UNC VMware Environment
![Page 2: UNC VMware Environment. UNC VMware Microsoft Windows 2003 (145 physical servers) HP hardware - Server and SAN infrastructure Developed a partnership with](https://reader036.vdocuments.us/reader036/viewer/2022083009/5697c0041a28abf838cc42f4/html5/thumbnails/2.jpg)
UNC VMware Microsoft Windows 2003 (145 physical servers) HP hardware - Server and SAN infrastructure Developed a partnership with reseller, Zunesis Zunesis assessment –
Executive summary Technical Roadmap Total Cost of Ownership Return on Investment
Bundled cost into other approved projects and utilized IT one-time dollars to fund.
Sept. 23, 2008 2CHECO Presentation
![Page 3: UNC VMware Environment. UNC VMware Microsoft Windows 2003 (145 physical servers) HP hardware - Server and SAN infrastructure Developed a partnership with](https://reader036.vdocuments.us/reader036/viewer/2022083009/5697c0041a28abf838cc42f4/html5/thumbnails/3.jpg)
UNC VMware UNC VMware Environment 3 HP C7000 Blade Chassis:
4 HP Virtual Connect Modules for Networking 2 HP Virtual Connect Modules for Fiber Redundant paths for networking and fiber Currently 10 Blades with ESX 3.5 Update 2
Each Blade has: 2 AMD 2.8GHz 16GB Ram 1 NIC for Management 1 NIC for Vmotion
HP EVA 4100 Configuration – EVA 4400 for E-Fort: LUNs are kept at 300GB 8 to 10 VMs per LUN Multiple paths Every ESX host has access to every LUN
Sept. 23, 2008 3CHECO Presentation
![Page 4: UNC VMware Environment. UNC VMware Microsoft Windows 2003 (145 physical servers) HP hardware - Server and SAN infrastructure Developed a partnership with](https://reader036.vdocuments.us/reader036/viewer/2022083009/5697c0041a28abf838cc42f4/html5/thumbnails/4.jpg)
UNC VMware Current status
34 production servers (24 migrated from Physical to Virtual)
12 test servers Services running in UNC VMware production
environment https://Beardrive.unco.edu http://emergency.unco.edu (out of E-Fort) SoftGrid (Application streaming) Campus printing services DHCP ResNet registration process (Cisco Network Registrar)