turner project # 201026 updated november 3, 2020
TRANSCRIPT
KGL 2nd Floor Ceiling Remov al
Yale Kline Geology Code Upgrades Project
New Hav en, CT
Turner Project # 201026
Updated Nov ember 3, 2020
What: Lower Level, 2nd Floor, 3rd Floor Corridor/Elevator Phasing Plan
Where: Corridor 90AK, 290, 390
Start Date: 11/19/2020
Impact: Elevator Shutdown, No Access to corridor in front of elevator. See attached plans.
Contacts:
Vic Hoyecki – Project Superintendent – (203)943-2950
Pam Buonocore – KGL Operations Manager – (203)915-4651
Mark Veroneau – Yale Associate Project Manager – (475)241-2476
UP
FD
CR
CR
DM
P
FD
UP
UP
UP
DN
DN
FD
FD
UP
A3.00K
A3.00K
A3.00KM2
D7
H2
DN
UP
16KGL
14KGL
12KGL
10KGL
8KGL
7KGL
5KGL
3KGL
2KGL
1KGL
BKGL
CKGL
DKGL
EKGL
GKGL
AKGL
742 SF
EXHIBIT PREP & OFFICES11
1144 SF
COLLECTIONS10
1890 SF
VERTEBRATEPALEONTOLOGY
COLLECTIONS21
781 SF
MECH RM23 453 SF
CONSERVATION15
697 SF
EXHIBIT PREP16
366 SF
FREEZERS5
147 SF
FREEZER5B
256 SF
COLLECTION SUPPORT29
452 SF
COLLECTION STORAGE13
1747 SF
COLLECTIONS27
100 SF
EMERGENCYSUPPLIES
7
1596 SF
EXHIBIT SW ING SPACE6
78 SF
ELEC24A
924 SF
MECH ROOM24
3869 SF
MECH RM35
STAIR 292S
415 SF
EXITPASSAGEW AY
92
72 SF
STAIR 592SA
601 SF
MECH ROOM31
387 SF
ELECTRICAL SW ITCHGEAR32
238 SF
MECH ROOM33
774 SF
G&G MACHINE SHOP25
405 SF
G&G MACHINE SHOP25B
128 SF
G&GMACHINE
SHOP26B
42 SF
G&G LAB26A
136 SF
G&GPREPLABS
26C
522 SF
ROCK LAB26
77 SF
ELEV90E
115 SF
ELEV MECH ROOM23B
24 SF
TELCOM90F
1741 SF
CORRIDOR90
553 SF
CORRIDOR90B
783 SF
CORRIDOR91
91 SF
UNISEX RESTROOM8
19 SF
ELEC90G
46 SF
STAIR95S
69 SF
TELCOM90H
14 SF
ELEC94A
STAIR 194S
23 SF
TELCOM90J
6 SF
TELCOM94B
453 SF
LAYOUT14
228 SF
CORRIDOR90A
98 SF
SECURITYCLOSET
5A
338 SF
CORRIDOR94
131 SF
STORAGE91B
1208 SF
PRODUCTION AREA ANDMATERIAL STORAGE
17
2302 SF
CARPENTRY AREA18
189 SF
CLEAN12
588 SF
EXHIBIT SW ING SPACE6A
340 SF
G&G LAB28
94C
92
-1
94
-2
21-1
90L
90J
94A
94S
90
H7-1
90G
5B
90F
23
21-2
19
0E
25
95S
23B
5A-2
5B
-2
26C
26
A2
5B
-2
26B
25
B-1
91B
24
A
24
92
-2
92S
35
92
SA
21-4 21-3
94B
DUST COLLECTION /COMPRESSED AIR
18A
STORAGE94C
CLOSET21B
A6.01K
M13
A6.01K
M10
A6.01K
M6
L2
A4.00K
F2
A4.00K
M2
A4.01K
F2
A4.01K
F8
A4.03K
M8
A4.03K
F1
A4.03K
M1
A4.03K
F8
A4.02K
M7
A4.02K
F1
A4.02K
M1
A4.02K
AR
CH
ITE
CT
UR
AL
PR
OJ
EC
T
LIM
IT L
INE
TO
RE
MA
IN
REFER TO YPM
4KGL
6KGL
W ELDING BOOTH16A
EAKGL
DAKGL
CLOSET21A
SHAFT GABOVE
SHAFT DABOVE
SHAFT FABOVE
SHAFT BABOVE
SHAFT EABOVE
SHAFT AABOVE
139 SF
CUSTODIALSTORAGE
90L
91
206 SF
CORRIDOR91A
228 SF
CORRIDOR90A
M6
M6
A7.02K
M3
25-2
A6.01K
M1
A6.01K
M3
EXISTING DOOR FRAME
EXISTING DOOR FRAME
94
-1
?
