APRIL 10, 2019 SWC MARQUAM HILL CONNECTION PUBLIC OPEN HOUSE
TUNNEL + ELE VATOR: OVERVIE W
1” = 200’
CAMPUS D
R
SAM JACKSON PARK R
D
CAMPUS DR
TERWILLIGER BLVD
GIBBS ST
WHITAKER ST
WOODS ST
2ND
AVE
1ST
AVE
PATH OF TRAM
Casey EyeIns�tute
Garage D
GarageE
DornbecherChildren’sHospital
VA PrimaryCare Clinic
AerialTram
KohlerPavilion
Physician’sPavilion
Sam JacksonHall
BiomedicalResearchBuilding
MultnomahPavilion
Ha�ieldResearch
Center
Elks Children’sEye Clinic
VA Skybridge VA MainHosp.
Shriner’sHosp.
OHSU Hosp.
Poten�alHospital
Expansion
2
3
1
#2 & #3 Have construc�bility concerns
Parkway boundary
Gibbs St. Sta�on
ECEC Casey Eye Ins�tute
Barbur Blvd.
Gibbs Street Sta�on
Poten�alHospital
Expansion
At Kohler Pavilion
32
1
ALIGNMENT OPPORTUNITIES DESTINATION OPPORTUNITIES
Casey Eye Institute
Potential Hospital Expansion
Kohler Pavilion1
2
3
PRECEDENT IMAGES
Miho Museum, Japan
Kings Cross, London
National Gallery of Art, Washington DC
200’
Alignment Opportunity
Current and Future Paths
APRIL 10, 2019 SWC MARQUAM HILL CONNECTION PUBLIC OPEN HOUSE
TUNNEL + ELE VATOR: CONCEP TUAL E X AMPLE
Plaza
Tunnel Entry+ 210’
Elevator Entry + 475’
Garage Below
Tunnel
Kohler
Pav
ilion
BusStop
Parking Garage
Terwilliger Blvd
Barbur Blvd
Campu
s Driv
e
Prot
ecte
d Vi
ew
Prot
ecte
d Vi
ew
Casey Eye Institute
BusStop
Station Area Design In Progress
Tunnel + Elevator - Section
Kohler Garage
Terw
illige
r Blv
d.
Tunnel
Barb
ur B
lvd.
Gib
bs S
t. St
atio
n
660’ 275’
Cam
pus
Dr.
Sam
Jac
kson
Par
k R
d.28
5’
Parkway Boundary
VIEW FROM BASE OF HILL, LOOKING WEST
AERIAL VIEW, LOOKING WEST
200’
APRIL 10, 2019 SWC MARQUAM HILL CONNECTION PUBLIC OPEN HOUSE
TUNNEL + ELE VATOR: E VALUATION
ACCESS
SAFETY
CONTEXT
OPERATIONAL
CATEGORY
“The Marquam Hill Connector should...”
GOALS DRAFTEVALUATION
NOTES
ENVIRONMENTAL
BUDGET/SCHEDULE
EXPERIENCE
• Provide connections between the light rail station and destinations on Marquam Hill
• Provide an efficient, convenient, equitable and comfortable connection for all types of users
• Create a safe and secure connection for all users
• Best fit with, enhance, and improve the unique historic, scenic, recreational and design character of this area
• Protect or enhance the area’s natural resources and sensitive habitat
• Provide a long-term, sustainable connection for current and future users
• Be cost effective and timely within the Southwest Corridor Light Rail Project
• Create a signature connection that provides a high-quality user experience and inspires civic pride
• Weather protection is inherent • Indirect access to OHSU lower campus, VA
Hospital, & recreational destinations• Long walk underground (675 ft/3.5 city blocks),
moving walkway may be incorporated
• Minimizes visual impacts on surroundings• Maintains use & identity of Terwilliger Parkway
• Construction footprint limited to portal & shaft construction areas
• Construction activities require monitoring for noise & vibration impacts to surroundings, debris hauling will impact adjacent roadways
• No precedent for a pedestrian tunnel of this scale in Portland, operational issues require further study
• Complex to maintain, may include attendants, limited hours, and/or user fee
• Approximate cost: $55-125 million• Difficult construction type, very high risk of cost
& schedule overruns
• Challenging environment to make high quality pedestrian experience
• Minimizes conflicts among modes• Users have low visibility from surrounding area• Will require monitoring equipment and/or staff
for security