IL 44-751-1 Instruction Leaflet Page 1 November,2001 Type DTW De-energized Tap Changer Application, Installation & Selection Guide

Upload: buinhi

Post on 14-May-2018

222 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Type DTW De-energized Tap Changer Application ... · De-energized Tap Changer Application, Installation & Selection Guide. IL 44 ... the moving contacts to easily slide up into

IL 44-751-1 Instruction Leaflet

Page 1 November,2001

Type DTW De-energized Tap ChangerApplication, Installation &Selection Guide

Page 2: Type DTW De-energized Tap Changer Application ... · De-energized Tap Changer Application, Installation & Selection Guide. IL 44 ... the moving contacts to easily slide up into

IL 44-751-1 Instruction Leaflet Page 2 November, 2001

Scope This guide contains general information for ordering and installing the type DTW de-energized tap changer. This guide does not describe all possible contingencies, which may arise during installation, operation, or maintenance of the tap changer, nor does it describe all details and variations of the equipment. If you require additional information regarding the installation and the operation or maintenance of your equipment, contact the local representative of ABB.

Safety Definitions Safety notations are intended to alert personnel of possible conditions, which may cause personal injury, property damage, or even death. They have been inserted into this instructional text prior to the step in which the condition is cited. The safety notations are headed by one of three hazard intensity levels, which are defined as follows: 1. DANGER- immediate hazard that will result in severe personal injury, property damage, or

death. 2. WARNING- hazard or unsafe practice that could result in personal injury, property damage,

or death. 3. CAUTION- hazard or unsafe practice, which could result in minor personal injury, or property

damage.

Introduction The type DTW de-energized tap changer is one of a family of ABB tap changers for power transformers. A de-energized tap changer is a switch, which is connected to the winding taps of the transformer. When the tap changer is moved from one position to another, the amount of the tap winding connected into the circuit is changed. This permits the adjustment of the voltage ratio of the transformer to best suit the voltage requirements at the transformer’s installation site. The de-energized tap changer is usually installed into the high voltage circuit of the transformer and, most of the time, it is used to adjust the primary voltage of the transformer within a 10 percent range in 5 steps.

D A N G E R The type DTW tap changer is a de-energized tap changer, and must, be operated only when the transformer is completely de-energized. This type of tap changer must never be operated when the transformer is energized. Operation when the transformer is energized is dangerous and will result in severe personal injury, property damage, or death. The type DTW tap changer is a modular, bridging-type (zigzag) tap changer with external operating mechanism. It is most commonly available as a 5-position device. Other configurations are available or can be designed; for these, please contact ABB. The type DTW tap changer is made up of individual tap decks (one or two per phase). The phase tap decks are connected to a common set of horizontal operating shafts through individual gear sets. The tap changer is mounted in front of each phase coil, parallel to the side of the transformer tank. The tap changer is supported by an insulating framework, which is part of and attached to the transformer superstructure. See Figure 1 for a general view of a type DTW tap changer installation. The ability to locate the type DTW tap changer on the side of each phase coil permits very direct tap lead routing with a minimum of bends.

Page 3: Type DTW De-energized Tap Changer Application ... · De-energized Tap Changer Application, Installation & Selection Guide. IL 44 ... the moving contacts to easily slide up into

IL 44-751-1 Instruction Leaflet Page 3 November, 2001

Figure 1: Typical installation of the type DTW tap changer

All materials used in the construction of the type DTW tap changer have been chosen for their superior electrical properties, mechanical strength, temperature extremes capability, corrosion resistance, transformer oil compatibility, and light weight.

Page 4: Type DTW De-energized Tap Changer Application ... · De-energized Tap Changer Application, Installation & Selection Guide. IL 44 ... the moving contacts to easily slide up into

IL 44-751-1 Instruction Leaflet Page 4 November, 2001

Ratings The type DTW tap changer is available in one basic current rating and is offered with several different electrostatic shielding and insulation options. Table 1 presents the various rating options.

