UFT RULE PROPOSALS 09.16.2015 ADOPTING STATEWIDE HORIZONTAL RULES IN TEXAS R. MARK HENKHAUS, PE, REGULATORY MANAGER, APACHE CORP

Upload: silas-terry

Post on 30-Dec-2015

216 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: UFT RULE PROPOSALS 09.16.2015 ADOPTING STATEWIDE HORIZONTAL RULES IN TEXAS R. MARK HENKHAUS, PE, REGULATORY MANAGER, APACHE CORP

UFT RULE PROPOSALS09.16.2015

ADOPTING STATEWIDE HORIZONTAL RULES IN TEXASR. MARK HENKHAUS, PE, REGULATORY MANAGER, APACHE CORP

Page 2: UFT RULE PROPOSALS 09.16.2015 ADOPTING STATEWIDE HORIZONTAL RULES IN TEXAS R. MARK HENKHAUS, PE, REGULATORY MANAGER, APACHE CORP

2

Horizontal (HZ) drilling is an old method with new technology and much potential

It has enabled complex geometry of well paths Allows precise placement of entire lateral length Has dramatically increased drilling in unconventional

reservoirs- makes uneconomic plays economic Has dramatically increased production Has brought the US and Texas to the forefront of

energy technology and production!

HORIZONTAL DRILLING

Page 3: UFT RULE PROPOSALS 09.16.2015 ADOPTING STATEWIDE HORIZONTAL RULES IN TEXAS R. MARK HENKHAUS, PE, REGULATORY MANAGER, APACHE CORP

3

UFT means Unconventional Fracture Treated Generally, an unconventional reservoir requiring

horizontal drilling and hydraulic fracturing for commercial production

There is no formal designation by the RRC at this time This effort is a unique, grass-roots driven effort by

industry to implement state-wide horizontal rules Led by multi-trade group including the Alliance,

TIPRO, PBPA, and TXOGA

UFT? WHAT’S A UFT?

Page 4: UFT RULE PROPOSALS 09.16.2015 ADOPTING STATEWIDE HORIZONTAL RULES IN TEXAS R. MARK HENKHAUS, PE, REGULATORY MANAGER, APACHE CORP

4

Horizontal drilling is governed by Statewide Rule 86 SWR 86 was implemented 1990, amended 2000, 2001

and 2004 Rule was developed prior to current technological

developments in HZ drilling and multi-stage frac’ing In 1990 a long lateral was 500 ft… now it is not

uncommon to see 10,000+ ft laterals Clearly, SWR 86 needs modernization

CURRENT HZ STATUS IN TEXAS

Page 5: UFT RULE PROPOSALS 09.16.2015 ADOPTING STATEWIDE HORIZONTAL RULES IN TEXAS R. MARK HENKHAUS, PE, REGULATORY MANAGER, APACHE CORP

5

HZ well must be on lease at all points from formation penetration to terminus

No off-lease formation penetration point permitted No alternative lease line spacing (“heel” and “toe”) No “no perf zones” No “box rule” No “stacked laterals” In general, SWR 86 restricts efficient HZ development

rather than encouraging it

CURRENT SWR 86 REQUIREMENTS

Page 6: UFT RULE PROPOSALS 09.16.2015 ADOPTING STATEWIDE HORIZONTAL RULES IN TEXAS R. MARK HENKHAUS, PE, REGULATORY MANAGER, APACHE CORP

6

A formal procedure for the RRC designate certain fields as “UFT” fields within the rule Permeability < 0.1 md 5 producing wells 80% of wells must have been HZ and frac’ed Notice to operators If objections, set for hearing

Approximately 60 fields are under consideration at this time

PROPOSED UFT RULES-FIELD DESIGNATION

Page 7: UFT RULE PROPOSALS 09.16.2015 ADOPTING STATEWIDE HORIZONTAL RULES IN TEXAS R. MARK HENKHAUS, PE, REGULATORY MANAGER, APACHE CORP

7

A formal procedure for operators to nominate fields as “UFT” fields Formal request Notice to operators Applicant must submit technical data, including

Core analysis Well test Logs, other data as needed

If no protest, approval is administrative If protest, hearing is required

PROPOSED UFT RULES-FIELD DESIGNATION

Page 8: UFT RULE PROPOSALS 09.16.2015 ADOPTING STATEWIDE HORIZONTAL RULES IN TEXAS R. MARK HENKHAUS, PE, REGULATORY MANAGER, APACHE CORP

8

Allows duplicate assignment of acreage between vertical and horizontal wells

Identical to recent Spraberry (Trend Area) field rules Requires new P-16 to manage acreage accounting Allows full HZ development on vertically developed

tracts without use of Rule 38 (density) exceptions Example: 640 acre lease with 80 acre density.

