CMMI Combined Tutorial Feb 16, 2004 CMMI V1.1 and Appraisal Tutorial Mike Phillips, CMMI Program Manager Sponsored by the U.S. Department of Defense © 2004 by Carnegie Mellon University Pittsburgh, PA 15213-3890

Upload: santhikumarg

Post on 10-Apr-2015

855 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: Tutorial CMMI

CMMI Combined Tutorial Feb 16, 2004

CMMI V1.1 and Appraisal Tutorial

Mike Phillips, CMMI Program Manager

Sponsored by the U.S. Department of Defense© 2004 by Carnegie Mellon University

Pittsburgh, PA 15213-3890

Page 2: Tutorial CMMI

2CMMI Combined Tutorial Feb 16, 2004

Agenda

• Why focus on Process?

• Background – Why use a Model?

• CMMI Structure

• Comparisons with SW-CMM v1.1

• Process Areas Overview

• Appraisal Methodology

• Training

Page 3: Tutorial CMMI

3CMMI Combined Tutorial Feb 16, 2004

Everyone realizes the importance ofhaving a motivated, quality work forcebut...

• ...even our finest peoplecan’t perform at their bestwhen the process is notunderstood or operating“at its best.”

PEOPLE

PROCESSTECHNOLOGY

Quality Leverage Points

Major determinants of productcost, schedule, and quality

Page 4: Tutorial CMMI

4CMMI Combined Tutorial Feb 16, 2004

General Definition of Process

• A process is a set of practices performed to achievea given purpose; it may include tools, methods,materials, and/or people.

• While process is often described as a leg of theprocess-people-technology triad, it may also beconsidered the “glue” that unifies the other aspects.

• How do you define process?

Page 5: Tutorial CMMI

5CMMI Combined Tutorial Feb 16, 2004

Why Focus on Process?

• Process provides a constructive, high-leverage focus...–as opposed to a focus on people

»Your work force, on the average, is as “good”as it is trained to be.

»Working harder is not the answer.»Working smarter, through process, is the

answer.–as opposed to a focus on technology

»Technology applied without a suitable roadmapwill not result in significant payoff.

»Technology provides the most benefit in thecontext of an appropriate process roadmap.

Page 6: Tutorial CMMI

6CMMI Combined Tutorial Feb 16, 2004

Underlying Premise of ProcessImprovement

“The quality of a product islargely determined by thequality of the process that isused to develop andmaintain it.”

Based on TQM principles as taught byShewhart, Juran, Deming and Humphrey.

Page 7: Tutorial CMMI

7CMMI Combined Tutorial Feb 16, 2004

Early Process Improvement

• The theories of process management are a synthesis ofthe concepts of Deming, Crosby, Juran, and others.

• Over the past 30 years, these theories have been used toaddress problems common to many organizations.

• Solutions have been discovered, but a gap existedbetween the state of the practice and the state of the art.

• Many of these concepts have been used to buildprocess-improvement models.

Page 8: Tutorial CMMI

8CMMI Combined Tutorial Feb 16, 2004

What Is a Process Model?

• A model is a structured collection of elements thatdescribe characteristics of effective processes.

• Processes included are those proven by experienceto be effective.

Page 9: Tutorial CMMI

9CMMI Combined Tutorial Feb 16, 2004

How Is a Model Used?

• to help set process improvement objectives andpriorities, improve processes, and provide guidancefor ensuring stable, capable, and mature processes

• as a guide for improvement of organizationalprocesses–a place to start–shares the benefit of a community’s prior experiences–a common language and a shared vision–simplified approximations of reality that provide insight

“All models are wrong, but some are useful.”–George Box

Page 10: Tutorial CMMI

10CMMI Combined Tutorial Feb 16, 2004

The Problem

• Systems and softwaredisciplines have traditionallynot been well integrated

• The importance of software insystems has increaseddramatically–Example: % of

requirements allocated tosoftware: *»B-2 Stealth Bomber-- 65%»F-22 Raptor -- 80%

• The DOD has emphasized theneed to make thesystems/software interfacemore seamless

Systems Software

* Source: Standish Group Chaos Report

Page 11: Tutorial CMMI

11CMMI Combined Tutorial Feb 16, 2004

Bridging the Divide

• Systems engineering andsoftware engineeringprocesses are integrated.

• Integrates systems andsoftware disciplines intoone processimprovement framework.

• Provides a framework forintroducing newdisciplines as needsarise.

Page 12: Tutorial CMMI

12CMMI Combined Tutorial Feb 16, 2004

But We Don’t Do That...

• Some organizations see themselves as performing just onediscipline– Software– Systems– Acquisition

• But…– Software always must be part of some kind of system– Systems that don’t have software are rare– Acquisition can involve both

• Communication and cooperation with other disciplines, even ifthey are external to our organization is vital

Page 13: Tutorial CMMI

13CMMI Combined Tutorial Feb 16, 2004

The CMMI Project

• DoD sponsored collaborationbetween industry, Government, SEI

• Over 100 people involved• U.S. Army, Navy, Air Force• Federal Aviation Administration• National Security Agency• Software Engineering Institute• ADP, Inc.• AT&T Labs• BAE• Boeing• Computer Sciences Corporation• EER Systems• Ericsson Canada• Ernst and Young• General Dynamics• Harris Corporation• Honeywell

• KPMG• Lockheed Martin• Motorola• Northrop Grumman• Pacific Bell• Q-Labs• Raytheon• Reuters• Rockwell Collins• SAIC• Software Productivity Consortium• Sverdrup Corporation• TeraQuest• Thomson CSF• TRW

Page 14: Tutorial CMMI

14CMMI Combined Tutorial Feb 16, 2004

CMMI Models

Source Models

• Capability MaturityModel for Software V2,draft C (SW-CMM V2C)

• EIA Interim Standard731, System EngineeringCapability Model (SECM)

• Integrated ProductDevelopment CapabilityMaturity Model, draftV0.98 (IPD-CMM)

CMMI-SE/SW

Staged

Representation

CMMI-SE/SW

Continuous

Representation

• Combined System Engineering /Software Engineering model

• Can be applied to:– Just the software engineering

projects in an organization– Just the system engineering

projects in an organization– Both– IPPD can be used in either/both

Page 15: Tutorial CMMI

15CMMI Combined Tutorial Feb 16, 2004

Advantages of EachRepresentation

Overall results summarized in a maturitylevel

Improvement of process areas can occurat different rates

Provides familiar benchmarkingcapability

Easy comparison to ISO 15504

Easy upgrade from SW-CMMEasy upgrade from EIA 731

Focuses on organizational improvementHigh visibility of improvement withinprocess areas

Predefined and proven path with casestudy and ROI data

Provides maximum flexibility for order ofprocess improvement

Staged RepresentationContinuous Representation

Page 16: Tutorial CMMI

16CMMI Combined Tutorial Feb 16, 2004

Staged

ML 1

ML2

ML3

ML4

ML5

. . .for an established set of process areas across anorganization

Continuous

. . .for a single process areaor a set of process areas

PA PA

Pro

cess

Are

aC

apab

ility

0

1 2

3

4

5

PA

ComparingModel Representations

Page 17: Tutorial CMMI

17CMMI Combined Tutorial Feb 16, 2004

Relating Process Area Capabilityand Organizational Maturity 1

• Process area capability and organizationalmaturity are similar concepts.

• The difference between them is that process areacapability deals with a set of processes relating toa single process area or specific practice, whileorganizational maturity pertains to a set ofprocess areas across an organization.

Page 18: Tutorial CMMI

18CMMI Combined Tutorial Feb 16, 2004

CMMI Product Suite

• Models–Disciplines

»Systems Engineering SE»Software Engineering SW»Integrated Product and

Process Development(IPPD)

»Supplier Sourcing (SS)–Representations

»Staged»Continuous

• Training–Model

»Introduction to CMMI»Intermediate Concepts

–Instructor Training–Lead Appraiser

• Appraisal methods–Appraisal Requirements

for CMMI (ARC)–SCAMPI Method Description

Document (MDD)

Page 19: Tutorial CMMI

19CMMI Combined Tutorial Feb 16, 2004

The Bottom Line 1

• Process improvementshould be doneto help the business—not for itsown sake.

“In God we trust, all others bring data.”

- W. Edwards Deming

Page 20: Tutorial CMMI

20CMMI Combined Tutorial Feb 16, 2004

The Bottom Line 2

• Improvement means different things to differentorganizations:

–What are your business goals?

–How do you measure progress?

• Improvement is a long-term, strategic effort:

–What is the expected impact onthe bottom line?

–How will impact be measured?

Page 21: Tutorial CMMI

21CMMI Combined Tutorial Feb 16, 2004

Categories of ProcessImprovement Benefits

• Process improvement benefits fall into one of eightgeneral categories:–improved schedule and budget predictability–improved cycle time–increased productivity–improved quality (as measured by defects)–increased customer satisfaction–improved employee morale–increased return on investment–decreased cost of quality

Page 22: Tutorial CMMI

22CMMI Combined Tutorial Feb 16, 2004

Results: Boeing EffortEstimation

.

0 %

140%

-140%

....

.

..

. ... .

.

. .

. . . .

.. . .

. .

.

.. . . .. .. . . . . .... . . .. .

.. .

. ...

..

. .. .. ...... . .. . ... . .. . .. ..

Without Historical Data With Historical DataVariance between + 20% to - 145% Variance between - 20% to + 20%

(Mostly Level 1 & 2) (Level 3)

Ove

r/U

nd

er P

erce

nta

ge

.

(Based on 120 projects in Boeing Information Systems)

.. . .

.

.. .

...

. .

. ..

.. .

..

.. .. . .. . . . . .. . . . . .. .

... . .. . . . . . .. . . .. . . . .

. . . . .. . . . .. . . . . .. . . . .. . . . . .

. . . . . .. . . . .. . .

. . . . . . . .

. . . . . . . . .

. . . . . .. . . . . .

. . . . . .

Reference: John D. Vu. “Software Process Improvement Journey:From Level 1 to Level 5.” 7th SEPG Conference, San Jose, March 1997.

Improved Schedule andBudget Predictability

Page 23: Tutorial CMMI

23CMMI Combined Tutorial Feb 16, 2004

Project Cycle Times

0250500750

1991

1992

1993

1994

1995

1996

Year

Avg

Wo

rkin

gD

ays Req Def

Implement

Source: Software Engineering Div., Hill AFB, Published in Crosstalk May 1999

Improved Cycle Time

Page 24: Tutorial CMMI

24CMMI Combined Tutorial Feb 16, 2004

Source: Software Engineering Div., Hill AFB, Published in Crosstalk May 1999

Man-hours per LOC

0

0.2

0.4

0.6

0.8

1

1.2

A B C D E

Release

No

rmal

ized

Man

-ho

urs

Increased Productivity

Page 25: Tutorial CMMI

25CMMI Combined Tutorial Feb 16, 2004

Increased Productivity andQuality

Page 26: Tutorial CMMI

26CMMI Combined Tutorial Feb 16, 2004

Topics

• The structure of the CMMI documents

• The structure of the CMMI Continuous representation

• The structure of the CMMI Staged representation

• Summary

Page 27: Tutorial CMMI

27CMMI Combined Tutorial Feb 16, 2004

Organization ofContinuous Model -1

• Six chapters provide an overview–The Introduction–Structure of the Model–Model Terminology–Capability Level and Generic Model components–Understanding the Model–Using the Model

Page 28: Tutorial CMMI

28CMMI Combined Tutorial Feb 16, 2004

Organization ofContinuous Model -2

• Process areas»Process management»Project Management»Engineering»Support

• Appendixes»References»Acronyms»Glossary»Required and expected Model Elements»CMMI Project Participants»Equivalent Staging

Page 29: Tutorial CMMI

29CMMI Combined Tutorial Feb 16, 2004

Organization ofStaged Model -1

• Six chapters provide an overview–The Introduction–Structure of the Model–Model Terminology–Maturity Levels, Common Features, and Generic

Practices–Understanding the Model–Using the Model

Page 30: Tutorial CMMI

30CMMI Combined Tutorial Feb 16, 2004

Organization ofStaged Model -2

• Process areas»Maturity Level: 2 Managed»Maturity Level: 3 Defined»Maturity Level: 4 Quantitatively Managed»Maturity Level: 5 Optimizing

• Appendixes»References»Acronyms»Glossary»Required and expected Model Elements»CMMI Project Participants

Page 31: Tutorial CMMI

31CMMI Combined Tutorial Feb 16, 2004

Model Components

• Process Areas–Specific Goals–Specific Practices–Generic Goals–Generic Practices

»Typical Work Products»Sub-practices»Notes»Discipline Amplifications»Generic Practice Elaborations»References

Page 32: Tutorial CMMI

32CMMI Combined Tutorial Feb 16, 2004

CMMI StructureOne Model, Two Representations

Maturity Level 5 OID, CAR

Maturity Level 4 OPP, QPM

Maturity Level 3 REQD, TS, PI, VER, VAL, OPF, OPD, OT, IPM, RSKM, DAR

Overview Introduction Structure of the Model Model Terminology Maturity Levels, Common Features, and Generic Practices Understanding the Model Using the Model

Maturity Level 2 REQM, PP, PMC, SAM, MA, PPQA, CM

Appendixes

Engineering REQM, REQD, TS, PI, VER, VAL

Project Management PP, PMC, SAM IPM, RSKM, QPM

Process Management OPF, OPD, OT, OPP, OID

Process Management PAs - Goals - Practices

Support CM, PPQA, MA, CAR, DAR

Appendixes

CMMI-SE/SWStaged

Overview Introduction Structure of the Model Model Terminology Capability Levels and Generic Model Components Understanding the Model Using the Model

CMMI-SE/SWContinuous

Page 33: Tutorial CMMI

33CMMI Combined Tutorial Feb 16, 2004

Topics

• Structure of the CMMI documents

• The structure of the CMMI continuous representation

• The structure of the CMMI staged representation

• Summary

Page 34: Tutorial CMMI

34CMMI Combined Tutorial Feb 16, 2004

Process Area Capability Profile

A process area capability profile may be represented bya set of points in two dimensions.–the process dimension

»“What” you do–the capability dimension

»“How well” you do it

Cap

abili

ty(H

ow

wel

l)

Process Area (What you do)

Page 35: Tutorial CMMI

35CMMI Combined Tutorial Feb 16, 2004

The Process Dimension

• The values on this axis describe what processes(described within Process Areas) you perform.

