uk/norway mentoring 16-17 th march geir helgesen sales –director 1
TRANSCRIPT
UK/Norway mentoring 16-17th March
Geir HelgesenSales –Director
1
The Abbon value proposition
The Abbon performance monitoring system ”Making real-time flow rates per well available in the operation center”
Long term contract - CoP
Ongoing contract CoP Synergy & Turnkey Solutions
Field tests-CoP & Qatar
Optimum Online Onshore Operations Center
Overview
PerformanceMonitoring
ProcessTrending
AnalysisTools
1
2
3
4
Ekofisk Operations CentreMonday March 22nd 20003
Last Optimum Run: 07:00:00 CET Well Performance Split per Platform In-Field Distribution Process Transport Ekofisk Mimic
Daily Well Performance
Production Potential
Actual Production
Average Production Last 24h
Average Production this month
Current values
Trend
385 550
374 800
388 800
404 000 BOE
BOE
BOE
BOE
Graphics
Show Top Ten Wells
Actual Daily Production
382,000
383,000
384,000
385,000
386,000
387,000
388,000
1 3 5 7 9 11 13 15 17 19
March 2003
BO
E
Show Ten Worst Wells
Quit New Cancel
Select NewClose Graphics Combine
Onshore Operations CentreMonday March 22nd 20003
Last Optimum Run: 07:00:00 CET Well Performance Split per Platform In-Field Distribution Process Transport Ekofisk Mimic
Performance per Platform
2/4 A
Trend Production Performance per Well
Quit New CancelClose Graphics
2/4 B
2/4 C
2/4 X
62 000 BOE
64 500 BOE
72 000 BOE
155 000 BOE
Production PotentialEKOFISK
2/7 A
2/7 B
Embla
Tor
13 500 BOE
18 000 BOE
25 000 BOE
5 000 BOE
ELDFISK
57 485 BOE
61 480 BOE
70 090 BOE
141 520 BOE
Actual Production
12 200 BOE
16 000 BOE
22 800 BOE
4 550 BOE
Platform 2/4 A
WellNo
STATUSProduction Potential Actual Production
Oil Flow Gas Flow Gas FlowOil Flow
PRODUCES
GAS-LIFT
GAS-LIFT
GAS-LIFT
GAS-LIFT
PRODUCES
PRODUCES
PRODUCES
PRODUCES
GAS-LIFT
A - 1
A - 11
A - 10
A - 9
A - 8
A - 7
A - 6
A - 5
A - 4
A - 3
A - 2
A - 18
A - 17
A - 16
A - 15
A - 14
A - 13
A - 12
1 510 5.10 1 474 4.67
Select Platform
Onshore Operations CentreMonday March 22nd 20003
Last Optimum Run: 07:00:00 CET Well Performance Split per Platform In-Field Distribution Process Transport Ekofisk Mimic
In-Field Distribution
24" LP Sep
Pipeline Distribution
C3
2/4 XPlatformC2
C1
61 480 MMscf/D
61 480 MMscf/D
61 480 MMscf/D
61 480 MMscf/D
61 480 Bbl/D
30" HP Sep
24" Oil2/7 B
Platform
30" Gas
24" Oil
61 480 MMscf/D
61 480 Bbl/D
61 480 MMscf/D
61 480 bbl/D
30" Gas
Pipeline Distribution
Quit New Cancel
Network software
Eg. ReO, Prodman
GAP
HYSYS Assett
PipeSim
Prosper
ABB
Siemens
Honeywell
etc
PI or
Alternative
Optimum
Online
Offline
Online
Optimum
Online
Other
3
Visualization Collaboration Decision support
Reporting
Pressure & temperature Differential pressure Multi-phase flow rates
Measuring
Proven and patented solutions for continuous well surveillance
4
Analyzing
Analysis of production data Verification of models Validation of allocation scheme
Data processing &analytic modeling
Field proven solutions for continuous well surveillance
Status –Business challenges
5
• Where are we now & where are we going?
• Nov-09 March-2010
Status –Business challenges
6
• Where are we now? Summary
• Spent time internally to define the value of the company
• Meetings with contractors who have a frame agreement with the operators
• Examples: ABB, Siemens,Halliburton, etc..• Discussed how to cooperate with one of them
• Meetings with operators on the UK side• Have been invited for a 2nd meetings
• Probing the market for an industrial partner/owner• See a need for a WW distribution network
• One meeting with the Mentor - March
Status –Business challenges
7
• Where are we going? Focus
• Contractors with frame agreements – Complementary• Operators – gain more info about the offshore fields • Be invited to present Abbon’s products in events where
enhanced recovery per well is one of the main topics• Competitor analysis – Differentiator • Products
• Optimum Online and Optimum Installation are commercial• Optimum metering – measurement per well
• To be taken one step further