Page 1: Uemc apr 19_2011

UEM CONSTRUCTION SDN BHDhttp://www.uembuilders.com/uemc_n/

Page 2: Uemc apr 19_2011

UEM Builders (Singapore) Pte Ltd

UEM Builders-Ansal API Pvt Ltd

CORPORATE STRUCTURE

Page 3: Uemc apr 19_2011

Buildings

Infrastructure

Earthworks

- Roads

- Rail

- Drainage

- Bridges

- Utilities

- Landscaping

- Hospitals

- Airports

- Townships

- Stadiums

- Industrial Parks

- Residential & Commercial

- Earth cutting and filling

- Ground treatment

- Retaining wall system

Page 4: Uemc apr 19_2011

0

100

200

300

400

500

2007 2008 2009

Year

USD Million

Page 5: Uemc apr 19_2011

40 years’ experience in engineering & construction

880 experienced professional staff (Engineers, Architects, QS,

Accountants)

USD 315 million paid up capital

USD 1.3 billion total assets

Machineries available for local and international projects

USD 80mil worth of equipment in India, Malaysia and Qatar

Page 6: Uemc apr 19_2011

http://www.uembuilders.com/uemc_n/

LANDMARK PROJECTS

Page 7: Uemc apr 19_2011

848 km of tolled expressway

Completed in 1993

Project cost: USD 1.8 bil.

Role: Concessionaire, Project Management, Construction

NORTH SOUTH EXPRESSWAY

Page 8: Uemc apr 19_2011

KUALA LUMPUR INTERNATIONAL AIRPORT

Development Area 100 km2

Development Period 7 years

Gross Development Value (GDV) USD 3.6 bil

Role

Project Management

Construction (Satellite

Building)

Integrated Development

Page 9: Uemc apr 19_2011

NATIONAL SPORTS COMPLEX

100,000 seat capacity National Stadium (outdoor stadium)

16,000 seat Putra Stadium (indoor stadium)

3,700 seat National Aquatic Centre (swimming complex)

Completed in 1998

Project cost: USD 400 million

Role: Concessionaire, Project Management, Construction

Page 10: Uemc apr 19_2011

KUALA LUMPUR LIGHT RAIL TRANSIT

Total length: 29 km (22 km elevated, 5 km underground and 2 km

at-grade)

First world’s longest driverless LRT system completed in 1999

Capacity: 25,000 passengers/hr/direction

Project cost: USD2.04 billion

Role: Concessionaire, Project Management, Construction.

Page 11: Uemc apr 19_2011

http://www.uembuilders.com/uemc_n/

COMPLETED PROJECTS

Page 12: Uemc apr 19_2011

NORTH SOUTH EXPRESSWAY

CENTRAL LINKConstruction and O&M of 45 km of tolled

expressway

PENANG BRIDGEOperation and Maintenance of 13.5 km bridge

NORTH SOUTH

EXPRESSWAY

MALAYSIA SINGAPORE SECOND CROSSINGConstruction and O&M of 44 km of highways including 2 km bridge

Construction and O&M of

955 km tolled Highway

EXPRESSWAYS

Page 13: Uemc apr 19_2011

Construction of several packages amounting to 203 km dual

two lanes tolled expressway.

Involved in implementation of heavy repair works and

routine maintenance of the completed 848 km

expressway since 1994.

Completed in May 1995.

Project cost: USD 630 million.

NORTH-SOUTH EXPRESSWAY

Page 14: Uemc apr 19_2011

Construction of 45 km of tolled expressway linking NKVE to

Nilai North Interchange at NSE. Gateway to KLIA airport and

Cyberjaya/Putrajaya.

Involved in implementation of heavy repair works and routine

maintenance of the completed 60 km expressway since 1997.

Completed in December 1997.

Project cost: USD 236 million.

NORTH SOUTH EXPRESSWAY CENTRAL LINK

Page 15: Uemc apr 19_2011

Construction of 44 km of dual two/three lane tolled

expressway and 2 km of bridge linking Johor to Singapore

and to Johor City & NSE.