Process

ProcessArea 1

ProcessArea n

ProcessArea 2

ProcessArea 3

Cap

abili

ty

Page 36: Tutorial CMMI

36CMMI Combined Tutorial Feb 16, 2004

Process Areas

•Process Areas (PAs) are a cluster of relatedpractices.

•They are the major building blocks in establishingprocess capability.

•Example PA: “Requirements Management”

Page 37: Tutorial CMMI

37CMMI Combined Tutorial Feb 16, 2004

Requirements ManagementRequirements DevelopmentTechnical SolutionProduct IntegrationVerificationValidation

Engineering

ProjectManagement

Project PlanningProject Monitoring and ControlSupplier Agreement ManagementIntegrated Project Management(IPPD)Integrated Supplier Management (SS)Integrated Teaming (IPPD)Risk ManagementQuantitative Project Management

Organizational Process FocusOrganizational Process DefinitionOrganizational TrainingOrganizational Process PerformanceOrganizational Innovation and Deployment

ProcessManagement

Configuration ManagementProcess and Product Quality AssuranceMeasurement and AnalysisCausal Analysis and ResolutionDecision Analysis and ResolutionOrganizational Environment for Integration (IPPD)

Support

ContinuousOrganization of Process Areas

Category Process Area

Page 38: Tutorial CMMI

38CMMI Combined Tutorial Feb 16, 2004

Decision Analysis and Resolution Requirements Development

System Product Deliveries

Project Planning

Supplier Agreement Management

Product Control

Products

Outcome & Feedback

ProductVerification

ValidationMeasurementand Analysis

Deficiencies

Directives, Constraints,

Contracting Activity Planning

Requirements DefinitionBudgeting Priority

Assessment & Certification

Integrated ProjectManagement

Project Monitoringand Control

Risk Management

TechnicalSolution

ProductIntegration

RequirementsManagement

ConfigurationManagement

Quality Assurance

Program ManagementTechnical Execution

ProcessFocus

ProcessDefinition Training

QuantitativeMgmt

ProcessPerformance

Innovation andDeployment

Process Maturation

Organizational Process Management

Mission Area Planning

ConcurrentFront-EndActivities

Causal Analysisand Resolution

Life Cycle Relationships

Mission Shortfalls

Integrated SupplierManagement

Integrated Teaming

Environmentfor

Integration

Page 39: Tutorial CMMI

39CMMI Combined Tutorial Feb 16, 2004

Capability Levels

• A capability level is a well-defined evolutionaryplateau describing the capability of a processarea.

• There are six capability levels.

• Each level is a layer in the foundation forcontinuous process improvement.

• Thus, capability levels are cumulative, i.e., ahigher capability level includes the attributes ofthe lower levels.

Page 40: Tutorial CMMI

40CMMI Combined Tutorial Feb 16, 2004

The Capability Levels

5 Optimizing

4 Quantitatively Managed

3 Defined

2 Managed

1 Initial

0 Incomplete

Page 41: Tutorial CMMI

41CMMI Combined Tutorial Feb 16, 2004

An Example Process AreaCapability Profile

P r o c e s s A r e aREQM PP PMC etc

5

4

3

2

1

0

C a

p a

b i

l i t

y

Page 42: Tutorial CMMI

42CMMI Combined Tutorial Feb 16, 2004

Goals and Practices

• Goals and Practices are the model elements used torealize the values on both the capability and processdimensions.–Goal

»A high level statement of the outcome to be achievedby effective implementation of a group of practices.(These are “required.”)

–Practice»A description of an action that is necessary

to enact a key element of a process area. (These are“expected,” and “alternate practices” are acceptable.)

Page 43: Tutorial CMMI

43CMMI Combined Tutorial Feb 16, 2004

Specific and Generic Goals andPractices

• Specific Goals and Specific Practices– realize the process dimension– therefore, they apply to a particular Process

Area

• Generic Goals and Generic Practices– realize the capability dimension– therefore, they apply across all Process Areas

Page 44: Tutorial CMMI

44CMMI Combined Tutorial Feb 16, 2004

Critical Distinctions

• performed vs. managed

•--the extent to which the process is planned; performance is managedagainst the plan; corrective actions are taken when needed

•managed vs. defined

•--the scope of application of the process descriptions, standards, andprocedures (i.e., project vs. organization)

•defined vs. quantitatively managed

•--the predictability of process performance

•quantitatively managed vs. optimizing

•--the process is continuously improved by addressing common causes ofprocess variation

Page 45: Tutorial CMMI

45CMMI Combined Tutorial Feb 16, 2004

Improving a Process Area

CL0 Not performed, incompleteNo GPs or SPs exist

GP1.1 CL1 (base) SPs

GP1.1 through GP2.10CL1 + CL2* SPs

GP1.1 through GP3.2CL1+CL2*+CL3* SPs

GP1.1 through GP4.2CL1+CL2*+CL3* SPs

GP1.1 through GP5.2CL1+CL2*+CL3* SPs

CL1Performed Perform the work

CL2Managed

Adhere to policy, follow documented plans and processes,apply adequate resources, assign responsibility andauthority, train people, apply CM, monitor, control, andevaluate process, identify and involve stakeholders,review with management

CL3Defined

Project’s process is tailored from organization’sstandard processes, understand process qualitatively,process contributes to the organizations assets

CL4 Quantitatively

Managed

Measure process performance,stabilize process, control charts, deal with causes of special variations

CL5Optimizing

Defect prevention, proactive improvement,innovative technology insertion and deployment

* Advanced practices exist only in the Engineering PAs.

Page 46: Tutorial CMMI

46CMMI Combined Tutorial Feb 16, 2004

REQM - Capability Levels 1 & 2

Requirements ManagementSpecific practices (CL1 - “base”)

SP1.1-1: Obtain an Understanding of Requirements

SP1.3-1: Manage Requirements ChangesSP1.5-1: Identify Inconsistencies Between

Project Work and Requirements

Generic practices (CL1)

GP1.1: Perform Base Practices

Specific practices (CL2 - “advanced”)

SP1.2-2: Obtain Commitment to RequirementsSP1.4-2: Maintain Bidirectional Traceability of Requirements

Generic practices (CL2)

GP2.1: Establish an Organizational PolicyGP2.2: Plan the ProcessGP2.3: Provide ResourcesGP2.4: Assign ResponsibilityGP2.5: Train PeopleGP2.6: Manage ConfigurationsGP2.7: Identify and Involve Relevant StakeholdersGP2.8: Monitor and Control the ProcessGP2.9: Objectively Evaluate AdherenceGP2.10: Review Status with Higher Level Management

Page 47: Tutorial CMMI

47CMMI Combined Tutorial Feb 16, 2004

REQM - Capability Level 3

Requirements Management

Specific practices (CL1 & CL2)

SP1.1-1: Obtain an Understanding of Requirements

SP1.2-2: Obtain Commitment to RequirementsSP1.3-1: Manage Requirements ChangesSP1.4-2: Maintain Bidirectional Traceability of

RequirementsSP1.5-1: Identify Inconsistencies Between

Project Work and Requirements

Generic practices (CL1 & CL2)

GP1.1: Perform Base PracticesGP2.1: Establish an Organizational PolicyGP2.2: Plan the ProcessGP2.3: Provide ResourcesGP2.4: Assign ResponsibilityGP2.5: Train PeopleGP2.6: Manage ConfigurationsGP2.7: Identify and Involve Relevant StakeholdersGP2.8: Monitor and Control the ProcessGP2.9: Objectively Evaluate AdherenceGP2.10: Review Status w/Higher Level Management

Specific practices (CL3)

All the CL1 & CL2 Specific Practices

Generic practices (CL3)

All the CL1 & CL2 Generic Practices plus(+):

GP3.1: Establish a Defined ProcessGP3.2: Collect Improvement Information

Page 48: Tutorial CMMI

48CMMI Combined Tutorial Feb 16, 2004

REQM - Capability Levels 4 & 5

Requirements Management

Specific practices (CL4)

All the CL1 & CL2 Specific Practices

Generic practices (CL4)

All the CL1 & CL2 & CL3 Generic Practices plus(+):

GP4.1: Establish Quantitative Objectives for the ProcessGP4.2: Stabilize Subprocess Performance

Specific practices (CL5)

All the CL1 & CL2 Specific Practices

Generic practices (CL5)

All the CL1 & CL2 & CL3 & CL4 Generic Practices plus(+):

GP5.1: Ensure Continuous Process ImprovementGP5.2: Correct Root Causes of Problems

Page 49: Tutorial CMMI

49CMMI Combined Tutorial Feb 16, 2004

Summary

• CMMI models were developed with broadparticipation and review.

• Process Areas identify “what you do.”

• Capability Levels identify “how well you do it.”

Page 50: Tutorial CMMI

50CMMI Combined Tutorial Feb 16, 2004

Topics

• Structure of the CMMI documents

• The structure of the CMMI Continuous representationdocument

• The Structure of the CMMI Staged representation

• Summary

Page 51: Tutorial CMMI

51CMMI Combined Tutorial Feb 16, 2004

Maturity Levels

• A maturity level is a well-defined evolutionaryplateau on the path to becoming a matureorganization.

• There are five maturity levels.

• Each level is a layer in the foundation forcontinuous process improvement.

Page 52: Tutorial CMMI

52CMMI Combined Tutorial Feb 16, 2004

The Maturity Levels

Process unpredictable,poorly controlled andreactive

Process characterized forprojects and is oftenreactive

Process characterizedfor the organizationand is proactive

Process measuredand controlled

Focus on processimprovement

Optimizing

QuantitativelyManaged

Defined

Initial

Managed

Optimizing

Defined

1

2

3

4

5

Page 53: Tutorial CMMI

53CMMI Combined Tutorial Feb 16, 2004

Structure of the CMMIStaged Representation

Maturity Level

Process Area Process Area Process Area

Generic Goals Specific Goals

Commitmentto Perform

Ability toPerform

DirectingImplementation

Verification

CommonFeatures

Commitment to Perform: creates policies and secures sponsorship for process improvement effortsAbility to Perform: ensures that the project and/or organization has the resources it needs to pursue process improvementDirecting Implementation: collects, measures, and analyzes data related to processesVerification: verifies that the projects and/or organization’s activities conform to requirements, processes, and procedures

Commitment to Perform: creates policies and secures sponsorship for process improvement effortsAbility to Perform: ensures that the project and/or organization has the resources it needs to pursue process improvementDirecting Implementation: collects, measures, and analyzes data related to processesVerification: verifies that the projects and/or organization’s activities conform to requirements, processes, and procedures

Generic Practices Specific Practices

Page 54: Tutorial CMMI

54CMMI Combined Tutorial Feb 16, 2004

Maturity LevelsCannot Be Skipped

• A level provides a necessary foundation foreffective implementation of processes at thenext level.

– Higher level processes are easily sacrificedwithout the discipline provided by lowerlevels.

– The effect of innovation is obscured in anoisy process.

• Higher maturity level processes may beperformed by organizations at lower maturitylevels, with risk of not being consistentlyapplied in a crisis.

Page 55: Tutorial CMMI

55CMMI Combined Tutorial Feb 16, 2004

Process Areas

•Process Areas (PAs) are clusters of relatedpractices performed collectively to achieve a set ofgoals.

•They are the major building blocks in establishingthe process capability of an organization.

•Each process area has been defined to resideat a given maturity level.

Page 56: Tutorial CMMI

56CMMI Combined Tutorial Feb 16, 2004

Process Areas by Maturity Level

Organizational Innovation and DeploymentCausal Analysis and Resolution5 Optimizing

4 Quantitatively Managed

3 Defined

2 Managed

Continuous process improvement

Quantitativemanagement

Processstandardization

Basicprojectmanagement

Organizational Process PerformanceQuantitative Project Management

Requirements DevelopmentTechnical SolutionProduct IntegrationVerificationValidationOrganizational Process FocusOrganizational Process DefinitionOrganizational Training Integrated Project ManagementIntegrated Supplier ManagementRisk ManagementDecision Analysis and ResolutionOrganizational Environment for IntegrationIntegrated TeamingRequirements ManagementProject PlanningProject Monitoring and ControlSupplier Agreement ManagementMeasurement and AnalysisProcess and Product Quality AssuranceConfiguration Management

1 Initial

Process AreasLevel Focus

(IPPD)(IPPD)

(SS)

Page 57: Tutorial CMMI

57CMMI Combined Tutorial Feb 16, 2004

Common Features

Common features are a means of categorizingGeneric practices.

– Commitment to perform:establishment of management policies

– Ability to perform:establishment and maintenance of plans,resources, assigned responsibility andauthority, and training

– Directing implementation:measurement, control, and performance practices

– Verification:ensure implementation and compliance

Page 58: Tutorial CMMI

58CMMI Combined Tutorial Feb 16, 2004

Another way to look atCommon Features -1

• Common feature categories are very similar acrossprocess areas.

