Projects in Ingushetia
modusof programme/project of reconstruction approach of beneficiaries
![Page 4: UNHCR NC Shelter Survey 2000-2010](https://reader034.vdocuments.us/reader034/viewer/2022042906/589d235c1a28abeb478b50a3/html5/thumbnails/4.jpg)
Agency :Update (dd/mm/yyyy) : 30/11/2010 by (first name, surname, function) :
Name Location Number Completionof programme/project of programme/project of objects rate
(last update)
indi
vidua
l hou
sing
socia
l hou
sing
com
plet
e (re
)con
stru
ctio
n
exte
nsive
reha
bilit
atio
n
repa
ir
"self
-help
" (m
ater
ial su
pply)
"turn
-key
" (co
ntra
cted
wor
k)
# (ho
uses
)
# (fa
milie
s)
= # (
indi
vidua
ls)
dire
ct
by IP
for d
onor
by IP
/ for
don
or :
agen
cy
% o
n th
e day
of t
he la
test
asse
ssm
ent
DRC-ChR'09 "self-help" complete rehabilitation of destroyed houses Gudermes, Alkhan-Kala & Stary Achkhoi x x x 11 (12) 1) 11 (12) 58 (67) x by DRC 96(mostly cat. IV) (2nd complete assessment; 11/03/'10)
Urus-Martan x x x 13 13 65 x by DRC 57(2nd complete assessment; 02/12/'09)
Samashki x x x 5 5 27 x by DRC 84(2nd complete assessment; 03/02/'10)
DRC-ChR'09/'10 "box tents" (improved standard) Sernovodsk x x x 34 27 144 x by DRC/Vesta 100 2)housing units assembling (1st assessment - 7 sites; 03/02/'10) (34 of 34 units)
&Grozny, Urus-Martan, Alkhan-Kala, Gekhi, Stary Achkhoi, Novy Sharoi,
Samashki, Yandy, Khambi-Irzi, Zakan-Yurt
Name Location Number Completionof programme/project of programme/project of objects rate
(last update)
indi
vidua
l hou
sing
socia
l hou
sing
com
plet
e (re
)con
stru
ctio
n
exte
nsive
reha
bilit
atio
n
repa
ir
"self
-help
" (m
ater
ial su
pply)
"turn
-key
" (co
ntra
cted
wor
k)
# (ho
uses
)
# (fa
milie
s)
= # (
indi
vidua
ls)
dire
ct
by IP
for d
onor
by IP
/ for
don
or :
agen
cy
% o
n th
e day
of t
he la
test
asse
ssm
ent
UNHCR-ChR'10 "turn-key" RUS48 Standard Houses Grozny (Oktyabrsky & Zavodskoy) x x x 5 5 32 x 65(4th complete assessment; 13/10/'10)
DRC-ChR'10 "self-help" complete rehabilitation of destroyed houses 1st package / 1st part: Grozny urban district x x x 13 13 60 x by DRC 45(mostly cat. IV & V, some objects III, II, I) - Grozny-Oktyabrsky & Grozny-Leninsky
(3rd complete assessment; 13/10/'10)1st package / 2nd part: Grozny rural district x x x 5 5 27 x by DRC 32
- Alkhan-Kala(2nd complete assessment; 14/09/'10)
2nd package / 1st part: Urus-Martan district x x x 8 8 33 x by DRC 21- Alkhan-Yurt & Urus-Martan
(2nd complete assessment; 25/08/'10)2nd package / 2nd part: Urus-Martan district & Achkhoi-Martan district x x x 5 5 26 x by DRC 36
- Gekhi, Khambi-Irzi, Novy Sharoi, Achkhoi-Martan(1st complete assessment; 14/09/'10)
DRC-ChR'09/'10 "box tents" (improved standard) Grozny, Sernovodsk, Shalazhi, Shali, Sovkhoz Rodina, Duba-Yurt, x x x 116 99 417 x by DRC/Vesta 83 3)housing units assembling Katar-Yurt, Stary Atagi, Achkhoi-Martan, Urus-Martan, Chechen-Aul, 166 of 163+37=200 units:
Zakan-Yurt, Samashki, Goyskoye, Alkhazurova, Kalinovskaya, Gekhi, 43 in RI, 116 in ChR, 7 in RNOA Roshi-Chu, Tangi-Chu, Gush-Kort, Yarysh-Mardi, Valerik, Prigorodnoe
Khambi-Irzi, Yandy, Serzhen-Yurt, Ulus-KertUNHCR Sub-Office Vladikavkaz René Edward Knupfer KRE - 19.02.2010 1) 1 object excluded from programme due to lack of progress (in Stary Achkhoi) 2) as on 31/01/2010, (books closed)
