tw erosion control works area 1 & 2 area 1 · gabion failure exposing the bank scour pool in...

5
! ( ! ( ! ( ! ( ! ( " ) " ) " ) " ) " ) " ) " ) " ) " ) " ) " ) " ) . April 13, 2017 0 100 200 50 Meters Planned Stream Restoration Projects (1 S year horizon) Sanitary Trunk Sewer ! ( TRCA Erosion Control Structures TW Erosion Control Works " ) 5 - 10 years " ) 2018 - 2020 " ) completed " ) unknown TRCA Floodline TRCA Floodplain Hydro Line Railway Creeks Taylor Creek ESA Boundary Taylor Massey Sub-Watershed Study Area Flood and Stream Restoration Taylor Massy Creek Sub-Watershed Master Plan Development Kep Map 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Slumping gabions exposing bridge support, scouring in channel at base Crib wall (RB) large sand bar along LB Concrete pad crossing flush with bed, water flows across Bottom layer of gabions scroued out at bridge and US Gabion failure exposing the bank scour pool in channel Gabion wall empty at base Perched outfall with concrete pad for flow dissipation Gabion failure scoured at base and pushed away from bank by flow from US Failed gabions creating mid-channe bar, LB has exposed till in bank and bed Slope instability large armoutstone protecting, some blocks failing, manhole potentially at risk Gabions leaning, slumping and scoured throughout downstream of the reach Concrete pad crossing flush with bed, overlapping by flow Lower level of gabions has eroded away resulting in slumping of upper level exposing bridge support Combined pipe exposed in bed from mid-channel to right bank Beneath left part of bridge gabions scoured at base first level is empty of material Bridge currently being replaced Bank top has eroded back to edge of trail, gabions at base of bank are entact Small CSP partially eroded out of bank Bank blown out, eroding, trail potentailly at risk Loss of material near bridge desk where it connects to trail CSP discharging from LB, crossing is covered with gravel material, possibly previously exposed Gabions failed bank blown out across from outfall Bridge currently being replaced Outfall elevated with concrete pad for dissipation, rip rap leading to channel. A large piped coming from the parking lot lies on top of the outfall. Pedestrian bridge under construction 3 CSPs perched on DS side Large area of sand deposition Bottom layer of gabions has been scoured out large bar of gabion stone Gabions slumping bank slope failure 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Geomorphic and Infrastructure Issues Source: Geomorphic and Habitat Systems Study, Parrish Engineering 2013 Area 1 & 2

Upload: others

Post on 25-Mar-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TW Erosion Control Works Area 1 & 2 Area 1 · Gabion failure exposing the bank scour pool in channel Gabion wall empty at base Perched outfall with concrete pad for flow dissipation

!(!(

!(!(!(

!(!(

!(

!(

!(

")")

")

") ")

") ") ") ")

")")

")

. April 13, 20170 100 20050

Meters

Planned Stream Restoration Projects(1 S year horizon)

Sanitary Trunk Sewer

!( TRCA Erosion Control Structures

TW Erosion Control Works") 5 - 10 years

") 2018 - 2020

") completed

") unknown

TRCA Floodline

TRCA Floodplain

Hydro Line

Railway

Creeks

Taylor Creek ESA Boundary

Taylor Massey Sub-Watershed Study Area

Flood and StreamRestoration

Taylor Massy Creek Sub-WatershedMaster Plan Development

Area 1

Kep Map1

2

3

45 6 7

89

1011 12 13

14

15

16 17

1819

20

21

22 23

24

25

26

2728

Slumping gabionsexposing bridgesupport, scouringin channel at base

Crib wall (RB) largesand bar along LB

Concrete pad crossingflush with bed, waterflows across

Bottom layer ofgabions scrouedout at bridge and US

Gabion failureexposing the bankscour pool in channel

Gabion wall emptyat base

Perched outfall withconcrete pad forflow dissipation

Gabion failure scouredat base and pushed away from bank by flow from US

Failed gabionscreating mid-channebar, LB has exposed till in bank and bed

Slope instability large armoutstone protecting,some blocks failing, manhole potentially at risk

Gabions leaning, slumpingand scoured throughoutdownstream of the reach

Concrete pad crossingflush with bed, overlappingby flow

Lower level of gabionshas eroded away resultingin slumping of upperlevel exposing bridge support