• They are referred to as Institutionalization CommonFeatures because they:

– ensure the process areas are effective,repeatable and lasting

– provide needed infrastructure support

Page 59: Tutorial CMMI

59CMMI Combined Tutorial Feb 16, 2004

Common Feature Examples -1from Requirements Management Process Area

•Commitment to perform:

–Establish and maintain an organizationalpolicy for planning and performing therequirements management process.

•Ability to perform:

–Train the people performing or supportingthe requirements management process asneeded.

Page 60: Tutorial CMMI

60CMMI Combined Tutorial Feb 16, 2004

Common Feature Examples -2from Requirements Management Process Area

• Directing implementation:

– Place designated work products of therequirements management process underappropriate levels of configurationmanagement.

• Verification:

– Review the activities, status, and results ofthe requirements management processwith higher level management and resolveissues.

Page 61: Tutorial CMMI

61CMMI Combined Tutorial Feb 16, 2004

Summary -1

• There is one CMMI Model with two representations,Staged and Continuous.

• The material in both representations is the same justorganized differently.

• Each representation provides different ways ofimplementing processes

• The CMMI model should be applied using intelligence,common sense, and professional judgment.

Page 62: Tutorial CMMI

62CMMI Combined Tutorial Feb 16, 2004

Summary -2

• Continuous–Flexible in its application so the organization can

choose which areas to emphasize.–Provides equivalent staging to compare to staged

representation.

• Staged–Structured for implementation based on proven

grouping and ordering of processes.

Page 63: Tutorial CMMI

63CMMI Combined Tutorial Feb 16, 2004

CMMI-SE/SWCompared to SW-CMM v1.1

Page 64: Tutorial CMMI

SW-CMM v1.1 vs. CMMIProcess Areas

Defect Prevention Causal Analysis and ResolutionTechnology Change Mgmt Organizational Innovation & DeploymentProcess Change Management

Quantitative Process Mgmt Organizational Process PerformanceSoftware Quality Mgmt Quantitative Project Management

Organization Process Focus Organization Process Focus Organization Process Definition Organization Process DefinitionTraining Program Organizational TrainingIntegrated Software Mgmt Integrated Project Management

Risk ManagementSoftware Product Engr Requirements Development

Technical SolutionProduct Integration

Intergroup Coordination VerificationPeer Reviews Validation

Decision Analysis and Resolution

Requirements Management Requirements ManagementSoftware Project Planning Project PlanningSoftware Project Tracking & Oversight Project Monitoring and ControlSoftware Subcontract Mgmt Supplier Agreement ManagementSoftware Quality Assurance Product & Process Quality AssuranceSoftware Configuration Mgmt Configuration Management

Measurement and Analysis

LEVEL 5OPTIMIZING

LEVEL 4MANAGED

LEVEL 3DEFINED

LEVEL 2REPEATABLE

64

Page 65: Tutorial CMMI

65CMMI Combined Tutorial Feb 16, 2004

CMMI ImprovementsOver the CMM

• Emphasis on measurable improvements to achievebusiness objectives.

• Process areas have been added to place moreemphasis on some important practices:–Risk Management–Measurement and Analysis–Engineering Process Areas–Decision Analysis

Page 66: Tutorial CMMI

66CMMI Combined Tutorial Feb 16, 2004

Overview of CMMISM

SE/SW/IPPD/SS ModelProcess Areas

Page 67: Tutorial CMMI

67CMMI Combined Tutorial Feb 16, 2004

Requirements ManagementRequirements DevelopmentTechnical SolutionProduct IntegrationVerificationValidation

Engineering

ProjectManagement

Project PlanningProject Monitoring and ControlSupplier Agreement ManagementIntegrated Project Management(IPPD)Integrated Supplier Management (SS)Integrated Teaming (IPPD)Risk ManagementQuantitative Project Management

Organizational Process FocusOrganizational Process DefinitionOrganizational TrainingOrganizational Process PerformanceOrganizational Innovation and Deployment

ProcessManagement

Configuration ManagementProcess and Product Quality AssuranceMeasurement and AnalysisCausal Analysis and ResolutionDecision Analysis and ResolutionOrganizational Environment for Integration (IPPD)

Support

ContinuousOrganization of PAs

Category Process Area

Page 68: Tutorial CMMI

68CMMI Combined Tutorial Feb 16, 2004

Project ManagementProcess Areas

• There are eight Project Management Process Areas.–Project Planning–Project Monitoring and Control–Supplier Agreement Management–Integrated Project Management–Integrated Supplier Management (SS)–Risk Management–Quantitative Project Management

–Integrated Teaming (IT) and IPM(IPPD) will bediscussed with IPPD.

Page 69: Tutorial CMMI

69CMMI Combined Tutorial Feb 16, 2004

Basic ProjectManagement PAs

PPWhat To Build

What To Do

SAM

PMC

What To Monitor Replan

Plans

Status, issues,resultsof progressand milestonereviews

Product component requirements Technical issuesCompleted product componentsAcceptance reviews and tests

Engineeringand Support

process areas

Status, issues, results of process and product evaluations;measures and analyses

Commitments

Measurement needs

Corrective action

Supplier

Supplieragreement

Correctiveaction

Page 70: Tutorial CMMI

70CMMI Combined Tutorial Feb 16, 2004

Project Planning

• Purpose:

• Establish and maintain plans that defineproject activities.

Page 71: Tutorial CMMI

71CMMI Combined Tutorial Feb 16, 2004

Project Planning - Context

PlanningData

EstablishEstimates

ObtainCommitmentto the Plan

Develop aProject Plan

ProjectPlans

PMC

Page 72: Tutorial CMMI

72CMMI Combined Tutorial Feb 16, 2004

Project Planning - Context

Determine Estimates

of Effortand Cost

PlanningData

Establish Estimates

Estimate the Scope

of the Project

EstablishEstimates of

Work Product and Task Attributes

Define ProjectLife Cycle

Page 73: Tutorial CMMI

73CMMI Combined Tutorial Feb 16, 2004

Project Planning - Context

Establish the Budget

andSchedule

Planning Data

Develop a Project Plan

Planfor Data

Management

Plan Stakeholder

Involvement

Plan forProject

Resources

Project Plans

Establishthe Project

Plan

IdentifyProject Risks

Plan forNeeded

Knowledge and Skills

Page 74: Tutorial CMMI

74CMMI Combined Tutorial Feb 16, 2004

Project Planning - Context

Obtain Commitmentto the Plan

ReconcileWork andResource

Levels

ProjectPlans

ReviewPlans that

Affect the Project

ObtainPlan

Commitment

Page 75: Tutorial CMMI

75CMMI Combined Tutorial Feb 16, 2004

Project Monitoring and Control

• Purpose:

• Provide understanding into the project’sprogress so that appropriate corrective actionscan be taken when the project’s performancedeviates significantly fromthe plan.

Page 76: Tutorial CMMI

76CMMI Combined Tutorial Feb 16, 2004

Project Monitoring and Control - Context

Project Plans

Monitor Project Risks

Monitor Commitments

Analyze Issues

TakeCorrective

Actions

ConductMilestoneReviews

MonitorData

Management

Monitor ProjectPlanning

Parameters

ManageCorrective Actions

to Closure

Monitor Project Against Plans

ConductprogressReviews

Monitor StakeholderInvolvement

ManageCorrective Actions

PP

Page 77: Tutorial CMMI

77CMMI Combined Tutorial Feb 16, 2004

Supplier Agreement Management

• Purpose:

• Manage the acquisition of products from suppliersfor which there exists a formal agreement.

Page 78: Tutorial CMMI

78CMMI Combined Tutorial Feb 16, 2004

Supplier Agreement ManagementContext

Product

List of Products

EstablishSupplier

Agreements

Supplier Agreement

ReviewCOTS

Products

Determine Acquisition

Type

TransitionProducts

Accept the Acquired

Product

SelectSuppliers

Supplier Requirements

Executethe SupplierAgreement

Establish Supplier Agreements

Satisfy Supplier Agreements

Page 79: Tutorial CMMI

79CMMI Combined Tutorial Feb 16, 2004

Coordination & collaboration; Sharedvision & IT structure

subprocesses forquantitative mgmt.

AdvancedProject Management PAs

Process Performance Objectives, Baselines, Models

QPM

Organization’s Std. Processes

IPMRSKM

Lessons Learned,Performance Data

Project’sDefinedProcess

Statistical Mgmt Data

RiskTaxonomies

& Parameters,Status,

Mitigation,and

Corrective Action

ProcessManagement

process areas

Basic ProjectManagement

process areas

Risk exposure due to unstable processes

Identified risks

Engineering &Support

process areas

Coordination,commitments,issues; Product Architecture for Structuring Teams

ITIT mgmt forengineeringprocesses;

Integratedworkenvironmentpeople &practices

Page 80: Tutorial CMMI

80CMMI Combined Tutorial Feb 16, 2004

Integrated Project Management

• Purpose:

• Establish and manage the project and theinvolvement of the relevant stakeholdersaccording to an integrated and defined processthat is tailored from the organization’s set ofstandard processes.

Page 81: Tutorial CMMI

81CMMI Combined Tutorial Feb 16, 2004

Integrated Project Management - Context

ManageStakeholderInvolvement

ManageDependencies

ResolveCoordination

Issues

Coordinate withRelevant

Stakeholders

Documented Technical

Issues

Documented Critical

Dependencies

Agendas andSchedules forCollaborative

Activities

Use the Project’s Defined Process DefinedProcessBased

Project Plan

Project’s Defined Process

Use OrgProc Assetsfor Planning

ProjectActivities

Integrate PlansOPD

• Estimates and Measures• Documentation• Lessons Learned

Other Project& Org Functions

Establishthe Project’s

DefinedProcess

Contributeto Org

ProcessAssets

ManageProject Using

IntegratedPlans

Page 82: Tutorial CMMI

82CMMI Combined Tutorial Feb 16, 2004

Integrated Supplier Management

• Purpose:

• Proactively identify sources of products that maybe used to satisfy the project’s requirements andto manage selected suppliers while maintaining acooperative project-supplier relationship.

Page 83: Tutorial CMMI

83CMMI Combined Tutorial Feb 16, 2004

Integrated Supplier Management -Context

MonitorSelectedSupplier

Processes

Analyze Potential

Sources of Products

Revise the Supplier

Agreement or Relationship

Evaluate and

Determine Sources of

Products

Supplier Processes

Evaluate Selected Supplier

Work Products

Analyze and Select Sources of Products

Coordinate Work with Suppliers

SAM

Supplier Work Products

Page 84: Tutorial CMMI

84CMMI Combined Tutorial Feb 16, 2004

Risk Management

• Purpose:

• Identify potential problems before they occur,so that risk handling activities may be plannedand invoked as needed across the life of theproduct or project to mitigate adverse impacts onachieving objectives.

Page 85: Tutorial CMMI

85CMMI Combined Tutorial Feb 16, 2004

Risk Management - Context

IdentifyRisks

Evaluate, Categorize, and

PrioritizeRisks

Identify andAnalyze Risks

From Project Planning and Project Monitoring

and Control

DevelopRisk

MitigationPlans

ImplementRisk

MitigationPlans

Mitigate Risks

DAR

Risk Repository

DetermineRisk

Sourcesand

Categories

DefineRisk

Parameters

Prepare for Risk Management

Establish a Risk

ManagementStrategy

Page 86: Tutorial CMMI

86CMMI Combined Tutorial Feb 16, 2004

Quantitative Project Management

• Purpose:

• Quantitatively manage the project’s definedprocess to achieve the project’s establishedquality and process-performance objectives.

Page 87: Tutorial CMMI

87CMMI Combined Tutorial Feb 16, 2004

Quantitative Project Management - Context

Definitions ofMeasures;

DerivedObjectives

SubprocesseCapabilityMeasure

Statistically Manage Subprocess Performance

RecordStatistical

ManagementData

MonitorPerformance of Selected

Subprocesses

ApplyStatistical

Methods toUnderstand

Variation

SelectMeasures

and AnalyticTechniques

StableSub-

processes

SelectedSubprocesses

OPP

Predictions ofQuality and

Process Performance

OrganizationMeasurement

Repository

EstablishProject’s

Objectives

Compose the Defined

Process

Quality and ProcessPerformance Objectives

RemedialActions

Selectthe

Subprocessesthat will be Statistically

Managed

Quantitatively Manage the Project

ManageProject

Performance

Project’sDefinedProcess

Page 88: Tutorial CMMI

88CMMI Combined Tutorial Feb 16, 2004

Summary• Project Planning

• Project Monitoring and Control

• Supplier Agreement Management

• Risk Management

• Integrated Project Management

• Integrated Supplier Management (SS)

• Quantitative Project Management

Special Note: Integrated Teaming (IT) and IPM(IPPD) will bediscussed with IPPD.

Page 89: Tutorial CMMI

89CMMI Combined Tutorial Feb 16, 2004

Support Process Areas

There are six Support Process Areas:

• Configuration Management

• Process and Product Quality Assurance

• Measurement and Analysis

• Causal Analysis and Resolution

• Decision Analysis and Resolution

• Organizational Environment for Integration will bediscussed with IPPD.

Page 90: Tutorial CMMI

90CMMI Combined Tutorial Feb 16, 2004

Understanding SupportProcesses

• Support process areas cover the practices thatsupport product development, maintenance, andacquisition.

• They provide essential processes used by all theCMMI process areas, and are typically used in thecontext of performing other processes.