3) as on 30/11/2010
Type Type Number of programme/project of reconstruction approach of beneficiaries
Number
Implementation Implementation
Plans 2010Type Implementation
Shelter Programmes/Projects in North Caucasus 2009/2010René Edward Knupfer, Technical Coordinator
Shelter Programmes/Projects in ChechnyaReview 2009
UNHCR
modus
of programme/project of reconstruction approach of beneficiaries modusType Implementation
![Page 5: UNHCR NC Shelter Survey 2000-2010](https://reader034.vdocuments.us/reader034/viewer/2022042906/589d235c1a28abeb478b50a3/html5/thumbnails/5.jpg)
Agency :Update (dd/mm/yyyy) : 30/11/2010 by (first name, surname, function) :
Name Location Number Completionof programme/project of programme/project of objects rate
(last update)
indi
vidua
l hou
sing
socia
l hou
sing
com
plet
e (re
)con
stru
ctio
n
exte
nsive
reha
bilit
atio
n
repa
ir
"self
-help
" (m
ater
ial su
pply)
"turn
-key
" (co
ntra
cted
wor
k)
# (ho
uses
)
# (fa
milie
s)
= # (
indi
vidua
ls)
dire
ct
by IP
for d
onor
by IP
/ for
don
or :
agen
cy
% o
n th
e day
of t
he la
test
asse
ssm
ent
UNTFHS-RNOA'09 "self-help" - 1st package : x x x 7 7 34 x DRC 95United Nations Trust Fund for Human Security (UNTFHS), Khataldon 7 sites
sustainable integration & recovery in North Ossetia-Alania RNOA; (7th complete assessment; 07/09/'10)RUS63 (60), 63m2 (60m2) Standard Houses 2nd package : x x x 9 9 36 x DRC 74
Tsalykovo 1 site, Mairamadag 2 sites, Beslan 4 sites, Vladikavkaz 2 sites(4th complete assessment; 26/08/'10 & 07/09/'10)
Name Location Number Completionof programme/project of programme/project of objects rate
(last update)
indi
vidua
l hou
sing
socia
l hou
sing
com
plet
e (re
)con
stru
ctio
n
exte
nsive
reha
bilit
atio
n
repa
ir
"self
-help
" (m
ater
ial su
pply)
"turn
-key
" (co
ntra
cted
wor
k)
# (ho
uses
)
# (fa
milie
s)
= # (i
ndivi
duals
)
dire
ct
by IP
for d
onor
by IP
/ for
don
or :
agen
cy
% o
n th
e day
of t
he la
test
asse
ssm
ent
UNTFHS-RNOA'10 "self-help" - Brut, Darg-Kokh, Kardzhin, Zmeyskaya, Krasnogor, Ardon, Nart, x x x 16 16 82 x DRC 12United Nations Trust Fund for Human Security (UNTFHS), Dzuarikau, Alagir, Khataldon, Mairamadag, Vladikavkaz
sustainable integration & recovery in North Ossetia-Alania RNOA; (2nd complete assessment; 26/08/'10 & 07/09/'10)RUS63 (60), 63m2 (60m2) Standard Houses
UNHCR-RNOA'10 "turn-key" …...… (locations not yet defined) x x x ~ 5 ~ 5 nn x ..RUS48 Standard Houses
DRC-RNOA'10 "box tents" (improved standard) Nart, Vladikavkaz, Ardon, Alagir, Dzuzarikau x x x 7 7 40 x DRC 83 1)housing units assembling 166 of 163+37=200 units:
43 in RI, 116 in ChR, 7 in RNOA UNHCR Sub-Office Vladikavkaz René Edward Knupfer KRE - 19.02.2010 1) as on 30/11/2010
Type Implementation ImplementationNumber of reconstruction approach of beneficiaries modus
Typeof programme/project
Review 2009Implementation ImplementationType Type Number
of beneficiaries
Shelter Programmes/Projects in North Caucasus 2009/2010UNHCR
René Edward Knupfer, Technical Coordinator
Shelter Programmes/Projects in North Ossetia-Alania
approach modus
Plans 2010
of programme/project of reconstruction