Table 1. DTW RatingsTest/ Parameter Rated Value Ref. Dimension

on Tap Changer Voltage Class See note 3 N/A Phase to ground and phase to phase: Lightning Impulse 60 Hz. Power Frequency

See note 3 N/A

Between Adjacent contacts: Lightning Impulse 60 Hz. Power Frequency

220 kV 70 kV

(A-B, B-C, C-D, D-E, E-F, F-A)1

Short circuit current

10,000 A r.m.s. N/A

Rated Current2 850 A N/A 1 See Figure 2 2 Based on a steady state contact temperature rise of 15°C at a continuous current equal to 120% of rated current. 3 The dielectric withstand from tap deck to ground and from phase to phase is very much dependent on the electrical clearance distances which are maintained by the transformer design. See also Electrostatic Shielding and Insulation (page 9).

Figure 2.

Page 5: Type DTW De-energized Tap Changer Application ... · De-energized Tap Changer Application, Installation & Selection Guide. IL 44 ... the moving contacts to easily slide up into

IL 44-751-1 Instruction Leaflet Page 5 November, 2001 Construction Details and Features Basic Information The DTW, de-energized tap changer, is constructed from six major components: 1) Tap deck, 2) Worm gear set, 3) Moving contacts, 4) Stationary contacts, 5) Mounting post and 6) Drive shaft and External operating mechanism. These individual components (except number 6) are shown in Figure 3 and Figure 4.

1

3

4

5

Contact DriveShaft

Tap DeckPlate

Moving ContactAssembly

StationaryContact

Copper MountingPost

Silver/CopperContact Button

Figure 3: Contact structure

Figure 4: Worm gear set, 2), and ball end fittings

Page 6: Type DTW De-energized Tap Changer Application ... · De-energized Tap Changer Application, Installation & Selection Guide. IL 44 ... the moving contacts to easily slide up into

IL 44-751-1 Instruction Leaflet Page 6 November, 2001

Tap Deck The tap deck is a flat insulating plate. This plate serves as the base to which all of the other tap changer components are bolted. The main deck contains six through holes, which are used to bolt the tap changer to the transformer framework. The flat insulating plate is machined from high strength, electrical grade, low power factor Micarta. This structure carries all of the mechanical loads created by the weight of the tap leads and the thrust and weight of the drive shafts. Worm Gear Set This gear set is mounted on the main deck’s outboard face. Its function is to convert the rotary action of the driving shaft 90 degrees in order to turn the moving contacts from position to position. This gear set is contained within a cast metal housing. The function of the housing is to position and hold the gear set and to provide a smooth, rounded corner enclosure in order to minimize electrical stress concentration. The nature of the gearing is such that one full turn of the drive shaft rotates the moving contacts from one set of stationary contacts to the next. Contacts The stationary contacts are machined from copper flat stock and are 0.25 inches (6.4 mm) thick. The leading edges are chamfered to permit the moving contacts to easily slide up into position. These contacts are tin-plated. The stationary contacts are bolted to copper mounting posts, which in turn, are bolted to the phase deck. Two bolts are used for each contact. The bolt heads and nuts are shielded with special, toriodially-shaped, washers to minimized electrical stress concentration. The copper mounting posts serve as the connection point for the tap leads. The tap leads from the coil should be terminated with a two-hole flat connector. The flat connector is bolted to the mounting post with two 0.375 (9.5 mm) bolt sets. The mounting posts “capture” the bolt head so that only the nut has to be turned to tighten the joint. The moving contact set is a “pincer” type of contact; the spring loaded contact plates slide over the stationary contacts. See Figure 5. Each contact plate is made from copper flat stock. The copper plates are tipped with semi-spherical, silver-copper alloy contact buttons. This alloy contact button assures a positive, low friction, low resistance current path at all times, even when taps are changed very infrequently. The sliding action of the contact button over the chamfered stationary contact plate creates a good wiping action during the tap change which further guarantees a solid, low resistance electrical contact. Contact pressure is precisely controlled by two coil springs, which are set and calibrated at the factory to provide uniform and consistent contact pressure. The combination of contoured interface surfaces between the moving and stationary contacts and the accurately calibrated spring loaded pincer contacts minimizes the force needed to drive the tap changer from one position to another. The pincer type of contact takes advantage of the magnetic attractive forces created during through faults or current surges. These additional compression forces yield high fault current withstand capability by preventing contact bounce and arcing during faults. These features permit the tap changer to have a relatively low driving torque and, yet maintain a high through fault current withstand capability.

