  • 5/21/2018 Ultimate Final SCADA Presentation

    1/37

    Development & Implementation of a

    SCADA System for Load Control of the

    Power System Simulator (PSS)

    Ahmed Fayez 199905252

    Mohammed Adnan 199901444

    Khalid Yousif 199900237

    Salman Al katheeri 199900317

  • 5/21/2018 Ultimate Final SCADA Presentation

    2/37

    Presentation Layout

    SCADA Introduction

    SCADA Hardware

    RTU

    PSS

    Wiring SCADA Software

    ISaGraF

    Citect

    DNP

    Future Work Demonstration

  • 5/21/2018 Ultimate Final SCADA Presentation

    3/37

    Introduction

  • 5/21/2018 Ultimate Final SCADA Presentation

    4/37

    Introduction (What Is SCADA?)

    Stands for supervisory control And data

    acquisition.

    SCADA systems are used in industrial

    processes: steel making, power generation(conventional and nuclear) and distribution.

    There Are 4 Components In the SCADA

    System.

  • 5/21/2018 Ultimate Final SCADA Presentation

    5/37

    SCADA Components

    Field Instrumentation.

    Sensors, devices to control.

    Remote Terminal Units.

    RTU Vs. PLC Communications Network.

    Equipment needed to transfer data to and from different sites

    Central Monitoring Station

    Collecting information gathered by the remote stations togenerate the necessary action

  • 5/21/2018 Ultimate Final SCADA Presentation

    6/37

    Disadvantages Of Relay Systems

    Relays used only for on/off control. Complicated control systems

    Expensive System.

    System takes up much floor and space.

    Control relays are power- hungry,heat

    generation.

    Any change in control program requires the

    rewiring of relays.

    For complicated control systems, it is difficult to

    troubleshoot and locate the faults.

  • 5/21/2018 Ultimate Final SCADA Presentation

    7/37

    Advantages Of SCADA systems

    Easily programmed or reprogrammed

    Easy maintained (self diagnostic).

    Capability to do arithmetic function.

    The ability to communicate with othercontroller or a master host computer.

    PLCs. were able to move past simple on/off

    control to more complex schemes as PIDcontrol.

  • 5/21/2018 Ultimate Final SCADA Presentation

    8/37

    Applications Of SCADA

    Almost every business in the manufacturing

    sector and many in the service sector

    Aerospace

    Bottling and Canning

    Chemicals Plants

    Petroleum, Petrochemical

  • 5/21/2018 Ultimate Final SCADA Presentation

    9/37

    Remote Terminal Unit (RTU)

  • 5/21/2018 Ultimate Final SCADA Presentation

    10/37

    PDS eNET OVERVIEW

    DIGITAL / ANALOG INPUTS

    32 x Digital Inputs

    9-28V DC Operation range

    LED Indication (Disable Option)

    Optically Isolated (1500V peak)

    12 x Analog Inputs0-5V,1-5V,0-10V,0-20mA, 4-20mA

    (selectable per channel)

    Surge Protection

  • 5/21/2018 Ultimate Final SCADA Presentation

    11/37

    4 x Analog Outputs

    Internal / External power supply Source

    0-20mA, 4-20mA

    (Voltage output with external resistor)

    Short circuit protected

    NET OVERVIEWeRTU PDS

    DIGITAL / ANALOG OUTPUTS

  • 5/21/2018 Ultimate Final SCADA Presentation

    12/37

    RTU Scan Time

  • 5/21/2018 Ultimate Final SCADA Presentation

    13/37

    Power System Simulator

  • 5/21/2018 Ultimate Final SCADA Presentation

    14/37

    Power System Simulator ( PSS):

    The objective of the PSS is to

    simulate a real power system.

    Power system should be divide

    in to three sections , the

    generator station, transmission

    line and load ( distribution

    section ).

  • 5/21/2018 Ultimate Final SCADA Presentation

    15/37

    PSS Parts

    1- Generator Stations:

    The generator station contains two internal generators and athird external generator.

    Separately excited synchronous generator is the type of the

    machine which used in PSS. The DC motor in PSS is used as prime mover.

    The DC motor in PSS is Shunt DC motor type.

  • 5/21/2018 Ultimate Final SCADA Presentation

    16/37

    2- Transmission lines: It is represented by wires that are different in shape and

    size.

    The size and shape is depended on the level voltages and

    the load.

  • 5/21/2018 Ultimate Final SCADA Presentation

    17/37

    3- The loads:

    As in the real power system, the PSS has three type of load:

    Residential.

    Commercial .

    Industrial.

    The difference between these come from values of :

    - Load.

    - Power consumption.

    - Power factor for each type. Also the difference rises in the

    peak load timing for each type.

