1
Multivoltage IEEE P1801 (UPF)
Methodology Update for B-
2008.09 Release of Design
Compiler and IC Compiler
2
Agenda
Galaxy IEEE P1801 (UPF) Low-Power Overview
Implementation Using Design Compiler
Design Compiler to IC Compiler Interface
IC Compiler IEEE P1801 (UPF) Methodology Overview
Design Planning
Physical Implementation
3
Agenda
Galaxy IEEE P1801 (UPF) Low-Power Overview
Implementation using Design Compiler
Design Compiler to IC Compiler Interface
IC Compiler IEEE P1801 (UPF) Methodology Overview
Design Planning
Physical Implementation
4
UPF
RTL
PG
Netlist PrimeRail
Formality
Ref
Impl
Formality
Ref
Impl
Synopsys IEEE P1801 (UPF) Flow
PrimeTime
PrimeTime PX
UPF”
Gate
IC Compiler
VCS+MVSIM
MVRC
PrimeTime
PrimeTime PX
UPF’
Gate
Formality
Ref
Impl
Design Compiler
Power CompilerVCS+MVSIM
MVRC
5
Agenda
Galaxy IEEE P1801 (UPF) Low-Power Overview
Implementation Using Design Compiler
Design Compiler to IC Compiler Interface
IC Compiler IEEE P1801 (UPF) Methodology Overview
Design Planning
Physical Implementation
6
IEEE P1801 (UPF) Methodology in
Design CompilerSetup Libraries
Read the RTL
Read the Power Intentload_upf
Apply Design Constraints
compile_ultra -scan
insert_dft
compile_ultra –scan -incr
Write the Design (DDC/ASCII/MW)
• UPF constraints are
honored during compile_ultra
• Power management
cell insertion
• Test follows UPF
constraints used during compile_ultra -scan
7
Always-on SynthesisDefinition
• Control signals for
power management
cells have to be live
while the logic around
are shut down
– Optimizing such
control signals with
special cells having
secondary power
(back-up power) is
always-on synthesis
PD_A 0.8V
PD_B 0.8V, OFF
RR
save
restore
ao
ao
ao
ao
8
Always-on Inference
• Automatic always-on inference
– Enable pins of enable level shifter
and isolation cells; save and
restore pins of retention registers
and control pin of switch cells are
automatically treated as always-
on anchor points
– Always on marking is done by
tracing back from always-on pins
• Control signals of special
cells such as isolation cells,
retention registers, enable
level shifters and switches are
treated as always on nets
• Always-on inference based on user
defined attributes
– Pins that have been marked as always on by the user using set_attribute
set_attribute my_cell/a
always_on true
– Always-on tracing stops at a multi input
cell
– Traces through buffers and inverters only
PD_B
PD_A 0.8V
PD_B 0.8V, OFF
RR
save
restore
ao
ao
ao
ao
9
Always-on Synthesis Feedthrough Nets
• Always-on power or ground
connections for buffers and
inverters are determined by
– The fanout of the net in the
domain
– Feedthrough nets do not have
any fanout in the domain
• Such always-on nets will be marked as dont_touch
VD
DB
Backu
p p
ow
er
PD_B0.8V, OFF
RR
save
restore
ao
ao
ao
aoAO
VD
DP
Pri
mary
po
wer
AO
10
Always-on SynthesisFeedthrough Net Example 1
• PD_TOP, PD_A are shutdown
domains
• PD_B is an always on domain
• iso_en drives the enable pin
of the isolation cells in PD_A
• The segment of net iso_en in PD_A will be marked always-
on
• Always-on buffers inserted will have their power and ground
pins connected based on the load of this net, i.e. the enable pin
of the isolation cell
PD_TOP0.8V, OFF
PD_A0.8V, OFF
PD_B1.0V
ISO
iso_enaoao, d
11
Always-on SynthesisFeedthrough Net Example 1
• PD_TOP, PD_A are shutdown
domains
• PD_B is an always-on domain
• iso_en drives the enable pin
of the isolation cells in PD_A
• The segment of net iso_en in PD_TOP will also be marked
always-on
• There is no load in PD_TOP. So the tool cannot derive the
power and ground connections required for always-on