Page 7: Type DTW De-energized Tap Changer Application ... · De-energized Tap Changer Application, Installation & Selection Guide. IL 44 ... the moving contacts to easily slide up into

IL 44-751-1 Instruction Leaflet Page 7 November, 2001

Figure 5. Moving contact

Driving System The drive system consists of several parts: 1) the worm gear drive, 2) the inter-phase shafts, 3) the main drive shaft and 4) the external operating mechanism. See Figure 6. The moving contact’s steel shaft is fixed to the worm gear assembly. The gear is meshed with the worm driver, which is attached to the drive shaft through ball joints. The entire worm driver assembly is designed to provide positive drive shaft engagement with a minimum of backlash and maximum forgiveness of shaft misalignment. The worm driver terminates in a ball-shaped, shaft end. The inter-phase shafts are non-metallic Micarta tubes. These shafts slide over the ball-ends of the worm drive shaft creating a ball and socket type of joint. The ends of each inter-phase shaft have slip joints to make assembly easy and also to allow for some minor miss-alignment and to accommodate movement due to thermal expansion of the transformer. The main drive shaft connects the operating mechanism to the first tap changer deck. This shaft is also a non-metallic Micarta tube. A telescoping connecting tube connects the main drive shaft to the external operating mechanism The combination of ball joint connectors, telescoping and slip joint shaft tubes allows the drive mechanism to accommodate misalignments between tap changer decks or the operating mechanism and permits the shaft and drive mechanism to adjust to dimensional changes that occur as the transformer responds to temperature variations. The shaft seal of the external operating mechanism consists of a packing gland backed up by a secondary O-ring to form a redundant shaft seal between the operating shaft and the atmosphere. The operating mechanism is sealed to the mounting boss by a flat gasket, which is retained by a machined groove in the flange of the mounting boss. The operating mechanism is bolted to the mounting boss. The external operating mechanism drives the tap changer’s operating shaft such that one complete revolution of the external handle indexes each tap deck one position. This one-turn-per-tap action allows the driving mechanism system to absorb any backlash in the entire tap changer structure and still provide precise positioning of the tap changer contacts. To make a tap change, the operator must perform two separate actions: 1) pull the fixing pin which frees the mechanism shaft and 2) turn the operating handle 360 degrees. The position number is indicated by a number on a Geneva dial and is visible through the view port. A position number is only fully visible when the tap changer is in position. The fixing pin will not re-seat itself

Page 8: Type DTW De-energized Tap Changer Application ... · De-energized Tap Changer Application, Installation & Selection Guide. IL 44 ... the moving contacts to easily slide up into

IL 44-751-1 Instruction Leaflet Page 8 November, 2001

unless the tap changer is fixed on a position. Positive mechanical stops are built into the tap changing mechanism, which will prevent turning past the lowest and highest positions. The external mechanism can be pad locked in any position (pad lock not supplied by ABB). Figure 7 shows the location of the pad-lock. All external parts are made of non-corrosive materials.

2

1

3

4

Worm GearAssembly

Ball End FittingDrive Shaft

Tap Changer Deck

Sliding FitConnection

Ball EndFitting

Inter-PhaseShaft

Mounting Boss (welded to tank)

External Operating Mechanism

Figure 6: Drive System (mounting boss not supplied by ABB Alamo)

Figure 7: Location of pad-lock on external mechanism. (Pad-lock not supplied by ABB Alamo)

Page 9: Type DTW De-energized Tap Changer Application ... · De-energized Tap Changer Application, Installation & Selection Guide. IL 44 ... the moving contacts to easily slide up into

IL 44-751-1 Instruction Leaflet Page 9 November, 2001 Electrostatic Shielding and Insulation Electrical spacing requirements between the tap decks and the tank wall and between the tap decks and adjacent phases or other metallic objects is a complex subject. When designing the transformer, required electrical clearance distances should be calculated between phase decks and between phase decks and ground or other parts of the transformer. Three levels of shielding and insulation are available for the tap decks.