  • 5/21/2018 Ultimate Final SCADA Presentation

    18/37

    Sensors

    In the industry field is now using computers to control and

    motions and sequences of machines.

    PLC cannot see, hear, feel or tester processes by themselves

    but use industrial sensors to give industrial controllers these

    capabilities. In our project the Sensors are used as feedback to PLC from

    PSS to enhance the system performance.

  • 5/21/2018 Ultimate Final SCADA Presentation

    19/37

    Sensors

    There were different types of sensor that will be used like Voltage

    sensor, current sensor, frequency sensor and power sensor.

    Current sensor have rating of 0 5 A.

    Voltage sensor has a rating of 0 - 150 V. Frequency sensor, it has a rating of 0 -100Hz.

    Power sensor, it has rating of 0- 5 A and 0 150 v.

    The outputs from all sensors which going to RTU were 4 20 mA. It is

    used this rating to sense any problem in system .

  • 5/21/2018 Ultimate Final SCADA Presentation

    20/37

    Wiring

  • 5/21/2018 Ultimate Final SCADA Presentation

    21/37

    Wiring

    Auxiliary Switch

    Output Port Input Port

    Relay1(External)

    Common

    12V

    0V

    Internal Relay

    0V

    Common

    Transistor

    Switch

    12V

    R1

    220V Start

  • 5/21/2018 Ultimate Final SCADA Presentation

    22/37

    0 V

    From RTU Power

    Supply

    12 V+

    0

    0

    +

    COM 1 2 3 4 5 Com 1 2 3 4

    220 V

    T.BControl Circuit

    A

    B

    C

    Coil 1

    Ax 1

    A

    B

    C

    Coil 2

    Ax 2

    ON

    NOff

    3Phase Motor

    M

    COM IN 1 IN 2 IN 3 IN 4 IN 5

    RTU 12 V

  • 5/21/2018 Ultimate Final SCADA Presentation

    23/37

    ISaGRAF

  • 5/21/2018 Ultimate Final SCADA Presentation

    24/37

    ISaGRAF

  • 5/21/2018 Ultimate Final SCADA Presentation

    25/37

    The Citect Interface

  • 5/21/2018 Ultimate Final SCADA Presentation

    26/37

    The DNP

  • 5/21/2018 Ultimate Final SCADA Presentation

    27/37

    The DNP

  • 5/21/2018 Ultimate Final SCADA Presentation

    28/37

    Future Plans

  • 5/21/2018 Ultimate Final SCADA Presentation

    29/37

    Future Plans

    Stand by generator.

    Adding generator 2 to the system.

    Power factor correction.

    Load scheduling.

    Improving the previous SCADA program.

  • 5/21/2018 Ultimate Final SCADA Presentation

    30/37

    Stand by generator

    The whole system will be supplied by the main

    supplying unit.

    A simulated fault will be applied on the system.

    During that generator 1 will be on a stand by mode. When the fault occur the main supplying unit will be

    disconnected from the loads by using circuit breakers

    and generator 1 will be supplying the whole system

    instead. All of this process will be done Automatically by the

    program.

  • 5/21/2018 Ultimate Final SCADA Presentation

    31/37

    Adding generator 2

    Generator 2 will be connected to the system using frequency and

    current sensors.

    Generator 2 will be also controlled by the program which will be

    installed on the RTU.

    Generator 2 will be as a back up if generator 1 didnt workproperly.

  • 5/21/2018 Ultimate Final SCADA Presentation

    32/37

    Back Up generator

  • 5/21/2018 Ultimate Final SCADA Presentation

    33/37

    Power factor correction

    Capacitor banks are used to correct the power factor..

    The value of the capacitance will depend on the value

    of the load.

    Capacitor banks will inject reactive power into the

    system.

    The reactive power will decrease the current in thecircuitreduce the losses in the transmission lines.

  • 5/21/2018 Ultimate Final SCADA Presentation

    34/37

    Load Scheduling

    There are two types of loads: Resistive load and active load.

    1. The resistive load are two types:

    Critical: supplying vital instruments &machines .

    Non-critical: Ex: lighting gardens.

    2. The active load: Simulated By a resistor and inductance in series.

  • 5/21/2018 Ultimate Final SCADA Presentation

    35/37

    Load Scheduling

    When the system suffers from overload on the

    generator the program disconnect the non-critical

    loads immediately.

    Thus in the program all of the loads will be identifiedso that the program can do this process

    Automatically.

  • 5/21/2018 Ultimate Final SCADA Presentation

    36/37

    Improving the SCADA program

    Some blocks will be added to increase the speed

    of analyses process. This process will be applied

    on the LADDER program.

    The Graphical Interface will be enhanced. Thisprocess will be applied on Citect.

  • 5/21/2018 Ultimate Final SCADA Presentation

    37/37

    Thanks for Listening

    Now, well make a demo for our

    work..