Optus Coverage Remediation
![Page 2: UC Ref Group Nov08 Part 2](https://reader036.vdocuments.us/reader036/viewer/2022062514/55861f58d8b42a88428b5034/html5/thumbnails/2.jpg)
www.uc.unimelb.edu.au2
Optus Coverage Remediation• Optus commissioned testing of the network in all campuses of the university
and at other locations identified by IS (for example the major teaching hospitals)
• Several areas were identified that required coverage enhancement including the Parkville & VCA campuses of the university.
• Site design visits were conducted on 6th and 7th November:– Optus Project Manager– Construction Engineers x3– RF Engineer– Heritage Consultant– Property Acquisition Consultant (Legal\Commercial)
• Optus have committed to resolving all coverage issues as expeditiously as possible and have set aside circa $3 million dollars to acquire and construct new mobile base stations within the University grounds
![Page 3: UC Ref Group Nov08 Part 2](https://reader036.vdocuments.us/reader036/viewer/2022062514/55861f58d8b42a88428b5034/html5/thumbnails/3.jpg)
www.uc.unimelb.edu.au3
Outcomes of initial Optus assessment
• At a high level Optus identified the following areas for mobile facilities that would meet the optimum coverage objectives for the campuses:– a new mobile site in the North East corner of the Parkville campus– a new mobile site in the South East area of the Parkville campus– a new mobile site in the North West corner of the Parkville campus– a new mobile site in the middle of the VCA– a new mobile site on the David Pennington building– a new mobile site at St Vincents Hospital
![Page 4: UC Ref Group Nov08 Part 2](https://reader036.vdocuments.us/reader036/viewer/2022062514/55861f58d8b42a88428b5034/html5/thumbnails/4.jpg)
www.uc.unimelb.edu.au4
![Page 5: UC Ref Group Nov08 Part 2](https://reader036.vdocuments.us/reader036/viewer/2022062514/55861f58d8b42a88428b5034/html5/thumbnails/5.jpg)
www.uc.unimelb.edu.au5
![Page 6: UC Ref Group Nov08 Part 2](https://reader036.vdocuments.us/reader036/viewer/2022062514/55861f58d8b42a88428b5034/html5/thumbnails/6.jpg)
www.uc.unimelb.edu.au6
![Page 7: UC Ref Group Nov08 Part 2](https://reader036.vdocuments.us/reader036/viewer/2022062514/55861f58d8b42a88428b5034/html5/thumbnails/7.jpg)
www.uc.unimelb.edu.au7
![Page 8: UC Ref Group Nov08 Part 2](https://reader036.vdocuments.us/reader036/viewer/2022062514/55861f58d8b42a88428b5034/html5/thumbnails/8.jpg)
www.uc.unimelb.edu.au8
![Page 9: UC Ref Group Nov08 Part 2](https://reader036.vdocuments.us/reader036/viewer/2022062514/55861f58d8b42a88428b5034/html5/thumbnails/9.jpg)
www.uc.unimelb.edu.au9
![Page 10: UC Ref Group Nov08 Part 2](https://reader036.vdocuments.us/reader036/viewer/2022062514/55861f58d8b42a88428b5034/html5/thumbnails/10.jpg)
www.uc.unimelb.edu.au10
![Page 11: UC Ref Group Nov08 Part 2](https://reader036.vdocuments.us/reader036/viewer/2022062514/55861f58d8b42a88428b5034/html5/thumbnails/11.jpg)
www.uc.unimelb.edu.au11
![Page 12: UC Ref Group Nov08 Part 2](https://reader036.vdocuments.us/reader036/viewer/2022062514/55861f58d8b42a88428b5034/html5/thumbnails/12.jpg)
www.uc.unimelb.edu.au12
![Page 13: UC Ref Group Nov08 Part 2](https://reader036.vdocuments.us/reader036/viewer/2022062514/55861f58d8b42a88428b5034/html5/thumbnails/13.jpg)
www.uc.unimelb.edu.au13
![Page 14: UC Ref Group Nov08 Part 2](https://reader036.vdocuments.us/reader036/viewer/2022062514/55861f58d8b42a88428b5034/html5/thumbnails/14.jpg)
www.uc.unimelb.edu.au14
![Page 15: UC Ref Group Nov08 Part 2](https://reader036.vdocuments.us/reader036/viewer/2022062514/55861f58d8b42a88428b5034/html5/thumbnails/15.jpg)
www.uc.unimelb.edu.au15
Timing & Prioritisation• Optus is totally committed to this project, and to that end the intention is to deploy the sites as quickly as
possible• A initial project plan was produced which is copied below for your reference, however it’s fair to say that the
intention is to better this by many months. • At this point in time Optus have effectively completed process step 2 of 7 and now seek your authorisation
to move forward
ID Task Name Start Finish DurationQ1 09Q4 08 Q2 09 Q3 09
Mar JunFeb Apr JulNov Dec Jan May
1 6w5/12/200827/10/2008Scoping & Design Visits
2 8w30/01/20098/12/2008Preliminary design and surveys
3 16w22/05/20092/02/2009Planning activities
4 16w22/05/20092/02/2009Property consent
5 6w3/07/200925/05/2009Construction
6 3w24/07/20096/07/2009Installation and Commissioning
7 1w31/07/200927/07/2009Sites tested & On-Air
Budget Allocation
$150,000
Included above
$20,000
$40,000
$1.9M
$390,000
Included above
Aug