buffering
• The segment is also marked dont_touch
• If this is a long wire, it could have max transition and/or max
capacitance violations
PD_TOP0.8V, OFF
PD_A0.8V, OFF
PD_B1.0V
ISO
iso_enaoao, d
12
• Manually insert an always-on buffer on the iso_en net in PD_TOP
• Mark its input pin as always-onset_attribute ao_buff/a always_on true
• Connect its power and ground pins to the proper always-on power
and ground suppliesconnect_supply_net –port ao_buff/VDDB VDDON
connect_supply_net –port ao_buff/VSS VSS
Always-on SynthesisFeedthrough Net Example 1
PD_TOP0.8V
PD_A0.8V, OFF
PD_B1.0V
ISO
• The net driving this buffer will now
be always-on, and be bufferable
by the always-on synthesis
• The net driven by this buffer will still be marked dont_touch
• Place the always-on seed buffer
close to the port to avoid DRC
violations on this net segment
AOAOAO
13
Always-on SynthesisFeedthrough Net Example 2
• PD_TOP is a shutdown domains
• iso_en is a top level feed through
net that needs to be always on
(drives an always-on cell at the full
chip level)
• To force the tool to perform always-on synthesis on net iso_en :
• Set the always-on attribute on the port iso_enable
set_attribute [get_ports iso_enable] always_on true
• Set the related supply nets for this port to the required always-on
power and ground supply netsset_related_supply_net –power VDD_ON –ground VSS –
object_list [get_ports iso_enable]
PD_A1.0V, OFF
PD_TOP0.8V, OFF
iso_en
set_attribute
set_related_supply_net
14
• Multivoltage designs require level shifters to
correct the voltage violations
– For some users, there are very specific locations that
are valid for level-shifter insertion
• e.g. Level shifter can only reside inside the blocks and not in
the top-level hierarchy
– Only want to use level shifters of a certain type in the
design or block
• For example, only low-to-high type level shifters are
necessary as all cells in the design can be over-driven
Level-Shifter Insertion
15
• Level shifter constraints from the UPF are soft constraints– The location argument reduces the solution space for
level-shifter insertion
• The power state table, PST, is used for level-shifter insertion decisions– If the PST is defined, only valid PST states are taken
into consideration for voltage violations
– If the PST is not defined, all port state combinations are considered for voltage violations
Level-Shifter InsertionVoltage Violations on Global Nets
16
• Paths from PD_Top to PD_B do not require level shifters as they both operate at the same voltage
• Paths from PD_Top to PD_A and from PD_A to PD_B need level-shifter cells as PD_A operates at a different voltage
Level-Shifter InsertionVoltage Violations on Global Nets
PD_Top 1.1V
PD_A
0.8V
PD_B
1.1V
?
?
? ? ? ?
Valid location for level-shifter insertion?
17
• The UPF set_level_shifter constraint is a
soft constraint
– Location specification is used to figure out valid level-
shifter insertion locations if level shifters were inserted
• -location self allows insertion inside power domain
• -location parent allows insertion outside power
domain
– All power domains have a default level-shifter strategy
that allows insertion anywhere to resolve voltage
violation
set_level_shifter <domain_name> -location
automatic -applies_to both -rule both
Level-Shifter InsertionHow to Reduce the Solution Space
18
set_level_shifter PD_A
-location self
-applies_to inputs
set_level_shifter PD_A
-location parent
-applies_to outputs
Level-Shifter InsertionReducing the Solution Space
PD_Top 1.1V
PD_A
0.8V
PD_B
1.1V
X
?
X ? ? ?
Valid location for level-shifter insertion?