![Page 6: UNHCR NC Shelter Survey 2000-2010](https://reader034.vdocuments.us/reader034/viewer/2022042906/589d235c1a28abeb478b50a3/html5/thumbnails/6.jpg)
type of shelter implementation
Ing
ush
eti
a (
RI)
Ch
ech
nya (
Ch
R)
No
rth
Oss
eti
a-A
lan
ia (
RN
OA
)
tota
l (R
I +
Ch
R +
RN
OA
)
individual houses new building: RUS48 standard "turn key" (TK) 122 5 7 134individual houses new building: RUS48 standard "self help" (SH) 99 99individual houses new building: non standard "self help" (SH) 40 40individual houses new building: RUS60 simplified standard "self help" (SH) 31 31individual houses new building: non standard, 48m² limited "self help" (SH) 90 90individual houses new building: miscellaneous or no standard "turn key" (TK) 247 247individual houses new building: miscellaneous or no standard "self help" (SH) 12 12individual houses rehabilitation: "roof + one dry room" "self help" (SH) 9612 9612temporary shelter "box tents" (BT): prefab hut, set supply "self help" (SH) 840 1938 33 2811
2000 - 2010 (30/11/'10)
UNHCR Northern Caucasus Shelter Programmes 2000 - 2010type of programme housing units completed
![Page 7: UNHCR NC Shelter Survey 2000-2010](https://reader034.vdocuments.us/reader034/viewer/2022042906/589d235c1a28abeb478b50a3/html5/thumbnails/7.jpg)
type of shelter implementation
RI
Ch
R
RN
OA
tota
l
individual houses new building: RUS48 standard "turn key" (TK) 122 5 7 134
2000 - 2010 (30/11/'10)
UNHCR Northern Caucasus Shelter Programmes 2000 - 2010type of programme housing units completed
![Page 8: UNHCR NC Shelter Survey 2000-2010](https://reader034.vdocuments.us/reader034/viewer/2022042906/589d235c1a28abeb478b50a3/html5/thumbnails/8.jpg)
type of shelter implementation
RI
Ch
R
RN
OA
tota
l
individual houses new building: RUS48 standard "self help" (SH) 99 99
2000 - 2010 (30/11/'10)
UNHCR Northern Caucasus Shelter Programmes 2000 - 2010type of programme housing units completed
![Page 9: UNHCR NC Shelter Survey 2000-2010](https://reader034.vdocuments.us/reader034/viewer/2022042906/589d235c1a28abeb478b50a3/html5/thumbnails/9.jpg)
type of shelter implementation
RI
Ch
R
RN
OA
tota
l
individual houses new building: non standard "self help" (SH) 40 40
2000 - 2010 (30/11/'10)
UNHCR Northern Caucasus Shelter Programmes 2000 - 2010type of programme housing units completed
![Page 10: UNHCR NC Shelter Survey 2000-2010](https://reader034.vdocuments.us/reader034/viewer/2022042906/589d235c1a28abeb478b50a3/html5/thumbnails/10.jpg)
type of shelter implementation
RI
Ch
R
RN
OA
tota
l
individual houses new building: RUS60 simplified standard "self help" (SH) 31 31
2000 - 2010 (30/11/'10)
UNHCR Northern Caucasus Shelter Programmes 2000 - 2010type of programme housing units completed
![Page 11: UNHCR NC Shelter Survey 2000-2010](https://reader034.vdocuments.us/reader034/viewer/2022042906/589d235c1a28abeb478b50a3/html5/thumbnails/11.jpg)
type of shelter implementation
RI
Ch
R
RN
OA
tota
l
individual houses new building: non standard, 48m² limited "self help" (SH) 90 90
2000 - 2010 (30/11/'10)
UNHCR Northern Caucasus Shelter Programmes 2000 - 2010type of programme housing units completed
