turtles lessons learned and the gulf regional biological opinion bob prince chief, operations and...
TRANSCRIPT
TurtlesTurtlesLessons Learned and Lessons Learned and
the Gulf Regional Biological the Gulf Regional Biological OpinionOpinion
Bob PrinceBob PrinceChief, Operations and Regulatory Chief, Operations and Regulatory
Community of PracticeCommunity of PracticeSouth Atlantic DivisionSouth Atlantic Division
Gulf Regional Biological Gulf Regional Biological OpinionOpinion
(GRBO)/Management Protocol(GRBO)/Management Protocol
•Three Divisions – SWD, MVD, SADThree Divisions – SWD, MVD, SAD•Four DistrictsFour Districts
– GalvestonGalveston– New OrleansNew Orleans– MobileMobile– JacksonvilleJacksonville
Executive Advisory Group Executive Advisory Group (EAG)(EAG)
•Operations Chiefs – Three DivisionsOperations Chiefs – Three Divisions– Policy and oversightPolicy and oversight– Decisions, in consultation with Decisions, in consultation with
Districts, dealing with ceasing Districts, dealing with ceasing dredgingdredging
– Communicate frequentlyCommunicate frequently– Meet annuallyMeet annually– Annual review of GRBO Protocol Annual review of GRBO Protocol
Federal ProjectsFederal Projects
•District trigger pointsDistrict trigger points•Reasonable and prudent measuresReasonable and prudent measures•Districts engage EAGDistricts engage EAG
– Four turtle takes – any species or Four turtle takes – any species or three endangeredthree endangered
– Seventy five percent of District Seventy five percent of District “trigger point” limit“trigger point” limit
Federal Projects Federal Projects (continued)(continued)
• Hopper Dredge InspectionHopper Dredge Inspection• Silent InspectorSilent Inspector• Sea Turtle Deflecting DragheadsSea Turtle Deflecting Dragheads• Sea Turtle ObserversSea Turtle Observers• Inflow/Overflow ScreensInflow/Overflow Screens• Pre-trawling Condition and Pre-trawling Condition and
Abundance SurveysAbundance Surveys• Relocation Trawling Relocation Trawling
Federal Projects Federal Projects (continued)(continued)
•Take one or two (Threatened or Take one or two (Threatened or Endangered)Endangered)– Continue dredgingContinue dredging– Simultaneously perform risk Simultaneously perform risk
assessmentassessment– Develop Risk Management Plan and Develop Risk Management Plan and
implementimplement
Federal Projects Federal Projects (continued)(continued)
– At three turtles – District notify EAGAt three turtles – District notify EAG– At four turtle takes – engage EAGAt four turtle takes – engage EAG– At first Sturgeon take – District notify At first Sturgeon take – District notify
EAGEAG– At two Sturgeon takes – District engage At two Sturgeon takes – District engage
EAGEAG– EAG remains engaged throughout the EAG remains engaged throughout the
remainder of the projectremainder of the project(Note – Dredging continues as all the above occurs)(Note – Dredging continues as all the above occurs)
COE Permitted ProjectsCOE Permitted Projects• No District trigger pointsNo District trigger points
• Reasonable and prudent measuresReasonable and prudent measures
• Districts engage EAGDistricts engage EAG– Four turtle takes – any species or three Four turtle takes – any species or three
endangeredendangered– Seventy five percent of incidental take Seventy five percent of incidental take
limit for any specieslimit for any species
• Role of Permittee’s ConsultantRole of Permittee’s Consultant– Dredge InspectionDredge Inspection– Risk AssessmentRisk Assessment
COE Permitted ProjectsCOE Permitted Projects(continued)(continued)
• Hopper Dredge InspectionHopper Dredge Inspection• Silent InspectorSilent Inspector• Sea Turtle Deflecting DragheadsSea Turtle Deflecting Dragheads• Sea Turtle ObserversSea Turtle Observers• Inflow/Overflow ScreensInflow/Overflow Screens• Pre-trawling Condition and Pre-trawling Condition and
Abundance Surveys Abundance Surveys • Relocation Trawling Relocation Trawling
COE Permitted ProjectsCOE Permitted Projects(continued)(continued)
• Take one or two (Threatened or Take one or two (Threatened or Endangered)Endangered)– Stop dredgingStop dredging– Perform risk assessmentPerform risk assessment– Develop Risk Management Plan and Develop Risk Management Plan and
implementimplement– District reviews and concurs – dredging District reviews and concurs – dredging
may continuemay continue
COE Permitted ProjectsCOE Permitted Projects(continued)(continued)
– At three turtles – District notify EAGAt three turtles – District notify EAG– At four turtle takes – engage EAGAt four turtle takes – engage EAG– At first Sturgeon take – District notify EAGAt first Sturgeon take – District notify EAG– At two Sturgeon takes – District engage At two Sturgeon takes – District engage
EAGEAG– EAG remains engaged throughout the EAG remains engaged throughout the
remainder of the projectremainder of the project(Note – Dredging stops at each take – turtle or (Note – Dredging stops at each take – turtle or
sturgeon)sturgeon)
Relocation Trawling TakesRelocation Trawling Takes
• Same for Federal and COE Permitted Same for Federal and COE Permitted ProjectsProjects
• Use as conditions dictateUse as conditions dictate• Plan for Sea Turtle Relocation TrawlingPlan for Sea Turtle Relocation Trawling• No District “Trigger Points”No District “Trigger Points”• Keep ERDC informed on relocationsKeep ERDC informed on relocations• If lethal/injurious take occurs – If lethal/injurious take occurs –
Notifications – District, NMFS, and ERDCNotifications – District, NMFS, and ERDC
Separate RBOSeparate RBO
•Preferred alternative, but, Preferred alternative, but, unsuccessful during discussions unsuccessful during discussions with NMFSwith NMFS
•Separate take limits – Federal and Separate take limits – Federal and Permitted projectsPermitted projects
• If either Federal takes or If either Federal takes or Permitted takes nearly Permitted takes nearly exhausted/exhausted - Reconsult exhausted/exhausted - Reconsult with NMFSwith NMFS