Page 91: Tutorial CMMI

91CMMI Combined Tutorial Feb 16, 2004

Basic Support Process Areas

PPQAMA

CM

All process areas

Measurements,analyses

Information needs

Configuration items;change requests

Baselines;audit reports

Processes and workproducts;standards andprocedures

Quality and noncompliance issues

Page 92: Tutorial CMMI

92CMMI Combined Tutorial Feb 16, 2004

Configuration Management

• Purpose:

• Establish and maintain the integrity of workproducts using configuration identification,configuration control, configuration statusaccounting, and configuration audits.

Page 93: Tutorial CMMI

93CMMI Combined Tutorial Feb 16, 2004

Configuration Management -Context

EstablishConfig Mgmt

Records

PerformConfiguration

Audits ActionItems

Audit Results

Status

Establish Integrity

Change RequestDatabase

ConfigurationManagement

System

ChangeRequests

Create orRelease

Baselines

Establisha Config.

ManagementSystem

IdentifyConfiguration

Items

Establish Baselines

ControlConfiguration

Items

TrackChange

Requests

TrackandControlChanges

Page 94: Tutorial CMMI

94CMMI Combined Tutorial Feb 16, 2004

Process and Product QualityAssurance

• Purpose:

• Provide staff and management with objectiveinsight into processes and associated workproducts.

Page 95: Tutorial CMMI

95CMMI Combined Tutorial Feb 16, 2004

Process and Product QualityAssurance - Context

WorkProducts

Reports and Records

Objectively

EvaluateProcesses

ObjectivelyEvaluate

Work Products

& Services

Objectively Evaluate Processes and Work Products

EstablishRecords

Communicateand Ensure

Resolution ofNon-compliance

Issues

Provide Objective Insight

Page 96: Tutorial CMMI

96CMMI Combined Tutorial Feb 16, 2004

Measurement and Analysis

• Purpose:

• Develop and sustain a measurement capabilitythat is used to support management informationneeds.

Page 97: Tutorial CMMI

97CMMI Combined Tutorial Feb 16, 2004

Measurement & Analysis - Context

Measurement Indicators

CollectMeasurement

Data Communicate

Results

StoreData &Results

Analyze Measurement

Data

Provide Measurement Results

Measurement Personnel

MeasurementRepository

Measurement Objectives Procedures,Tools

SpecifyMeasures

EstablishMeasurement

Objectives

SpecifyAnalysis

Procedures

SpecifyData

Collectionand StorageProcedures

Align Measurement Analysis Activities

Page 98: Tutorial CMMI

Advanced Support Process Areas

DAR

All process areas

CAR

Defects & other problems

Selected issues;

Process improvementproposals;

Structured decisions

OEI

ProcessManagement

PAs

ProjectManagement

PAs

Ability to develop& deploy IPPDprocesses& supportingassets; IPPD knowledge

& skill needs Integrated workenvironment &people practices

Organization IPPDInfrastructure

Page 99: Tutorial CMMI

99CMMI Combined Tutorial Feb 16, 2004

Causal Analysis and Resolution

• Purpose:

• Identify causes of defects and other problemsand take action to prevent them from occurringin the future.

Page 100: Tutorial CMMI

100CMMI Combined Tutorial Feb 16, 2004

Causal Analysis andResolution - Context

SelectData for Analysis

AnalyzeCauses

Defect &Problem

Data

DetermineCauses of Defects

ImplementAction

Proposals

EvaluateEffect ofChanges

RecordData

ActionProposal

Action Plans

CAR Records

PerformanceMeasures

Address Causesof Defects

Page 101: Tutorial CMMI

101CMMI Combined Tutorial Feb 16, 2004

Decision Analysis and Resolution

• Purpose:

• Analyze possible decisions using a formalevaluation process that evaluates identifiedalternatives against established criteria.

Page 102: Tutorial CMMI

102CMMI Combined Tutorial Feb 16, 2004

Decision Analysis and Resolution

• Applicability:

• The project should document guidelines for whena structured decision analysis process is to beused.

• DAR should be applied where significanttechnical, cost, or schedule risks evolve.

Page 103: Tutorial CMMI

103CMMI Combined Tutorial Feb 16, 2004

Decision Analysis andResolution -Context

EstablishGuidelines

for DecisionAnalysis

Guidelines

Evaluate Alternatives

SelectEvaluationMethods

Methods Criteria

EstablishEvaluation

Criteria

SelectSolutions

IdentifyAlternative Solutions

ProposedAlternatives

EvaluateAlternatives

Other PAs

Page 104: Tutorial CMMI

104CMMI Combined Tutorial Feb 16, 2004

Engineering Process Areas

• There are six Engineering Process Areas.

• Requirements Management

• Requirements Development

• Technical Solution

• Product Integration

• Verification

• Validation

Page 105: Tutorial CMMI

105CMMI Combined Tutorial Feb 16, 2004

Engineering Process Areas

RD PI

Val

CustomerTS

Ver

REQMRequirements

Customer needs

Product & product component requirements

Product components, work products, verification and validation reports

Productcomponents

Alternativesolutions

Require-ments

Product

Page 106: Tutorial CMMI

106CMMI Combined Tutorial Feb 16, 2004

Requirements Management

•Purpose:

•Manage the requirements of the project’s productand product components and identifyinconsistencies between those requirements andthe project’s plans and work products.

Page 107: Tutorial CMMI

107CMMI Combined Tutorial Feb 16, 2004

Requirements ManagementContext

Requirements

Obtain anUnderstanding

of Requirements

CL2Obtain

Commitmentto

Requirements

IdentifyInconsistenciesbetween Project

Work and Reqmts

TraceabilityHierarchy

CL2Maintain

Bi-directional Requirements Traceability

Manage Requirements

ManageRequirements

Changes

Page 108: Tutorial CMMI

108CMMI Combined Tutorial Feb 16, 2004

Requirements Development

• Purpose:

• Produce and analyze customer, product, andproduct component requirements.

Page 109: Tutorial CMMI

109CMMI Combined Tutorial Feb 16, 2004

Requirements Development -Context

Develop Customer

Requirements

CustomerRequirements

ProductRequirements

DevelopProduct

Requirements

Analyze andValidate

Requirements

ValidatedRequirements

Page 110: Tutorial CMMI

110CMMI Combined Tutorial Feb 16, 2004

Develop theCustomer

Requirements

Requirements DevelopmentContext

CustomerRequirements

Develop Customer Requirements

CollectStakeholder

Needs

CL2Elicit Needs

Page 111: Tutorial CMMI

111CMMI Combined Tutorial Feb 16, 2004

EstablishProduct &Product

ComponentRequirements

ProductRequirements

Develop Product Requirements

AllocateProduct and

Product-Component

Requirements

IdentifyInterface

Requirements

CustomerRequirements

Requirements DevelopmentContext

Page 112: Tutorial CMMI

112CMMI Combined Tutorial Feb 16, 2004

EstablishOperationalConcepts

& Scenarios

Establish aDefinition of

RequiredFunctionality

CL3Analyze

Requirements to Achieve

Balance

AnalyzeRequirements

ProductRequirements

ValidatedRequirements

Analyze and Validate Requirements

ValidateRequirements

CL2Validate

Requirementswith

ComprehensiveMethods

Requirements DevelopmentContext

Page 113: Tutorial CMMI

113CMMI Combined Tutorial Feb 16, 2004

Technical Solution

• Purpose:

• Design, develop, and implement solutionsto requirements. Solutions, designs andimplementations encompass products, productcomponents, and product related life-cycleprocesses either singly or in combinations asappropriate.

Page 114: Tutorial CMMI

114CMMI Combined Tutorial Feb 16, 2004

Select Product-Component

Solutions

Technical Solution - Context

ValidatedRequirements

Design Detail &Documentation

DeliveredProduct

Develop the Design

Implement theProduct Design

Alternative Designsand Evaluation Criteria

Page 115: Tutorial CMMI

115CMMI Combined Tutorial Feb 16, 2004

ValidatedRequirements

DevelopAlternative

Solutions andSelectionCriteria

Select Product Component Solutions

CL 2Develop Detailed

Solutions andSelectionCriteria

Alternative SolutionsSelection Criteria

New Technology Evaluations

SelectProduct

ComponentSolutionsSelection Decisions

Compliance w/ Reqmts

DAR

CL 2Evolve

OperationalConcepts &Scenarios

Operational ScenariosTimeline Analysis

Use Cases

Technical Solution - Context

Page 116: Tutorial CMMI

116CMMI Combined Tutorial Feb 16, 2004

Technical Solution - Context

Designthe Product or ProductComponent

Develop the Design

Establish aTech DataPackage

Tech DataPackage

EstablishInterface

Descriptions

CL 3Design

InterfacesUsing Criteria

I/F Design DocumentationI/F SpecificationI/F Control Documents

PerformMake, Buy,

or ReuseAnalyses

Selection CriteriaMake/Buy Analysis

Design MethodsDesign ToolsDesign Processes

Page 117: Tutorial CMMI

117CMMI Combined Tutorial Feb 16, 2004

Technical Solution - Context

Parts FabricatedSoftware CodedData DocumentedProcesses DocumentedFacilities Constructed

ImplementThe

Design

Implement the Product Design

Develop ProductSupport

Documentation

Training ManualsUsers ManualOperator’s ManualMaintenance ManualOn-line Help

Page 118: Tutorial CMMI

118CMMI Combined Tutorial Feb 16, 2004

Product Integration

• Purpose:

• Assemble the product from the productcomponents, ensure the product, asintegrated, functions properly and deliver theproduct.

Page 119: Tutorial CMMI

119CMMI Combined Tutorial Feb 16, 2004

Product Integration - Context

Assemble ProductComponents

and Deliver theProduct

IntegrationPlan

Prepare forProduct Integration

TechnicalSolution

DAR

EnsureInterface

Compatibility

Assemblies

Sub-assemblies

Page 120: Tutorial CMMI

120CMMI Combined Tutorial Feb 16, 2004

Integration Plan- Integration Resources- Integration Procedures- Interface Data

Prepare for Product Integration

Decision Analysis& Resolution

TechnicalSolution

Determine IntegrationSequence

CL3EstablishProduct

IntegrationProcedures and

Criteria

CL2Establish

the ProductIntegration

Environment

Product Integration - Context

Page 121: Tutorial CMMI

121CMMI Combined Tutorial Feb 16, 2004

Integration Plan- Integration Resources- Integration Procedures- Interface Data

Ensure Interface Compatibility

TechnicalSolution

ReviewInterface

Descriptionsfor

Completeness

ManageInterfaces

Product Integration - Context

Page 122: Tutorial CMMI

122CMMI Combined Tutorial Feb 16, 2004

Assemble Product Components and Deliver Product

TechnicalSolution

Confirm Readiness ofComponents

forIntegration

AssembleProduct

Components

EvaluateAssembled

ProductComponents

PackageAnd Deliverthe Productor Product Component

Integration Plan- Integration Resources- Integration Procedures- Interface Data

Product Integration - Context

Page 123: Tutorial CMMI

123CMMI Combined Tutorial Feb 16, 2004

Verification versus Validation

• Verification–Did you build the product right?

–That is, did you meet the requirementsspecification?

• Validation–Did you build the right product?

–That is, did you meet the operational need?

Page 124: Tutorial CMMI

124CMMI Combined Tutorial Feb 16, 2004

Verification

• Purpose:

• Ensure that selected work products meet theirspecified requirements.

Page 125: Tutorial CMMI

125CMMI Combined Tutorial Feb 16, 2004

Verification - Context

VerificationPlan

Prepare for Verification

CorrectiveActions

Verify SelectedWork Products

PerformPeer Reviews

Page 126: Tutorial CMMI

126CMMI Combined Tutorial Feb 16, 2004

Verification - Context

Select Work Products

forVerification

Requirements,Methods, Processes,Evaluation Criteria

Prepare for Verification

CL2Establish theVerification

Environment

Verification Plan- Verification Resources- Verification Procedures

TechnicalSolution

CL3Establish

Verification Procedures and Criteria

Page 127: Tutorial CMMI

127CMMI Combined Tutorial Feb 16, 2004

Verification - Context

PrepareFor Peer Reviews

Requirement for DataCollectionEntry and Exit CriteriaPeer Review Plan

Review ResultsReview IssuesReview DataAction ItemsConduct

PeerReviews

Perform Peer Reviews

CL 2Analyze

Peer ReviewData

Page 128: Tutorial CMMI

128CMMI Combined Tutorial Feb 16, 2004

Verification - Context

Verification ResultsDeficienciesVerification DataCorrective Actions

Verify Selected Work Products

PerformVerification

CL2Analyze

VerificationResults and

IdentifyCorrective

Actions

Page 129: Tutorial CMMI

129CMMI Combined Tutorial Feb 16, 2004

Validation

• Purpose:

• Demonstrate that a product or productcomponent fulfills its intended use whenplaced in its intended environment.

