ucsf medical center at mission bay proposed fourth street public plaza mission bay cac february 9,...
TRANSCRIPT
UCSF Medical Center at Mission BayProposed Fourth Street Public Plaza
Mission Bay CACFebruary 9, 2012
1
2
Agenda
• Overview: UCSF Medical Center at Mission Bay
• Proposal: Fourth Street Public Plaza– Plaza Area Concept
– Proposed Design
• Multi-Use Promenade
• Amphitheatre
• Central Plaza
• Grove
• Bench Walk
– Circulation
– Milestones and Public Input
• Children's Hospital – 183 beds
– urgent/emergency care and pediatric primary and specialty outpatient care
• Women's Specialty Hospital – 36 beds
– cancer care, specialty surgery, a 36-bed birth center and select women's ambulatory services
• Cancer Hospital – 70 beds
– first step to full cancer services at MB
• Outpatient Building and Helipad
• Energy Center (central plant)
• Parking
The Plan for Mission Bay – 2014Integrated Children’s, Women’s Specialty and Cancer Hospitals
3
Children’s(183 beds)
Women’s (36 beds) Cancer (70 beds)
Energy Center
Children’s &Women’s
UCSFResearchCampus
(Future Cancer 2020)
MA
RIP
OS
A S
TR
EE
T
FOURTH STREET
Helipad
HospitalOutpatient
4
UCSF Benioff Children’s Hospital
5
Third Street Plaza
6
Outpatient Building and Helipad
7
8
Proposal: Fourth Street Public Plaza
• Opportunity to create a warm and welcoming open space for all community members – including patients, visitors, staff
• Public realm – pedestrians, bike path, landscaping
• Farmer’s markets; concerts; urban experience
• Accessible by fire/emergency vehicles and can be easily opened in an emergency that requires through traffic
• After extensive consultation the City Family is supportive of proposed design
Mission Bay Context Plan
9
4th Street Public Plaza
Constituents’ Goals
10
Community: Garden feel, “not corporate”; clear pedestrian access; vehicular access in emergency
Hospital: Drop off loops; welcoming/healing environment; place for events
Patients, Visitors: Relaxing; clear way-finding; waiting area
City Family: Remains public realm; reduce cars; pedestrian oriented; storm water; ADA access
SFFD: Emergency access
Bicycle Coalition: Through path; safety
Child Life: Engaging for children; interactive
Staff: Safety at night; place for meetings/lunch
Proposed Design
11
12
Concept Plan – Phase 1
13
Concept Plan – Phase 2
14
Multi-use Promenade
15
Promenade images
Multi-use Promenade – From North
16
Multi-use Promenade – View South
17
Multi-use Promenade – Plaza
18
Multi-use Promenade – From South
19
Promenade Access
20
Fourth Street Public Plaza
21
Amphitheater
22
Amphitheater – From North Drop-off
23
Amphitheater – From Central Plaza
24
Amphitheater – From Central Plaza
25
Amphitheater – From Top
26
Amphitheater – From Bridge
27
Central Plaza
28
29
Front Porch Grove
30
Grove – From South Drop-Off
31
Grove – From South
32
Bench Walk
33
Bench Walk – Pedestrian
34
35
Circulation
36
Primary Movement Corridors
37
38
Class I Bicycle Lane: Separate ROW
Class II Bicycle Lane:Striped lane
Class III Bicycle Lane: Shared with arrow striping
Existing Bicycle Network & Currently Proposed Changes to Mission Bay Plan
Traffic Analysis of Proposed Change
• The closure of Fourth Street to vehicular through traffic was analyzed as a project alternative in UCSF’s 2008 Medical Center at Mission Bay EIR
• Traffic improvement measures have been identified to address effects if Fourth Street were closed to vehicular through traffic
• Implementation of these measures would allow intersections to operate at acceptable levels of service
• UCSF would fund the implementation of these measures
39
New Right Turn Lane
Street Widening, Turn Lanes and Median
Restriping in Existing ROW
Restriping in Existing ROW
Fourth Street Public Plaza
Energy Center Turnout
New Traffic Signal
Proposed Traffic Improvement Measures
Changes to Optimize CirculationChanges for 4th Street Public Plaza 40
Milestones and Public Input
41
42
Anticipated Project Milestones
Nov 2011: Design competition for landscape architect
Feb 2012: Draft EIR Published
Mar 2012: Draft EIR Public Hearing
Mar 2012: Plaza Design Complete
Summer 2012: Final EIR
Summer 2012: UC Certification of EIR, Approval of Budget & Design
Jul or Sep 2012: SF Board of Supervisors
Continued
43
Anticipated Project Milestones (continued)
Sept 2012: Underground utility construction begins
Nov 2012: Plaza construction documents complete
Mar 2013: Approval and Permits from State Fire Marshal and SF DPW
May 2013: Plaza construction begins
2015: UCSF Medical Center at Mission Bay opens
Public input opportunities follow
44
Opportunities for Public Input
Past Opportunities
2008 – 2009 Community design meetings
Jun 1, 2011 UCSF Mission Bay CAG Action Team
Jul 12, 2011 Dogpatch Neighborhood Association
Sep 12, 2011 South Beach Mission Bay Rincon Hill Neighborhood Association
Oct 15, 2011 Potrero Hill Festival information table
Oct 22, 2011 Potrero Hill History Night information table
Nov 9, 2011 Dogpatch Neighborhood Association
45
Opportunities for Public InputAnticipated Opportunities 2012January 23 UCSF Community Meeting
February 9 Mission Bay Citizens Advisory Committee
March 12 South Beach/Rincon/Mission Bay Neighborhood Assn
March 13 Dogpatch Neighborhood Association
Feb–Mar Draft EIR Public Comment Period
March Draft EIR Public Hearing
March DPW Director Hearing on Major Encroachment Permit
Summer UC Certification of EIR, Approval of Budget and Design
Summer Successor Agency Oversight Board Meeting on Public Plaza Design
Summer (Potential) MTA Board Meeting on Fourth Street
Summer (Potential) Planning Commission Meeting on General Plan Referral
Summer SF Board of Supervisors
END OF PRESENTATION
46
47
Circulation – Phase 1
48
Circulation – Phase 2
49
Promenade Access Phase 1
50
Promenade Access Phase 2
51
Promenade Tree Spacing Study – West Elevation
Future Widened Mariposa Street
52
Future WidenedI-280 Off-Ramps
53