8A
A7.01K
D13
ABANDONED SUBBASEMENT
BELOW
312 SF
CORRIDOR90AK
EXISTING FLOOR
TO REMAIN
SEAL ALL PENETRATIONS TO ELEVATOR MECHANICAL ROOM
5A-1
5-1
32
33
31
OVERALL PLAN LEGEND
EXISTING W ALLS
NEW W ALLS
EXISTING DOORS
NEW DOORS
AREA BEYOND ARCHITECTURAL PROJECT SCOPE
OW NER FURNISHED
ARCHITECTURAL W OODW ORK AND CASEW ORK
RF-1 - NEW BBT FLOORING INCLUDING EGRESS STAIR TREADS UNLESS NOTED OTHERW ISE IN FLOOR FINISH SCHEDULE
PCF-2 - GROUND, SEALED AND POLISHED CONCRETE
00
0
14KGL
12KGL
DKGL
EKGL
ROOM ABANDONEDD10
A1.00K
KGL - 1st FLOOREL. 47' - 7 7/8"
KGL - BASEMENTEL. 33' - 7 7/8"
KGL - SUB BASEMENTPLAN
EL. 21' - 11 7/8"
EKGL
N KEYPLAN
ESC
ADDITION
PEABODY
KGL
LOADING
PROJECT NAME
ISSUE/REVISION
Central Campus
New Haven, CT 065202 Whitney AvenueOffice of Facilities
Yale University
BUILDING NAME & ADDRESS
PROJECT NUMBER
DRAW ING TITLE
SCALE DRAW N BY
CAD FILENAME DATE
DRAW ING NUMBER
Telephone 860.767.0175
860.767.8719Facsimile
Post Office Box 955
Centerbrook, Connecticut 06409-0955
Architects and Planners, LLP
C E N T E R B R O O K
67 Main Street
LAY E
VXUL TE ATIRE S
Code Consultant
Structural Engineer
Mechanical, Electrical, & Plumbing Engineer
GILZANZ MURRAY STEFICEK LLP
ARUP
PHILIP R. SHERMAN, P.E
Acoustic and Audio Visual Consultant
CAVANAUGH TOCCI ASSOCIATES Inc.
Civil Engineer
LANGAN ENGINEERING
Building Envelope Consultant
LEAVITT ASSOCIATES Inc.
Lighting Designer
CBBLD Inc.
Landscape Architects
JAMES CORNER FIELD OPERATIONS
Specification W riter
KALIN ASSOCIATES Inc.
PHASE
M
L
J
K
A
B
C
D
E
F
G
H
4321 8765 1211109 1413
1/8" = 1'-0"
6/1
1/2
020 6
:38:5
5 P
MC
:\R
evit L
ocal F
iles\1
674 Y
ale
KG
L A
18 C
entr
al_
para
dis
.rvt
Yale Kline GeologyLaboratory Code
Upgrades
17081006
YALE KLINE GEOLOGY LABORATORY
210 W HITNEY AVE, NEW HAVEN, CT 06511
A1.00K
AAE
6/12/202017081006 A1.00K
LOW ER LEVEL FLOOR PLAN
BID DOCUMENTS
1/8" = 1'-0"M1
LOW ER LEVEL PLAN
GENERAL NOTES - FLOOR PLAN
1. DIMENSIONS NOTED AS "EQUAL" OR "EQ" WITHIN A ROOM REFER TO A DISTANCERELATIONSHIP CONTAINED ONLY IN THAT ROOM AT AN OPPOSING OR PARALLEL WALLUNLESS NOTED OTHERWISE.