Invalid location for level-shifter insertionX
19
• This design should use only low-to-high level shifters
• Will the following be sufficient for PD_A & PD_B?
set_level_shifter \
-applies_to inputs \
-rule low_to_high \
-location self
Level Shifter-InsertionOnly Insert Low-to-High Level Shifters
PD_Top 1.1V
PD_A
0.8V
PD_B
1.1V
Test Decompressor
20
• Every power domain
has a default level-
shifter strategyset_level_shifter \
-applies_to both \
-rule both \
-location automatic
• Need to override
default strategyset_level_shifter \
-applies_to both \
-rule low_to_high
Level Shifter-InsertionOnly Insert Low-to-High Level Shifters
PD_Top 1.1V
PD_A
0.8V
PD_B
1.1V
LS
LS
Test Decompressor
LS
H2L
H2LL2H
21
• Isolation cells are used to prevent dead logic
from driving live logic
– Support for more isolators
• Able to support having isolators whose primary
power and back-up power are different
– Support for pre-instantiated methodologies
• Able to associate manually instantiated isolators in
their own hierarchical wrappers to UPF isolation
constraints
Isolation Cells
22
• Isolation power for an
isolation cell can be
different than the primary
power of the power domain
– Power Domain operates at
1.08V
– Isolation Power runs at 0.8V
– Any buffers or inverters
inserted on the control signal
will operate at the voltage of
isolation power
Support for Isolation Cells with
Different Primary and Isolation Power
PD_A
1.08V
ISO
ISO Power
0.8V
0.8V
Data
@1.08V
Ctrl
@0.8V
Primary Power
1.08V
23
Support for Isolation Cells in WrappersB-2008.09-SP1
• Pre-instantiated isolators can be in self or parent
– Will trace from port inwards or outwards through
hierarchical boundaries until either a cell or a power
domain boundary is encountered
– If cell is isolator, will be associated to the UPF
isolation constraint
• Design Compiler or IC Compiler can determine the power
and ground connections for the isolator based upon isolation
constraint
• UPF-75 messages during check_mv_design reports that
a specific isolator has been associated with a specific
isolation strategy
24
Support for Isolation Cells in WrappersB-2008.09-SP1
• Pre-instantiate ISO cells placed in their own hierarchical
wrappers can be matched to UPF isolation constraints
– These isolators are output isolators of PD_A with a
location of self
PD_A
ISO
ISO
ISO
ISO
25
• Isolation constraints initially honored using GTECH cells
– Mapping will convert the GTECH cells to technology isolators, either ISO or ELS as necessary
• 6 flavors of GTECH isolators are available
– Clamp values: 0, 1, latch
– Enable sense: 0, 1 for each clamp value
Isolation CellsWhy Do I Have GTECH in my Netlist?
26
• Will see a TRANS-11 warning if Design
Compiler cannot convert GTECH isolator to
technology isolator
Warning: Target library contains no
replacement for isolation cell '%s'
(%s); it was not translated. (TRANS-11)
– Are your isolation cells marked as dont_use?
– Do your isolation constraints match your technology
isolators?
– Can your isolation cells be used where you are
specifying them?
– Do you have always-on inverters?
Isolation CellsTRANS-11
27
• Combines semantics of an isolation cell and a
level shifter in a single cell
– Cell needs to match the isolation constraint, and
– Cell needs to be able to shift all possible voltages as
defined in PST
• How do you infer an enable level shifter?
Enable Level Shifters
28
• Conceptually, Design Compiler needs to see an
isolation cell directly connected to a level shifter
on the same side of the power domain boundary
Enable Level ShiftersHow Do I Infer Enable Level Shifters?
PD_A
ISOLS
• Level shifter + Input isolation
cell is a candidate for
replacement with an enable
level shifter.