Page 130: Tutorial CMMI

130CMMI Combined Tutorial Feb 16, 2004

Validation - Context

- Customer Requirements- Product Requirements- Products- Validation Requirements

Prepare for Validation

- Requirements Validation Plan- Product Validation Plan- Process and Support Needs

Validate Product orProduct Components

- Conformance- Deficiencies

Page 131: Tutorial CMMI

131CMMI Combined Tutorial Feb 16, 2004

Validation - Context

Select ProductsFor Validation

- Validation Plan- Support Needs- Environment Needs- Resources

- Test Case Scenario- Validation Procedures

Prepare for Validation

CL3EstablishValidation

Proceduresand

Criteria

CL2Establish the

ValidationEnvironment

Requirements

Page 132: Tutorial CMMI

132CMMI Combined Tutorial Feb 16, 2004

Validation - Context

Validate Product or Product Components

PerformValidation

Validation ReportsValidation ResultsCross Reference MatrixAs run procedures logOperational Demonstrations

AnalyzeValidation

Results

Validation Deficiency ReportsValidation IssuesProcedure Change Request

Page 133: Tutorial CMMI

133CMMI Combined Tutorial Feb 16, 2004

Process Management Process Areas

• There are six Process Management Process Areas:–Organizational Process Focus–Organizational Process Definition–Organizational Training–Organizational Process Performance–Organizational Innovation and Deployment–Organizational Environment for Integration will be

covered with IPPD

Page 134: Tutorial CMMI

134CMMI Combined Tutorial Feb 16, 2004

Understanding ProcessManagement Process Areas

•The process management PAs apply across theorganization as a whole and provide details thatsupport the Capability Level 3 Generic Goal.

•For selected PAs, the organization has standardprocesses, which individual projects tailor to theirneeds.

Page 135: Tutorial CMMI

135CMMI Combined Tutorial Feb 16, 2004

•Process Management PAs can capitalize onproject level stability provided by PAs that areinstitutionalized at CL 2.

•(i.e., policy, planning, resources, responsibility,training, performing the process, managingconfigurations, monitoring and controlling,objective verification, management review)

Understanding ProcessManagement Process Areas

Page 136: Tutorial CMMI

136CMMI Combined Tutorial Feb 16, 2004

Basic Process Management PAs

OPF OPDResources and Coordination

OT

Std Process and OtherAssets

Training for Projects andSupport Groups in StdProcess and Assets

Organization’sprocess needsand objectives

Std Process and Other

Assets

Senior Management

Organization’sbusiness objectives

Project Management,Support, and

Engineering processareas

Training needs

Improvement information(e.g., lessons learned, data, artifacts)Process Improvement

Proposals; Participation indefining, assessing, anddeploying processes

Page 137: Tutorial CMMI

137CMMI Combined Tutorial Feb 16, 2004

Organizational Process Focus

• Purpose:

• Plan and implement organizational processimprovement based on a thorough understandingof the current strengths and weaknesses of theorganization’s processes and process assets.

Page 138: Tutorial CMMI

138CMMI Combined Tutorial Feb 16, 2004

Selected Improvements

ImprovementInitiatives

Pilots, Action

Teams

Organizational Process Focus- Context

• Findings

•& Ratings

Appraise Org’s

Processes

Identify Org.’sProcess

Improve- ments

EstablishOrganizational

ProcessNeeds

Process Needsand Objectives

DetermineProcessImprovementOpportunities

Establish Process Action Plans

ImplementProcessActionPlans

Process Action plans

Deployable Process Assets

(Revised) ProcessAssets

IncorporateProcess-Related

Experiences

Process Experiences

Deploy Organizational

ProcessAssets

Planand ImplementProcessImprove-mentActivities

Page 139: Tutorial CMMI

139CMMI Combined Tutorial Feb 16, 2004

• Purpose:

• Establish and maintain a usable set of organizationalprocess assets.

Organizational Process Definition

Page 140: Tutorial CMMI

140CMMI Combined Tutorial Feb 16, 2004

Establish the Organization’s Measurement

Repository

Establish the Organization’s

Process AssetLibrary

Organizational ProcessDefinition - Context

ProcessImplementers

EstablishTailoring

Criteria andGuidelines

Establish Life-Cycle

Model Descriptions

Establish Standard

Processes

Establish Organizational Process Assets

Life Cycle Models

Organizational Standard Processes

Organizational Library of Process

Documentation

Organizational Measurement

Repository

Improvements

OPF

Deploy-ment

Tailoring Guidelines

Page 141: Tutorial CMMI

141CMMI Combined Tutorial Feb 16, 2004

Organizational Training

•Purpose:

•Develop the skills and knowledge of peopleso they can perform their roles effectivelyand efficiently.

Page 142: Tutorial CMMI

142CMMI Combined Tutorial Feb 16, 2004

Organizational Training - Context

DeliverTraining

Materials

Records ChangeRequests

AssessTraining

Effectiveness

EstablishTrainingRecords

Surveys

Records

Provide Necessary Training

Establish the Strategic Training

Needs

Analysis Needs Strategy Reqmts

Determinewhich TrainingNeeds are theResponsibility

of the Org.

MaterialsTraining Repository

Establish an OrganizationalTraining Capability

Establish Training

Capability

Establish anOrganizational

TrainingTactical Plan

Page 143: Tutorial CMMI

143CMMI Combined Tutorial Feb 16, 2004

Senior Management

OPP

Progress towardachieving business

objectives

OID

Quality and process performance objectives,

measures, baselines, models

Cost and benefitdata from pilotedimprovements

Quality and processperformance

objectives,measures, baselines,

models

Process performanceand capability data

“Basic Set” of ProcessManagement

Process Areas

Project Management,Support, andEngineering

process areas

Ability to developand deploy processand supporting assets

OrganizationImprovements

Common measures

Advanced ProcessManagement Process Areas

Page 144: Tutorial CMMI

144CMMI Combined Tutorial Feb 16, 2004

Organizational Process Performance

•Purpose:

•Establish and maintain a quantitativeunderstanding of the performance of theorganization’s set of standard processes insupport of quality and process-performanceobjectives, and to provide the processperformance data, baselines, and models toquantitatively manage the organization’sprojects.

Page 145: Tutorial CMMI

145CMMI Combined Tutorial Feb 16, 2004

Organizational ProcessPerformance - Context

EstablishQuality and

ProcessPerformance

Measures

Organizational ProcessPerformance Baselines

ProcessPerformance

Models

Organization’sStandard Processes

Project ProcessMeasurements

SelectProcesses

Selected Subprocesses fromOrg. Std. Processes

BusinessObjectives

Organizational ProcessPerformance Objectives

EstablishProcess

PerformanceModels

Establish Process

Performance Objectives

EstablishProcess

PerformanceBaselines

•Org set ofmeasures

QPM

QPM

BusinessObjectives

Establish Performance Baselines and Models

MA

Page 146: Tutorial CMMI

146CMMI Combined Tutorial Feb 16, 2004

Organizational Innovation andDeployment

• Purpose:

• Select and deploy incremental and innovativeimprovements that measurably improve theorganization’s processes and technologies.The improvements support the organization’squality and process-performance objectives asderived from the organization’s businessobjectives.

Page 147: Tutorial CMMI

147CMMI Combined Tutorial Feb 16, 2004

Manage theDeployment

MeasureImprovements

Effects

Plan theDeployment

Deploy Improvements

Organizational Innovation andDeployment - Context

Collectand AnalyzeImprovement

Proposals

MeasurementResults

PilotImprovements

Improvement Proposalsand Analysis

Select Improvements

for Deployment

Improvements

Select Improvements

Identify and AnalyzeInnovations

Page 148: Tutorial CMMI

148CMMI Combined Tutorial Feb 16, 2004

Overview of Integrated Productand Process Development

IPPD

Page 149: Tutorial CMMI

149CMMI Combined Tutorial Feb 16, 2004

About IPPD

• IPPD affects all process areas.

• IPPD is not a discipline like SE or SW.

• Rather, it is a way of doing business.

• IPPD is employed in conjunction with the CMMIdisciplines (software and systems engineering).

• Implementation of IPPD shapes how you performthe work in these disciplines.

Page 150: Tutorial CMMI

150CMMI Combined Tutorial Feb 16, 2004

IPPD - Definition

IPPD provides a systematic approach toproduct development that achieves a timelycollaboration of relevant stakeholdersthroughout the product life cycle to bettersatisfy customer needs.

Page 151: Tutorial CMMI

151CMMI Combined Tutorial Feb 16, 2004

IPPD - Definition -2

Integration of the development of product-related processes (e.g., manufacturing,support, training, disposal) during productdevelopment is embedded in SE/SW specificpractices by involving relevant stakeholdersfrom all life cycle phases and by the conceptof “work product.”

Page 152: Tutorial CMMI

152CMMI Combined Tutorial Feb 16, 2004

Stakeholder Involvement

• Stakeholder Involvement is guided and assured bythree constructs in CMMI- SE/SW/IPPD:

• GP 2.7 Identify and involve the relevant stakeholdersof the process as planned.

• PP SP 2.6-1 Plan the involvement of identifiedstakeholders.

• IPM SG 2 Collaborate and coordinate with relevantstakeholders.

Page 153: Tutorial CMMI

153CMMI Combined Tutorial Feb 16, 2004

CMMI Work Product - Definition

–Any artifact produced by a process.

–This may include files, documents, parts of theproduct, services, processes, specifications, andinvoices.

–Examples of processes as work product include amanufacturing process, a training process, and adisposal process.

–A key distinction between a work product and aproduct component is that a work product neednot be engineered (although it may be).

Page 154: Tutorial CMMI

154CMMI Combined Tutorial Feb 16, 2004

IPPD in CMMI Models

• Then, what makes IPPD different from pure SE/SWimplementations?

• IPPD relies on integrated teams to develop theproduct and processes.

• IPPD provides an integrated work environment andthe management of people to incentivize teamwork.

• Processes are tailored to be used by integratedteams.

Page 155: Tutorial CMMI

155CMMI Combined Tutorial Feb 16, 2004

CMMI Integrated Team Definition

• An integrated team is comprised of people–with complementary skills and expertise–appropriate skills and advocacy–fully empowered to represent stakeholders–from all phases of the work product’s life cycle

• These people are committed to and arecollectively responsible for–delivering specified work products–through timely collaboration

Page 156: Tutorial CMMI

156CMMI Combined Tutorial Feb 16, 2004

Scope of IPPD

•CMMI SE/SW/IPPD adds to CMMI-SE/SW:

–Two new process areas»Organizational Environment for Integration»Integrated Teaming

–A revised Integrated Project Management (IPPD)process area

–IPPD amplifications and references–New glossary definitions and acronyms–Overview material

Page 157: Tutorial CMMI

157CMMI Combined Tutorial Feb 16, 2004

Organizational Environmentfor Integration (OEI)

•Purpose:

•To provide an Integrated Product and ProcessDevelopment (IPPD) infrastructure and managepeople for integration.

Page 158: Tutorial CMMI

158CMMI Combined Tutorial Feb 16, 2004

Provide IPPD

Infrastructure

IPPD-EnabledPeople

andWork

Environments

ManagePeople forIntegration

Mechanismsand

Incentivesto SupportIntegration

andCollaboration

Organizational Environmentfor Integration (OEI)- Context

Page 159: Tutorial CMMI

159CMMI Combined Tutorial Feb 16, 2004

Organizational Environment forIntegration – Context

Guidelines forLeadership,

Decision-makingContext

Manage People for Integration

Establish Leadership

Mechanisms

Establish Incentives for

Integration

Establish Mechanisms to Balance Responsi-

bilities

Guidelines forEmpowerment

Process forIssue Resolution

Team &IndividualRewards

OrganizationalGuidelines

JointPerformance

Review Process

Organization’sShared Vision

Establish an Integrated Work Environ-

ment

Establish theOrganization’s

Shared Vision

Provide IPPD Infrastructure

IntegratedWork

Environment

Identify IPPD-Unique

Skill Require- ments

Guidelines for Shared Vision

Building

IPPD Tactical & StrategicTraining

Needs

OPD

OT

Page 160: Tutorial CMMI

160CMMI Combined Tutorial Feb 16, 2004

Integrated Project ManagementFor IPPD

• Purpose:

• Establish and manage the project and theinvolvement of the relevant stakeholdersaccording to an integrated and defined processthat is tailored from the organization’s set ofstandard processes.

• For Integrated Product and Process Development,Integrated Project Management also covers theestablishment of a a shared vision for the projectand an integrated team structure that will carryout the objectives of the project.

Page 161: Tutorial CMMI

161CMMI Combined Tutorial Feb 16, 2004

Integrated Project Management(IPPD) - Context

Use theProject’sDefinedProcess

Coordinate and Collaborate with Relevant Stakeholders

Stakeholders

ProductRequirements

DefinedProcessBased

Project Plan

Contributions toOrganization’s Process Assets

Use theProject’s

Shared Visionfor IPPD

Project’sSharedVision

Stakeholders

ProjectPlanning

OrganizeIntegrated

Teamsfor IPPD

IntegratedTeams

OrganizationalEnvironment for

Integration

Page 162: Tutorial CMMI

162CMMI Combined Tutorial Feb 16, 2004

Work Breakdown Structure

Integrated Teams

Integrated Project Management(IPPD)

Responsibility & Requirements

Allocation

Info onOrg/Project Situation

Organize Integrated Teamsfor IPPD

Use the Project’s SharedVision for IPPD

Define theProject’sShared Vision

Context

Establish the

Project’s Shared Vision

OEI

Project’s SharedVision

DetermineTeam

Structure

Develop aPreliminary

Distribution ofRequirements

EstablishIntegrated

Teams

Team Structure

Member Aspirations

List ofTeams

IntegratedTeaming

Page 163: Tutorial CMMI

163CMMI Combined Tutorial Feb 16, 2004

Integrated Teaming

•Purpose:

•To form and sustain an integrated teamfor the development of work products.