2 TYPICAL CODE-REQUIRED MANEUVERING CLEARANCES FOR ACCESSIBILITY AT DOORSIS SHOWN IN THE CODE PLANS LEGEND. THE REQUIRED MANEUVERING CLEARANCESFOR EACH DOOR ARE SHOWN ON THE FLOOR PLAN OR LAYOUT DRAWINGS. THECONTRACTOR SHALL BE FULLY RESPONSIBLE TO COORDINATE THE REQUIREMENT FORMANEUVERING CLEARANCES WITH SUBCONTRACTORS, VENDORS AND INSTALLERS ANDVERIFY THAT THE INSTALLED WORK WILL PROVIDE THE REQUIRED MANEUVERINGCLEARANCES. REPORT ALL DEVIATIONS FROM THE MANEUVERING CLEARANCEREQUIREMENTS TO THE ARCHITECT. DO NOT PROCEED WITH THE INSTALLATION OFANY WORK ENCROACHING ON THE REQUIRED MANEUVERING CLEARANCES UNTIL THEISSUE HAS BEEN RESOLVED WITH THE ARCHITECT. MAKE NECESSARY CORRECTIONS.
3. DIMENSIONS SHOWN ON ARCHITECTURAL FLOOR PLANS AND ENLARGED PLAN DETAILSARE TO FACE OF STUD, TO FACE OF MASONRY OR TO CENTER LINE OF COLUMN UNLESSOTHERWISE NOTED.
4. ENSURE FINISH SURFACES ARE FLUSH AND SEAMLESS WHERE PARTITIONS AND/ORFURRING ARE COPLANAR.
5. ALL PIPING, CONDUITS AND RELATED MECHANICAL AND ELECTRICAL ITEMS SHALL BECONCEALED WITHIN PARTITION WALL ASSEMBLY IN FINISHED AREA, U.N.O..
6. PROVIDE BACKING/BLOCKING TO SUPPORT ALL WALL MOUNTED ITEMS.
7 ALL MECHANICAL PADS TO BE 4" HIGH MINIMUM. U.N.O SIZE OF PAD TO BE VERIFIED BYCONTRACTOR.
8 PITCH SLABS (AND OTHER FLOORS) TO FLOOR DRAINS, TYP.
1/8" = 1'-0"G10
SUB BASEMENT PARTIAL PLAN
1/8" = 1'-0"D10
STAIR 95S SECTION
NO. DATE REVISION
011
UP
DNUP
UPDN
16KGL
14KGL
12KGL
10KGL
8KGL
7KGL
5KGL
3KGL
2KGL
1KGL
BKGL
CKGL
DKGL
EKGL
FKGL
GKGL
AKGL
VERTEBRATEPALEONTOLOGY
COLLECTION218
CORRIDOR293C
JOUR OFF217
FAC OFF216
FAC OFF214
FAC OFF211
FAC OFF210
RES LAB209
RES LB SV219A
RES LB SV219B
RES LAB219
ELEC290G
ELEC290H
RES LAB215
INSTA LAB213
STAIR 1290S
KITCH290L
ELEC290M
CORRIDOR290
RES LAB219C
VEST219D
PD OFF220
RES LAB223
JAN291D
MEN225
OFFICE227
PD OFF221B
RES LAB221
RES LAB221A
TELECOM290F
CONF RM208A
FAC OFF208
FAC OFF207
RES LAB206
RES LAB205
OFFICE204
OFFICE203
OFFICE202
OFFICE201
STOR206A
TELECOM290N
EXHIBIT291B
SEMINAR226
EXHIBIT291C
COMP/ TCH228
ATRIUM CORRIDOR291
STAIR 3291S
GSTU OFF230
GSTU OFF231
GSTU OFF229
CORRIDOR292
GSTU OFF232
GSTU OFF233
GSTU OFF235
GSTU OFF234
CORRIDOR293
GSTU OFF237
EXHIBIT291E
LOUNGE258
W OMEN258A
STAIR 2292S
ELEC292A
GSTU OFF239
GSTU OFF238
GSTU OFF240
GSTU OFF241
GSTU OFF242
GSTU OFF243
GSTU OFF244
LOUNGE257
EXHIBIT291F
TELECOM293B
GSTU OFF246
GSTU OFF245
GSTU OFF247
STU OFF254
CORRIDOR294
GSTU OFF252
GSTU OFF253
GSTU OFF256
GSTU OFF248
GSTU OFF250
GSTU OFF249
GSTU OFF251
ELEV290E
4KGL
6KGL
AR
CH
ITE
CT
UR
AL
P
RO
JE
CT
LIM
IT L
INE
TO
RE
MA
IN
EAKGL
DAKGL
SHAFT G
SHAFT F
SHAFT E
SHAFT A
SHAFT B
SHAFT D
SELECTIVE DEMOLITION OF PLASTER CEILING TO EXTENT REQUIRED FOR
MEPFP W ORK ABOVE CEILING. FINISHES ARE TO BE RESTORED IN-KIND
DN
DEMO ALL FIXTURES, FINISHES, CEILING AND
FLOOR. DEMO PARTITIONS AS INDICATED
DEMO ALL FIXTURES, FINISHES, CEILING AND
FLOOR. DEMO PARTITIONS AS INDICATED
DEMOLITION PLAN LEGEND
EXISTING W ALL TO REMAIN
EXISTING CONSTRUCTION TO BE REMOVED
ABATE EXISTING VAT FLOORING INCLUDING EGRESS STAIR TREADS. CONFIRM W ITH EXTENT OF NEW FLOOR FINISH AND YALE ABATMENT REPORT.