• Isolation power of isolation
cell becomes the driving
power of enable level shifter
For illustrative purposes only
29
• Design Compiler attempts to map the GTECH
isolation cell directly to an enable level-shifter
based upon voltage violations
– Isolation power of isolation cell becomes driving
power of enable level shifter
– Pwr 2 is the switched version of ISO Power
Enable Level Shifters Enable Level-Shifter Mapping
ISOLSELS
ISO Power ISO PowerPwr 1 Pwr 1Pwr 2 Pwr 2
30
• Isolation cell and level shifter are separated by a
hierarchical or power domain boundary
Enable Level Shifters Mapping Example 1
Isolation cell belongs to PD_A
Level shifter is shifting to the
voltage of PD_A
Solution:
• Move the isolation constraint
from self to parent, or
• Move the level shifter from
parent to self
PD_A
ISOLS
31
PD_B
• Isolation cell and level shifter are separated by a
hierarchical or power domain boundary
Enable Level Shifters Mapping Example 2
Isolation cell belongs to power
domain, PD_A
Level shifter is inserted inside of
PD_B
Solution:
• Force the level shifter from
self in PD_B to self in PD_A
• no_shift for PD_B, and
• self for PD_A
PD_A
ISOLS
32
• Retention registers are useful for designs
that have to recover the state of their block
after coming back from shutdown
– Ability to use retention registers whose
retention power differs from the primary power
of the power domain
– Getting GTECH in your designs instead of
retention registers
Retention Registers
33
Specification in the UPF:set_retention mult_ret -domain PD_A -retention_power_net VDDB
-retention_ground_net VSS
map_retention_cell mult_ret -domain PD_A -lib_cell_type RSDFC
Support for Retention Registers with
Different Primary and Backup Powervoltage_map(VDD, 0.8);
voltage_map(TVDD, 0.6);
voltage_map(VSS, 0.00);
.
.
cell (RRFF) {
retention_cell : "RSDFC" ;
pg_pin(VDD) {
voltage_name : VDD;
pg_type : primary_power;
}
pg_pin (TVDD) {
voltage_name : TVDD;
pg_type : backup_power;
}
PD_B1.0V, OFF
RR
save
restore
AO
AO
AO
AOAO
AO
34
• Check if you have correctly specified the retention library cell or cell type to be used– In B-2008.09, map_retention_cell accepts only simple cell
names with the lib_cells option. For example:• map_retention_cell ret_strategy –domain PD_A -lib_cells
{SDRFFX1 SDRFFX2}
• map_retention_cell ret_strategy -domain PD_A -lib_cells
{SDRFF*}
– The target library, or target library subset, if specified, should have the specified library cells
– Ensure that they do not have a dont_use or dont_touch attribute
– Check that the specified cells are modeled correctly
Retention RegistersWhy Mapping Did Not Occur
35
• Check if the specified retention library cells correspond to the RTL
For example:
The above RTL requires a retention register with a reset.
If the target library does not have a retention register that satisfies this requirement, you will see the following TRANS-4 warning message during the compile_ultra command
Warning: Target library contains no replacement
for register 'S0/y_reg[0]' (**FFGEN**). (TRANS-4)
Retention RegistersWhy Mapping Did Not Occur
always @(posedge clk or posedge rst)
if(rst == 1) y <= 1'b0;
else if(ena && enb) y <= data;
36
Reporting & Querying Commands
UPF Construct Reporting Command Querying Command
create_power_domain report_power_domain get_power_domains
create_supply_port report_supply_port get_supply_ports
create_supply_net report_supply_net get_supply_nets
create_power_switch report_power_switch get_power_switches
37
Special Cell Reporting Commands
UPF Construct Reporting Command
set_level_shifter report_level_shifter
set_isolation
set_isolation_control
report_isolation_cell
set_retention
set_retention_control
map_retention_cell
report_retention_cell