Involved in implementation of heavy repair works and

routine maintenance of the completed 44 km expressway

since 1997.

Completed in December 1997.

Project cost: USD 310 million.

MALAYSIA-SINGAPORE SECOND CROSSING BRIDGE

Page 16: Uemc apr 19_2011

NORTH-SOUTH EXPRESSWAY- THIRD LANE WIDENING

North South Expressway – Proposed Third

Lane Widening and Modification for Non-

Stop Through Traffic for Packages 1, 2A,

2B, 3A, 3B, 4, 5 and 5A.

Commenced:

Package 1 -July 2005 (Completed)

Package 2A,2B,3A,3B & 4 –Aug 2005

(Completed)

Package 5 – August 2005 (Completed)

Package 5A –July 2005 (Completed)

Value : USD 253 million

Page 17: Uemc apr 19_2011

PENANG BRIDGE WIDENING

Construction of widening of the existing Penang Bridge.

Involvement of rejuvenation of the existing east side

approach embankment foundations alongside extending

the existing substructure of the main viaduct and

providing longitudinal beams and construction of Uni-

Directional Ramps to mainland side.

Completed on August 2009.

Project cost: USD 143 million.

Page 18: Uemc apr 19_2011

COMPLETED HIGHWAYS IN INDIA

Page 19: Uemc apr 19_2011

MAJOR HIGHWAYS COMPLETED IN INDIA

Construction & Maintenance (for 15 years) of

Tuni - Anakapalli, NH 5, Andhra Pradesh

Length : 59 km.

Project Cost (@ EPC) : USD 48 mil.

Construction & Maintenance (for 15 years) of

Tambaram-Tindivanam,NH 45,Tamil Nadu

Length : 93 km.

Project Cost : USD 63 mil.

Tumkur–Haveri-NH4, Pkg. 2,4,5-Karnataka

Length : 200 km.

Project Cost (@ EPC) : USD 152.7 mil.

Page 20: Uemc apr 19_2011

MAJOR HIGHWAYS COMPLETED IN INDIA

Etawah to Sikandra-NH 2, Uttar Pradesh – Pckg.1C

Length : 72km.

Project Cost : USD 63 mil.

Bhiwandi-Kalyan-Shil Phata, Maharastra

Length : 25 km.

Project Cost : USD 17 mil.

Kerala State Transport Project Phase-1

Length : 127 km.

Project Cost : USD 50 mil.

Page 21: Uemc apr 19_2011

Upgrading of existing R1 Expressway

Length: 6.6km dual 3-lane highway

Completed: April 1998

Project cost: USD23 million

MANILA-CAVITE TOLL EXPRESSWAY PKG 1, PHILIPPINES

Page 22: Uemc apr 19_2011

PROJECT IN QATAR

Qatar Primary Routes - Salwa Road Phase 1

Upgrading 81 km dual 4 lane highway linkingQatar-Saudi Border at Salwa to Doha

Total project cost: USD 265 million.

Completed: December 2008

Page 23: Uemc apr 19_2011

LIGHT RAIL TRANSIT SYSTEMConstruction of total 29km elevated, underground and at

grade track including stations for the driverless automated

Light Rail Transit.

ELECTRIFIED DOUBLE TRACK Construction of total 182km of

Electrified Double Track Railway Lines

between two major cities

TRANSPORTATION

Page 24: Uemc apr 19_2011

PUTRA LIGHT RAIL TRANSIT STATIONS, KUALA LUMPUR

Completed: 1999Value: USD 494.3 million

Project involved the construction of 29 km track way for Light Rail Transit System in Kuala Lumpur involving 22 km elevated track, 5 km underground tunnel and 2 km at-grade track.

Construction of 5 underground LRT stations, 17 above-ground and 2 at-grade stations throughout the LRT system.

Longest driverless automated LRT in the world.

Implemented in November 1994 and completed in June 1999.

Page 25: Uemc apr 19_2011

Construction of 155 bridge crossings for the 182 km

electrified railway line linking Rawang to Ipoh.

Project Cost: USD 436 million.