AREA OF W ORK NOT W ITHIN SCOPE
AREA OF CEILING TO BE REMOVED AND REPAIRED/REPLACED
DOOR TO BE REMOVEDEXISTING FRAME TO REMAIN
NOTE:
DEMOLISH ALL CEILINGS W HERE NEW CEILINGS ARE SHOW N ON THE REFLECTED CEILING PLANS. CEILINGS IN CORRIDOR ARE TO BE DEMOLISHED; FIXTURES AND DEVICES ARE TO REMAIN IN PLACE AND PROTECTED DURING CONSTRUCTION.
CEILINGS W ITHIN PROGRAM SPACES ARE TO BE TEPORARILY REMOVED PROTECTED AND REINSTALLED TO ALLOW FOR INSTALLATION OF FIRE PROTECTION SYSTEM. NOTIFY ARCHITECT AND OW NER OF DAMAGED CEILINGS AND CEILING DISCREPENCIES.
N KEYPLAN
ESC
ADDITION
PEABODY
KGL
LOADING
PROJECT NAME
ISSUE/REVISION
Central Campus
New Haven, CT 065202 Whitney AvenueOffice of Facilities
Yale University
BUILDING NAME & ADDRESS
PROJECT NUMBER
DRAW ING TITLE
SCALE DRAW N BY
CAD FILENAME DATE
DRAW ING NUMBER
Telephone 860.767.0175
860.767.8719Facsimile
Post Office Box 955
Centerbrook, Connecticut 06409-0955
Architects and Planners, LLP
C E N T E R B R O O K
67 Main Street
LAY E
VXUL TE ATIRE S
Code Consultant
Structural Engineer
Mechanical, Electrical, & Plumbing Engineer
GILZANZ MURRAY STEFICEK LLP
ARUP
PHILIP R. SHERMAN, P.E
Acoustic and Audio Visual Consultant
CAVANAUGH TOCCI ASSOCIATES Inc.
Civil Engineer
LANGAN ENGINEERING
Building Envelope Consultant
LEAVITT ASSOCIATES Inc.
Lighting Designer
CBBLD Inc.
Landscape Architects
JAMES CORNER FIELD OPERATIONS
Specification W riter
KALIN ASSOCIATES Inc.
PHASE
M
L
J
K
A
B
C
D
E
F
G
H
4321 8765 1211109 1413
As indicated
6/1
1/2
020 6
:50:1
2 P
MC
:\R
evit L
ocal F
iles\1
674 Y
ale
KG
L A
18 C
entr
al_
para
dis
.rvt
Yale Kline GeologyLaboratory Code
Upgrades
17081006
YALE KLINE GEOLOGY LABORATORY
210 W HITNEY AVE, NEW HAVEN, CT 06511
D1.02K
Author
6/12/202017081006 D1.02K
SECOND FLOOR DEMOLITIONPLAN
BID DOCUMENTS
1/8" = 1'-0"M1
2ND FLOOR DEMOLITION PLAN
GENERAL NOTES - DEMOLITION
1. THE DEMOLITION NOTES ARE A DESCRIPTIVE GUIDE ONLY, WITH THE EXCEPTION OF ITEMS SPECIFICALLY INDICATED TOREMAIN. IT IS NOT THE INTENT TO POINT TO EACH AND EVERY ITEM. THE CONTRACTOR WILL BE RESPONSIBLE FORREMOVING ALL QUANTITIES OF EACH ITEM. THE DEMOLITION DRAWINGS INDICATE GENERAL LAYOUT OF WALLS,COLUMNS, STAIRS, DOORS, AND WINDOWS. EXACT LOCATION, SIZE, AND QUANTITY OF THESE ITEMS MAY DIFFER FROMTHOSE INDICATED ON PLANS. REFER TO SPECIFICATIONS FOR CONTRACTOR OBLIGATIONS IN REGARDS TOVERIFICATION OF EXISTING CONDITIONS AND SCOPE OF WORK.