Page 164: Tutorial CMMI

164CMMI Combined Tutorial Feb 16, 2004

Integrated Teaming - Context

Establish TeamComposition Govern Team

Operation

RelevantStakeholders

Sponsor’sObjectives

AssignedProduct

Requirements

IntegratedTeam

ProjectPlanning

Plans and

Commitments

OrganizationalEnvironment forIntegration

(IPPD) OEI

PP

IPM

Page 165: Tutorial CMMI

165CMMI Combined Tutorial Feb 16, 2004

Identify Team Tasks

Establish TeamComposition

Results Lists

Identify Knowledge and Skills

Functions, Skills,& Expertise

Lists

Assign Appropriate

Team Members

IntegratedTeam

Stakeholders

AssignedProduct

Requirements

Govern TeamOperation

Establish a Shared

Vision

TeamCharter Establish

a Team Charter

Assignments,& Respon-sibilities

Define Roles & Respon- sibilities

Ground Rulesand

Procedures

Establish Operating

Procedures

Collaborate among

Interfacing Teams

Plans and Commitments

Team’sShared Vision

SponsorsObjectives

Integrated Teaming - Context

TaskDescriptions

Page 166: Tutorial CMMI

CMMI Combined Tutorial Feb 16, 2004

Training

Page 167: Tutorial CMMI

167CMMI Combined Tutorial Feb 16, 2004

“Introduction to the CMMI” Course,Staged & Continuous (Separate

Courses)

• Introduction course will enable the participant to– Understand the importance of defined processes– Understand the rationale for process improvement– Comprehend the CMMI model– Identify ways of applying the CMMI model

for process improvement

• Broad audience– Systems and software developers– Systems, Program and software managers– Practitioners of disciplines that support systems and software– Government and industry acquirers of software-intensive systems

• Assumes one year of experience in systems and software

• No process improvement or Capability MaturityModel (CMM ) experience assumed

Page 168: Tutorial CMMI

168CMMI Combined Tutorial Feb 16, 2004

“Intermediate Concepts ofCMMI Models” Course

• Provides a deeper understanding of theCMMI and it’s fundamental concepts.–PA’s in more detail–Linking the PA’s together– Interpreting the CMMI for appraisals–Application of CMMI for process

improvement

• Required as a prerequisite to SCAMPILead Appraiser training and “train thetrainer” course.

Page 169: Tutorial CMMI

169CMMI Combined Tutorial Feb 16, 2004

• Similar to the current CMM AppraisalFramework (CAF) V1.0–A guide to appraisal method developers

• Specifies the requirements for classes ofappraisal methods–Class A: Full, comprehensive appraisal methods–Class B: Initial, incremental, self-appraisals–Class C: Quick-look

• Method developers can declare which class theirmethod fits

• Implications of the desired class of appraisal

Appraisal Requirements for CMMI (ARC) v1.1

Page 170: Tutorial CMMI

170CMMI Combined Tutorial Feb 16, 2004

Standard CMMI Appraisal Method forProcess Improvement (SCAMPI)

• Similar to CBA IPI method

• Led by authorized Lead Appraiser

• Tailorable to organization andmodel scope

• Source selection appraisals or process monitoring aretailoring options of SCAMPI

• SCAMPI Method Definition Document V1.1

Page 171: Tutorial CMMI

171CMMI Combined Tutorial Feb 16, 2004

• Similar to existing SEI Lead Assessorand Lead Evaluator programs–Administered by SEI

• Will transition current SW & SE Lead Assessorsor Evaluators, as well as new candidates

• Lead Appraiser requirements:–Introduction to CMMI Training–Appraisal team experience–Intermediate CMMI Training–SCAMPI Lead Appraiser Training

CMMI Lead Appraiser Program

Page 172: Tutorial CMMI

172CMMI Combined Tutorial Feb 16, 2004

Discoveries in Use

•Appraisal time shows an excellent learning curve

–40% reduction in appraisal time over five Australianassessments

•“Shadow appraisals” show ease of transition

–High maturity CBA IPI at Litton PRC

–TSP based Level 4 CBA IPI at China Lake

•Mappings and gap analyses confirm evolutionaryexpansion from predecessor models

–Government and contractors agree on CMMI’s improvedengineering coverage in contract monitoring

Page 173: Tutorial CMMI

CMMI Combined Tutorial Feb 16, 2004

Wrap-Up

Page 174: Tutorial CMMI

174CMMI Combined Tutorial Feb 16, 2004

CMMI Transition Plan

Development Phase• Development of CMMI products• Verification and validation of CMMI products

Transition Phase• Approval of initial CMMI products for

public release• Evidence of sufficient use• Transition planning to help organizations

use CMMI products

Sustainment Phase• Upkeep and continuous improvement

of the product suite• Additional evidence of adoption and use

V1.0Aug 2000

V1.1Dec 2001

SW-CMM, EIA 731 phased outDec 2003

V0.2Aug 1999

Pilots

Page 175: Tutorial CMMI

175CMMI Combined Tutorial Feb 16, 2004

CMMI Schedule

• Available now

– CMMI-SE/SW/IPPD/SS, V1.1

– SCAMPI Method Definition Document. V1.1

– V1.1 model and method training

• December 2003

– Sunset period for SW-CMM, EIA/IS 731 completed (nomore public courses, new lead assessors)

• January 2004

– Acquisition “module” available

• December 2005

– SEI acceptance of SW-CMM appraisals ends

Page 176: Tutorial CMMI

176CMMI Combined Tutorial Feb 16, 2004

CMMI – What is coming next?

• Emphasis through 2004 is on CMMI adoption and transitionfrom legacy models like SW-CMM V1.1; review and analysis forV1.2

•“Communities of Practice” will be encouraged (Yahoo groups,TPWeb)

• “Technical Notes” and “Special Reports” will complement V1.1:– Mapping CMMI with other standards and models (ISO

9001:2000)– Managing COTS integration– Making attribute tradeoffs in design (product line practices)– Allowing prototypical coverage for specific interests

(e.g., services [released]; acquisition [in work]; safety & security[in work]; marketing [in work]

Page 177: Tutorial CMMI

177CMMI Combined Tutorial Feb 16, 2004

CMMI...Re-cap

• ... Is not so different from the models with which weare familiar

• ... Has 2 representations in a single model:– Staged– Continuous

• ... Contains specific and generic goals that must besatisfied

• ... Is directly related to our work:– Not everything we do is just ‘software’

engineering– There is a lot of systems engineering and

“other”

Page 178: Tutorial CMMI

178CMMI Combined Tutorial Feb 16, 2004

Appraisal Topics

•Appraisal Requirements for CMMI

•SCAMPI V1.1 Overview

•SCAMPI Lead Appraiser Authorization

•Future Directions

•Data on Process Improvement

Page 179: Tutorial CMMI

179CMMI Combined Tutorial Feb 16, 2004

Appraisal Requirements forCMMI

•“The Appraisal Requirements for CMMI (ARC) V1.1 defines therequirements considered essential to appraisal methods intendedfor use with Capability Maturity Model-Integrated (CMMI) models.”

•Based on appraisal principles common to source methods

•Defines three classes of appraisal methods– classes reflect common usage modes of appraisal methods– ARC requirements are allocated to each method class so as to

align with the usage mode characteristics

Page 180: Tutorial CMMI

180CMMI Combined Tutorial Feb 16, 2004

ARC Appraisal Principles

•Start with an appraisal reference model.

•Use a formalized appraisal process.

•Involve senior management as appraisal sponsor.

•Focus the appraisal on the sponsor’s businessobjectives.

•Observe strict confidentiality and non-attribution of data.

•Approach the appraisal collaboratively.

•Focus on follow-on activities and decision-making basedupon the appraisal results.

Page 181: Tutorial CMMI

181CMMI Combined Tutorial Feb 16, 2004

Appraisal Method Classes

Persontrained andexperienced

LeadAppraiser

or persontrained andexperienced

LeadAppraiser

Appraisal Team LeaderRequirements

SmallMediumLargeTeam size (relative)

LowMediumHighResource needs (relative)

NoNoYesRatings generated

LowMediumHighAmount of objectiveevidence gathered(relative)

Class CClass BClass ACharacteristics

Page 182: Tutorial CMMI

182CMMI Combined Tutorial Feb 16, 2004

Implications

•Consider a family of appraisal methods in determining overallappraisal needs

– fit the appraisal method to the actual need,

– many appraisal needs can be met without maturity level orcapability level ratings

•Class A methods may not be the most appropriate choice fororganizations early in their process improvement cycle

Page 183: Tutorial CMMI

183CMMI Combined Tutorial Feb 16, 2004

Fundamental ARC Concepts

•(Process) appraisal

•Appraisal reference model

•Organizational unit

•Instantiation

•Objective evidence

Page 184: Tutorial CMMI

184CMMI Combined Tutorial Feb 16, 2004

Process Appraisal

(Process) appraisal - an examination of one or more processesby a trained team of professionals using an appraisalreference model as the basis for determining strengths andweaknesses

Appraisal reference model – the CMMI model to which anappraisal team correlates implemented process activities.

Page 185: Tutorial CMMI

185CMMI Combined Tutorial Feb 16, 2004

Organizational Unit (OU)

•“The part of an organization that is the subject of an appraisal(also known as the organizational scope of the appraisal). Anorganizational unit deploys one or more processes that have acoherent process context and operates within a coherent set ofbusiness objectives. An organizational unit is typically part of alarger organization, although in a small organization, theorganizational unit may be the whole organization.”

Page 186: Tutorial CMMI

186CMMI Combined Tutorial Feb 16, 2004

Appraisal Scope

•Defining the

•“Organizational Unit”

•Selecting CMMISM Model,Representation, and Scope

CMM

I-SE/S

W

2

3

4

5Level

3

PA1PA2PA3PA4PA5PA6

0 1 2 3

Page 187: Tutorial CMMI

187CMMI Combined Tutorial Feb 16, 2004

Instantiation -1

•CMMI practices are abstractions which are implemented andmade real in their application and implementation by projects andorganizations

•The context within which the practice is applied “governs” theimplementation

•The details of the implementation as well as the context withinwhich the practice is implemented is referred to as theinstantiation (organizational or project)

Page 188: Tutorial CMMI

188CMMI Combined Tutorial Feb 16, 2004

“Automobile” Instantiations -2

Page 189: Tutorial CMMI

189CMMI Combined Tutorial Feb 16, 2004

Instantiation -3

• Sampling and instantiation in process appraisal:

• A representative sample of the practice instantiations(within the organizational unit) is identified,

• The implementation of the practice is reviewed for eachmember of the sample,

• The extent to which the practice is implemented (asaggregated across the sample) is taken to be a proxy forthe extent to which the practice is implemented in theorganizational unit.

Page 190: Tutorial CMMI

190CMMI Combined Tutorial Feb 16, 2004

Objective Evidence

•“Qualitative or quantitative information, records, or statementsof fact pertaining to the characteristics of an item or service or tothe existence and implementation of a process element, whichare based on observation, measurement, or test and areverifiable.”

•[Adapted from ISO 10011:1994].

•CMMI Appraisal methods are based on the consideration ofobjective evidence as the basis for formulation of weaknesses,strengths and ratings.

Page 191: Tutorial CMMI

191CMMI Combined Tutorial Feb 16, 2004

Data Collection

Instruments

Documents

Interviews

Presentations

Page 192: Tutorial CMMI

192CMMI Combined Tutorial Feb 16, 2004

Sources of Objective Evidence

•Instruments– Organizational assets reflecting evidence of

implementation of model practices (e.g., mapping tables)– Questionnaires

•Interviews– Standard structured interviews; on-call interviews;

follow-up interviews– Exploratory or focused questions targeted at manager,

practitioners and/or users

•Presentations– Briefings, demonstrations

•Documents– Hardcopy, softcopy, hyperlinks

Page 193: Tutorial CMMI

193CMMI Combined Tutorial Feb 16, 2004

Data Collection and Recording

•Team member notes– Tagged to model and data collection sources

•Observations– Inventory of objective evidence for implementation of each

model practice– Weaknesses (where applicable); note that strengths have a

different connotation (“above and beyond”) and are lessrelevant to determinations of practice implementation

•Findings– Aggregation of weaknesses

Page 194: Tutorial CMMI

194CMMI Combined Tutorial Feb 16, 2004

CMMI Appraisal Premises• Goal achievement is a function of the extent to which the

corresponding practices are present in the planned andimplemented processes of the organization.

• Practice implementation at the organizational unit level is afunction of the degree of practice implementation at theinstantiation level (e.g., projects)

• The aggregate of objective evidence available to the appraisalteam is used as the basis for determination of practiceimplementation.

• Appraisal teams are obligated to seek and consider objectiveevidence of multiple types in determining the extent ofpractice implementation.

Page 195: Tutorial CMMI

195CMMI Combined Tutorial Feb 16, 2004

What is Practice ImplementationVerification?

•Verifying practice implementation means thesubstantiation of practice implementation based on thereview of objective evidence.

•For example:– one might inquire as to whether a (project-specific)

practice is implemented within a project, or– one might inquire as to whether a (organization-specific)

practice is implemented within an organization.

Page 196: Tutorial CMMI

196CMMI Combined Tutorial Feb 16, 2004

What are practice implementationindicators?

•The fundamental idea of practiceimplementation indicators (PIIs) is quitesimple and broadly applicable to anypractice or activity; it is based on thepresumption that the conduct of anactivity or the implementation of apractice will result in “footprints” whichare attributable to the activity or practice.

Page 197: Tutorial CMMI

197CMMI Combined Tutorial Feb 16, 2004

Example: Balancing aCheckbook

•If one balances one’s checkbook at the end of the month thenthere are several potential ways to confirm that this activity hasindeed taken place:

– the person who engaged in the checkbook balancingactivity can affirm that this activity was conducted,

– there will likely be a mark in the checkbook for each checkor transaction which matches with a corresponding entry inthe bank’s statement,

– there will likely be a mark on the bank’s statement for eachcheck or transaction which matches with a correspondingentry in the checkbook,

– additional artifacts could be identified.

