Page 1: UNCLASSIFIED 1 Afloat Readiness Supervisor of Shipbuilding Newport News RDML Tom Moore OPNAV N43B July 21, 2009

UNCLASSIFIED

UNCLASSIFIED 1

Afloat Readiness

Supervisor of Shipbuilding Newport NewsRDML Tom Moore

OPNAV N43BJuly 21, 2009

Page 2: UNCLASSIFIED 1 Afloat Readiness Supervisor of Shipbuilding Newport News RDML Tom Moore OPNAV N43B July 21, 2009

2UNCLASSIFIED

UNCLASSIFIED

A Typical Day in the Navy

143/283 Ships Underway (51%)• 5 CVNs/3 Large Decks• 15 Subs

46% of all OIF/OEF TACAIR 75% of OIF,100% of OEF Airborne

Electronic Attack 90% of Theater Equipment by Sealift CENTCOM Sailors: 14K Ashore,

9.7K Afloat Anti-Piracy Global Maritime Security, Sea

Control, Deterrence, TSC, HA/DR

Shore, Valued at $124B• 11 Regions, 77 Installations,

75,000 Facilities• Provides Operational Support,

Environmental & Facilities Support, and QOL to:

283 Ships, 71 Subs, and 3700+ Aircraft

332K AC, 67K RC, 101K CIV, 436K Family Members, and 440K Retirees

Page 3: UNCLASSIFIED 1 Afloat Readiness Supervisor of Shipbuilding Newport News RDML Tom Moore OPNAV N43B July 21, 2009

3UNCLASSIFIED

UNCLASSIFIED

Aircraft Safety and Proficiency

• 1000+ Student Pilots

• 853 Navy TACAIR 11 hrs/crew/mo

• 792 USMC TACAIR at T 2.0

• 341 FRS A/C and 1000 replacement pilots

• I-level maintenance of all A/C

Cost $5.8B

Ship Safety and Proficiency

• Funds 15 U/W days/qtr/hull

• ~12,500 steaming days

• Repair Parts, OPTAR, Admin, Utilities

• Nuclear Fuel

Cost $1.7B

Maint. Basic Integrated Sustainment

$18.7B plus

Output Cost Total

1+1+1 = $900M $19.6B

2+1+1 = $1.7B $20.4B

3+1+1 = $2.5B $21.2B

3+2+1 = $2.7B $21.4B

3+3+1 = $3.0B $21.7B

Aviation Depot Maintenance

• 1.1M Man-days of work

• $726M of material

• 828 Airframes

• 2244 Engines

Cost $1.6B

+

Ship Depot Maintenance

• 7.4M Man-days of work (Public and Private)

• $763M of material

• 101 Carriers, Subs and Surface ships

Cost $6.1B

Maintain/Recap/Reset Ready… for Safe Ops Set….to SurgeGo...for MCO Deployment

$7.8B

NECC Equipment Sets

Cost: $118M NECC: Cost $500M

Support Programs: Cost: $2.9B

$10.9B

The Baseline Ready Force

Page 4: UNCLASSIFIED 1 Afloat Readiness Supervisor of Shipbuilding Newport News RDML Tom Moore OPNAV N43B July 21, 2009

4UNCLASSIFIED

UNCLASSIFIED

0

5000

10000

15000

20000

Ship Maintenance

Aviation Depot Maintenance

Fleet Training, Ranges & Targets, CNMOC, Aviation/Ship Support

USMC Flying Hour Program

Fleet Readiness Requirement

0+1+11+1+1

2+1+13+1+1 3+2+1 3+3+1

NECC MAINT

NECC OPS

CSG FRP Ao / Total N43 Requirement

Ship Operations

USN Flying Hour Program

OW

NE

MP

LO

Y

Flying Hour Program FRPShip Ops FRP

OW

NE

MP

LO

Y

Page 5: UNCLASSIFIED 1 Afloat Readiness Supervisor of Shipbuilding Newport News RDML Tom Moore OPNAV N43B July 21, 2009

5UNCLASSIFIED

UNCLASSIFIEDThe Evolution of Ship Maintenance Funding

Ship Maintenance Relatively Flat Since 2002

Ship Maintenance Funding History(FY09 Constant $)

$-

$1,000

$2,000

$3,000

$4,000

$5,000

$6,000

$7,000

$8,000

$9,000

FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011

Mill

ion

s

Ship Depot Maintenance (OMN OMNR 1B4B) PHNSY & IMF (OMN 1B5B)Intermediate Maintenance (OMN OMNR 1B3B) SRF Yokosuka Overhead (OMN OMNR 1B5B)PSNSY Reimbursable SCN & OMN Overhead* FTSC / SUPSHIP Repair / Port Engineers (OMN 1B5B)NNSY & PNSY Reimbursable Overhead * RMC MILPERS CIVSUBSSBN Submarine ERO SSN EROs (SCN Funded) become SSN EOHs (OMN Funded)Supplemental