38
Multivoltage Methodology With
IEEE P1801 (UPF) Checklist
• Requirements for implementing UPF designs in Design Compiler
UPF file to describe power intent
Libraries for Implementation
Power management cells are properly modeled
Rich set of power management cells Power management cells have the appropriate enable
Always-on buffers and inverters
Level shifters that can exist on either side of the power domain boundary
Characterization data for each voltage, for which the design will be optimized
39
Agenda
Galaxy IEEE P1801 (UPF) Low-Power Overview
Implementation using Design Compiler
Design Compiler to IC Compiler Interface
IC Compiler IEEE P1801 (UPF) Methodology Overview
Design Planning
Physical Implementation
40
Input and Output to IC Compiler
Recommendation
Physical
Implementation
(IC Compiler)
Netlist + UPF
(Design Compiler)
Netlist + UPF
PG Netlist
Input to IC Compiler• Synthesized netlist with
UPF
– Binary format
– ASCII format
Output from IC Compiler• Netlist with UPF
• Fully realized netlist with power and ground connections
41
Agenda
IC Compiler IEEE P1801 (UPF) Methodology Overview
Design Planning
• Voltage Area Creation
• Switch Cell Insertion and Sleep Net Synthesis
• Power Network Synthesis
Physical Implementation
• Multivoltage Aware Placement & Optimization
• Power and ground (PG) Connection
• Chipfinishing
• Netlist Editing and ECO
• Checking and reporting
• Multivoltage Checklist
42
Agenda
IEE P1801 (UPF) Methodology Overview In IC Compiler
Design Planning
• Voltage Area Creation
• Switch Cell Insertion and Sleep Net Synthesis
• Power Network Synthesis
Physical Implementation
• Multivoltage Aware Placement and Optimization
• Power and ground (PG) Connection
• Chipfinishing
• Netlist Editing or ECO
• Checking and reporting
• Multivoltage Checklist
43
IEEE P1801 (UPF) Methodology in IC Compilercheck_mv_design
Power and
Ground
network
connection
through out
the flow
Netlist for Sign-Off
route_opt
chip finishing
Read the Design
clock_opt
place_opt
Design Planning
44
Agenda
IC Compiler IEEE P1801 (UPF) Methodology Overview
Design Planning
• Voltage Area Creation
• Switch Cell Insertion and Sleep Net Synthesis
• Power Network Synthesis
Physical Implementation
• Multivoltage Aware Placement and Optimization
• Power and Ground (PG) Connection
• Chipfinishing
• Netlist Editing and ECO
• Checking and reporting
• Multivoltage Checklist
45
Design PlanningVoltage Area Creation
• Map voltage area
to power domain
defined in UPF
– Rectilinear shapes
are allowed
create_voltage_area
MY_VA
-power_domain PD1
-coordinate ...
UPF Construct To Create Power Domaincreate_power_domain PD1...
46
Design PlanningSwitch Cell Insertion
create_power_switch_array
-lib_cell “MY_SW"
-voltage_area MY_VA
-x_increment ..
-y_increment ..
• Insert switches (header or footer) in floorplan
– -lib_cell option accepts mapped power switch
UPF Constructs For Power Switch
create_power_switch MY_SW
–domain ...
map_power_switch –domain ..
-lib_cell ... <MY_SW>
47
Design PlanningSleep Net Synthesis (1/3)
Daisy Chain Mode
connect_power_switch
-source SLEEP –mode daisy
–direction ..
-port_name ...
-voltage_area ....
48
Design PlanningSleep Net Synthesis (2/3)
connect_power_switch –source..
-port_name.. -mode daisy
–direction ...-voltage_area ..
-lib_pin [list \
<lib>/<cell>/sleepin1 \
<lib>/<cell>/sleepout1] ..
connect_power_switch –source..
-port_name.. -mode daisy
–direction ...-voltage_area ..
-lib_pin [list \
<lib>/<cell>/sleepin2 \
<lib>/<cell>/sleepout2] ...
Dual Input Daisy
Chain Connection
sleepout1Sleepin1
Sleepin2 sleepout2
49
Design Planning
Sleep Net Synthesis (3/3)
High Fanout Mode
connect_power_switch
–source SLEEP -port_name..
–mode hfn -voltage_area ..