1. Unshielded: Tap decks do not have any electrostatic shields. This configuration is typically used for applications, which have a impulse voltage withstand requirement of 200 kV or less. See Figure 8.

2. Level 1 Electrostatic Shielding: A cast-aluminum electrostatic shield ring is placed between the tap changer deck and the transformer tank wall. This ring is referred to as the “outer shield”. The ring is bolted to an aluminum mounting plate, which is, in turn, bolted to the worm gear housing. The ring portion of each shield is insulated with a layer of crepe paper wrap. This configuration is, typically, used for applications, which require a impulse voltage withstand of 650 kV or less. See Figure 9.

3. Level 2 Electrostatic Shielding: Cast-aluminum, electrostatic shield rings are mounted on both the tank wall side and the coil side of each tap deck. Both the inner and outer shield rings are bolted to the shield mounting plate, which was described above. The outer ring portion of each shield is a continuous ring. The inner shield consists of two half-circle rings. See Figure 10. In addition to the aluminum rings, a pressboard disk is placed in front of the aluminum mounting plate and a pressboard box shield is added to the tank wall side of each tap deck. This box shield is attached to the transformer support structure with cotton tape. The pressboard disk is attached to the aluminum mounting plate with cotton tape. This configuration is, typically, used for applications which require a impulse voltage withstand greater than 650 kV; the upper limit of impulse withstand in this configuration is determined by the electrical clearances designed into the transformer.

Figure 8. DTW without any shielding. Figure 9. DTW with shield on tank side.

Figure 10. DTW with both inner and outer

shielding. NOTE: only one of the inner shields are assembled in this figure.

Page 10: Type DTW De-energized Tap Changer Application ... · De-energized Tap Changer Application, Installation & Selection Guide. IL 44 ... the moving contacts to easily slide up into

IL 44-751-1 Instruction Leaflet Page 10 November, 2001

Standard Configurations The type DTW tap changer is built in three standard configurations based on mounting the tap decks along the side of each phase coil. The operating mechanism may be ordered for mounting on either the left or the right hand side of the tap decks (when viewed from outside of the transformer). An ordering data sheet is provided to permit the customer to specify configuration, mechanism location, critical spacing dimensions and electrostatic shielding requirements. This information is necessary before a complete order can be entered for a tap changer. ♦ Configuration A: One tap deck per phase coil, (three tap decks in total). The operating

mechanism and shafts are aligned horizontally with the tap deck. The external operating mechanism is located at the approximate vertical center of the tap deck. See Figure 11. An optional, external gear box and mechanism set is available which permits the external operating mechanism to be located at ground level. This is called Configuration C

♦ Configuration B: Two tap decks per phase coil, (six tap decks in total). In this configuration, two sets of operating shafts are brought to the outside of the transformer in two gearboxes. The mechanical connection between the two sets of deck drive shafts being made through appropriate gearing and shafting within and between the two gearboxes. See Figure 12.

♦ Configuration C: Same as configuration A except the bevel gear set and operating mechanism of Configuration B are used to lower the height of the operating mechanism. This configuration is used when the operating mechanism must be located close to ground level. See Figure 13.

Figure 11. Configuration A Figure 12. Configuration B

Figure 13. Configuration C NOTE: Figures show operating mechanisms and bevel gears on both sides of the tank. This is for illustration purposes only to show that the parts can be assembled on either side of the tap changer. When installing the tap changer only one operating mechanism set is needed

Page 11: Type DTW De-energized Tap Changer Application ... · De-energized Tap Changer Application, Installation & Selection Guide. IL 44 ... the moving contacts to easily slide up into

IL 44-751-1 Instruction Leaflet Page 11 November, 2001

Installation Inspection upon Receiving

• Before opening the shipping carton, check carton for any obvious signs of damage or poor handling.