![Page 12: UNHCR NC Shelter Survey 2000-2010](https://reader034.vdocuments.us/reader034/viewer/2022042906/589d235c1a28abeb478b50a3/html5/thumbnails/12.jpg)
type of shelter implementation
RI
Ch
R
RN
OA
tota
l
individual houses new building: miscellaneous or no standard "turn key" (TK) 247 247
UNHCR Northern Caucasus Shelter Programmes 2000 - 2010type of programme housing units completed
2000 - 2010 (30/11/'10)
![Page 13: UNHCR NC Shelter Survey 2000-2010](https://reader034.vdocuments.us/reader034/viewer/2022042906/589d235c1a28abeb478b50a3/html5/thumbnails/13.jpg)
type of shelter implementation
RI
Ch
R
RN
OA
tota
l
individual houses new building: miscellaneous or no standard "self help" (SH) 12 12
2000 - 2010 (30/11/'10)
UNHCR Northern Caucasus Shelter Programmes 2000 - 2010type of programme housing units completed
![Page 14: UNHCR NC Shelter Survey 2000-2010](https://reader034.vdocuments.us/reader034/viewer/2022042906/589d235c1a28abeb478b50a3/html5/thumbnails/14.jpg)
type of shelter implementation
RI
Ch
R
RN
OA
tota
l
individual houses rehabilitation: "roof + one dry room" "self help" (SH) 9612 9612
2000 - 2010 (30/11/'10)
UNHCR Northern Caucasus Shelter Programmes 2000 - 2010type of programme housing units completed
![Page 15: UNHCR NC Shelter Survey 2000-2010](https://reader034.vdocuments.us/reader034/viewer/2022042906/589d235c1a28abeb478b50a3/html5/thumbnails/15.jpg)
type of shelter implementation
RI
Ch
R
RN
OA
tota
l
temporary shelter "box tents" (BT): prefab hut, set supply "self help" (SH) 840 1938 33 2811
UNHCR Northern Caucasus Shelter Programmes 2000 - 2010type of programme housing units completed
2000 - 2010 (30/11/'10)
![Page 16: UNHCR NC Shelter Survey 2000-2010](https://reader034.vdocuments.us/reader034/viewer/2022042906/589d235c1a28abeb478b50a3/html5/thumbnails/16.jpg)
UUNNHHCCRR NNoorrtthheerrnn CCaauuccaassuuss
RRUUSS 4488 SSttaannddaarrdd HHoouusseess SShheelltteerr PPrrooggrraammmmee 22000066--22001100
![Page 17: UNHCR NC Shelter Survey 2000-2010](https://reader034.vdocuments.us/reader034/viewer/2022042906/589d235c1a28abeb478b50a3/html5/thumbnails/17.jpg)
![Page 18: UNHCR NC Shelter Survey 2000-2010](https://reader034.vdocuments.us/reader034/viewer/2022042906/589d235c1a28abeb478b50a3/html5/thumbnails/18.jpg)
RUS 48 UNHCR Northern Caucasus Standard House
![Page 19: UNHCR NC Shelter Survey 2000-2010](https://reader034.vdocuments.us/reader034/viewer/2022042906/589d235c1a28abeb478b50a3/html5/thumbnails/19.jpg)
RUS 48 UNHCR Northern Caucasus Standard House
![Page 20: UNHCR NC Shelter Survey 2000-2010](https://reader034.vdocuments.us/reader034/viewer/2022042906/589d235c1a28abeb478b50a3/html5/thumbnails/20.jpg)
Типовой дом 48
RUS 48 UNHCR Northern Caucasus Standard House
optional house extension
RUS48 UNHCR “Turn-Key” Standard House; 10.00 m x 4.80 m = 48 m² optionally extendable (+ 37 m²) from 48 m² (10.00 m x 4.80 m) to 85 m² :
+ [(3.095 + 0.25 + 3.095 + 0.475) x (0.475 + 4.445 + 0.475)] = + (6.915 x 5.395); the result will be a new L-shaped layout
layout extension partially along front façade (next to entrance/corridor/bedroom), corridor extension (l = 2.30, w = 1.10) & new entrance to corridor extension,
result : additional two bedrooms, extension of foundation, façades & roof construction