turkishtechnicturkishtechnicturkishtechnicturkishtechnicturkishtechnicturkishtechnicturkishtechnicturkishtechnicturkishtechnicturkishtechnic...

26
CHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURK CHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURK COMPANY PRESENTATION & IMPROVEMENTS November 2013 Suat Sağıroğlu

Upload: colin-byrd

Post on 18-Dec-2015

218 views

Category:

Documents


0 download

TRANSCRIPT

TURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNIC

COMPANY PRESENTATION

&

IMPROVEMENTS

November 2013

Suat Sağıroğlu

HTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKIS

1955 : All civil aviation companies are re-organized under Turkish Airlines.

1957 : Maintenance and revisions of three DC-3 aircrafts were made. 2006 : Turkish Technic Inc established with 100% shares belonging to

Turkish Airlines with nearly 2400 personnel.

2012 : Turkish Technic has over 4000 personnel with 4 Hangars.

Turkish Technic OverwievBRIEF HISTORY

HTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKIS

: Both Boeing (B737-CL, B737-NG, B777-200/300/300ER) and Airbus (A320, A330 and A340 Series) Aircraft.

: In TEC (partner with P&W) V2500 and CFM56 Engines Family.

: Sundstrand and Honeywell Series.

: B737-CL, B737-NG, A320, A330 and A340 Series.

: Radio&Devices, Hydraulic&Pneumatic&Mechanic Components and Brake Systems.

: Maintenance Management, Structural Damage Evaluation, Relability Services

Line and BaseMaintenance

EngineMaintenance

APUMaintenance

Landing GearMaintenance

ComponentMaintenance – Pool Services

EngineeringServices

MAIN SERVICESTurkish Technic Overwiev

HTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKIS

Turkish Technic OverwievCUSTOMERS

HTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKIS

THY Technic Number of aircraft maintenance

HTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKIS

THY Technic Number of aircraft maintenance2013 - Monthly

HTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKIS

THY Technic Number of Aircraft maintenanceM/H Summary

HTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKIS

2013 – M/H monthlyTHY Technic Number of Aircraft maintenance

HTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKIS

Has mature and large fleet

Has 737-700/800 and 900ERs

High aircraft utilization

Seasonal variation in utilization

( ie. Hadj season)

Flexible manpower available

Has central maintenance base

C check optimization;

Some of the C tasks that do not have the exact C-Check intervals are done in A Checks

By grouping zonal tasks and using access removal/installation cards, labour hours spent on panel removal and installation are reduced.

Maintenance Check Intervals; A check 150 FH / 600 FH C check 7500 fh/730 day

THY Maintenance Check OptimizationTHY B737-NG FLEET

HTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKIS

THY Maintenance Check Optimization

PREVIOUS SITUATION

A checks used to be performed at every 150 FH and every 600 FH, there was a 4A, or Big A, check.

THY B737NG fleet can be grouped in 3 categories according to daily utilization.

Group 1 (6,7 FH/Day) 14 A/C , A check at every 22 days Group 2 (9,7 FH/Day) 38 A/C, A check every 15 daysGroup 3 (12,4 FH/Day) 12 A/C, A check every 11 days

HTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKIS

THY Maintenance Check Optimization

Workload for each A check is 1 shift ( 0,33 day) and 2 shifts (0,66 day ) for each 4A checks. Annual Total ground time of each group are specified below.

Group 1 (6,7 FH/Day) 14 A/C , 92 daysGroup 2 (9,7 FH/Day) 38 A/C, 376 daysGroup 3 (12,4 FH/Day) 12 A/C, 163 days

Approximately 24 A checks are performed per A/C for a year. 1536 A checks performed for 64 A/C fleet and total ground time of fleet is 631 days.

PREVIOUS SITUATION

HTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKIS

THY Maintenance Check Optimization

New A-Check Organization

Stationed in IST (Base) 130 personnel, working in 4 teams, 3 shifts, 24 hours a day.

Each team has 30 mechanics from all technical skills, making it possible to cover all required maintenance (mechanical and avionic) actions. Specialization and only working on A check tasks provide more effective maintance.

The target is 2 A checks a day with an average of 15 checks a week.

OPTIMIZATION PROJECT

TURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNIC

1000 1500 2000 2500 3000 3500 4000 4500 5000 5500 6000 6500 70000

5

10

15

20

25

30

35

40

grup 1grup 2grup 3

Interval

TASK CARDS vs REFERENCE INTERVAL

Task Card Number

THY Maintenance Check Optimization

HTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKIS

THY Maintenance Check Optimization

OPTIMIZATION PROJECT

New Intervals: 1000 FH for A checks and 300FH / 30 Days for L checks

A Check interval for each group in days would be approximately,

Group 1(6,7 FH/Day) 14 A/C , A check every 149 days Group 2 (9,7 FH/Day) 38 A/C, A check every 103 daysGroup 3(12,4 FH/Day) 12 A/C, A check every 80 days

L Check interval for each group in days would be approximately,

Group 1 (6,7 FH/Day) 14 A/C ,L check every 30 days Group 2 (9,7 FH/Day) 38 A/C, L check every 30 days Group 3(12,4 FH/Day) 12 A/C, L check every 24 days

TURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNIC

THY Maintenance Check Optimization

A001 A002 A003 A004 A005 A006 A0070

20

40

60

80

100

120

group 1

group 2

group 3

Series4

Total M/H

EQUALIZED A CHECKS EQUALIZED L CHECKS

L001 L002 L003 -

10.0

20.0

30.0

40.0

50.0

60.0

grup 1grup 2grup 3

Checks

Total M/H

TURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNIC

THY Maintenance Check OptimizationDETAILS of NEW CHECKS

A checks, which contains all of the tasks that have 1000 FH and above intervals, will be accomplished in 2 shifts (0.66 days) at the main base (IST) and will have an average of 105 manhours.

