TYNDP 2018 Projects
Rares Mitrache
System Development Adviser
Overview
Brussels, 8 June 2018
2
TYNDP 2018 Project Collection Timeline
3
Project Collection Timeline
(after 31 May)
4
New elements in TYNDP 2018 Project Collection
5
TYNDP 2018 projects – new elements 1/3
1. Use of Practical Implementation Document for TYNDP 2018
> The PID is a requirement of the Regulation (EU) No 347/2013 (Annex III 2.5). It has been developed in a 2 layer approach:
Based on EC « high level » Guidelines, ENTSOG had to:
> Define specific inclusion criteria (Administrative and Technical)
> Collect supporting data from promoters
> Decide on project inclusion based on criteria fulfilment
EC « high-level » Guidelines
ENTSO-E Implementation Guidelines
ENTSOG Implementation Guidelines
6
TYNDP 2018 projects – new elements 2/3
PRJ-G_XXX
e.g. interconnector A-B
Promoter A
TRA-N-111 Internal Reinforcements
TRA-N-222Increase of exit capacity at the
border A
Promoter B
TRA-N-333Increase of exit capacity at the
border B
2. Creation of “PRJ level” for specific types of projects
> Often, a number of functionally-related project items need to be implemented for their benefit(s) to materialize
> Promoters submitting the following category of projects were asked to indicate whether their submission is part of one common “functional project”:
> Interconnector of two (or more) countries
> LNG terminal (and connecting pipe)
> Underground storage (and connecting pipe)
> They were grouped under a “PRJ” level
7
3. Cost information refer to planned CAPEX, OPEX and cost ranges (+/- %)
For TYNDP 2018
> promoters` costs submission has been mandatory
> costs will be published unless declared confidential by promoters but...
> ... for promoters intending to apply to PCI alternative cost estimates
will be published in the TYNDP to ensure transparency and level-playing field
▪ either provided by promoter or established by ENTSOG (e.g. using Unit Investment Costs)
> Costs to be published together with the draft TYNDP expected for October, 2018
TYNDP 2018 projects – new elements 3/3
8
TYNDP 2018 Projects - Overview
9
Project items and PRJs207 project items submitted for TYNDP 2018
> 128 “individual” projects submitted by one single promoter
> 79 projects included in 32 PRJs
160 projects” + PRJs
160 Projects
142
61
1
71
128
Interconnection 2/more MSs
Reverse flow
LNG + connecting pipe
UGS+connecting pipe
L/H Gas
IP Capacity increment
Projects with more phases
Individual projects
10
TYNDP 2018: project items submitted27 projects less (9 %) compared
to TYNDP 2017TYNDP 2015
279 projects TYNDP 2017
234 projects
Existing infra
Projects(279)
Completed(20)
Existing infra
Cancelled / not re-
submitted
Projects already in TYNDP15
(175)
New Projects
(59)
Completed (9)
Existing infra
Cancelled / not re-
submitted(47)
Projects already in previous TYNDPs
(181)
New Projects (26)
TYNDP 2018
207 projects
11
Commissioned projects
West to East operation of the
IP Waidhous
CS RothenstadtPipeline “Schwandorf-Finsing
Bordolano first phase
CS “Herbstein”
CS “Werne”
Extension Receiving Terminal
Greifswald
Exit Capacity Budince
Reverse Flow Transitgas Switzerland
Reverse Flow TENP
˃ 5 projects commissioned
since TYNDP 2017
Monaco section
Burghausen-FinsingVal de Saône
Reverse capacity from CH to FR at Oltingue
Gascogne Midi
Revythoussa (2nd upgrade)
Cornegliano
Support to the North West
market and bidirectional
cross-border flows
Interconnection with UGS
in Cornegliano Laudense
Romania-Bulgaria Interconnection
IP/receiving terminal
Compressor station (CS)
Pipeline
Storages
LNG
Projects expected to be
commissioned in 2018
Projects commissioned since
TYNDP 2017
12
TYNDP 2018: projects status
46
71
90
FID ADVANCED LESS-ADVANCED
TYNDP 2018
Total 207 Total 234
Progress in project status since TYNDP 2017:
> FID projects increased from 34 to 46
> Advanced projects increased from 52 to 71
TYNDP 2017
34
52
148
13
TYNDP 2018: infrastructure type
168
27
12
TRA LNG UGS
Total 207
186
18
30
TRA UGS LNG
Total 234
TYNDP 2018 TYNDP 2017
> No of all infra type projects dropped especially TRA and UGS.
14
1
Projects status & infra type
37
56
756
9
12
3
6
3
0
10
20
30
40
50
60
70
80
90
100
FID Advanced Less-Advanced
# p
roje
cts
Project status
UGS LNG TRA
> Proportional distribution of TRA and LNG projects along the project status
15
PCIs submission
97 project items in the 3rd PCI list:
> 94 projects submitted for TYNDP 2018
> 3 projects actively cancelled
21
45
28
FID
Advanced
Less-advanced
94 PCIs
16
> 37 countries submitted projects for TYNDP 2018
> Italy and Germany submitted each 20 projects
Projects per Country
16
19
15
12
9 9
5
9 98
65
42
34 4
31
32
13 3
21
21 1 1 1 1 1 1 1
1
1
2
1
21
6
2
21
21
12
1 1
31
12
1
1
11 1
0
5
10
15
20
25
Ital
y
Ge
rman
y
Gre
ece
Cro
atia
Po
lan
d
Ro
man
ia
Spai
n
Fran
ce
Bu
lgar
ia
Hu
nga
ry
Slo
ven
ia
Slo
vaki
a
Po
rtu
gal
Esto
nia
Un
ited
Kin
gdo
m
Cze
chia
Au
stri
a
Ne
the
rlan
ds
Bel
giu
m
Bo
snia
Her
zego
vin
a
Alb
ania
Latv
ia
Ukr
ain
e
FYR
OM
Lith
uan
ia
Irel
and
Den
mar
k
Turk
men
ista
n
Swit
zerl
and
Ge
org
ia
Fin
lan
d
Turk
ey
Mal
ta
Cyp
rus
Aze
rbai
jan
Mo
ldav
ia
Swed
en
# p
roje
cts
Host Country
UGS LNG TRA
17
> 134 projects (65 %) planned to be commissioned by end of 2022
Projects per commissioning year
0
10
20
30
40
50
60
2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2034
# p
roje
cts
Indicated commissioning year
Less-Advanced
Advanced
FID
18
PS-CBA in TYNDP 2018
19
Project-specific assessment (PS-CBA)
> Only for projects intending to apply for PCI as indicated during Project Collection and by Draft CBA Methodology
> Based on its status, project-specific assessment is carried with/without each project (or project group) for both infra levels
> It measures the incremental impact in mitigating the identified infrastructure gaps (based on the CBA Methodology 2.0)
20
Project-specific assessment (PS-CBA) process in TYNDP 2018
> ENTSOG CBA Methodology 2.0 proposes inclusion of the project-specific assessment (PS-CBA) in TYNDP and publication of results in the TYNDP Report
Project collectionDoes the project promoter intend to apply for the next PCI round?
YESRun PS-CBA + Submit results to promoters
NONo PS-CBA
Confirmation of PCI intentionDoes project promoter confirmthe intention to apply for PCI?
YESPS-CBA results published
NONo publication of PS-CBA results
1
2
3 4
PS-CBA will be run only on projects for which promoters have stated the intention to apply to PCI in point 1
Thank You for Your Attention