Proposal would allow 8 vertical wells and 8 horizontal wells in this tract

PROPOSED UFT RULES-ACREAGE

Page 9: UFT RULE PROPOSALS 09.16.2015 ADOPTING STATEWIDE HORIZONTAL RULES IN TEXAS R. MARK HENKHAUS, PE, REGULATORY MANAGER, APACHE CORP

9

Proposal will allow field-wide density reduction to one-half existing density upon good evidence increased density needed for full development

Notice to operators Administrative approval if no objections

PROPOSED UFT RULES-DENSITY REDUCTION

Page 10: UFT RULE PROPOSALS 09.16.2015 ADOPTING STATEWIDE HORIZONTAL RULES IN TEXAS R. MARK HENKHAUS, PE, REGULATORY MANAGER, APACHE CORP

10

Streamlined procedure for Rule 38 density exceptions Reduced notice requirements- 600 ft radius No technical information required 21 day waiting period If no objections, administrative approval Similar to current Spraberry (Trend Area) procedure

PROPOSED UFT RULES-SWR 38

Page 11: UFT RULE PROPOSALS 09.16.2015 ADOPTING STATEWIDE HORIZONTAL RULES IN TEXAS R. MARK HENKHAUS, PE, REGULATORY MANAGER, APACHE CORP

11

Allows double assignment of acreage between vertical and horizontal wells

No requirements for Rule 38s in this case Does not affect field spacing Encourages HZ development without forcing vertical

operators into obligation drilling Essentially as Spraberry (Trend Area) rules allow now

PROPOSED UFT RULES- DOUBLE ASGMT OF ACREAGE

Page 12: UFT RULE PROPOSALS 09.16.2015 ADOPTING STATEWIDE HORIZONTAL RULES IN TEXAS R. MARK HENKHAUS, PE, REGULATORY MANAGER, APACHE CORP

12

Establishes a per-acre allocation formula for UFT fields.

Per-acre factors proposed: 100 bbl/acre oil, 600 mcf/acre gas

Overproduction can be cancelled upon request Allows for typical HZ production curves, with very

high rates early, steep decline, and long life

PROPOSED UFT RULES-ALLOWABLES

Page 13: UFT RULE PROPOSALS 09.16.2015 ADOPTING STATEWIDE HORIZONTAL RULES IN TEXAS R. MARK HENKHAUS, PE, REGULATORY MANAGER, APACHE CORP

13

Does not change field rule spacing Allows off-lease penetration point, with notice Allows Stacked Laterals Allows drilling box Allows NPZs- Non-Perf Zones in a well

PROPOSED UFT RULES-SPACING

Page 14: UFT RULE PROPOSALS 09.16.2015 ADOPTING STATEWIDE HORIZONTAL RULES IN TEXAS R. MARK HENKHAUS, PE, REGULATORY MANAGER, APACHE CORP

14

HZ lease line spacing without special field rules

Illustrated with statewide spacing

Page 15: UFT RULE PROPOSALS 09.16.2015 ADOPTING STATEWIDE HORIZONTAL RULES IN TEXAS R. MARK HENKHAUS, PE, REGULATORY MANAGER, APACHE CORP

15

HZ well-to-well spacing without special field rules

Illustrated with statewide spacing

Page 16: UFT RULE PROPOSALS 09.16.2015 ADOPTING STATEWIDE HORIZONTAL RULES IN TEXAS R. MARK HENKHAUS, PE, REGULATORY MANAGER, APACHE CORP

16

Does not change field rule spacing Allows off-lease penetration point, with notice Allows Stacked Laterals Allows drilling box Allows NPZs- Non-Perf Zones in a well

PROPOSED UFT RULES-SPACING

Page 17: UFT RULE PROPOSALS 09.16.2015 ADOPTING STATEWIDE HORIZONTAL RULES IN TEXAS R. MARK HENKHAUS, PE, REGULATORY MANAGER, APACHE CORP