50
Power Network Synthesis For
Multiple Voltage Areas
• Setup mesh constraints for each voltage area
• In one pass, power network synthesis creates all meshes to meet target voltage drop requirement
• Power network synthesis for power switch array
• Commit power mesh to floorplan
set_fp_rail_voltage_area_constraints
-voltage_area -nets –layer –global
–ring_nets
synthesize_fp_rail
-synthesize_voltage_area -power_budget
synthesize_fp_rail
-synthesize_power_switch_array
-power_budget
commit_fp_rail
51
Power Network Synthesis Constraints
Application For Multiple Voltage Areas
?
Select a voltage area
Specify synthesis constraints
Specify layer, ring, and global
constraints
Run power network synthesis
Analyze results
Commit power routes
OK?
yes
no
All Voltage Area synthesizedyes
TCL Commands: synthesize_fp_rail; commit_fp_rail
52
Power Network Synthesis GUI
53
Synthesis Constraints
a
b
c
d
e
a. Power and ground
net name
b. Voltage value
c. Power budget
(optional)
d. Target IR drop
e. Set the constraint
54
Voltage Area Layer Constraints
a
b
c
d
e
a. Layer and
direction
b. Number of straps
range or pitch
range
c. Strap width range
d. PG spacing
e. Set the constraint
55
Ring and Strap Constraints
a. Specify if core ring
for DEFAULT_VA
should be generated
b. Nets and Layers to
use
c. Width, Offset, and
Spacing
d. Strap extension
control
e. Set the constraint
a
b
c
d
e
56
Voltage Area Global Constraints
a
b
d
c
a. Choose a
voltage area
b. Select
global
constraints
c. Specify
individual
constraints
d. Set the
constraintssynthesize_fp_rail
-synthesize_voltage_area -power_budget
Commit_fp_rail
57
Agenda
IC Compiler IEEE P1801 (UPF) Methodology Overview
Design Planning
• Voltage Area Creation
• Switch Cell Insertion and Sleep Net Synthesis
• Power Network Synthesis
Physical Implementation
• Multivoltage Aware Placement and Optimization
• Power and Ground (PG) Connection
• Chipfinishing
• Netlist Editing or ECO
• Checking and reporting
• Multivoltage Checklist
58
• Adaptive Leakage Optimization
• Concurrent Multicorner-
Multimode Optimization
• Hierarchical Methodology
• Timing-SI-Fixing
• Clock Tree Synthesis &
Optimization
• Routing
• Power and ground pin connection
based on UPF
• Secondary power pin routing of
special cells
IC Compiler Physical ImplementationAll Features and Methodologies are Supported with UPF
ICC
Concurrent
OptimizationYield
Opt Signoff
Driven
XPS
PhysicalPower
DesignPlanning
Milkyway
Tcl
PhysicalDFT
GUI
59
Multivoltage Aware Placement
• Placement respects
voltage area boundary
• Special level shifter and
isolation cell placement
– Special cells placed
closer to voltage area
boundary
• Voltage area-aware
physical scan reordering
• High fanout net synthesis
• Routing estimation detours
around voltage area
Isolation cells
place_opt
Lever shifter
60
Multivoltage Aware Optimization
• Automatic High Fanout Net Synthesis
• Automatic Always-On Synthesis
– Always-on inference based on UPF
– Dual power (default) and single power always-on
strategy supported
– User defined always-on attribute based synthesis
61
Always-on Synthesis Definition
• Control signals for
power management
cells need to be live
while the logic around
are shut down
– Optimizing such
control signals with
special cells having
secondary power
(backup power) is
always-on synthesis
PD_A 0.8V
PD_B 0.8V, OFF
RR
save
restore
ao
ao
ao
ao
62
Always-on inference
• Automatic always-on inference
– Enable pins of enable level shifter
and isoaltion cells; save and
restore pins of retention registers
and control pin of switch cells are
automatically treated as always-
on anchor points
– Always-on marking is done by
tracing back from always on pins
• Control signals of special
cells such as isolation cells,
retention registers, enable
level shifters and switches are
treated as always-on nets
• Always-on inference based on user
defined attributes
– Pins that have been marked as always-on by the user using the set_attribute
command
set_attribute my_cell/a
always_on true
– Always-on tracing stops at a multi input
cell
– Traces through buffers and inverters only
PD_B
PD_A 0.8V
PD_B 0.8V, OFF
RR
save
restore
ao
ao
ao
ao
63
Power and Ground (PG) Connection
• PG network connection with derive_pg_connection
• PG pins of standard cells hooked up to PG nets
• Use -create_net/-reconnect options after linking
•–all option completes incremental tie and PG connections
• Always-on cells are hooked up to correct PG net
• Check for any PG connection violations
derive_pg_connection
check_mv_design –power_nets
64
Chip Finishing
• Chipfinishing commands recognize supply nets
in UPF
– insert_stdcell_filler
– add_tap_cell_array
– insert_tap_cell_by_rule
• PG connections for physical only cells using derive_pg_connection command:
• derive_pg_connection -power_net VDDVA
-power_pin VDDC –cells ...