Page 198: Tutorial CMMI

198CMMI Combined Tutorial Feb 16, 2004

Indicators

•Things that provide a useful and reliable way of predicting thatsomething else is present or true.

•E.g. the fuel gauge in your automobile.

•Pros:– Can highly simplify repetitive

and costly operations– Can be great time savers

•Cons:– Can be misleading– Can be wrong

Page 199: Tutorial CMMI

199CMMI Combined Tutorial Feb 16, 2004

Indicators in CMMI

•In CMMI, practice implementation indicators (PIIs) refer to the“footprints” that are the necessary or incidental consequence ofpractice implementation.

•PIIs include artifacts as well as information gathered frominterviews with managers and practitioners.

Page 200: Tutorial CMMI

200CMMI Combined Tutorial Feb 16, 2004

Practice Implementation Indicator Types

•Direct Artifacts– Tangible outputs resulting directly from implementation of

a practice (e.g., Typical Work Products)

•Indirect Artifacts– Artifacts that are a side-effect or indicative of performing a

practice (e.g., meeting minutes, reviews, logs, reports)

•Affirmations– Oral or written statements confirming or supporting

implementation of the practice(e.g, interviews, questionnaires)

Page 201: Tutorial CMMI

201CMMI Combined Tutorial Feb 16, 2004

PII-based Process Appraisal

•PII-based process appraisal uses practice implementationindicators as the focus for verification of practice implementation.

•This is in contrast to an observation-based approach that relies onthe crafting of observations that pertain to model implementationstrengths or weaknesses (CBA IPI and SCAMPI V1.0 are examplesof observation-based approaches.)

Page 202: Tutorial CMMI

202CMMI Combined Tutorial Feb 16, 2004

Example – Indicators of Practice Implementation

PP SP1.1-1:

Establish

a top-level work breakdown structure (WBS)

to estimate the scope of the project.

Primary artifacts:-top-level WBS-task descriptions-work package descriptions

Affirmations:- “I worked on the WBS team”- “We used the WBS”

Indirect artifacts:-Meeting minutes,-Team charter,-WBS development notes

Page 203: Tutorial CMMI

203CMMI Combined Tutorial Feb 16, 2004

Direct (type A PIIs)

•The tangible outputs resulting directly from implementation of aspecific or generic practice.

•An integral part of verifying practice implementation.

•May be explicitly stated or implied by the practice statement orassociated informative material.

Page 204: Tutorial CMMI

204CMMI Combined Tutorial Feb 16, 2004

Indirect (type B PIIs)

•Artifacts that are a consequence of performing a specific orgeneric practice or that substantiate its implementation, butwhich are not the purpose for which the practice is performed.

•This indicator type is especially useful when there may bedoubts about whether the intent of the practice has been met;e.g., a artifact exists but there is no indication of where it camefrom, who worked to develop it, or how it is used.

Page 205: Tutorial CMMI

205CMMI Combined Tutorial Feb 16, 2004

Affirmation (type C PIIs)

•Oral or written statements confirming or supportingimplementation of a specific or generic practice.

•These are usually provided by the implementers of thepractice and/or internal or external customers, but may alsoinclude other stakeholders (e.g., managers, suppliers).

Page 206: Tutorial CMMI

206CMMI Combined Tutorial Feb 16, 2004

Aggregation Paradigm

• Practice implementation (practice instantiation level)

• Practice implementation (OU level)

• Goal satisfaction

• Capability level and/ormaturity level ratings

Page 207: Tutorial CMMI

207CMMI Combined Tutorial Feb 16, 2004

Discipline Model (CMMI SE/SW)

•In making inferences about the extent to which practices are orare not in place (e.g. implemented), appraisers are expected todraw upon the entire model document as the basis for theirdecisions.

•Examples:– Glossary definitions– Front matter– Sub-practices– Related process areas

Page 208: Tutorial CMMI

208CMMI Combined Tutorial Feb 16, 2004

Tutorial Topics

•Appraisal Requirements for CMMI

•SCAMPI V1.1 Overview

•SCAMPI Lead Appraiser Authorization

•Future Directions

•Data on Process Improvement

Page 209: Tutorial CMMI

209CMMI Combined Tutorial Feb 16, 2004

Standard CMMI Appraisal Methodfor Process Improvement (SCAMPI)

•Full comprehensive benchmarking appraisal method for CMMI

•ARC class A method

•Lead appraiser authorization program managed andadministered by SEI

•SCAMPI version 1.1 deployed April 2002

Page 210: Tutorial CMMI

210CMMI Combined Tutorial Feb 16, 2004

SCAMPI Objectives

•Provide a common, integrated appraisal method capable ofsupporting appraisals in the context of internal processimprovement, supplier selection, and process monitoring

•Provide an efficient appraisal method capable of beingimplemented within reasonable performance constraints.

Page 211: Tutorial CMMI

211CMMI Combined Tutorial Feb 16, 2004

SCAMPI: New Features

•Usage Modes: internal process improvement, supplier selection,process monitoring

•Reuse: enhanced ability to use existing model implementationknowledge and reduce the cost of the appraisal

•Disclosure: standard recommended set of appraisal data fordisclosure of appraisal results

•Method Definition: Produced by CMMI Product Team ( AMIT)

Page 212: Tutorial CMMI

212CMMI Combined Tutorial Feb 16, 2004

Focused Investigation

•Emphasize effective data collection and management techniquesthroughout the appraisal process

– Understand what objective evidence is available, and how itcontributes toward implementation of model practices

– Continually consolidate data to determine progress towardsufficient coverage

– Focus appraisal resources where further investigation is needed– Avoid unnecessary or duplicated effort that does not contribute

toward sufficient coverage or significantly greater confidence inappraisal results

Page 213: Tutorial CMMI

213CMMI Combined Tutorial Feb 16, 2004

Appraisal Concept of Operations

ProjectImplementation

OrganizationImplementation

• Model / process mapping• Objective evidence

Inventory ofObjectiveEvidence

• Verified implementation• Strengths, weaknesses• Findings, ratings

DefinedProcesses

• Process improvement• Class B, C appraisals

Organization

CMMI Steward

AppraisalTeam

CMMIProductSuite

• Transition• Deployment• Tailoring

• Appraisal planning• Readiness review

• Verification• Validation• Aggregation• Focused Investigation

• Model• Method• Training

PAIS

• Appraisal results• Performance data

Page 214: Tutorial CMMI

214CMMI Combined Tutorial Feb 16, 2004

SCAMPI Phase Structure

•Phase I - Plan and Prepare For Appraisal

•Phase II - Conduct Appraisal

•Phase III - Report Appraisal Results

Page 215: Tutorial CMMI

215CMMI Combined Tutorial Feb 16, 2004

MDD v1.1 Outline

Phase I:Plan and Preparefor Appraisal------------ - --- --------- ---- ----- -------------------Phase II:ConductAppraisal------------ - --- --------- ---- ----- -------------------Phase III:ReportResults------------ - --- --------- ---- ----- -------------------

Primary ReferenceMaterial

IntroductoryProse------------ - --- --------- ---- ----- -------------------

Doc. Overview______________________________

Part1 Descriptive nameand information______________________________

Part2 Descriptive nameand information______________________________

...______________________________

Part N Descriptive nameand information______________________________

ExecutiveSummary for theAppraisal Sponsor------------ - --- --------- ---- ----- -------------------

Method Overviewwith audience-specific summaryof this document------------ - --- --------- ---- ----- -------------------

Front Matter

Glossary------------ - --- --------- ---- ----- -------------------

SCAMPIAppraisalDisclosureStatement (ADS)------------ - --- --------- ---- ----- -------------------

Role of PIIs inVerifying PracticeImplementation------------ - --- --------- ---- ----- -------------------ARC/MDD

Traceability------------ - --- --------- ---- ----- -------------------

Appendices

FocusedInvestigationElaboration andGuidance------------ - --- --------- ---- ----- -------------------

Page 216: Tutorial CMMI

216CMMI Combined Tutorial Feb 16, 2004

SCAMPI MDD V1.1 Processes

• Analyze Requirements

• Develop Appraisal Plan

• Select and PrepareTeam

• Obtain and AnalyzePreliminary ObjectiveEvidence

• Prepare for Collectionof Objective Evidence

• Examine Objective Evidence

• Verify and Validate ObjectiveEvidence

• Document ObjectiveEvidence

• Generate Appraisal Results

• Deliver Appraisal Results

• Package and ArchiveAppraisal Assets

Page 217: Tutorial CMMI

217CMMI Combined Tutorial Feb 16, 2004

3.1 Analyze Requirements

Purpose Understand the business needs of the organization for whom the appraisal is being requested. The Appraisal Team Leader will collect information and help the appraisal sponsor match appraisal objectives with their business objectives.

Entry CriteriaInitial contact between the appraisal sponsor and authorized SCAMPI Lead Appraiser has occurred. The Lead Appraiser has been given access to members of the sponsoring organization, and asked to develop a proposal.

Inputs • Sponsor,• Initial Requirements and Constraints,• Process-related Legacy Information

Activities 3.1.1. Determine Appraisal Objectives3.1.2. Determine Appraisal Constraints3.1.3. Determine Appraisal Scope3.1.4. Determine Outputs3.1.5. Obtain Commitment to Appraisal Input

Outputs Appraisal Input

Outcome The decision to proceed with the appraisal based on a shared understanding of the appraisal objectives, constraints and scope.

Exit Criteria The appraisal input has been approved by the appraisal sponsor and placed under change management.

•Example MDD process descriptionbased on information mappingapproach.

•MDD processes contain thefollowing, as applicable:• Purpose - Entry Criteria - Inputs - Activities -Outputs - Outcomes - Exit Criteria

• Tools and techniques - Metrics - Verification &Validation - Records - Tailoring - Interfaces -Summary of activities

•Tags and format are usedconsistently to aid navigation andreferences.

Sample MDD Process

Page 218: Tutorial CMMI

218CMMI Combined Tutorial Feb 16, 2004

Sample MDD Activity

Sample MDD Activity

3.1.1 Determine Appraisal Objectives

Activity Description

The business needs for process improvement drive the requirements for the conduct of any given appraisal, and generally include one or more of three closely related factors:• Reducing costs• Improving quality, and• Decreasing time to market

The fundamental premise of process improvement is that organizationalprocesses significantly impact these factors.

A fair and objective characterization of the process in use in the organization(s) is the essential reason for conducting an appraisal. In addition to this motivation, a sponsor' s desire to conduct an appraisal could be driven by one or more of the following business related goals:• Document a credible benchmark that reflects successful process

improvement• Evaluate areas of potential risk that may effect the performance of the

organization• Involve members of the appraised organization in improving the

performance of the process• Support specific decisions related to the direction of a new or existing

improvement program• Motivate a supplier to focus on process issues that affect their performance

on a contract

Required Practices

Identify sponsor and relevant stakeholders, and establish communication.

Document business and appraisal objectives

Assure alignment of appraisal objectives to business objectives

Determine and document appraisal usage mode (internal process improvement, supplier selection, process monitoring).

Parameters and Limits

At least one communication between appraisal team leader and sponsor (Some usage modes may limit this significantly, others may re quire much more than one interaction).

•Example MDD activity descriptionbased on information mappingapproach.

•Content for MDD activities isstructured as follows:

• Activity Description

• Required Practices

• Parameters and Limits

• Optional Practices

• Implementation Guidance

Page 219: Tutorial CMMI

219CMMI Combined Tutorial Feb 16, 2004

Determination of Practice Implementation

• Assumptions:• the appraisal team understands the context in which the practice is

being implemented, and• understands the practice intent.

• The basic approach to determination of practiceimplementation is to:

• characterize the degree to which the practice is implemented, and• note any factors which should be considered in addition as the

instantiation data is aggregated (strengths, weaknesses, etc.).

Page 220: Tutorial CMMI

220CMMI Combined Tutorial Feb 16, 2004

Characterizing Practice Implementation -1

•Assign characterization values reflecting the extent ofpractice implementation for each instance

•Aggregate practice characterizations to organizational unitlevel using defined method aggregation rules

•Iterate and focus revisions to data collection plan

•Generate findings based on aggregation of weaknessesand strengths

Page 221: Tutorial CMMI

221CMMI Combined Tutorial Feb 16, 2004

Characterizing Practice Implementation -2

• Any situation not covered by aboveNotImplemented(NI)

• Direct artifacts absent or judged inadequate

• Artifacts or affirmations indicate some aspects ofthe practice are implemented

• One or more weaknesses noted

PartiallyImplemented(PI)

• Direct artifacts present and appropriate

• Supported by indirect artifact and/or affirmation

• One or more weaknesses noted

LargelyImplemented(LI)

• Direct artifacts present and appropriate

• Supported by indirect artifact and/or affirmation

• No weaknesses noted

FullyImplemented(FI)

Page 222: Tutorial CMMI

222CMMI Combined Tutorial Feb 16, 2004

Practice Implementation AcrossInstantiations

FIProjects(other)

(W) Weakness words…PIProject 2

(S) Strength words…FIProject 1

Preliminary FindingsExtent ofImp.

Instantiation

Page 223: Tutorial CMMI

223CMMI Combined Tutorial Feb 16, 2004

Aggregation to Goal

FISP x.4-1

FISP x.3-1

(W) …PISP x.2-1

(S) ….FISP x.1-1

Preliminary FindingsExtent ofImp.

Practice

Page 224: Tutorial CMMI

224CMMI Combined Tutorial Feb 16, 2004

Inst. Direct Indirect Affirmation

I1

I2

I3

I4

Obs.