31st March 2007

IPOH-RAWANG ELECTRIFIED DOUBLE TRACKING

Page 26: Uemc apr 19_2011

NATIONAL SPORTS COMPLEXConstruction of National Stadium, aquatic centre and indoor stadium for the nation sport facilities.

KUALA LUMPUR INTERNATIONAL AIRPORT (KLIA)Construction of Satellite Building and ancillary works for the Malaysia’s largest airport.

BUILDINGS & FACILITIES

JSNACConstruction of Johor State New Administration Centre in Johor

MARDI Agriculture CentreConstruction of National Stadium, aquatic centre and indoor stadium for the nation sport facilities.

MINISTRY OF FINANCE II BUILDINGConstruction of Government Building for the Federal Government Administrative Centre in Putrajaya.

NATIONAL HEART INSTITUTEConstruction of new healthcare facilities for the extension of the National Heart Institute.

Page 27: Uemc apr 19_2011

NATIONAL SPORTS COMPLEX, BUKIT JALIL, KUALA LUMPUR

Completed: 1998

Value: USD 286 million

100,000 capacity National Stadium (outdoor

stadium), 3,700 seat National Aquatic Centre

(swimming complex) and 16,000 seat Putra

Stadium (indoor stadium).

Implemented in January 1994 and completed in

July 1998 for the XVI Commonwealth Games.

Page 28: Uemc apr 19_2011

COMMONWEALTH GAMES VILLAGE, BUKIT JALIL, KUALA LUMPUR

Completed: 1998

Value: USD 77.7 million

Gross Floor Area: 198,774 m²

Construction of multi storey apartment blocks

complete with recreational facilities.

1,500 units were built in total.

Page 29: Uemc apr 19_2011

KUALA LUMPUR INTERNATIONAL AIRPORT,

SATELLITE BUILDING, SEPANG

Completed: 1998

Value: USD 157 million

Gross Floor Area: 148,000 m².

Design and construction of the satellite building

and its ancillary works as part of the Kuala

Lumpur International Airport Complex.

Project implementation in joint venture with

international construction companies as

consortium partners.

Page 30: Uemc apr 19_2011

EAST MALAYSIA HOSPITALS

The planning, design, construction, equipping, commissioning

and maintenance of six hospitals with a combined total of 976

beds were delivered to the Ministry of Health Malaysia in stages

from 2002 till 2005. Five of the hospitals are located in the state

of Sabah in East Malaysia, namely Lahad Datu, Keningau,

Kuala Penyu, Pitas and Kunak. One more hospital is located in

the state of Sarawak, also in East Malaysia, in Sarikei.

Completed: 2005

Value: USD 256 million

Page 31: Uemc apr 19_2011

Sarikei, Sarawak

Completed: December 2005

Value: USD 74 million

Total of 268 beds

Gross Floor Area: 40,000 sq. ft

EAST MALAYSIA HOSPITALS

Pitas, Sabah

Completed: June 2005

Value: USD 24 million

Total of 76 beds

Gross Floor Area: 15,284 m2

Page 32: Uemc apr 19_2011

EAST MALAYSIA HOSPITALS

Kuala Penyu, Sabah

Completed: May 2005

Value: USD 22 million

Total of 76 beds

Gross Floor Area: 15,284 m2

Kunak, Sabah

Completed: May 2005

Value: USD 24 million

Total of 76 beds

Gross Floor Area: 15,284 m2

Page 33: Uemc apr 19_2011

EAST MALAYSIA HOSPITALS

Keningau, Sabah

Completed: September 2002

Value: USD 58 million

Total of 212 beds

Gross Floor Area: 63,477 m2

Page 34: Uemc apr 19_2011

EAST MALAYSIA HOSPITALS

Lahad Datu, Sabah

Completed: January 2002

Value: USD 61 million

Total of 268 beds

Gross Floor Area: 68,1000 m2

Page 35: Uemc apr 19_2011

Sarikei Hospital, Malaysia (268 Beds)

EAST MALAYSIA HOSPITALS

Completed: December 2003

Value: USD 74 million

Total of 268 beds

Gross Floor Area: 40,000 sqft.