65
Netlist Editing and ECO Commands
• To connect or disconnect signal, power, and tie netsconnect_net <net> <object_list>
disconnect_net <net> <object_list>
• To create new hierarchical power and ground network, update and report existing power and ground network create_pg_network...
remove_pg_network ...
• Multivoltage aware ECO capability in eco_netlist– Use the -by_verilog_file option to specify verilog ECO file
– Use the –compare_pg option to perform ECO changes on PG ports and nets
– Use the –physical option to perform ECO changes on physical only cells
66
Mulitvoltage Checking Commands
check_mv_design
After each major step in the flow run these checks:
• Power domain and voltage area checking
• Power pin and connection checking
• Always-on synthesis checking
• Special cell checking
check_mv_design \
-power_nets \
-connection_rules \
-level_shifters \
-isolation ....
67
Multivoltage Checking Command check_physical_design
• Checks the design readiness for IC Compiler
• The –stage pre_place_opt option checks and analyzes multivoltage design constraints and setup
check_physical_design –stage pre_place_opt
68
Reporting & Querying Commands
UPF Construct Reporting Command Querying Command
create_power_domain report_power_domain get_power_domains
create_supply_port report_supply_port get_supply_ports
create_supply_net report_supply_net get_supply_nets
create_power_switch report_power_switch get_power_switches
69
Special Cell Reporting Commands
UPF Construct Reporting Command
set_level_shifter report_level_shifter
set_isolation
set_isolation_control
report_isolation_cell
set_retention
set_retention_control
map_retention_cell
report_retention_cell
70
Power Switch
IC Compiler Query & Report Log
icc_shell>report_power_switch******************************Report : Power Switch******************************Power switch name: new_swCurrent Scope: BLK1Power domain: DOMAIN1Lib Cell Name: sw_lib1/hdr1 Input port net: {in VDD}Output port net: {out VDDI}
icc_shell> get_power_switches{new_sw }
UPF constructs Reporting Command Querying Command
create_power_switch report_power_switch get_power_switches
71
IEEE P1801 (UPF) Browser
• GUI equivalent for all IEEE P1801 (UPF) constructs
• Easy to analyze & report power domain contents – Supply nets
– Supply ports and so on
• Enables debugging and analyzing design in layout window
72
Agenda
IC Compiler IEEE P1801 (UPF) Methodology Overview
Design Planning
• Voltage Area Creation
• Switch Cell Insertion and Sleep Net Synthesis
• Power Network Synthesis
Physical Implementation
• Multivoltage Aware Placement and Optimization
• Power and Ground Connection
• Chipfinishing
• Netlist Editing and ECO
• Checking and reporting
• Multivoltage Checklist
73
Multivoltage Methodology With IEEE P1801
(UPF) Checklist (1/5)
• Requirements for implementing UPF designs in Design Compiler
UPF file to describe power intent
Libraries for Implementation
Power management cells are properly modeled
Rich set of power management cells Power management cells have the appropriate enable
Always-on buffers and inverters
Level shifters that can exist on either side of the power domain boundary
Characterization data for each voltage for which the design will be optimized
74
MV Methodology With IEEE P1801 (UPF) Checklist (2/5)
• Requirements for implementing UPF designs in IC Compiler
Bring in design and UPF from Design Compiler to IC Compiler via binary or ASCII format Isolation cells and retention registers must be inserted