17

Terminus

PenetrationPoint

First Take Pt

Surface Loc

Off Lease Penetration Point

Off Lease Surface Location

Allows full lateral length on lease

Page 18: UFT RULE PROPOSALS 09.16.2015 ADOPTING STATEWIDE HORIZONTAL RULES IN TEXAS R. MARK HENKHAUS, PE, REGULATORY MANAGER, APACHE CORP

18

Does not change field rule spacing Allows off-lease penetration point, with notice Allows Stacked Laterals Allows drilling box Allows NPZs- Non-Perf Zones in a well

PROPOSED UFT RULES-SPACING

Page 19: UFT RULE PROPOSALS 09.16.2015 ADOPTING STATEWIDE HORIZONTAL RULES IN TEXAS R. MARK HENKHAUS, PE, REGULATORY MANAGER, APACHE CORP

1919

STACKED LATERAL WELLS

Vertical Section View Plat View

Page 20: UFT RULE PROPOSALS 09.16.2015 ADOPTING STATEWIDE HORIZONTAL RULES IN TEXAS R. MARK HENKHAUS, PE, REGULATORY MANAGER, APACHE CORP

20

The “red” wells are stacked laterals They share acreage and allowable

Page 21: UFT RULE PROPOSALS 09.16.2015 ADOPTING STATEWIDE HORIZONTAL RULES IN TEXAS R. MARK HENKHAUS, PE, REGULATORY MANAGER, APACHE CORP

21

Stacked laterals allow the conservation of acreage by allowing “multiple assignment” of acreage in multiple landing zones

Wells must be within a defined distance in distinct landing zones, 660 ft

Allow efficient drilling and development in thick, tight unconventional reservoirs

Enables additional HZ wells to “share” acres and allowable with the parent well

Common in modern HZ fields now

PROPOSED UFT RULES-STACKED LATERALS

Page 22: UFT RULE PROPOSALS 09.16.2015 ADOPTING STATEWIDE HORIZONTAL RULES IN TEXAS R. MARK HENKHAUS, PE, REGULATORY MANAGER, APACHE CORP

22

Does not change field rule spacing Allows off-lease penetration point, with notice Allows Stacked Laterals Allows drilling box Allows NPZs- Non-Perf Zones in a well

PROPOSED UFT RULES-SPACING

Page 23: UFT RULE PROPOSALS 09.16.2015 ADOPTING STATEWIDE HORIZONTAL RULES IN TEXAS R. MARK HENKHAUS, PE, REGULATORY MANAGER, APACHE CORP

23

Box Rule for Drilling Allows a “legal well” to be within a box 50 ft either side of

permitted well path Provides for drilling efficiency Common in recent HZ field rules

Page 24: UFT RULE PROPOSALS 09.16.2015 ADOPTING STATEWIDE HORIZONTAL RULES IN TEXAS R. MARK HENKHAUS, PE, REGULATORY MANAGER, APACHE CORP

24

Does not change field rule spacing Allows off-lease penetration point, with notice Allows Stacked Laterals Allows drilling box Allows NPZs- Non-Perf Zones in a well

PROPOSED UFT RULES-SPACING

Page 25: UFT RULE PROPOSALS 09.16.2015 ADOPTING STATEWIDE HORIZONTAL RULES IN TEXAS R. MARK HENKHAUS, PE, REGULATORY MANAGER, APACHE CORP

25

NPZ Illustration Allows penetration

closer to lease line than field rules allow

All take points must be within field rules

Notice required to NPZ offsets, opportunity for protest

Page 26: UFT RULE PROPOSALS 09.16.2015 ADOPTING STATEWIDE HORIZONTAL RULES IN TEXAS R. MARK HENKHAUS, PE, REGULATORY MANAGER, APACHE CORP

26

To address concern about wellbore placement and legal well spacing and take points, survey required

Requires as-drilled, as-completed plats for all HZ wells showing actual well path and first/last take pts

Plats must be certified by RPLS or PE as to the wellbore path and take points.

