uncertainty - active power€¦ · % full load active power parallel on-line conventional double...

4
Reliable, predictable and repeatable backup power for your organisation doesn’t have to be complicated. PowerHouse continuous power systems protect your critical operations every step of the way. You spend less money, time, space and energy – requiring less involvement from your staff – all adding up to huge savings and genuine peace of mind. PowerHouse Continuous Power System

Upload: others

Post on 06-Aug-2020

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Uncertainty - Active Power€¦ · % Full Load Active Power Parallel On-Line Conventional Double Conversion Efficiency 100% 98% 96% 94% 92% 90% 88% 86% 84% 82% 80% 20% 40% 60% 80%

Reliable, predictable and repeatable backup power for your organisation doesn’t have to be

complicated. PowerHouse continuous power systems protect your critical operations every step

of the way. You spend less money, time, space and energy – requiring less involvement from

your staff – all adding up to huge savings and genuine peace of mind.

PowerHouseContinuous Power System

LessUncertainty

Page 2: Uncertainty - Active Power€¦ · % Full Load Active Power Parallel On-Line Conventional Double Conversion Efficiency 100% 98% 96% 94% 92% 90% 88% 86% 84% 82% 80% 20% 40% 60% 80%

Crit ical P

ower Solutions

Active Power delivers you the most power dense architecture in the industry that is also the most flexible and rugged for your deployment needs. Eliminate the dedicated inside space - and more importantly the strictly temperature controlled battery room – and gain back as much as 21% of your real estate for revenue-generating IT equipment.

Example based on 500kVA UPS deployment.

With the highest overall efficiency, lower service and maintenance cost and never having to replace batteries again you can

LessSpace

LessCost

25% Less CAPEX and 60% TCO Savings

Cost

£

Years

9,900,000

8,700,000

7,500,000

6,300,000

5,100,000

3,900,000

2,700,000

1,500,000

300,000

Active Power PowerHouse Brick & Mortar Construction

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

% Full Load

Active Power Parallel On-Line Conventional Double Conversion

Effic

ienc

y

100%

98%

96%

94%

92%

90%

88%

86%

84%

82%

80%20% 40% 60% 80% 100%

21% Space Savings

Page 3: Uncertainty - Active Power€¦ · % Full Load Active Power Parallel On-Line Conventional Double Conversion Efficiency 100% 98% 96% 94% 92% 90% 88% 86% 84% 82% 80% 20% 40% 60% 80%

Effic

ienc

y

100%

98%

96%

94%

92%

90%

88%

86%

84%

82%

80%20% 40% 60% 80% 100%

Cost

$

Years

$16,500,000

$14,500,000

$12,500,000

$10,500,000

$8,500,000

$6,500,000

$4,500,000

$2,500,000

$500,000

Active Power PowerHouse Brick & Mortar Construction

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

UPS ModuleGenerator Module

Chiller Module

Customer Facility

10,000

8,000

6,000

4,000

2,000

0

PowerHouseLegacy

Carbon Footprint (Tons of CO2 )

12,000

10,000

8,000

6,000

4,000

2,000

0Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9

12,000

10,000

8,000

6,000

4,000

2,000

0Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9

Installed Capacity in KW Load in KW Installed Capacity in KW Load in KW

PowerHouse Scalability Brick & Mortar Complete Build-Out

0 2 4 6 8 10 12 14 16 18

Brick-and-Mortar

PowerHouse

Deployment Expenses

Project Timeline (in months)

% Full Load

Active Power Conventional

Effic

ienc

y

100%

98%

96%

94%

92%

90%

88%

86%

84%

82%

80%20% 40% 60% 80% 100%

Cost

$

Years

$16,500,000

$14,500,000

$12,500,000

$10,500,000

$8,500,000

$6,500,000

$4,500,000

$2,500,000

$500,000

Active Power PowerHouse Brick & Mortar Construction

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

UPS ModuleGenerator Module

Chiller Module

Customer Facility

10,000

8,000

6,000

4,000

2,000

0

PowerHouseLegacy

Carbon Footprint (Tons of CO2 )

12,000

10,000

8,000

6,000

4,000

2,000

0Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9

12,000

10,000

8,000

6,000

4,000

2,000

0Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9

Installed Capacity in KW Load in KW Installed Capacity in KW Load in KW

PowerHouse Scalability Brick & Mortar Complete Build-Out

0 2 4 6 8 10 12 14 16 18

Brick-and-Mortar

PowerHouse

Deployment Expenses

Project Timeline (in months)

% Full Load

Active Power Conventional

Large capital outlays required to build out a complete brick-and-mortar facility carry both risk and cost. Just-in-time accounting principles applied to investment and construction can yield benefits because less capital locked in lengthy projects means more capital is available for other business investments.

PowerHouse is a fully scalable system. It can be deployed in a modular fashion, improving operational efficiency through better infrastructure utilisation and more closely matching capital expenses to real time demand.

PowerHouse architecture is pre-assembled and tested offsite, taking the guess-work and unknowns out of the installation and commissioning phase. This enables repeatable and efficient integration by eliminating the time, cost and uncertainty inherent to delivery, testing, integration and commissioning of every individual component as it arrives on site. In the process, you reduce the risk and cost of inconsistencies between design specifications and actual implementation.