L checks consist of less complicated tasks that have intervals between 300 FH and 1000 FH. Moreover, they will be accomplished in 1 shift (0.33 days) at 5 different out-stations with an average of 45 manhour workload.

There is going to be 2,85 A and 12 L checks per A/C annually. The total amount for the entire 64 A/C fleet will be 182 A checks and 768 L checks, which corresponds to a total ground time of 328 days.

Total gain in ground time for the B737NG fleet will be 303 days.

TURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNIC

THY Maintenance Check OptimizationTOTAL GAIN

For Turkish Airlines, as the ground time for planned maintenance will be reduced by a total of 303 days, they will have 303 extra days for the entire 737-NG fleet to operate, which will net them a total of almost 9 million $ a year.

For Turkish Technic, lesser ground time of THY fleet will make maintenance slots available for third party companies, resulting in extra revenue. Moreover, since the maintenance deal with THY was done in PbtH, 303 days will earn Turkish Technic 100.000 $ a year.

TURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNIC

THY Maintenance Check OptimizationSUMMARY

150 FH “A Checks” are converted into 300 FH / 30 Days “L Checks” whereas 600 FH, Big A Checks are into 1000 FH A Checks.

New A checks are accomplished by a new A-Check maintenance organization under Turkish Technic, which is specialized in A Checks, making it possible to complete a 1000 FH maintenance at the same amount of time with a 600 FH one.

Ground times caused by scheduled maintenance will be reduced by 303 days for the entire THY 737-NG fleet, from which THY will earn around 9 million $ whereas Turkish Tehcnic will also receive 100.000 $ through PbtH agreement.

TURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNIC

General Access Panel solution

THY Tecnich Job cards are prepared to base on the original manufacturer’s document by Maintenance Engineering Dept. Most of the job cards consist of the access panel lists which will be used for to access some maintenance areas.

In previous Situation; job cards are distributed to the technicians who would be work on the aircraft by supervisor. Supervisors also tried to grouping them for preventing to duplication of the opening and closing the panels. But it was not work all the time because of 3-shift working system.

TURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNIC

SOLUTIONAccess Panel solution

Access panel removal and installation reference task cards are created for every possibility of working zone and also cabin interior (galleys, lavatories, seat tracks, ceiling panels etc.) on the aircraft. These task cards includes detail information to removing and installing the panels with detailed figures.

And also panel index lists issued for all zone to use in maintenance action

TURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNIC

RESULTAccess Panel solution

Every maintenance package has got its individual panel index lists. One for removing the panels which should be removes in this maintenance action, and one for installing panels which was removed in maintenance. All panels are removed before maintenance, after all job cards and EO’s are applied, all panels are closed with the installation task cards.

Access Panel M/H values are removed from the task card’s itself and added to panel index for helping to planning also

TURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNIC

New Hangar Project for VIP and Training aircrafts

Number of aircraft: CESSNA 172 S – 10 DIAMOND DA42 and 42 NG – 2

1500 m2 closed hangar is avilable in İSTANBUL ATA AIRPORT

Maintenance check interval for types of aircraft: CESSNA 172S - .A, B, C, DDIAMOND DA42 Tipi uçaklara A, B, D Bakımları yapılmaktadır .

For training aircrafts, predicted yearly FH utilisation;CESSNA 172 S; 650 FHDIAMOND DA42; 300 FH

Intervals of the checks;A CHECK- 50 FHB CHECK- 100 FHC CHECK- 200 FHD CHECK- 1 year

Current Situation

TURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNIC

New Hangar Project for VIP and Training aircrafts

Future overview

Future plan: at the beginning 140 pilot will be trained a year than this number will reach to 300 or more after new deliveries of aircrafts.

• In 16-month – 140 pilot will 22820 FH real flight + 7000 simulation fligth.

• In a year 2014 –will have 20 aircraft for training, and predicted yearly utilisations will be 855

• C Check will be estimated every 3 days

• 1 C Check = 50 M/H (aprx.)

TURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNIC

New Hangar Project for VIP and Training aircrafts

Future overview

As of 2014, will increase the number of aircraft, new hangar project is implemented due to lack of place of Atatürk airport. Aydın hangar has started to line maintenace immedietly, and waited for the base maintenance approval.

Future planCurrent Situation

TURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNIC

Studies of A and C check shortening the TAT of B737NG

Within the context of the continuous improvement of business development carried out by the unit according to the needs of the units, to include all the processes are carried out maintenance or overhaul.

Studies of A and C check shortening the duration of B737NG TAT;

1. New material and toll kits2. Keep ready to use be used materials, tools and kits before the maintenance3. People organized for erranding the material and tool to the technichian who is

still work on the aircraft in maintenance action.4. Put the board with PC for easy access to maintenance docments (AMM, IPC,

CMM etc.) for every aircraft which is in maintenance action.

with above type actions, all working distances are shorthend for technician in maintenance action then gained up to %40 time for TAT.

TURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNICTURKISHTECHNIC

THANK YOU