tunisia
DESCRIPTION
TUNISIA. Status of the National Nuclear Infrastructure Development in Tunisia. Prof. Adel Trabelsi Centre National des Sciences et Technologies Nucléaires. Jomâa SOUISSI*, Ing. Société Tunisienne de l'Électricité et du Gaz. IAEA 09 – 12 February 2010. Country Overview. - PowerPoint PPT PresentationTRANSCRIPT
09 Feb. 2010 STATUS of INP in TUNISIA 1
TUNISIA
Status of the National Nuclear Infrastructure Development
in Tunisia
Jomâa SOUISSI*, Ing.
Société Tunisienne de l'Électricité et du Gaz
Prof. Adel Trabelsi
Centre National des Sciences et Technologies Nucléaires
IAEA 09 – 12 February 2010
09 Feb. 2010 STATUS of INP in TUNISIA 2
Country Overview
Area : 162 155 km²
Population : 10.3 millions
Population density : 63.7
inhabitants/km²
Urban Population : 65.8 %
GDP : 37 Billions of current US$
GDP per capita : 7534 PPP US$
09 Feb. 2010 STATUS of INP in TUNISIA 3
0
1000
2000
3000
4000
5000
6000
2004 2011 2016 2021 2026 2031
Ktoe
Industry Transport Households Services
0
2000
4000
6000
8000
10000
12000
14000
16000
18000
2004 2011 2016 2021 2026 2031
GWh
Industry Transport Households Services
DECISION FACTORS FOR NUCLEAR POWER : Energy demand
09 Feb. 2010 STATUS of INP in TUNISIA 4
Diversification of sources' supply for a better energetic Diversification of sources' supply for a better energetic
independence. In 2007, about 85% of the produced electric independence. In 2007, about 85% of the produced electric
energy came from natural gas.energy came from natural gas.
Diversification of sources' supply for a better energetic Diversification of sources' supply for a better energetic
independence. In 2007, about 85% of the produced electric independence. In 2007, about 85% of the produced electric
energy came from natural gas.energy came from natural gas.
Hydraulic0,5%
Wind0,4%
Natural Gas85,2%
Heavy Fuel13,9%
Electricity production by resource / fuel typeElectricity production by resource / fuel type
DECISION FACTORS FOR NUCLEAR POWER : Energy mix
09 Feb. 2010 STATUS of INP in TUNISIA 5
National production of fossil fuel isNational production of fossil fuel is limited and will be in deficit limited and will be in deficit
from 2015 (for a pessimistic scenario without considering from 2015 (for a pessimistic scenario without considering
eventually the discoveries of new fields). eventually the discoveries of new fields).
National production of fossil fuel isNational production of fossil fuel is limited and will be in deficit limited and will be in deficit
from 2015 (for a pessimistic scenario without considering from 2015 (for a pessimistic scenario without considering
eventually the discoveries of new fields). eventually the discoveries of new fields).
0100020003000400050006000700080009000
10000
2010
2012
2014
2016
2018
2020
2022
2024
2026
2028
2030
KT
OE
Gas availability Gas demand
DECISION FACTORS FOR NUCLEAR POWER : fossil fuel deficit
09 Feb. 2010 STATUS of INP in TUNISIA 6
The optimization study was carried out with WASP model, shows the following preliminary scenario:
400 MW combined cycle from 2011 to 2022
First 1000 MW NPP by 2023 First 600 MW units of coal
production from 2024 to 2029 Second 1000 MW NPP by 2030. Gradual downgrading of thermal
The total installed capacity will be 11.8 GW by the 2031 for a foreseen total demand of about 48,3 TWh, production of 54,3 TWh and a peak of approximately 9.7 GW.
0
2000
4000
6000
8000
10000
12000
14000
Renewable
Thermal
Gas Turbine
Combine cycle
Coal
Nuclear
Plans and scenarios
09 Feb. 2010 STATUS of INP in TUNISIA 7
The nuclear option introduction is seen as a favorable opportunity to develop the country‘s industry, enhance the industrial activities and boost theier quality aspects.
