udine - april 19th 20041 data check for magic raquel de los reyes universidad complutense de madrid...

22
Udine - April 19th 2004 1 Data Check for MAGIC Raquel de los Reyes Universidad Complutense de Madrid (U.C.M.)

Post on 22-Dec-2015

215 views

Category:

Documents


1 download

TRANSCRIPT

Udine - April 19th 2004 1

Data Check for MAGIC

Raquel de los ReyesUniversidad Complutense de

Madrid(U.C.M.)

Udine - April 19th 2004 2

Contents The program Central control data check DAQ data check Conclusions

Udine - April 19th 2004 3

Program

Group of scripts and Root macros to check the subsystems and the data taken at the end of each night shift.

Two scripts: CCDataChecking & DAQDataChecking

Two macros: CCDataCheck.C & DAQDataCheck.C

Thanks to F. Goebel and R. Wagner

http://www.magic.iac.es/operations/datacheck

Udine - April 19th 2004 4

Central control data checkDrive systemGeneral camera statusCamera HVCamera DCCamera LVCooling systemTrigger systemTrigger macro cellsWeather station

Udine - April 19th 2004 5

Drive system(CC_2004_02_15.ps)

CrabNebula

OffMrk421-1Mrk42

1

OffCrab4

21:58 & 03:22 :Cosy crashed

no reported

Thanks to T. Bretz and D. Dorner

Udine - April 19th 2004 6

General camera status (CC_2004_02_15.ps)

21:35: Guagua crashed

Change source: OffCrab4 – Mrk421

Move to CrabNebula

End shift

Udine - April 19th 2004 7

Camera High Voltages (HV)

(CC_2004_02_15.ps)

Failure of master voltage regulator boards and the six adc boards

monitoring HV y DC in sectors 3-5

no reported

21:35: Guagua crashed

21:35: Guagua crashed

Thanks to J.Flix

Udine - April 19th 2004 8

Camera Direct Currents (DC)

(CC_2004_02_15.ps)

21:35: Guagua crashed

no reported

Udine - April 19th 2004 9

Camera Low Voltages (LV)(CC_2004_02_15.ps)

21:35: Guagua crashed

no reported

Udine - April 19th 2004 10

Cooling system (CC_2004_02_15.ps)

Thanks to E. Domingo and R. Firpo

Udine - April 19th 2004 11

Trigger system(CC_2004_02_15.ps)

21:26: ZetaTauri

Pedestal runs(PED)/calibration runs(L1_5NN:L2_DEFAULT)

Thanks to R. Paoletti and A. Stamerra

Calibration runs

Firing macrocells 2 and 7

Low threshold pixels 3, 9 and 21

Udine - April 19th 2004 12

Trigger macro cells(CC_2004_02_15.ps)

UMa51 in pixels 3, 9 and 21: Macrocells 2 and 7

Fire not reported:

Pixels(HW) 88, 89, 123, 124, 125, 165, 166

Udine - April 19th 2004 13

Weather station(CC_2004_02_15.ps)

Thanks to A. Torres

Udine - April 19th 2004 14

DAQ data check

PedestalCalibration

Conversion factorDefect pixelsFitted chargesReduced sigma per chargeAbsolute arrival times

Timing

Udine - April 19th 2004 15

Pedestals(IFAE sample C (on): 15/02 - 17031-17123)

Udine - April 19th 2004 16

Calibration (I): Conversion factor

(IFAE sample C (on): 15/02 - 17031-17123)

Thanks to J. Cortina and M. Gaug

Udine - April 19th 2004 17

Calibration (II):Defect pixels

(IFAE sample C (on): 15/02 - 17031-17123)

Udine - April 19th 2004 18

Calibration (III):Fitted charges

(IFAE sample C (on): 15/02 - 17031-17123)

Udine - April 19th 2004 19

Calibration (IV):Reduced sigma per charge

(IFAE sample C (on): 15/02 - 17031-17123)

Udine - April 19th 2004 20

Calibration (V):Absolute arrival times

(IFAE sample C (on): 15/02 - 17031-17123)

Udine - April 19th 2004 21

Timing( CrabOn: 17/02 - 18249 – 18482 )

Thanks to M. López

Udine - April 19th 2004 22

ConclusionsThe CC check plots will allow us to take a look to night conditions and hardware problems.The DAQ check plots will make a preliminar analysis of night data.In the future these scripts could interact with the DataBase to collect the hardware problems.STATUS:

CC data check runningDAQ data check in tests.