Page 36: Uemc apr 19_2011

UNIVERSITY OF TECHNOLOGY PETRONAS (UTP) MOSQUE,

TRONOH, PERAK

Completed: October 2005

Value: USD 7.7 million

Gross Floor Area: 5,659 m²

The construction and completion of this

uniquely designed ‘floating’ mosque at

Bandar Seri Iskandar, Perak has a

capacity to accommodate 4,000

people.

The enclosed main prayer area is air-

conditioned and can accommodate

1,000 people. The covered prayer area,

accommodating 3,000 people, which

was previously ventilated naturally, has

been changed into an air-conditioned

system.

Page 37: Uemc apr 19_2011

• Commenced: 10 September 2004• Completion: 6 November 2005• Value: USD90.5 million

Construction and completion of 64 units of 3-storey link home and sewerage pump, Danau Villa Link Home, Taman Desa, Kuala Lumpur.

DANAU VILLA LINK HOME, TAMAN DESA, KUALA LUMPUR

Page 38: Uemc apr 19_2011

MINISTRY OF FINANCE BUILDING 2, PUTRAJAYA

Commenced: 4 December 2002Completed: 30 April 2007Value: USD 60 millionGross Floor Area: 67,108 m²

Design, construction and completion of office buildings to house agencies under the Ministry of Finance at the New Federal Government Administrative Centre in Putrajaya.

2 office blocks, 8 and 10-storey high with each housing two levels of basement car parks.

Scope of works include interior design works.

Page 39: Uemc apr 19_2011

CASA DESA CONDOMINIUM, KUALA LUMPUR

Commenced: 11 July 2005Completed : 31 March 2008Value: USD 24 millionGross Floor Area: 9,794 m2

For the 410-unit Casa Desa Condominium, the contract package consists of substructure works and superstructure works.

Project involves construction of 7 blocks of condominium buildings including earthworks, bored piling and pile caps.

Page 40: Uemc apr 19_2011

Project : Agriculture Exposition Centre (Phase 2) –

MARDI, Serdang

Commenced : 27 November 2007

Completed : 30 June 2008

Value : USD 64 million

Gross Floor Area: 25,000 m²

AGRICULTURE EXPOSITION CENTRE (PHASE 2)-MARDI, SERDANG

Page 41: Uemc apr 19_2011

JOHOR STATE NEW ADMINISTRATIVE CENTRE (JSNAC), PHASE 1, JOHOR

Commenced: November 2005Completed: August 2008Value: USD 62 million

The development of the JSNAC on a 320-acre sitelocated at Bandar Nusajaya, 25 km from JohorBahru, Johor is divided into three precinctscomprising the Government precinct (273 acres), VIPresidences and Istana reserve (17 acres) andgovernment housing reserve (30 acres).

Phase 1 of this development is divided into five packages where three packages, has been awarded. Project involves the construction of office buildings for the new state administrative centre in Johor.

Page 42: Uemc apr 19_2011

STATE DEPARTMENT COMPLEX (JSNAC), NUSAJAYA

Commenced: November 2005Completed: February 2009Value: USD 63 million

Page 43: Uemc apr 19_2011

UEM GROUP NEW CORPORATE OFFICE, KUALA LUMPUR

Commenced: 1 June 2005Completed: December 2008Value: USD 45 million Gross Floor Area: 35,000 m²

This project involves the design and construction of a 29-storey office building with an 8-storey annex building at KL Sentral. The scope of works involves interior design.

Page 44: Uemc apr 19_2011

PLUS HEADQUARTERS, SUBANG

Development of one block of 10-storey

office tower at Subang Toll, Petaling Jaya,

Selangor Darul Ehsan

Commenced : 15 January 2007

Completed : December 2008

Value : USD 29 million

Page 45: Uemc apr 19_2011

NATIONAL HEART INSTITUTE, KUALA LUMPUR

Commenced: 5 September 2005Completed: March 2009Value: USD 64.6 millionGross Floor Area: 32,840 m²

Design, construction, supply and commissioning and maintenance of new healthcare facilities for the extension of the National Heart Institute.