STEG had established, since 1970’s, industrial subsidiaries (SACEM, SIAME, STE) which had been afterward privatized.
For large STEG thermal power projects, the use of local subcontractors have been always highly encouraged and positively quoted in the bid evaluation.
Local industry integration and job creation
09 Feb. 2010 STATUS of INP in TUNISIA 8
On November 03rd 2006, the President of the
Republic commanded the state owned Electricity
Utility (STEG) to conduct the preliminary studies
for an NPP introduction in collaboration with the
Ministry of Higher Education, Scientific Research
and Technology (in charge of the nuclear
applications promotion.)
On November 03rd 2006, the President of the
Republic commanded the state owned Electricity
Utility (STEG) to conduct the preliminary studies
for an NPP introduction in collaboration with the
Ministry of Higher Education, Scientific Research
and Technology (in charge of the nuclear
applications promotion.)
Government Commitment
09 Feb. 2010 STATUS of INP in TUNISIA 9
NATIONAL STRATEGIC ACTION PLAN
THE STRATEGIC ACTION PLAN (SAP) WAS ELABORATED following THE 19 AGENCY MILESTONES (NG-G.3.1) TO DETERMINE OUR TARGETS AND OBJECTIVES TO ACHIEVE OUR GOAL
THE SAP DEFINES ALSO THE RESPONSIBILITIES OF DIFFERENT ACTORS FOR EACH OBJECTIVE TO BE REALIZED AND THE PERFORMANCE INDICATOR FOR IT.
09 Feb. 2010 STATUS of INP in TUNISIA 10
SEVERAL INTERRELATED ACTIVITIES CONSIDERED IN 3
MAJOR PHASES
CONSIDERATIONS BEFORE A DECISION TO LAUNCH A NPP PROGRAM ARE TAKEN
PREPARATION WORK FOR THE CONSTRUCTION OF A NPP AFTER A POLICY DECISION HAS BEEN MADE
ACTVITIES TO IMPLEMENT THE FIRST NPP
NATIONAL STRATEGIC ACTION PLAN
09 Feb. 2010 STATUS of INP in TUNISIA 11
AT THE END OF EACH PHASE : 3 MILESSTONES
1. READY TO MAKE A KNOWLEDGEABLE COMMITMENT TO A NUCLEAR PROGRAMME
2. READY TO INVITE BIDS FOR THE FIRST NPP
3. READY TO COMMISSION AND OPERATE THE FIRST NPP
NATIONAL STRATEGIC ACTION PLAN
09 Feb. 2010 STATUS of INP in TUNISIA 12
THE SAP ALLOWS UNDERSTANDING THE NEED FOR DEVELOPMENT AND ESTABLISHMENT THE OTHERS ASPECTS:
HUMAN RESSOURCES DEVELOPMENT;
COMMUNICATION PLAN WITH STAKEHOLDERS;
FUEL CYCLE STRATEGY (PROCUREMENT POLICY, DISPOSAL ...);
NUCLEAR MATERIAL MANAGEMENT PLAN, etc…
THE SAP HAS BEEN REVIEWED AND VALIDATED BY IAEA ON APRIL 2009 FOR PHASE 1
NATIONAL STRATEGIC ACTION PLAN
09 Feb. 2010 STATUS of INP in TUNISIA 13
(PRE-) FEASABILITY STUDY:
SEVERAL ACTIVITIES ACHIEVED BY THE STEG PROJECT TEAM:
ECONOMIC STUDY,
FINANCIAL ASPECTS,
ELECTRIC SUPPLY NETWORK, etc …
ENERGY PLANNING IN COLLABORATION WITH THE IAEA AND INTERNATIONAL EXPERTS.