• Open shipping crate and closely examine the tap changer components for any sign of damage.

• All DTW tap changers are shipped with the moving contacts in position 1. Please check to verify that the moving contacts are indeed in position 1 before continuing. Refer to Figures 14 and 15.

• Verify that the shipment is complete and contains all components ordered.

• Check that the type designation and shop order number agree with the delivery documents (i.e. the packing list or ABB’s ordering acknowledgement). The shop order number is stamped on the rating plate.

Required Tools and Materials

• Wrench with 9/16-inch (14.3 mm)hex socket (for connection of leads to the tap deck and for assembly of the aluminum shield casting).

• Screwdriver with flat head (used together with 9/16-inch (14.3 mm) hex socket wrench in assembly of aluminum shield casting).

• Two wrenches with 3/4 inch (19 mm) hex socket (for tightening bolt and nut on external operating mechanism).

• Installation guide (this document).

Pre-installation Work Required by Customer

• Make the appropriate size hole in the transformer tank according to the dimensions shown in the tap changer outline drawing.

• In addition to the hole required to accept the mounting boss and tap changer operating mechanism, a hand hole will most likely be required in this vicinity to allow the final mechanical connections to be made between the operating mechanism and the drive shaft.

• Weld the mounting boss/bosses (not supplied by ABB) to the transformer wall. These welds must be gas-tight.

• Prepare the transformer superstructure with holes for the assembly of each DTW deck.

Figure 14. Position 1 Left Hand Drive Figure 15. Position 1 Right Hand Drive

Page 12: Type DTW De-energized Tap Changer Application ... · De-energized Tap Changer Application, Installation & Selection Guide. IL 44 ... the moving contacts to easily slide up into

IL 44-751-1 Instruction Leaflet Page 12 November, 2001

The common installation feature, regardless of other options chosen, is that each deck of the DTW tap changer mounts to the transformer superstructure with six glass-fiber bolts. There are one or two DTW decks installed per phase depending on the design of the transformer. Following are the steps required to properly install a DTW de-energized tap changer: 1. Remove the DTW deck from the shipping carton and verify that it is in position number 1.

Note: for Left Hand Drive, the number 1 position will be as shown in figure 14 and for Right Hand Drive the number 1 position will be as shown in figure 15. All DTW tap changers are shipped in position number 1.

2. Once the transformer superstructure has been prepared with holes for the mounting bolts, the tap changer can be bolted onto the transformer superstructure. Six glass-fiber bolts and twelve glass-fiber nuts are needed for each DTW deck (not supplied). The nuts should be tightened.

3. Prepare the ends of the tap leads from the coil. If the leads are wire-cable, a flat connector will have to be attached to each lead. Make sure that each tap lead is the correct length. If the leads are flat copper strap of sufficient size, no additional termination connector will be required. Appropriately spaced holes should be drilled to match the hole spacing on the tap changer stationary contact posts. NOTE: It might be easier to prepare the tap leads from the coil if the DTW deck is not mounted to the superstructure.

4. If the decks are not mounted to the superstructure in Step 2, now is the time to do so. The leads are connected to the tap changer’s Stationary Contact Copper Mounting Post according to the transformer specifications. Each lead is fastened with two bolts (not supplied). The bolt head should on the inner side of the copper mounting post as shown in Figure 16. Note that the Stationary Contact Copper Mounting Post has a recess, which accepts the bolt head and prevents the bolt head from rotating during the tightening process. Each tap lead requires two mounting bolts, two flat washers, two cup-washers, two lock-washers and two nuts. See Figure 16. NOTE: If the number of leads from the coil is less than the number of mounting posts on the DTW deck, the transformer specification should be reviewed for correct placement of any additional jumper cables.

Figure 16. Strip wire leads from coil connected to the copper mounting posts.