2 THIS DRAWING DOES NOT SHOW, NOR IS IT INTENDED TO SHOW THE FULL EXTENT OF DEMOLITION REQUIRED FORUNDERSLAB WORK.
3. DASHED LINES WITH ASSOCIATED TAG OR NOTE INDICATE CONSTRUCTION TO BE DEMOLISHED AND REMOVED.
4. COORDINATE THE WORK OF THIS DRAWING WITH ALL LANDSCAPE, CIVIL, ARCHITECTURAL, STRUCTURAL, SITE UTILITY,PLUMBING, MECHANICAL, AND ELECTRICAL DRAWINGS AND SPECIFICATIONS. REFER TO MECHANICAL, ELECTRICAL,PLUMBING, AND STRUCTURAL DEMOLITION DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL SCOPE.
5. PROVIDE BRACING AND/OR SHORING AS REQUIRED TO MAINTAIN ADEQUATE SAFETY STANDARDS AND STRUCTURALINTEGRITY OF THE BUILDING. PROVIDE TEMPORARY RAILINGS AND FALL PROTECTION TO MAINTAIN ADEQUATE SAFETYPROVISIONS.
6. CONTRACTOR TO COORDINATE WITH OWNER ITEMS TO BE SAVED OR REUSED. COORDINATE LOCATION(S) FORSTORAGE WITH OWNER.
7. VERIFY REMOVAL OF HM FRAMES AT DEMOLISHED DOORS AS INDICATED IN DOOR AND FRAME SCHEDULE.
8. REMOVE EXISTING CASEWORK IN SPACES TO BE RENOVATED ADN CONFIRM DISPOSAL WITH OWNER AND ARCHITECT.
9. ABATE VYNIL ASBESOTS TILE TO EXTENT DEFINED IN YALE HAZARDOUS ABATEMENT REPORT
10. REMOVE EXISTING FLOOR AND CEILING FINISHES TO TEH EXTENT REQUIRED TO INSTALL NEW PER FLOOR AND CEILINGPLANS
11. MAINTAIN EMERGENCY EGRESS THROUGHOUT DEMOLITION. ALL EXITS SHALL BE READILY ACCESSIBLE AT ALL TIMES.
12. OBEY ALL CODES, STATUTES AND LAWS AS APPLICABLE TO DEMOLITION WORK IN AN OCCUPIED BUILDING AND FORREMOVAL OF MATERIAL, INCLUDING OSHA REGULATIONS.
13. DISPOSE OF ALL UNWANTED MATERIALS AND OTHER DEMOLITION DEBRIS OFF SITE PER APPLICABLE CODES ANDREGULATIONS.
14. OVER DEMOLITION SHALL BE CORRECTED SUCH THAT SURFACES TO BE REBUILT MATCH MATERIAL, STRUCTURALINTEGRITY, AND APPEARANCE OF THOSE THAT WERE REMOVED.
15. CREATE ROUGH OPENINGS FOR NEW HM FRAMES PER DOOR SCHEDULE.
16 REMOVE EXISTING FINISHES (PAINT, GWB, ETC.) IN AREAS THAT ARE DETERIORATING AND THAT MUST BE REMOVEDPRIOR TO THE PROPER APPLICATION OF NEW FINISHES UNTIL WORKABLE SUBSTRATES OR UNDAMAGED ADJACENTFINISHES ARE REACHED INCLUDING WINDOW JAMBS.
17 PATCH, REPAIR AND PAINT ALL EXISTING PARTITIONS THAT REQUIRE DEMOLITION TO INSTALL SWITCHES, FIRE ALARMSAND ALL OTHER ITEMS. REFER TO ELECTRICAL, MECHANICAL AND PLUMBING PLANS FOR LOCATIONS.