THE NATIONAL PRELIMINARY ENERGY LANNING PROGRAMME WILL BE ESTABLISHED AND FINALIZED ON JUNE 2010
TAKING INTO CONSIDERATION THE RENEWABLE ENERGIES UTILISATION AS INPUT FOR THE NATIONAL ENERGY MIX.
APPROACH and PLANNING
09 Feb. 2010 STATUS of INP in TUNISIA 14
REALISATION OF ACTIVITIES BY NATIONAL INSTITUTIONS (CNSTN, CNRP, ANME, INM, …) AND ENGINEERING DEPARTMENTS IN COLLABORATION WITH FOREIGN COUNTRIES:
A- PARTICIPATION OF NATIONAL INDUSTRIAL SECTOR TO THE NPP PROJECT IMPLEMENTATION, SECURITY, SAFETY AND PHYSICAL PROTECTION, etc
B- SITES STUDIES:
UNDER THE PHASE 1 OF NPP TWO CANDIDATE SITES HAVE BEEN SELECTED AND APPROVED BY AUTHORITIES AMONG ABOUT 19 INITIALY IDENTIFIED.
APPROACH and PLANNING
09 Feb. 2010 STATUS of INP in TUNISIA 15
THESE STUDIES ARE BEEING CARRIED OUT BY NATIONAL SPECILIZED ORGANISATION (CNSTN, CNRP, ANME, INM, …) AND ENGINEERING FIRMS, WITH FOREIGN ASSISTANCE
THE MAJORITY OF THE ACTIVITIES OF THE TWO SITE EVALUATION STUDY ARE PERFORMED BY THE STEG’s TEAM AND NATIONAL INSTITUTIONS (CNSTN, CNRP, ANME, INM, …)
IN THIS CONTEXTE THE STEG’s TEAM WILL GET INTERNATIONAL ASSISTANCE FROM FOREIGN FIRMS (AFNI,…) UNDER A BILATERAL AGREEMENT .
APPROACH and PLANNING
09 Feb. 2010 STATUS of INP in TUNISIA 16
REALISATION OF ACTIVITIES BY INTERNATIONAL SPECILIZED ENGINEERING COMPANIES
- FUEL CYCLE AND RADIOACTIVE WASTE MANAGEMENT,
- REACTOR TECHNOLOGY SELECTION, - NPP CONSTRUCTION SCHEDULE,
- INVITATION OF TENDER.
APPROACH and PLANNING
09 Feb. 2010 STATUS of INP in TUNISIA 17
SITE - RISKS OF FLOODS,
INDUCED HUMAN ACTIVITIES ASSESMENT,
INFRASTRUCTURE,
CONSTRUCTION MATERIAL
ASSESMENT OF ENVIRONMENTAL IMPACTS,
THE FOREINS FIRMS WILL UNDERTAKE THE OVERALL OF THE SITE STUDIES RESPONSIBILITY USING THE DATA COLLECTED BY ALL INVOLVED BODIES IN VIEW TO FINALIZE THE SITE SELECTION PROCESS.
APPROACH and PLANNING
09 Feb. 2010 STATUS of INP in TUNISIA 18
THE TUNISIAN APPROACH FOR HRD HAD DEFINED THE FOLLOWING OBJECTIVES WHICH SHOULD BE ACHIEVED FOR RELIABLE SUPPLY OF COMPETENT WORKFORCE:
Ensure needed competence,
Organize work activities,
Anticipate human resources needs,
Monitor and continually improve performance
HUMAN RESSOURCES DEVELOPMENT PROGRAM
09 Feb. 2010 STATUS of INP in TUNISIA 19
INTEGRATING THE ASSESMENT OF SKILLS AND COMPETENCES NEEDED THROUGHOUT THE PROJECT LIFE OF THE PLANNED NPP.
HR DEVELOPMENT STRATEGIC PLAN –TAKING INTO ACCOUNT ALL ORGANIZATIONS INVOLVED AND THE ENTIRE NPP PROJECT
THIS PLAN SHOWS THE STRATEGY TO TIMELY FILL THE NEED OF SKILLS FOR EACH PHASE OF THE PROJECT, INCLUDING THE TRAINING AND THE FOREIGN ASSISTANCE PROGRAM.