5. Assemble the Inter-Phase Shaft to the worm gear ball end fitting. The Inter-Phase Shaft

slides onto the ball end fitting so that the slot in the shaft is aligned with the hole in the ball end fitting. When this is done, place a Spacer ring into the hole; this ring should ride in the groove of the ball end fitting. Bolt this assembly together using the Nylock bolt, lock washer, cup washer and shield washer (see Figure 17). Tighten the bolt.

Page 13: Type DTW De-energized Tap Changer Application ... · De-energized Tap Changer Application, Installation & Selection Guide. IL 44 ... the moving contacts to easily slide up into

IL 44-751-1 Instruction Leaflet Page 13 November, 2001 NOTE: Make sure that the Nylock bolt has a blue Nylon patch near the bottom end. This patch provides anti rotational locking and prevents the bolt from becoming loose. If this bolt assembly is removed, a new Nylock bolt should be used to insure this positive locking action is maintained. NOTE: If the DTW decks are mounted to the superstructure as described in Step 2, it will be necessary to loosen the nuts for at least the second phase to be able to fit the Inter-phase shafts.

Figure 17. Nylock Screw, Creep washer, cup washer and lock washer

for assembly of Inter-phase Shaft to ball end fitting of a DTW.

6. Fit the second DTW deck to the Inter-phase shaft mounted in Step 5 and then repeat Steps 3, 4 and 5 for this deck. NOTE: Make sure that the moving contact of the first and the second deck are both in position number 1, when connecting the shaft.

7. Fit the third DTW deck to the Inter-Phase Shaft of the second deck and repeat Steps 3, 4 and 5 for this deck. NOTE: Make sure that the moving contact of the first, second and third decks are all in the number 1 position, when connecting this shaft.

8. Mount the Drive Shaft to the DTW at the appropriate end (Left or Right) as specified on the transformer drawings. The drive shaft is assembled to the ball end fitting in the same way as the Inter-Phase Shafts. NOTE: Make sure that the two Spring pins at the end of the Drive Shaft are undamaged. Proper operation of these pins is necessary for proper operation of the tap changer.

9. If electrostatic shielding kits are to be used, they should be mounted at this time.

10. To install a Level 1 shield kit, bolt the crepe paper wrapped aluminum shield casting / aluminum mounting disk to the worm gear housing with the three bolts provided in the kit. NOTE: Make sure that the top mounting bolt holding the aluminum casting to the gear housing does not make contact with, nor interfere with the gear, See Figure 18.

11. To install a Level 2 shield kit bolt the crepe paper wrapped aluminum shield casting / aluminum mounting disk to the worm gear housing with the three bolts provided in the kit as in Step 10. The outer continuous ring shield is put in position and, after that, the inner half-circle ring shields are put in position. Both the outer ring and the inner half-circle rings are bolted to the cast aluminum-mounting disc with a total of four bolts. See Figure 19.

Page 14: Type DTW De-energized Tap Changer Application ... · De-energized Tap Changer Application, Installation & Selection Guide. IL 44 ... the moving contacts to easily slide up into

IL 44-751-1 Instruction Leaflet Page 14 November, 2001

Figure 18. Bolt for shield not touching the gear.

Figure 19. Assembly of outer and inner shielding on DTW.

12. After the drying and impregnation process of the core and coil make sure the glass fiber nuts holding the Micarta boards to the Super structure are tightened by once again.

13. Before the core and coil is mounted into the tank the Main Drive shaft should be positioned at the correct height so that it is aligned with the hole in the mounting boss. A length of cotton tape (or similar material) can be used as a sling to assist in this alignment process. Once the drive shaft is properly aligned, tie the cotton tape sling to the superstructure to hold the shaft in place temporarily. See figure 20.

Page 15: Type DTW De-energized Tap Changer Application ... · De-energized Tap Changer Application, Installation & Selection Guide. IL 44 ... the moving contacts to easily slide up into

IL 44-751-1 Instruction Leaflet Page 15 November, 2001

Temporary cotton tape

Superstructur

Coil

Drive shaft

Figure 20. Drive shaft tied in position to the superstructure.