18 CORE EXISTING CONCRETE FLOORING FOR UTILITY PIPING AS REQUIRED. COORDINATE WITH MECHANICAL, ELECTRICALAND PLUMBING REQUIREMENTS. REFER TO MEP DRAWINGS.
19 COORDINATE ANY WORK AT ADJACENT SPACES OR FLOORS WITH ARCHITECT AND OWNER.
20 PATCH, REPAIR AND FINISH EXPOSED AND DAMAGED SURFACES TO MATCH ADJACENT SURFACE UNLESS NOTEDOTHERWISE.
21. CONTRACTOR TO VERIFY AND COORDINATE ALL DIMENSIONS AND WORK OF ALL TRADES PRIOR TO BEGINNING WORK.
22 CAP AND MAKE SAFE ALL EXISTING HVAC, GAS, PLUMBING SUPPLY, WASTE, FIRE PROTECTION, AND ELECTRIC LINES TOBE ABANDONED BELOW EXISTING FLOOR. COORDINATE DISCONNECTION WITH OWNER, ARCHITECT, AND ENGINEER.
23 REFINISH OR REPLACE DAMAGED WALLS AND CEILINGS AS REQUIRED IN ORDER TO OBTAIN A UNIFORM AND UNFLAWEDFINISH. PATCHED SURFACES SHALL BE INDISTINGUISHABLE FROM UNAFFECTED AREAS.
24 COORDINATE THE EXACT LOCATION OF DUMPSTERS, CHUTES, AND MATERIALS STORED AT GRADE (IF ANY) WITH THEARCHITECT AND BUILDING OWNER IN THE FIELD, PRIOR TO PLACEMENT.
25 COORDINATE ACCEPTABLE USE OF STAIRS, HALL, COMMON SPACES OUTSIDE THE WORK AREA DURING DEMOLITIONWITH THE ARCHITECT AND BUILDING OWNER IN THE FIELD PRIOR TO START OF WORK. PROTECT SUCH SPACES ASREQUIRED.
26 DAILY OPERATIONS OF THE OWNER (AND ITS TENANT) MUST NOT BE DISRUPTED. THROUGHOUT THE PROJECTCONSTRUCTION TRAFFIC AND BUILDING ACCESS MUST BE COORDINATED WITH THE ARCHITECT AND BUILDING OWNER.
27 REMOVE EXISTING ELECTRICAL WIRING, OUTLETS, AND DEVICES WHERE THEY INTERFERE WITH NEW CONSTRUCTION.REFER TO ELECTRICAL DRAWINGS FOR EXTENT OF WORK.
28 CONTRACTOR IS RESPONSIBLE FOR ALL TEMPORARY PARTITIONS IN ORDER TO ISOLATE WORK ZONES,WEATHER-TIGHT, AND AS DICTATED BY PHASING AND OCCUPANCY. SUBMIT FOR ARCHITECT AND OWNER APPROVAL, APLAN AND SCHEDULE SHOWING THE VARIOUS TEMPORARY PARTITIONS, TYPES, DOORS, LOCATIONS, ANDWEATHER-TIGHT MEANS AND METHODS. THIS SUBMITTAL DOES NOT NEGATE THE CONTRACTOR FROM PROVIDING ANYAND ALL TEMPORARY PARTITIONS TO ENSURE A WEATHER-TIGHT AND SAFE ENVIRONMENT FOR THE OCCUPANTS ANDCONTENTS OF THE BUILDINGS.