in Design Compiler Run the check_mv_design –verbose command
with relevant options to ensure special cell insertion is complete
If floorplan is read via DEF PG port names in DEF and UPF must be consistent run derive_pg_connection after reading in DEF
Command map_power_switch should be applied for all created power switches
75
Multivoltage Methodology With IEEE P1801
(UPF) Checklist (3/5)
Use the set_operating_condition for top-level and use the set_voltage for all supplies of design Top level operating conditions
set_operating_condition <opcond_name>
Current operating voltage of supply netsset_voltage <floating_point_value>
-object_list <supply_nets>
Run check_mv_design –verbose throughout the flow
76
Multivoltage Methodology With IEEE P1801
(UPF) Checklist (4/5)
Ensure placement and legalization steps are
done before clock tree synthesis and routing
Run check_legality to ensure placement is legal
Run legalize_placement to fix any illegal
placement
77
Multivoltage Methodology With IEEE P1801
(UPF) Checklist (5/5)
Secondary Power Pin Routing
– Use preroute_standard_cell –nets for
special cells
– Use signal router to route secondary power pins of
always-on cells inserted during optimization and clock
tree synthesis
To write PG netlist of a design with UPF loaded
into IC Compiler use
write_verilog –pg outputfilename.v
78
UPF
RTL
PG
Netlist PrimeRail
Formality
Ref
Impl
Formality
Ref
Impl
Synopsys IEEE P1801 (UPF) Flow
PrimeTime
PrimeTime PX
UPF”
Gate
IC Compiler
VCS+MVSIM
MVRC
PrimeTime
PrimeTime PX
UPF’
Gate
Formality
Ref
Impl
Design Compiler
Power CompilerVCS+MVSIM
MVRC
79
Multivoltage Methodology With IEEE P1801
(UPF)Summary
• IEEE P1801 (UPF) commands supported
• Power and ground network connection based
on UPF
• Automatic always-on inference and synthesis
throughout the flow
• Fully realized netlist with power and ground
information + UPF from IC Compiler for
verification and sign-off analysis
80
Appendix
81
##open design ddcread_ddc design.ddclink
check_mv_design –verbose
## power and ground connectionsderive_pg_connection –create_net/reconnect
## floorplan stepsread_io_constraints design.iosinitalize_floorplancreate_voltage_area –power_domain PD1 –guard_band_x 1
–guard_band_y 1check_mv_design –verbose
A Sample IC Compiler Script For
IEEE P1801 (UPF) Methodology (1/3)
82
## Switch cell mapping and insertionmap_power_switch –domain top –lib_cell HDRS1<name_of_switch> create_power_switch_array –lib_cell \“name_of_switch”-orientation N =x 4.2 –y 3.6 –prefix “inst_header”
##Connect switch cells in daisy/hfn modeconnect_power_switch –source inst_on –port_name on –mode hfn –verbose
##Power network synthesis and secondary power pin routing steps
create_fp_virtual_pad -net VDD108 -layer ME2...
set_fp_rail_voltage_area_constraints -voltage_area ...
synthesize_fp_rail -synthesize_voltage_areas -voltage_area ....
commit_fp_rail
report_fp_rail_voltage_area_constraints –all
preroute_standard_cells -mode net-net VDDG -h_layer M5
-v_layer M6 -h_width 0.38 -v_width 0.3
A Sample IC Compiler Script For
IEEE P1801 (UPF) Methodology (2/3)
83
##Implementation stepsplace_optclock_optroute_opt
derive_pg_connection –all
##Chip finishinginsert_stdcell_filler –cell_without_metal......check_mv_design
## Write results outsave_upf out2.upfwrite_verilog –pg out.v (pg netlist)
A Sample IC Compiler Script For
IEEE P1801 (UPF) Methodology (3/3)