14. Assemble the Connecting Tube to the ball-end fitting of the Operating mechanism the same way as the Inter-Phase Shafts were assembled to the individual DTW decks.

15. Slide the Operating Mechanism with the Connecting Tube through the mounting boss onto the Main Drive shaft. The slot in the Connecting Shaft should engage the spring pins on the Main Drive Shaft. Note: the spring pin should not be forced against the bottom end of the Connecting Shaft slot. There should be approximately 0.25 to 0.50 inches of space between the pin and the bottom of the slot. The purpose for this clearance space is to provide for movement of parts due to thermal movement of the transformer. See Figure 21 and 22.

M ain Drive Shaft

Connecting Tube

Interphase shaft

M ounting B ossOperating M echanism

Figure 21. Assembly

Page 16: Type DTW De-energized Tap Changer Application ... · De-energized Tap Changer Application, Installation & Selection Guide. IL 44 ... the moving contacts to easily slide up into

IL 44-751-1 Instruction Leaflet Page 16 November, 2001

16. NOTE: Make sure that the position shown on the External Operating Mechanism agrees with the position of each tap deck The correct position is position number 1.

Figure 22. Fitting of Connector shaft and Drive shaft.

17. Make sure that the gasket in the groove of the Mounting Boss is undamaged and properly

seated

18. Tighten the four bolts holding the Operating Mechanism to the Mounting Boss by using two wrenches with ¾ inch hex socket.

19. If the Bevel Gear Housing is to be used for this transformer assembly, these additional instructions should be followed.

♦ If the transformer has two rows of tap decks, or if the height of the operating mechanism is to

be different from the height of the tap decks, a Bevel Gear Housing is needed.

♦ When the Bevel Gear Housing is used, the Connecting Shaft is mounted to the Bevel Gear assembly in the same manner as was described above for the Operating Mechanism. The Bevel Gear Housing is mounted to transformer tank in the same manner as the Operating Mechanism housing.

♦ To make the external connection between the Bevel Gear Housing and the Operating Mechanism assembly, an adjustable steel shaft (supplied by ABB when the Bevel Gear Housing is ordered) is used. This shaft should be pinned to both the Bevel Gear vertical shaft and to the Operating Mechanism vertical shaft. See figure 23.

NOTE: Make sure that the position shown on the External Operating Mechanism agrees with the position of each tap deck

Page 17: Type DTW De-energized Tap Changer Application ... · De-energized Tap Changer Application, Installation & Selection Guide. IL 44 ... the moving contacts to easily slide up into

IL 44-751-1 Instruction Leaflet Page 17 November, 2001

Figure 23. Bevel gear and Operating mechanism

connected with the adjustable steel shaft.

D A N G E R

The next step verifies that the tap changer mechanism is working properly, and should not be performed unless the transformer is de-energized. Failure to do so will result in severe personal injury, property damage, or death. 20. The DTW tap changer has now been installed and should be checked for proper operation.

To operate, pull out the locking pin until it disengages the Geneva Indicator Dial and turn the operating mechanism handle one complete turn. This should put the tap changer into Position number 2. Verify that the Geneva Indicator Dial reads “2” and verify that each tap deck is in position 2. Continue verification through all positions. NOTE: all DTW tap changers have the same Geneva Indicator Dial (i.e., the dial has 7 indicator positions) but, depending on the actual tap changer ordered, the limits of operation will be controlled by mechanical stops placed at the proper position within the indicating mechanism.