LessRisk

LessComplexityEf

ficie

ncy

100%

98%

96%

94%

92%

90%

88%

86%

84%

82%

80%20% 40% 60% 80% 100%

Cost

$

Years

$16,500,000

$14,500,000

$12,500,000

$10,500,000

$8,500,000

$6,500,000

$4,500,000

$2,500,000

$500,000

Active Power PowerHouse Brick & Mortar Construction

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

UPS ModuleGenerator Module

Chiller Module

Customer Facility

10,000

8,000

6,000

4,000

2,000

0

PowerHouseLegacy

Carbon Footprint (Tons of CO2 )

12,000

10,000

8,000

6,000

4,000

2,000

0Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9

12,000

10,000

8,000

6,000

4,000

2,000

0Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9

Installed Capacity in KW Load in KW Installed Capacity in KW Load in KW

PowerHouse Scalability Brick & Mortar Complete Build-Out

0 2 4 6 8 10 12 14 16 18

Brick-and-Mortar

PowerHouse

Deployment Expenses

Project Timeline (in months)

% Full Load

Active Power Conventional

Brick & Mortar Deployment PowerHouse Deployment

Factory Work On-Site Work Factory Work On-Site Work

Engineering X X

X X

Assembly X X

Testing X X

Installation X X

Site Testing X X

X X

Customer Focused Project Management

Infrastructure Needs Assessment Vetting & Validati on

Alignment with Business Objectives System Design Assembly &

Testi

ng

Dep

loym

ent,

Star

t-Up

& C

omm

issi

onin

g S

ervic

e, Su

pport &

Monitoring

CUSTOMER

One of the most compelling benefits of a PowerHouse solution is single source accountability. Active Power will do it all from design to commissioning to ongoing care. Active Power provides expert assessment, design, implementation, project management, maintenance and support during every phase of your critical power system deployment and operation.

Page 4: Uncertainty - Active Power€¦ · % Full Load Active Power Parallel On-Line Conventional Double Conversion Efficiency 100% 98% 96% 94% 92% 90% 88% 86% 84% 82% 80% 20% 40% 60% 80%

© ® TM 2017 Piller Power Systems Inc. All rights reserved. Materials and specifications are subject to change without notice. PWRHSE-400-EN-0417

LESS is MOREPowerHouse is a modular, portable continuous power system available for rapid deployment in four standard configurations based on Active Power’s

high efficiency and highly resilient architecture. The complete system is housed in a standard ISO shipping container and can be deployed in any

number of locations - a roof, redundant loading bays, secure compounds or even the car park. Designed to offer a highly flexible architecture to your

constantly changing environment, PowerHouse is available in a series of standard formats from 200kW up to 800kW and is constructed to be fully

scalable, enabling you to expand your backup power infrastructure on demand. The pre-engineered, factory tested system is delivered as a complete

and repeatable solution to your site versus a legacy component-by-component implementation.

Space saving, unobtrusive and unmatched in efficiency, you can rapidly deploy PowerHouse to best accommodate site constraints, access and security.

Need to relocate? This system can be disconnected, transported to a new site, and be fully operational in a matter of hours.

“Economically Green” means good for everyone. The critical power path in the PowerHouse system is our high efficiency architecture, shown below in comparison to conventional systems with batteries. This helps achieve a 75% reduction in carbon emissions versus legacy power solutions. And when you LOSE less energy, you USE less energy, saving money on power bills and reducing your impact on the environment.

PowerHouse is less costly and complex, more energy efficient, and takes up less critical real estate. But that’s no comfort at 2:00 a.m. when your facility takes a power hit. You need to know the solution you choose will protect your investments with reliable, predictable, continuous operation.

Here’s why we are certain PowerHouse will deliver:

monitored and proven to be up to seven times less likely to fail than legacy systems.

of field runtime in 40+ countries, including some of the harshest environments in the world.

time system visibility from virtually anywhere to improve your awareness of power-related events.

LessEnergy LessUncertainty

Effic

ienc

y

100%

98%

96%

94%

92%

90%

88%

86%

84%

82%

80%20% 40% 60% 80% 100%

Cost

$

Years

$16,500,000

$14,500,000

$12,500,000

$10,500,000

$8,500,000

$6,500,000

$4,500,000

$2,500,000

$500,000

Active Power PowerHouse Brick & Mortar Construction

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

UPS ModuleGenerator Module

Chiller Module

Customer Facility

10,000

8,000

6,000

4,000

2,000

0

PowerHouseLegacy

Carbon Footprint (Tons of CO2 )

12,000

10,000

8,000

6,000

4,000

2,000

0Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9

12,000

10,000

8,000

6,000

4,000

2,000

0Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9

Installed Capacity in KW Load in KW Installed Capacity in KW Load in KW

PowerHouse Scalability Brick & Mortar Complete Build-Out

0 2 4 6 8 10 12 14 16 18

Brick-and-Mortar

PowerHouse

Deployment Expenses

Project Timeline (in months)

% Full Load

Active Power Conventional

Cost

£

Years

9,900,000

8,700,000

7,500,000

6,300,000

5,100,000

3,900,000

2,700,000

1,500,000

300,000

Active Power PowerHouse Brick & Mortar Construction

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

% Full Load

Active Power Parallel On-Line Conventional Double Conversion

Effic

ienc

y

100%

98%

96%

94%

92%

90%

88%

86%

84%

82%

80%20% 40% 60% 80% 100%

Batteries not IncludedImagine never having to replace another toxic, unreliable chemical battery. With battery-free PowerHouse, you’ll achieve operational and space savings. Plus you will further reduce energy costs by no longer requiring a temperature controlled battery room.

www.activepower.com

Active Power Headquarters [email protected]

Active Power [email protected]

Active Power [email protected]

Active Power [email protected]