Weakness(es)

Strength(s)

!

!

!

!

!

Indicator(s) Indicator(s)

Indicator(s)

Indicator(s)

Indicator(s) Indicator(s)

Indicator(s)

Indicator(s)

Char.

LI

FI

PI

FI

"

"

!

Instantiation Level

Indicator(s) " !Indicator(s)

(Pra

ctic

es)

SCAMPI Aggregationand Rating

OrganizationalUnit Level

PreliminaryFindings

Char.

Strength(s)LIWeakness(es)

Final Findings

Goals

Maturity LevelsCapability Levels

Process Areas(optional)

Page 225: Tutorial CMMI

225CMMI Combined Tutorial Feb 16, 2004

Rating Goals

•Goal ratings are a function of the extent to which thecorresponding practices are present in the planned andimplemented processes of the organization.

•Team judgement is used to rate goals where the objectiveevidence doesn’t render the outcome plainly obvious.– If all practices are FI, then the goal must be satisfied.– If all practices are NI, the goal can’t be satisfied.– The conditions between the two extremes require professional

judgment.

Page 226: Tutorial CMMI

226CMMI Combined Tutorial Feb 16, 2004

Aggregation and Consensus

• Practice Implementation Characterizations

• (practice instantiation level)

• Practice Implementation Characterizations

• (organizational unit level)

• Goal Satisfaction Ratings

• Capability Level and/orMaturity Level Ratings

Level ofConsensus

Mini-Team

Full Team

Full Team

Full Team

Page 227: Tutorial CMMI

227CMMI Combined Tutorial Feb 16, 2004

Data Collection and RatingConcepts

•Corroboration

– Must have direct artifacts, combined with either indirect artifact oraffirmation

•Coverage

– Must have sufficient objective evidence for implementation ofeach practice, for each instance

– Must have face-to-face (F2F) affirmations (avoid “paper-onlyappraisals”):

» At least one instance for each practice (“one column”)

» At least one practice for each instance (“one row”)

» or 50% of practices for each PA goal, for each project, have at least oneF2F affirmation data point

Page 228: Tutorial CMMI

228CMMI Combined Tutorial Feb 16, 2004

Affirmation Coverage Rules - Summary

∑ Column

∑ Row

PA.SPx.4-1

PA.SPx.3-1

PA.SPx.2-1

PA.SPx.1-1

Project-4Project-3Project-2Project-1

1. “One Row, One Column”

or, 2. “50% rule”: > 50% of PA practices for each goal, foreach project, have at least one face-to-face (F2F)affirmation data point

Page 229: Tutorial CMMI

229CMMI Combined Tutorial Feb 16, 2004

Verification and Reporting

•Verification– Verify implementation of model practices at instantiation and

organizational levels– Populate appraisal team inventory of objective evidence from

organizational assets

•Reporting– Preliminary findings– Final findings

Page 230: Tutorial CMMI

230CMMI Combined Tutorial Feb 16, 2004

Tailoring SCAMPI

•SCAMPI users need to clearly understand the “degrees offreedom” they have when planning an appraisal– Where can there be no deviation from what is prescribed by

the method?– Where can alternative implementations be considered?– Where are there opportunities for customization?

•Why alternative implementations and/or customizations?– Adapt method to special circumstances– Exploit opportunities for additional efficiencies– Take advantage of special circumstances

Page 231: Tutorial CMMI

231CMMI Combined Tutorial Feb 16, 2004

Appraisal Disclosure Form -1

•New to SCAMPI V1.1 – a standard set of information for use byappraisal sponsors in disclosing the results of an appraisal

•Benefits the community by recognizing that there is a minimumamount of information which must be disclosed in order forreasonable conclusions to be drawn or for comparisons to bemade.

•A fully executed ADS is a required part of the appraisal reportsubmitted by the SCAMPI Lead Appraiser to the SEI.

Page 232: Tutorial CMMI

232CMMI Combined Tutorial Feb 16, 2004

Appraisal Disclosure Form -2

• Standard information content for SCAMPI Appraisal DisclosureForm:

– Appraisal sponsor and sponsor’s organizational affiliation– Appraisal Team Leader, appraisal team members and

organizational affiliations– Organizational Unit appraised– CMMI model (version, representation and domains)– Appraisal method used (e.g. SCAMPI V1.1)– Itemization of process areas rated and process areas not rated– Maturity level and/or capability level ratings assigned– Dates of onsite activity– Date of issuance of ADS

• Signature of Appraisal Team Leader (as a minimum); appraisalteam members and appraisal sponsor optional

Page 233: Tutorial CMMI

233CMMI Combined Tutorial Feb 16, 2004

SEI Appraisal Program

•Goals:– Maximize value and use of SEI appraisal methods facilitated by

qualified, trained individuals.– Transition appraisal technology in an effective manner,

maintaining consistency and quality in the process.

•The SEI has added a SCAMPI track to its Appraisal Program forSCAMPI Lead Appraisers

Page 234: Tutorial CMMI

234CMMI Combined Tutorial Feb 16, 2004

SEI Transition Partners

•To provide leadership in the transition of new softwareengineering technology into practice, Carnegie Mellon

University/SEI licenses specific SEI technologies—typically training courses or appraisal services — to

organizations that we call "transition partners."

Page 235: Tutorial CMMI

235CMMI Combined Tutorial Feb 16, 2004

TP Infrastructure for CMMI

SEI

TP A

TP licenseagreement

TP-agentaffiliation

SEIAuthorization

TP B

Agents(individuals)

TP <x> Legal entities

Page 236: Tutorial CMMI

236CMMI Combined Tutorial Feb 16, 2004

Authorization Costs

$1,500/day +travel

$1,500/day +travel

$1,200/day +travel

SEI Observation Fee (dailyrate plus travel)

$2,400 – 1st

$2,000 – 2nd+

$3200 per seat

U.S.Government

$4,500 – 1st

$3,750 – 2nd+

$3,000 – 1st

$2,500 – 2nd+

Annual Support Fee (percandidate or authorizedLead Appraiser)

$6,000 perseat

$4,000 per seatSCAMPI Lead AppraiserTraining (5 days)

Int’l*U.S. Industry*Course or Service

* The costs indicated above apply to U.S. Industry and International organizations withinternal and/or commercial use licenses.

Page 237: Tutorial CMMI

237CMMI Combined Tutorial Feb 16, 2004

SLA Authorization Timeline

Satisfy prerequisitesincluding field

experience in atleast two SCAMPIs

2

SuccessfulObservation by a

qualified observingSCAMPI Lead

Appraiser

1

Satisfactorilyfulfill Lead Appraiser

requirements.Pay annual support

fee.

3

Time

TrainingDate

Attend SCAMPILead Appraiser

Training

12 months max 24 months max

AuthorizationDate

RenewalDate

RenewalAuthorization

Become FullyAuthorized

24 months max

Page 238: Tutorial CMMI

238CMMI Combined Tutorial Feb 16, 2004

Information Returned to the SEI

•The Process Appraisal Information System (PAIS) exists atthe SEI as a repository of appraisal data.

•Strict confidentiality is maintained; results are reported inindustry aggregates without attribution to project, persons,or organizations.

•The PAIS form, along with other required appraisal artifacts,are to be returned to the SEI within 30 days after eachappraisal.

Page 239: Tutorial CMMI

239CMMI Combined Tutorial Feb 16, 2004

Renewal of Authorization

•Authorization as a Lead Appraiser is currently valid for a two-year period.

•Renewal depends upon satisfactorily meeting Lead Appraiserresponsibilities and having an affiliation with an SEI TransitionPartner with a license for delivering SCAMPI Appraisal services.

•Successful completion of any courses required for authorizationrenewal.

Page 240: Tutorial CMMI

240CMMI Combined Tutorial Feb 16, 2004

Renewal Considerations•Sponsor feedback forms

•Team member feedback forms

•Random audit results

•Substantiated reports of any misuse of SEI materials andSCAMPI methodology

•Review of appraisal data returned to SEI

Page 241: Tutorial CMMI

241CMMI Combined Tutorial Feb 16, 2004

Tutorial Topics

•Appraisal Requirements for CMMI

•SCAMPI V1.1 Overview

•SCAMPI Lead Appraiser Authorization

•Future Directions

•Data on Process Improvement

Page 242: Tutorial CMMI

242CMMI Combined Tutorial Feb 16, 2004

Future Directions

•SCAMPI Class B and C Appraisals

•“Registered” Appraisals for Source Selection

•SCAMPI appraisals on SW-CMM V1.1

Page 243: Tutorial CMMI

243CMMI Combined Tutorial Feb 16, 2004

Tutorial Topics

•Appraisal Requirements for CMMI

•SCAMPI V1.1 Overview

•SCAMPI Lead Appraiser Authorization

•Future Directions

•Data on Process Improvement

Page 244: Tutorial CMMI

244CMMI Combined Tutorial Feb 16, 2004

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

20000

1995 1996 1997 1998 1999 2000 2001 2002 YTD2003

Intro to the CMM and CMMI Attendees (Cumulative)

CMM Intro

CMMI Intro

CMMI Intermediate

7-31--03

Page 245: Tutorial CMMI

245CMMI Combined Tutorial Feb 16, 2004

CMMI Appraisals Around theWorld

United States

United Kingdom

Taiwan

Switzerland

South Korea

Russia

Japan

India

France

China

Canada

Australia

Analysis conducted 13 June 2003

Page 246: Tutorial CMMI

246CMMI Combined Tutorial Feb 16, 2004

Geographic Distributionof Appraisal Results

• USA 39

• Japan 21

• India 9

• United Kingdom 5

• Australia 3

• China 2

• France 2

• Taiwan 2

• Canada 1

• Russia 1

• South Korea 1

• Switzerland 1

Page 247: Tutorial CMMI

247CMMI Combined Tutorial Feb 16, 2004

Organization Maturity Profile

25.6%

11.5%

21.8%

25.6%

2.6%

12.8%

0.0%

5.0%

10.0%

15.0%

20.0%

25.0%

30.0%

35.0%

40.0%

Not Given Initial Managed Defined QuantitativelyManaged

Optimizing

% o

f Org

aniz

atio

ns

Analysis conducted 13 June 2003

Page 248: Tutorial CMMI

248CMMI Combined Tutorial Feb 16, 2004

U.S. and Non-U.S. OrganizationMaturity Profiles

31.3%

6.3%

12.5%

40.6%

0.0%

9.4%

21.7%

15.2%

28.3%

15.2%

4.3%

15.2%

0%

5%

10%

15%

20%

25%

30%

35%

40%

45%

50%

Not Given Initial Managed Defined QuantitativelyManaged

Optimizing

% o

f Org

aniz

atio

ns

USA Non-USAAnalysis conducted 13 June 2003

Page 249: Tutorial CMMI

249CMMI Combined Tutorial Feb 16, 2004

SCAMPISM Version 1.1 Appraisals

• 93 Appraisals

• 87 Organizations

• 46 Participating companies

• 12 Countries

• 55% Non-U.S. organizations

•Analysis conducted July 10, 2003

Page 250: Tutorial CMMI

250CMMI Combined Tutorial Feb 16, 2004

Where are the Appraisal ResultsComing From?

•87 Organizations

• Commercial 41

• DoD Contractor 30

• Civil Contractor 8

• Military Org 2

• Civil Org 2

• In House Dev 3

Page 251: Tutorial CMMI

251CMMI Combined Tutorial Feb 16, 2004

Reporting Organization Types

6.4%

48.7%

44.9%

0.0% 10.0% 20.0% 30.0% 40.0% 50.0% 60.0%

Military/Federal

Commercial/In-house

DoD/Fed Contractor

Analysis conducted 13 June 2003

Page 252: Tutorial CMMI

252CMMI Combined Tutorial Feb 16, 2004

Organization Size

1001 to 200012.8%

25 or fewer10.3%

201 to 3007.7% 101 to 200

11.5%

76 to 1007.7%

51 to 759.0%

25 to 5014.1%

2000+2.6%

501 to 100015.4%

301 to 5009.0%

Based on the total number ofemployees within the area of theorganization that was appraised

Analysis conducted 13 June 2003

Page 253: Tutorial CMMI

253CMMI Combined Tutorial Feb 16, 2004

Appraisal Data Analysis

8/2SE

20/6SW

5/2SW + SE + + SS

1/2SW + SE + IPPD + SS

1/1SW + SE + IPPD

34/8SW + SE

Staged/ContinuousModel

Selected Models

Page 254: Tutorial CMMI

254CMMI Combined Tutorial Feb 16, 2004

0

50

100

150

200

250

300

350

400

450

1994 1995 1996 1997 1998 1999 2000 2001 2002 YTD2003

Lead Evaluators(SCE)Lead Assessors(CBA IPI)Lead Appraisers(SCAMPI)

7-31-03

Number of Lead Appraisers Authorized(Cumulative)

Page 255: Tutorial CMMI

255CMMI Combined Tutorial Feb 16, 2004

Number of Appraisals Reported to the SEI by Year31 July 2003

0

100

200

300

400

500

600

1987

1988

1989

1990

1991

1992

1993

1994

1995

1996

1997

1998

1999

2000

2001

2002

2003

SPA SEI CBA IPI SCAMPI vX

Page 256: Tutorial CMMI

256CMMI Combined Tutorial Feb 16, 2004

For More Information About CMMI

–Go to CMMI Website

» http://sei.cmu.edu/cmmi» http://seir.sei.cmu.edu/seir/» https://bscw.sei.cmu.edu/pub/bscw.cgi/0/79783» http://dtic.mil/ndia (first second, and third annual CMMI

Conferences)» http://www.faa.gov/aio