This project is divided into four phases and worksentail the renovating and refurbishing of existingfacilities.

Page 46: Uemc apr 19_2011

COLLEGE OF TECHNOLOGY (COT), DOHA, QATAR

Construction of 21 multidisciplinary buildings comprising classrooms, workshops/labs, cafeterias, recreation facilities, auditorium and administration buildings with a total area of 63,000 m2 and external infrastructure for campus area of 300,000 m2.

Project cost: USD 100 million.

Completed: October 2006

Page 47: Uemc apr 19_2011

Project : 548 Units (5 Blocks) Apartment

Using Industrialised Building System (IBS) Method

Commenced : September 2006

Exp. Completion : March 2008

Value : USD 39 million

Gross Floor Area: 60,500 m²

GOVERNMENT APARTMENTS, PUTRAJAYA

Page 48: Uemc apr 19_2011

Proposed Basement Structural Works for

Universal Studio

Commenced: March 2008

Completed: July 2008

Value: USD 4.5 million

Gross Floor Area: 65,800 m²

RESORTS WORLD AT SENTOSA, SINGAPORE

MC04-F1

Page 49: Uemc apr 19_2011

http://www.uembuilders.com/uemc_n/

ON-GOING PROJECTS

Page 50: Uemc apr 19_2011

BANK KERJASAMA RAKYAT HEADQUARTERS, KUALA LUMPUR

Design, construction and completion of 2 office

towers (32 and 38-storeys), 1 block of 8-storey

annex comprises of car parks and 1 unit PPU

Commenced : 1 June 2009

Exp. Completion : December 2011

Value : USD 26 million

Gross Floor Area: 188,000 m²

Page 51: Uemc apr 19_2011

PENANG SECOND BRIDGE

Project : Design, Construction and Completion of the Penang Second Bridge. Package 2 : Super-structure Works of Approach Spans. • Overall length - 24 km• Length over water - 17 km,• Main span : Length - 250 meters• Height clearance (above water) – 30 meters• Number of vehicle lanes – 2 + 1 for motorcycles (each

direction) Commenced : June 2009 Exp. Completion : March 2013 Value : USD 473 million

Page 52: Uemc apr 19_2011

PHG’-S’GOR RAW WATER TRANSFER PROJECT

Pahang - Selangor Raw Water Transfer

Project Lot 1-1, Water Transfers

Tunnel & Related Works (2,260 Mld.)

Commenced : June 2009

Exp. Completion : May 2014

Value : USD 400 million

Length: 44.6km ; Diameter: 5.2m

Page 53: Uemc apr 19_2011

1,765-acre Sushant Golf City Project in Lucknow, Uttar Pradesh

Project : Construction of various

building and engineering works at

Sushant Golf City, Lucknow U.P. India.

Commenced : 1 April 2008

Exp. Completion : February 2012

Value : USD 497 million

Total Development Area : 1,765 acre

Page 54: Uemc apr 19_2011

Project : 4000 units Housing Project for the

National Housing Scheme, Brunei.

Commenced : 2 February 2010

Exp. Completion : February 2014

Value : USD 290 million

Total Development Area: 309 hectares

4000 UNITS HOUSING PROJECT, BRUNEI

Page 55: Uemc apr 19_2011

NEW LCC TERMINAL AT KLIA, SEPANG

Project : Design, Construction and Completion,

Testing, Commissioning and Maintenance of Main

Terminal Building, Satellite Building, Sky Bridge

and Piers.

Commenced : 16 August 2010

Exp. Completion : April 2012

Value : USD 316 million

Page 56: Uemc apr 19_2011

Thank You

This document is the property of United Engineers (Malaysia) Berhad. Neither the whole nor any part of this document may be reproduced, stored or transmitted in any forms or by any means without

written permission of United Engineers (Malaysia) Berhad.

This document is designed to provide information in relation to the subject matter covered for this presentation and should not be used for any other purpose. Whilst every care has been taken in its

preparation, no person should draw conclusions purely on the basis of the material contained herein. If assistance is required, reference should be made to the relevant professional of United Engineers

(Malaysia) Berhad.