HUMAN RESSOURCES DEVELOPMENT PROGRAM
09 Feb. 2010 STATUS of INP in TUNISIA 20
PREPARATION OF THE DECISION 2008-2012: Training programme for 10 engineers per year in collaboration with foreign Institutions,
INVITATION TO TENDER AND CONSTRUCTION 2013-2022:Training of 50 engineers per year at national institutions
TWO NATIONAL EDUCATION PROGRAMME FOR MASTER DEGREE IN NUCLEAR ENERGY AND ENERGY PLANIFICATION ARE PLANNED FOR THE NEXT ACADEMIC YEAR (2010-2012)
HUMAN RESSOURCES DEVELOPMENT PROGRAM
09 Feb. 2010 STATUS of INP in TUNISIA 21
STATUS OF OF THE NATIONAL NUCLEAR POWER INFRASTRUCTURE
TO BUILD THE NATIONAL NUCLEAR POWER TO BUILD THE NATIONAL NUCLEAR POWER INFRASTRUCTURE WE NEED THREE MAIN ACTORS:INFRASTRUCTURE WE NEED THREE MAIN ACTORS:
DECISION MAKERS (Government /Utility)DECISION MAKERS (Government /Utility)
TECHNOLOGY HOLDERS (Research CentersTECHNOLOGY HOLDERS (Research Centers,Institutions, Institutions, Industry)Industry)
INTERNATIONAL COOPERATIONINTERNATIONAL COOPERATION
09 Feb. 2010 STATUS of INP in TUNISIA 22
IN PARALLEL WITH TECHNICO-ECONOMIC STUDY OF PHASE1, THE LEGILATIF AND INSTITUTIONAL FRAMEWORK WAS PERFORMED BY A NATIONAL LEGISLATIF GROUP WORKING UNDER THE AUSPICES OF The National Atomic Energy Commission.
THE LEGISLATIF GROUP HAD ACHIEVED THE FOLLOWING TEXTES:
THE NATIONAL NUCLEAR LOW in 2009, including creation of a National Agency for Radioactive Waste and Spent fuel Management
THE LOW FOR CREATING THE National Nuclear Energy Agency (NNEA)
THE LOW FOR CREATING THE National Nuclear Safety Agency (NNSA- Regulatory Body)
THE NNEA AND NNSA SHOULD BE EFFECTIVE THIS YEAR 2010
STATUS OF OF THE NATIONAL NUCLEAR POWER INFRASTRUCTURE
09 Feb. 2010 STATUS of INP in TUNISIA 23
ACHIEVEMENT OF FEASIBILITY STUDY:2012
SUPPLYER SELECTION AND CONTRACT AWARD:2015
ENTRY IN FORCE OF CONTRACT :Beginning 2016
POURING THE FIRST STRUCTURE CONCRETE: Beginning 2017
NPP COMMISSIONNG: 2023
KEY DATES
09 Feb. 2010 STATUS of INP in TUNISIA 24
EMBARKING ON A NUCLEAR POWER PROGRAME REQUIRES LONG TERM COMMITMENTS AND ADEQUATE NUCLEAR INSTRASTRUCTURE WITH AN EFFECTIVE AND INDEPENDENT Regulatory Body TO SUPPORT IT, WHICH TUNISIA IS UNDERTAKING
ALTHOUGH GENERAL GUIDANCE AND CONSIDERATIONS ARE DERIVED FROM INTERNATIONAL “TOOLS” (IAEA Guides, EUR, URD,), TUNISIA IS ESTABLISHING ITS OWN REQUIREMENTS WITH RESPECT TO ITS NATIONAL STRATEGY AND CHARACTERISTICS WITH REALISTIC VISION ABOUT NUCLEAR TECHNOLOGY AVAILABLE FOR LONG TERM PROJECT.
CONCLUSION.