Combined pipe exposedin bed from mid-channelto right bank

Beneath left part ofbridge gabions scouredat base first level isempty of material

Bridge currentlybeing replaced

Bank top has erodedback to edge of trail,gabions at base ofbank are entact

Small CSP partiallyeroded out of bank

Bank blown out, eroding,trail potentailly at risk

Loss of material near bridgedesk where it connects to trail

CSP discharging fromLB, crossing is coveredwith gravel material,possibly previously exposed

Gabions failedbank blown outacross from outfall

Bridge currentlybeing replaced

Outfall elevated with concretepad for dissipation, rip rapleading to channel. A large piped coming from the parkinglot lies on top of the outfall.

Pedestrian bridgeunder construction3 CSPs perched onDS side

Large area ofsand deposition

Bottom layer of gabionshas been scoured outlarge bar of gabion stone

Gabions slumpingbank slope failure

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

Geomorphic and Infrastructure Issues

Source: Geomorphic and Habitat Systems Study, Parrish Engineering 2013

Area 1 & 2

Page 2: TW Erosion Control Works Area 1 & 2 Area 1 · Gabion failure exposing the bank scour pool in channel Gabion wall empty at base Perched outfall with concrete pad for flow dissipation

!(

!(

!(

!(!(

!(!(

!(

!(

!(!(

!(

!(!(

")

") ") ")

")")

") ") ")

")")

")

")")")

")")")

")

")

xleigh-Notley

. April 13, 20170 100 20050

Meters

Planned Stream Restoration Projects(1 S year horizon)

Sanitary Trunk Sewer

!( TRCA Erosion Control Structures

!( Stormwater Management Facility

TW Erosion Control Works") 0 - 5 years

") 5 - 10 years

") 2018 - 2020

") completed

") unknown

TRCA Floodline

TRCA Floodplain

Hydro Line

Railway

Creeks

Taylor Creek ESA Boundary

Warden Woods ESA Boundary

Taylor Massey Sub-Watershed Study Area

Taylor Massy Creek Sub-WatershedMaster Plan Development

Area 2

Kep Map

Flood and StreamRestoration

Area 3 & 4

Page 3: TW Erosion Control Works Area 1 & 2 Area 1 · Gabion failure exposing the bank scour pool in channel Gabion wall empty at base Perched outfall with concrete pad for flow dissipation

!(

!(

!(

!(

!(

!(!(

!(!(!(

!(

")

")")

") ")")

")

")

")

")")

")

")

")

")

")

")

. April 13, 20170 100 20050

Meters

Planned Stream Restoration Projects(1 S year horizon)

Sanitary Trunk Sewer

!( TRCA Erosion Control Structures

!( Stormwater Management Facility

TW Erosion Control Works") 0 - 5 years

") 5 - 10 years

") unknown

TRCA Floodline

TRCA Floodplain

Flood Vulnerable Area Clusters

Hydro Line

Railway

Creeks

Warden Woods ESA Boundary

Taylor Massey Sub-Watershed Study Area

Taylor Massy Creek Sub-WatershedMaster Plan Development

Area 3

Kep Map

Flood and StreamRestoration

77

8281

807978

8384 85

86 87

8889 90

9192

9394

95 96

98

97

100

99

104

105

106

107108

102

103

101

Corrugated steel retainingwall to protect outfalls

Slope eroding next toculvert

Culvert creating scourpool

Failed gabions andbank erosion

Rip-rap bank protection

Lateral bar and sanddeposition

Eroding bank throughoutfull extent of bendapproaching trail

Large lateral bar

Steel weir to protectsewer crossing;erosion along LBDS of weir

Large log/debris jam

Bank erosion andundercutting US andDS of outfall on RB

Undersized pedestrianbridge will need replacing

Outfall elevated approx.1m above bed, scour pool

Amourstone andconcrete retaining wall

Woody debris in channel

Scour pools at base ofoutfalls, dissipation structures old and decaying

Exposed sanitary sewer inchannel bed, concrete/urbandebris jams

Geomorphic and Infrastructure Issues

Failed gabions, debris jams,bend is severely eroded

Pedestrian bridge, undersized both footingsexposed, right bankmore severely

Bank erosion

Manhole casing exposedat edge of channel bed

On downstream sideof bridge, slope is eroding on either sideexposing sides of bridge

