typical high end residential project

6
Typical high-end residential project. Time lines & Valuations / budgets: Market value 2003 £850,000.00 Budget build price Phase 1 2007 £750,000.00 Planning Approval 2008 Building control approval 2008 Phase 1 build commenced 2009 Phase 1 completed 2010 Building valuation at Phase 1 2011 £3,100,000.00 Uplift from Phase 1 2011 £1,500,000.00 Areas of responsibility: Client Liaison Architectural design. Interior design. FF&E design. Project management. Structural Engineering co- ordination. Planning Application. Building control application. Site inspections Design brief: To create luxury living room, bedroom, ensuite, and dressing room over existing converted swimming pool area and to convert existing master bedroom into kitchen. Open up existing kitchen and dining room and turn into dining room. Move entrance hall and create circulation hall connecting all area on the upper and lower ground floor. Heating: build in wall and under floor heating with options to extend to solar / ground source heat pump and summer cooling systems.

Upload: nick-kirkman-wood-ma

Post on 17-Aug-2015

5 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Typical high end residential project

Typical high-end residential project. Time lines & Valuations / budgets:

Market value 2003 £850,000.00

Budget build price Phase 1 2007 £750,000.00

Planning Approval 2008

Building control approval 2008

Phase 1 build commenced 2009

Phase 1 completed 2010

Building valuation at Phase 1 2011 £3,100,000.00

Uplift from Phase 1 2011 £1,500,000.00

Areas of responsibility:

Client Liaison

Architectural design.

Interior design.

FF&E design.

Project management.

Structural Engineering co-

ordination.

Planning Application.

Building control application.

Site inspections

Design brief:

To create luxury living room, bedroom, ensuite,

and dressing room over existing converted

swimming pool area and to convert existing master

bedroom into kitchen. Open up existing kitchen and

dining room and turn into dining room. Move

entrance hall and create circulation hall connecting

all area on the upper and lower ground floor.

Heating: build in wall and under floor heating with

options to extend to solar / ground source heat

pump and summer cooling systems.

Page 2: Typical high end residential project

Phased Floor plan layout

Page 3: Typical high end residential project

View from living-room entrance arch

Page 4: Typical high end residential project

View from living-room corner window

Page 5: Typical high end residential project

Living room FF&E design layout

Page 6: Typical high end residential project

Bedroom FF&E design layout