NO. DATE REVISION
007
KGL 2nd Floor Corridor/Elevator Shutdown Abatement WorkYale Kline Geology Laboratory Code Upgrades ProjectNew Haven, CTTurner Project No. 201026Data Date: November 18, 2020By: VJH
No Access Start Date: 11/19/20Corridor Open Date: 11/30/20
Containment
Shower
DN
UP
A3.00K
A3.00K
A3.00KM2
D7
H2
16KGL
14KGL
12KGL
10KGL
8KGL
7KGL
5KGL
3KGL
2KGL
1KGL
BKGL
CKGL
DKGL
EKGL
FKGL
GKGL
AKGL
INSSTR LAB321B OFFICE
321A
RESLB SV321
STOR321CA
STOR331CB
INSTR LAB321C
PREP RM321D
DARKRM
321E
RES LAB322
RES LAB322B
RES LAB325A
RES LAB325
OFFICE327B
RES LAB327A
RESLB SV327
PREP RM327C
TELECOM390F
EXHIBIT391C
ELEV390E
PD OFF326
RES LAB324
CONST TMP324A
RESCI OFF323
ELEC390G
E FAC OFF320
FAC OFF319
FAC OFF316
CORRIDOR390
ELEC390H
INACTIVE390J
RES LAB315A
RES LAB315
FAC OFF314
PD OFF318
RES LAB317
INACTIVE390K
OFF SV390L
STAIR 1390S
ELEC390M
COPY311B
RES LAB313
RES LAB312B
RES LAB312
FAC OFF310
FAC OFF309
PD OFF306
FAC OFF305
PD OFF311A
STOR311
RESCI OFF308
KITCH307
STUDY328
CIRCUL328A
EXHIBIT391B
TELECOM390N
W OMEN330A
JAN329
CORRIDOR330
CORRIDOR391
STAIR 3391S
RES LAB332A
RES LAB332B
RESLBSV332
RESLBSV
332C
RES LAB332D
RESLBSV333
OFFICE304
OFFICE303
OFFICE302
OFFICE301
FAC OFF345
RES LAB344
RES LAB343
RES LAB342
RES LAB340
TELCOM392F
EXHIBIT391F
RESLB SV392E
RESLB SV392D
STOR392H
RESLB SV392G
MEN346
EXHIBIT391E
STAIR 2392S
ELEC392A
RES LAB334A
RES LAB SV334
RES LAB334C
STOR392C
CORRIDOR392
OFFICE339
VISIT OFF337
FAC OFF336
A6.01K
E10
A6.02K
F11
A6.01K
E13
A6.01K
M8
L2
A4.00K
F2
A4.00K
M2
A4.01K
F2
A4.01K
F8
A4.03K
M8
A4.03K
F1
A4.03K
M1
A4.03K
F8
A4.02K
M7
A4.02K
F1
A4.02K
M1
A4.02K
4KGL
6KGL
AR
CH
ITE
CT
UR
AL
P
RO
JE
CT
LIM
IT L
INE
TO
RE
MA
IN
EAKGL
DAKGL
SHAFT G
SHAFT F
SHAFT E
SHAFT A
SHAFT B
SHAFT D
A6.52K
C12
A6.50K
C12
A6.53K
C12
A6.54K
C12
A6.51K
D9
A6.55K
C12
390N
30
5-2
345
30
2-2
30
3-2
344
34
3
34
2
39
2E
39
2D
39
2H
39
2G
34
0X
39
2C
392A
392S
333
392K
33
6
332D-2
332D-1
332C
332B
33
2A
330-1330-2
329
327C390F
326325
327327B
32
7A
325A-2
32
5A
-1
322B
324A
324
323
322
321E
390G
321
321C
32
1C
33
1C
B
321B
32
1A
32
0
31
8-2
31
9
31
63
17
31
53
15
A
31
4
390M
390S
392F
332-2
332-1
332A-1
318-1 31
1A
-13
11
-2
311
308
307
34
6
33
7
33
9
313-2
312B
312
310
309
306
305-1
303-1
302-1
301
328-2
39
0H
RES LAB334B
STOR392BA
OFF SV335
EQUIP392K
STOR392J
304
33
4C
334B
33
4A
392B
392J
CORR392B
313-1Y
G03
391S
A8.01K
M9
39
1-3
39
1-2
39
1-1
39
1-4
32
8-1
X
ALTERNATE #1 - INSTALL FORBO BULLETIN BOARD. REFER TO INTERIOR ELEVATIONS
FOR EXTENT.
39
0E
?
392BA
321D
OVERALL PLAN LEGEND
EXISTING W ALLS
NEW W ALLS
EXISTING DOORS
NEW DOORS
AREA BEYOND ARCHITECTURAL PROJECT SCOPE
OW NER FURNISHED
ARCHITECTURAL W OODW ORK AND CASEW ORK
RF-1 - NEW BBT FLOORING INCLUDING EGRESS STAIR TREADS UNLESS NOTED OTHERW ISE IN FLOOR FINISH SCHEDULE
PCF-2 - GROUND, SEALED AND POLISHED CONCRETE
00
0
N KEYPLAN
ESC
ADDITION
PEABODY
KGL
LOADING
PROJECT NAME
ISSUE/REVISION
Central Campus
New Haven, CT 065202 Whitney AvenueOffice of Facilities
Yale University
BUILDING NAME & ADDRESS
PROJECT NUMBER
DRAW ING TITLE
SCALE DRAW N BY
CAD FILENAME DATE
DRAW ING NUMBER
Telephone 860.767.0175
860.767.8719Facsimile
Post Office Box 955
Centerbrook, Connecticut 06409-0955
Architects and Planners, LLP
C E N T E R B R O O K
67 Main Street
LAY E
VXUL TE ATIRE S
Code Consultant
Structural Engineer
Mechanical, Electrical, & Plumbing Engineer
GILZANZ MURRAY STEFICEK LLP
ARUP
PHILIP R. SHERMAN, P.E
Acoustic and Audio Visual Consultant
CAVANAUGH TOCCI ASSOCIATES Inc.
