tyco is oracle apps support project
TRANSCRIPT
Tyco IS Oracle Apps Support Project
Chandrasekhar RedrotuhuFinancial Techno functional Consultant
Oct 07, 2015
Agenda Oracle EBS At TYCO
EBS Technical Architecture
EBS Functional Applications
Oracle E-business Suite Concepts
Applications – Finance
Processes Flow
Current Environment Details
Defect Fix Cycle
Tools Usage
Ticketing Tool
Version Control Tool
Module Wise Flow Diagram
Project Governance
Application Directory Structure For R12
Oracle EBS at Tyco•Installation of Oracle Applications first performed in 1998
-10.7 Smart-Client Application (Prod 16.1)-Oracle 7.x database-Citrix-Meta Frame Middle ware used to access the applications over the WAN for distributed offices-GL, AP, FA, INV, PO, ONT, OTM,
•Upgrade to Oracle 11i in 2002-Upgraded to version 11.5.5-Database version 8.1.7.x-GL, AP, FA, INV, PO, ONT,
•I-Expense Implementation 2004-Implemented OIE.I RUP 1
•Perpetual Inventory Deployment 2004-Expanded to 150 inventory Orgs with local warehouses-MSCA
Oracle EBS at Tyco•Upgrade of Applications in 2006
-Upgraded applications to version 11.5.10.2-Upgraded database to version 9.2.0.7 (subsequently upgraded to 9.2.0.8)
•Implementation of 170 Systems Mark view in 2007-Imaging for AP Expense Reports-Imaging and Workflow for Supplier Invoices-OCR Implementation in December, 2008
•Hardware Upgrade in 2009 (EVE Project)-Upgraded hardware and changed technical architecture
•Upgrade of Applications in Apr-2014-Upgraded applications to version 12.1.3-Upgraded database to version 11.2.0.3.0
•Implemented Projects module and Field Services
Oracle General Ledger- Inbound Month-End Feeds from Legacy
(Mainframe) System- Inbound Feeds from Oracle Applications
Modules- Inbound weekly feed of Payroll GL Information
Applications - Finance
Maintenance of COA involves maintenance of rollup groups, parent-child relationships, additions/deletions to values and others for the General Ledger segments.
1. Company2. Town3. Department4. Account Major5. Account Minor6. Future
Current Environment Details
EBS Version 12.1.3
DB Version 11.2.0.3.0
DB Size 2.8 TB
3rd Party Applications
Vertex, BaaN, PeopleSoft, DW-BI, Antenna (Mobile Field Service), Planet Press (Invoice Printing), R2Web (Report to Web), Aceva(Application for collection), D &B interface, HEAT (Help desk ticketing system),Salesforce, Workday, Informatics, GPS- Trimble, BAAN, Hiperion etc.
Disaster Recovery
DR Plan - Utilizing the services of a third party site and restoration is from tape. Recovery method - Utilizing EMC BCV technology. 2 hours to perform a restore. currently in the middle of a tech refresh on DMX frame so the technology will change once the VMax is brought on-line. However, methodology will be similar.Development restores from tape and takes about 8 hrs. Backed up once a week.
Application patch set details 12.1.3 latest patches
Customization Details (approximately)
Reports 100+
Interfaces 100+
SQL Plus, SQL Loader, Host Program 75, 20, 60+
OA Framework, Workflow 55, 15+
Forms, Forms-Personalizations, custom.pll 35+, 270, > 50
Packages, Procedure and Functions 500+
Table and View 950+
Defect Fix cycleIdentified Defects once assigned to Wipro Development team will follow the below process:
Resource assigned to look into the defect will start with Analysis in the Development environment and will identity the fix subsequent to his analysis.
Post Analysis, the assigned resource will go ahead with the required develop activity to fix the issue. Once its fixed he will do unit testing to check if the desired functionality is achieved through the fix.
After completion of the development process, with the help of the onsite coordinator the code will be moved to UAT testing environment with the help of Tyco IS IT team. End Users/Business Team will carry out the testing to verify whether the issue is fixed or not.
After successful completion of UAT and all the defects raised during UAT are addressed, the code fix for the defect will be moved to production.
EnhancementsEnhancements assigned to Wipro Development team will follow the same process as described above.
Tools Usage
Sl. No. Tool Name Purpose
1 SQL Developer PL/SQL Development
2 Oracle Reports Builder 10g Oracle Reports Development
3 Oracle Forms Builder 10g Oracle Forms Development
4 Oracle BI Discoverer Administrator Oracle Discoverer Reports Development
5 Oracle BI Discoverer Desktop Oracle Discoverer Reports Development
6 XML Publisher Oracle Reports Development
7 Oracle application Framework(OAF) Oracle webpages Development
8 Oracle Workflow used for business process collaborations across two or more applications
Oracle General Ledger
General
Financials
Load/
Create
Journals
Post
Journals
Allocations Period
End Close
Open/
Close
Period
Oracle Accounts Payable
Setup
Suppliers
Create
PO:
Non-
Inventory
Load/
Create
Invoices
Match
Invoices
Pay
Invoices
Oracle I-Expense
CaptureExpenses
Approve
Expenses
Audit
Expenses
Create
Invoices
Pay
Expenses
Oracle Assets
Create
Assets
Maintain
Assets
Close
Period
Maintain
System
Module Wise Flow Diagram
Project GovernanceThis governance indicates how the project will be planned, tracked, monitored,
organization structures of customer and Wipro, levels of escalations etc.
For more information, please visit.
Contact: +1-5516897258 / [email protected]
Useful ERP Info.
http://csrerp.blogspot.com/p/home_14.html?_sm_au_=iVVL5RHLZVrD7jM5