Manhole casing exposedon channel bank

Bank erosion

Severely eroding valleywal contact

Manhole casing exposedat base of bank

Eroding valley wallcontact, woody debrisjam in channel

Eroding bank, scourpool, lateral sand bar

Bank eroding, concreterubble in channel, woodydebris

Manhole casing exposedat top of bank

Gabion wall (both banks)undermined

Localized bank failure

77

78

79

80

81

82

83

84

85

86

87

88

93

92

91

90

89

94

95

96

97

98

99

100

104

105

106

107

108

102

103

101

Source: Geomorphic and Habitat Systems Study, Parrish Engineering 2013

Area 5 & 6

Page 4: TW Erosion Control Works Area 1 & 2 Area 1 · Gabion failure exposing the bank scour pool in channel Gabion wall empty at base Perched outfall with concrete pad for flow dissipation

!(!(!(

")

")

")")

")

")

")

")")

. April 13, 20170 100 20050

Meters

Sanitary Trunk Sewer

!( TRCA Erosion Control Structures

TW Erosion Control Works") 0 - 5 years

") 5 - 10 years

") unknown

TRCA Floodline

TRCA Floodplain

Flood Vulnerable Area Clusters

Hydro Line

Railway

Creeks

Taylor Massey Sub-Watershed Study Area

Taylor Massy Creek Sub-WatershedMaster Plan Development

Area 4

Kep Map

Flood and StreamRestoration

109

110111

112

113

114115116

117

118

119

120

121122

124 123

125127

126128

131132

130

129

Storm outfall with underminedgabion wall (RB)

Storm outfall, bankstability

Gabion wall (RB) outflanked,undermined

Pedestrian bridge

Utility pole near bankfailure

Gabion wall (LB)undermined

Pedestrian bridge withexposed footings

Perched culverts

Exposed geoweb andfailed gabion

Localized slope failure

Geomorphic and Infrastructure Issues

109

110

111

112

113

114

115

116

117

118

119 Concrete-linedchannel (Birchmountto Eglinton)

Some rock in channelcreating minimal bedfeatures

Channel bed is interlockpieces of concrete andlow concrete banks beyond which banksare embankments

Some gravel materialon channel bed creatingpoorly formed riffles or bars

Paved concrete bednatural bank vegetation

Natural channel bed

Severe slope erosiontrail at risk

120

121

122

124

123

125

Outfall eroded out ofbank broken piece in channel

Outfall creating scourpool

Natural channel bedthroughout upstream portion of reach

Elevated concretespillway

Concrete along baseof bank across fromoutfalls

Bank erosion

Elecated outfall

127

126

128

131

132

130

129

Source: Geomorphic and Habitat Systems Study, Parrish Engineering 2013

Area 7

Page 5: TW Erosion Control Works Area 1 & 2 Area 1 · Gabion failure exposing the bank scour pool in channel Gabion wall empty at base Perched outfall with concrete pad for flow dissipation

!(!(

!(

!(

!(

. April 13, 20170 100 20050

Meters

Sanitary Trunk Sewer

!( Stormwater Management Facility

TRCA Floodline

TRCA Floodplain

Flood Vulnerable Area Clusters

Hydro Line

Railway

Creeks

Taylor Massey Sub-Watershed Study Area

Taylor Massy Creek Sub-WatershedMaster Plan Development

Area 5

Kep Map

Flood and StreamRestoration

133134

135

136

137

138139

140

141

142

143

Small elevation drop inconcrete

Exposed manholes alongbanks

Vegetation in channelon banks

Small lateral bar forming

Small areas of graveldeposition

Vegetated bar upstreamof rail crossing

Geomorphic and Infrastructure Issues

Vegetated bar upstreamof crossing

Vegetated bar downstreamof crossing

Channel is heavily vegetatedwith cattails and phragmitesthrough extent of hydrocorridor

Small amount of bank erosiondownstream of pedestrianbridge

Some sand accumulation

133

134

135

136

137

138

139

140

141

142

143

Source: Geomorphic and Habitat Systems Study, Parrish Engineering 2013

Area 8