Civil Engineer
LANGAN ENGINEERING
Building Envelope Consultant
LEAVITT ASSOCIATES Inc.
Lighting Designer
CBBLD Inc.
Landscape Architects
JAMES CORNER FIELD OPERATIONS
Specification W riter
KALIN ASSOCIATES Inc.
PHASE
M
L
J
K
A
B
C
D
E
F
G
H
4321 8765 1211109 1413
1/8" = 1'-0"
6/1
1/2
020 6
:40:0
6 P
MC
:\R
evit L
ocal F
iles\1
674 Y
ale
KG
L A
18 C
entr
al_
para
dis
.rvt
Yale Kline GeologyLaboratory Code
Upgrades
17081006
YALE KLINE GEOLOGY LABORATORY
210 W HITNEY AVE, NEW HAVEN, CT 06511
A1.30K
ECS
6/12/202017081006 A1.30K
THIRD FLOOR PLAN
BID DOCUMENTS
1/8" = 1'-0"M1
3rd FLOOR PLAN
GENERAL NOTES - FLOOR PLAN
1. DIMENSIONS NOTED AS "EQUAL" OR "EQ" WITHIN A ROOM REFER TO A DISTANCERELATIONSHIP CONTAINED ONLY IN THAT ROOM AT AN OPPOSING OR PARALLEL WALLUNLESS NOTED OTHERWISE.
2 TYPICAL CODE-REQUIRED MANEUVERING CLEARANCES FOR ACCESSIBILITY AT DOORSIS SHOWN IN THE CODE PLANS LEGEND. THE REQUIRED MANEUVERING CLEARANCESFOR EACH DOOR ARE SHOWN ON THE FLOOR PLAN OR LAYOUT DRAWINGS. THECONTRACTOR SHALL BE FULLY RESPONSIBLE TO COORDINATE THE REQUIREMENT FORMANEUVERING CLEARANCES WITH SUBCONTRACTORS, VENDORS AND INSTALLERS ANDVERIFY THAT THE INSTALLED WORK WILL PROVIDE THE REQUIRED MANEUVERINGCLEARANCES. REPORT ALL DEVIATIONS FROM THE MANEUVERING CLEARANCEREQUIREMENTS TO THE ARCHITECT. DO NOT PROCEED WITH THE INSTALLATION OFANY WORK ENCROACHING ON THE REQUIRED MANEUVERING CLEARANCES UNTIL THEISSUE HAS BEEN RESOLVED WITH THE ARCHITECT. MAKE NECESSARY CORRECTIONS.
3. DIMENSIONS SHOWN ON ARCHITECTURAL FLOOR PLANS AND ENLARGED PLAN DETAILSARE TO FACE OF STUD, TO FACE OF MASONRY OR TO CENTER LINE OF COLUMN UNLESSOTHERWISE NOTED.
4. ENSURE FINISH SURFACES ARE FLUSH AND SEAMLESS WHERE PARTITIONS AND/ORFURRING ARE COPLANAR.
5. ALL PIPING, CONDUITS AND RELATED MECHANICAL AND ELECTRICAL ITEMS SHALL BECONCEALED WITHIN PARTITION WALL ASSEMBLY IN FINISHED AREA, U.N.O..
6. PROVIDE BACKING/BLOCKING TO SUPPORT ALL WALL MOUNTED ITEMS.
7 ALL MECHANICAL PADS TO BE 4" HIGH MINIMUM. U.N.O SIZE OF PAD TO BE VERIFIED BYCONTRACTOR.
8 PITCH SLABS (AND OTHER FLOORS) TO FLOOR DRAINS, TYP.
NO. DATE REVISION
014