tunnel + elevator: overview - trimetapril 10, 2019 swc marquam hill connection public open house...

3
APRIL 10, 2019 SWC MARQUAM HILL CONNECTION PUBLIC OPEN HOUSE TUNNEL + ELEVATOR: OVERVIEW CAMPUS DR SAM JACKSON PARK RD CAMPUS DR TERWILLIGER BLVD GIBBS ST WHITAKER S WOODS ST 2ND AVE PATH OF TRAM Casey Eye Ins�tute Garage D Garage E Dornbecher Children’s Hospital Aerial Tram Kohler Pavilion Physician’s Pavilion Sam Jackson Hall Biomedical Research Building Multnomah Pavilion Ha�ield Research Center Elks Children’s Eye Clinic VA Skybridge VA Main Hosp. Shriner’s Hosp. OHSU Hosp. Poten�al Hospital Expansion 2 3 1 #2 & #3 Have construc�bility concerns Parkway boundary Gibbs St. Sta�on ECEC Casey Eye Ins�tute Barbur Blvd. Gibbs Street Sta�on Poten�al Hospital Expansion At Kohler Pavilion 3 2 1 ALIGNMENT OPPORTUNITIES DESTINATION OPPORTUNITIES Casey Eye Instute Potenal Hospital Expansion Kohler Pavilion 1 2 3 PRECEDENT IMAGES Miho Museum, Japan Kings Cross, London Naonal Gallery of Art, Washington DC 200’ Alignment Opportunity Current and Future Paths

Upload: others

Post on 13-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TUNNEL + ELEVATOR: OVERVIEW - TriMetapril 10, 2019 swc marquam hill connection public open house tunnel + elevator: overview. 1” = 200’ ark rd campus dr campus dr vd gibbs st aker

APRIL 10, 2019 SWC MARQUAM HILL CONNECTION PUBLIC OPEN HOUSE

TUNNEL + ELE VATOR: OVERVIE W

1” = 200’

CAMPUS D

R

SAM JACKSON PARK R

D

CAMPUS DR

TERWILLIGER BLVD

GIBBS ST

WHITAKER ST

WOODS ST

2ND

AVE

1ST

AVE

PATH OF TRAM

Casey EyeIns�tute

Garage D

GarageE

DornbecherChildren’sHospital

VA PrimaryCare Clinic

AerialTram

KohlerPavilion

Physician’sPavilion

Sam JacksonHall

BiomedicalResearchBuilding

MultnomahPavilion

Ha�ieldResearch

Center

Elks Children’sEye Clinic

VA Skybridge VA MainHosp.

Shriner’sHosp.

OHSU Hosp.

Poten�alHospital

Expansion

2

3

1

#2 & #3 Have construc�bility concerns

Parkway boundary

Gibbs St. Sta�on

ECEC Casey Eye Ins�tute

Barbur Blvd.

Gibbs Street Sta�on

Poten�alHospital

Expansion

At Kohler Pavilion

32

1

ALIGNMENT OPPORTUNITIES DESTINATION OPPORTUNITIES

Casey Eye Institute

Potential Hospital Expansion

Kohler Pavilion1

2

3

PRECEDENT IMAGES

Miho Museum, Japan

Kings Cross, London

National Gallery of Art, Washington DC

200’

Alignment Opportunity

Current and Future Paths

Page 2: TUNNEL + ELEVATOR: OVERVIEW - TriMetapril 10, 2019 swc marquam hill connection public open house tunnel + elevator: overview. 1” = 200’ ark rd campus dr campus dr vd gibbs st aker

APRIL 10, 2019 SWC MARQUAM HILL CONNECTION PUBLIC OPEN HOUSE

TUNNEL + ELE VATOR: CONCEP TUAL E X AMPLE

Plaza

Tunnel Entry+ 210’

Elevator Entry + 475’

Garage Below

Tunnel

Kohler

Pav

ilion

BusStop

Parking Garage

Terwilliger Blvd

Barbur Blvd

Campu

s Driv

e

Prot

ecte

d Vi

ew

Prot

ecte

d Vi

ew

Casey Eye Institute

BusStop

Station Area Design In Progress

Tunnel + Elevator - Section

Kohler Garage

Terw

illige

r Blv

d.

Tunnel

Barb

ur B

lvd.

Gib

bs S

t. St

atio

n

660’ 275’

Cam

pus

Dr.

Sam

Jac

kson

Par

k R

d.28

5’

Parkway Boundary

VIEW FROM BASE OF HILL, LOOKING WEST

AERIAL VIEW, LOOKING WEST

200’

Page 3: TUNNEL + ELEVATOR: OVERVIEW - TriMetapril 10, 2019 swc marquam hill connection public open house tunnel + elevator: overview. 1” = 200’ ark rd campus dr campus dr vd gibbs st aker

APRIL 10, 2019 SWC MARQUAM HILL CONNECTION PUBLIC OPEN HOUSE

TUNNEL + ELE VATOR: E VALUATION

ACCESS

SAFETY

CONTEXT

OPERATIONAL

CATEGORY

“The Marquam Hill Connector should...”

GOALS DRAFTEVALUATION

NOTES

ENVIRONMENTAL

BUDGET/SCHEDULE

EXPERIENCE

• Provide connections between the light rail station and destinations on Marquam Hill

• Provide an efficient, convenient, equitable and comfortable connection for all types of users

• Create a safe and secure connection for all users

• Best fit with, enhance, and improve the unique historic, scenic, recreational and design character of this area

• Protect or enhance the area’s natural resources and sensitive habitat

• Provide a long-term, sustainable connection for current and future users

• Be cost effective and timely within the Southwest Corridor Light Rail Project

• Create a signature connection that provides a high-quality user experience and inspires civic pride

• Weather protection is inherent • Indirect access to OHSU lower campus, VA

Hospital, & recreational destinations• Long walk underground (675 ft/3.5 city blocks),

moving walkway may be incorporated

• Minimizes visual impacts on surroundings• Maintains use & identity of Terwilliger Parkway

• Construction footprint limited to portal & shaft construction areas

• Construction activities require monitoring for noise & vibration impacts to surroundings, debris hauling will impact adjacent roadways

• No precedent for a pedestrian tunnel of this scale in Portland, operational issues require further study

• Complex to maintain, may include attendants, limited hours, and/or user fee

• Approximate cost: $55-125 million• Difficult construction type, very high risk of cost

& schedule overruns

• Challenging environment to make high quality pedestrian experience

• Minimizes conflicts among modes• Users have low visibility from surrounding area• Will require monitoring equipment and/or staff

for security