Continues requirements for directional companies to independently upload and certify directional surveys

PROPOSED UFT RULES-PLATS

Page 27: UFT RULE PROPOSALS 09.16.2015 ADOPTING STATEWIDE HORIZONTAL RULES IN TEXAS R. MARK HENKHAUS, PE, REGULATORY MANAGER, APACHE CORP

27

An orderly process for requesting new fields to be added to approved UFT list

Requires technical data Allows other operators to object Hearing process if objections, otherwise

administrative approval

PROPOSED UFT RULES-NEW FIELDS

Page 28: UFT RULE PROPOSALS 09.16.2015 ADOPTING STATEWIDE HORIZONTAL RULES IN TEXAS R. MARK HENKHAUS, PE, REGULATORY MANAGER, APACHE CORP

28

Alliance, PBPA, TIPRO, TXOGA have been working with RRC staff since early 2014 on this proposal

Those participating have the backing of their companies and their Trades

RRC staff has been very open to suggestions and have been very helpful in cleaning up proposals

Proposal exists in draft form only, has not been released by Trades or RRC

PROPOSED UFT RULES-CURRENT STATUS

Page 29: UFT RULE PROPOSALS 09.16.2015 ADOPTING STATEWIDE HORIZONTAL RULES IN TEXAS R. MARK HENKHAUS, PE, REGULATORY MANAGER, APACHE CORP

29

UFT group has requested RRC initiate formal rulemaking for SWR 5, 31, 38, 40, 45, 52, and 86

RRC must decide, at conference, to formally publish for rulemaking

Initially was to be at September conference, but we believe that is postponed until October

Upon publishing, public comments will be received

PROPOSED UFT RULES-GOING FORWARD

Page 30: UFT RULE PROPOSALS 09.16.2015 ADOPTING STATEWIDE HORIZONTAL RULES IN TEXAS R. MARK HENKHAUS, PE, REGULATORY MANAGER, APACHE CORP

30

When this proposal is open for rulemaking, please support the Alliance and the other Trades by expressing your support to the Commissioners, and commenting in writing to the RRC Rules Coordinator

PROPOSED UFT RULES-GOING FORWARD

Page 31: UFT RULE PROPOSALS 09.16.2015 ADOPTING STATEWIDE HORIZONTAL RULES IN TEXAS R. MARK HENKHAUS, PE, REGULATORY MANAGER, APACHE CORP

31

HZ development represents a sea-change in how we do business and how we develop resources

These proposed rules eliminate inconsistencies in existing rules

These proposed rules will eliminate red tape, increase efficiency, while still protecting correlative rights

These proposed rules will enable the technology shift to be utilized fully to the benefit of the operators, owners, and the State of Texas

BENEFIT OF UFT RULES

Page 32: UFT RULE PROPOSALS 09.16.2015 ADOPTING STATEWIDE HORIZONTAL RULES IN TEXAS R. MARK HENKHAUS, PE, REGULATORY MANAGER, APACHE CORP

32

These proposed rules will work These proposed rules are essentially in place now, in the Spraberry They work now in the Spraberry (Trend Area) Field

Page 33: UFT RULE PROPOSALS 09.16.2015 ADOPTING STATEWIDE HORIZONTAL RULES IN TEXAS R. MARK HENKHAUS, PE, REGULATORY MANAGER, APACHE CORP

33

Full Development in Action!

Page 34: UFT RULE PROPOSALS 09.16.2015 ADOPTING STATEWIDE HORIZONTAL RULES IN TEXAS R. MARK HENKHAUS, PE, REGULATORY MANAGER, APACHE CORP

34

Page 35: UFT RULE PROPOSALS 09.16.2015 ADOPTING STATEWIDE HORIZONTAL RULES IN TEXAS R. MARK HENKHAUS, PE, REGULATORY MANAGER, APACHE CORP

35

Texas has always been the most important contributor to American energy, but there has never been a time where the work of Texas operators has been so closely tied to international geopolitics, economics and the security of our nation. For the past 50 years we have been in a near-constant price war with OPEC. This paradigm has shifted... it is now a production war. As Texans we only know a few ways to deal with our problems: work harder, get better…. and Win!

PROPOSED UFT RULES- IN CLOSING

Page 36: UFT RULE PROPOSALS 09.16.2015 ADOPTING STATEWIDE HORIZONTAL RULES IN TEXAS R. MARK HENKHAUS, PE, REGULATORY MANAGER, APACHE CORP

36

Page 37: UFT RULE PROPOSALS 09.16.2015 ADOPTING STATEWIDE HORIZONTAL RULES IN TEXAS R. MARK HENKHAUS, PE, REGULATORY MANAGER, APACHE CORP

UFT RULE PROPOSAL09.16.2015

ADOPTING STATEWIDE HORIZONTAL RULES IN TEXAS

THANK YOU!