*note: you will not be able to run addional wires or cables in the same conduit should you use a 3/4 inch conduit. UNDERGROUND CONDUIT PLACEMENT SPECIFICATIONS The homeowner/developer/contractor is responsible for providing and adhering to the following underground requirements set by RACE. RACE needs to submit permit to Pole Owner and permit approved before any of these specificaons can be executed. Prior to the installaon of any conduit, a RACE Communicaons Field Engineer will need to be scheduled to verify conduit route, pole conduit stub out, and home stub out. A RACE Communicaons Field Engineer will need to be scheduled for conduit inspecon before trench fill. Two days advance noce must be provided prior to conduit inspecon, with a three day inspecon window. It is the homeowner / developer / contractor’s responsibility to contact “Call Before You Dig” prior to any excavaon. It is the homeowner / developer / contractor’s responsibility to contact local building department for any perming requirements. RACE Communicaons will reserve the right to refuse fiber installaon if any of these specificaons are not met. A scaled print of the project showing the lot layout. To be reviewed with RACE Communicaons Field Engineer. Any conduit run under 250’ will require 3/4 inch Schedule 40 PVC conduit.* For any run between 251’ and 400’, it will require a 3/4 inch Schedule 40 PVC conduit with a pull box.* Any conduit run over 400’ will require a pull box locaon. All conduits, sweeps, and couplers will be glued with PVC cement. Sweeps are to be ulized at any splice locaon, riser pole, or structure. No Hard 90 degree bends to be used. A maximum of 3 sweeps in conduit run. All conduit runs to have ¼” nylon pull rope installed within it. Both ends of rope should be secured to outside of conduit and accessible. Conduit at pole locaon will need to be stubbed up 2’ minimum. Conduit at structure locaon will need to be stubbed up 4’ minimum. Conduit install depth on private property is 12 - 18 inches. Please contact local building department for required private property depth based on county specificaons. SCHEDULING DIMENSION SCOPE www.race.com | 877.722.3833

Upload: others

Post on 24-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: UNDERGROUND CONDUIT PLACEMENT - Race …• RACE Communications will reserve the right to refuse fiber installation if any of these specifications are not met. • A scaled print of

*note: you will not be able to run additional wires or cables in the same conduit should you use a 3/4 inch conduit.

UNDERGROUND CONDUIT PLACEMENT

SPECIFICATIONS

The homeowner/developer/contractor is responsible for providing and adhering to the following underground requirements set by RACE.

• RACE needs to submit permit to Pole Owner and permit approved before any of these specifications can be executed.

• Prior to the installation of any conduit, a RACE Communications Field Engineer will need to be scheduled to verify conduit route, pole conduit stub out, and home stub out.

• A RACE Communications Field Engineer will need to be scheduled for conduit inspection before trench fill. Two days advance notice must be provided prior to conduit inspection, with a three day inspection window.

• It is the homeowner / developer / contractor’s responsibility to contact “Call Before You Dig” prior to any excavation.

• It is the homeowner / developer / contractor’s responsibility to contact local building department for any permitting requirements.

• RACE Communications will reserve the right to refuse fiber installation if any of these specifications are not met.

• A scaled print of the project showing the lot layout. To be reviewed with RACE Communications Field Engineer.

• Any conduit run under 250’ will require 3/4 inch Schedule 40 PVC conduit.*

• For any run between 251’ and 400’, it will require a 3/4 inch Schedule 40 PVC conduit with a pull box.*

• Any conduit run over 400’ will require a pull box location.

• All conduits, sweeps, and couplers will be glued with PVC cement.

• Sweeps are to be utilized at any splice location, riser pole, or structure. No Hard 90 degree bends to be used. A maximum of 3 sweeps in conduit run.

• All conduit runs to have ¼” nylon pull rope installed within it. Both ends of rope should be secured to outside of conduit and accessible.

• Conduit at pole location will need to be stubbed up 2’ minimum.

• Conduit at structure location will need to be stubbed up 4’ minimum.

• Conduit install depth on private property is 12 - 18 inches. Please contact local building department for required private property depth based on county specifications.