Page 18: Type DTW De-energized Tap Changer Application ... · De-energized Tap Changer Application, Installation & Selection Guide. IL 44 ... the moving contacts to easily slide up into

IL 44-751-1 Instruction Leaflet Page 18 November, 2001

Processing Temperatures The type DTW tap changer is designed to operate properly in the transformer environment. However, the transformer manufacturer must not over stress the tap changer, thermally, during transformer manufacturing and processing. The maximum temperature that the type DTW tap changer can be exposed to during transformer manufacturing is 125ºC. If the tap changer will be exposed to temperatures greater than 125ºC, ABB should be consulted for technical guidance. Processing within the temperature range of 105ºC to 125ºC should not exceed 48 hours total exposure time. Renewal Parts If renewal parts are required, order them through the nearest ABB representative. Please provide the item description and the identification numbers (model, style, catalog number) from the unit’s nameplate. Repairs In normal use, the DTW tap changer will not require repairs. We recommend that the transformer manufacturer be contacted before any repairs are made. Maintenance ABB de-energized tap changers require little or no maintenance to ensure proper mechanical and electrical operation of the switch. The transformer should be de-energized before operating the tap changer. The external operating mechanism should be inspected for any damage and gears should be lubricated to ensure proper operation. Operate the tap changer across its full range a minimum of twenty times to assure proper mechanical operation and cleaning of the contacts. The above should be performed if the position of the switch is changed for any reason.

W A R N I N G Before attempting any disassembly or repairs, de-energize the transformer and the auxiliary power source. Failure to do so could result in personal injury, property damage, or death.

Page 19: Type DTW De-energized Tap Changer Application ... · De-energized Tap Changer Application, Installation & Selection Guide. IL 44 ... the moving contacts to easily slide up into

IL 44-751-1 Instruction Leaflet Page 19 November, 2001

Page 20: Type DTW De-energized Tap Changer Application ... · De-energized Tap Changer Application, Installation & Selection Guide. IL 44 ... the moving contacts to easily slide up into

IL 44-751-1 Instruction Leaflet Page 20 November, 2001

Technical Support If a technical question arises regarding the product detailed in this document contact ABB Customer Service at the address below. Comments ABB Inc. continually strives to make its instruction literature current, accurate, and easy to understand. Suggestions to improve this document may be sent to: Literature Coordinator fax (731) 696-5269 or use the mailing address below. For a reply, please include name, company, phone number, and/or fax number. DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITY THERE ARE NO UNDERSTANDINGS, AGREEMENTS, REPRESENTATIONS, OR WARRANTIES, EXPRESSED OR IMPLIED, INCLUDING WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE OTHER THAN THOSE SPECIFICALLY SET OUT BY AN EXISTING CONTRACT BETWEEN THE PARTIES. ANY SUCH CONTRACT STATES THE ENTIRE OBLIGATION OF SELLER. THE CONTENTS OF THIS DOCUMENT SHALL NOT BECOME PART OF OR MODIFY ANY PRIOR OR EXISTING AGREEMENT, COMMITMENT, OR RELATIONSHIP. The information, recommendations, description, and safety notations in this document are based on our experience and judgement. THIS INFORMATION SHOULD NOT BE CONSIDERED TO BE ALL-INCLUSIVE OR COVERING ALL CONTINGENCIES. If further information is required, ABB Inc. should be consulted. NO WARRANTIES, EXPRESSED, OR IMPLIED, INCLUDING WARRANTIES OF FITNESS FOR A PARTICULAR PURPOSE OR MERCHANTABILITY, OR WARRANTIES ARISING FROM COURSE OF DEALING OR USAGE OF TRADE, ARE MADE REGARDING THE INFORMATION, RECOMMENDATIONS, DESCRIPTIONS AND SAFETY NOTATIONS CONTAINED HEREIN. In no event will ABB Inc. be responsible to the user in contract, in tort (including negligence), strict liability or otherwise for any special, indirect, incidental or consequential damage or loss whatsoever including but not limited to damage to or loss or use of equipment, plant or power system, cost of capital, loss of profits or revenues, cost of replacement power, additional expenses in the use of existing power facilities, or claims against the user by its customers resulting from the use of the information, recommendations, description, and safety notations contained herein.

ABB Inc. 1128 Highway 412 S. Alamo, TN 38001-3813, USA Tel:-(731)-696-5561 Fax: (731)-696-5269 www.abb.com