tullio arena expansion & renovation project information meeting thursday, august 26, 2010 2:00...
TRANSCRIPT
TULLIO ARENAEXPANSION & RENOVATION
Project Information Meeting
Thursday, August 26, 20102:00 – 3:30 pm
Please sign in on the attendance sheet
WELCOME
Project Team Project Overview Project Milestones Procurement Process Bureau of Minority & Women Business
Opportunities Q&A
Commonwealth of Pennsylvania
PA Department of General Services
Erie County
Project Team Introduction
DESIGN TEAM
Casey Wells, Executive DirectorChuck Iverson, Dir. of Finance & Admin.
Ron Desser, Director of Facilities
CONSTRUCTION MANAGER
ARCHITECTURALFriday/Sink Combs Dethlefs
Join Venture Assoc.
MEP ENGINEERSSmith Seckman Reid, Inc.
STRUCTURAL ENGINEERSMartin/Martin
SITE/CIVILT&M Associates
LANDSCAPETerra Design Studios
PRIME TRADE CONTRACTORS
GEOTECHPSI
ENVIRONMENTAL SURVEY
Andrew Martin Associates, Inc.
(Erie, PA)
ACOUSTICSWJHW
FOOD SERVICEDuray, J.F. Duncan
Industries
General Contractor
Mechanical
Electrical
Plumbing
Fire Protection
Specialty Trade
Specialty Trade
Specialty Trade
TURNER CONSTRUCTION COMPANY
Dan Sterling, Project ExecutiveJohn Zawodny, Project ManagerTom Hacke, Purchasing Manager
CONSTRUCTABILITY REVIEWBuehler & Associates
(Erie, PA - DGS WBE Certified
COMMISSIONINGH.F. Lenz (Erie, PA)
Urban Erie Community Development Corporation
(Workforce Diversity Assistance)
Project Overview Program
• 125,000 sq. ft. of Additions• 60,000 sq. ft. of Renovations• Program Space includes:
• Lobbies/vestibules• Administrative Offices• Arena Seating Areas • Concourses• Concessions and Toilets• Team Store• Locker Rooms• Training Areas• Mechanical Rooms• Food Service Prep Areas• Luxury Boxes• Club Seating• Ticketing
• Parking Garage Demolition• Maintain Arena Operations
Project Overview
French Street
E. 8th Street
E. 9th Street
Holland Street
Tullio Arena
Warner Theater Jerry Uht Park
State Street Existing Parking Garage
Project Overview
Event Level
Expanded to the North
Expanded Bowl to the
West
Expanded to the South
Relocated Central Plant
Reconstructed Team Offices/ Locker Rooms
Ice Floor
Food Services
Project OverviewExpanded Concourse
Expanded Concourse
Reconstructed Entry Plaza
Concourse Level
Renovated/ Expanded Restrooms
ADA Upgrades
New Seating
ConcessionsUpgrades
Project OverviewAdded Suite Concourse
Suite Level
Added Suite Concourse
Concessions / Seating
Additions
Project Milestones Schedule
Anticipated Dates
• Construction Documents 90% Complete Current
• Advertise for Bids September, 2010
• Pre-Bid Meeting September, 2010
• Receive Bids October,
2010
• Award Contracts October, 2010
• Start Construction November,
2010
• Construction Completion Late Summer 2012
Procurement Process Overview
• Publicly Bid – Lump Sum Contract
• 5-10 Prime Packages• General Contractor• Plumbing• Fire Protection• Mechanical
• Contracts held by Erie County Convention Center Authority• M/WBE Program/Compliance• Bid Bond (Prime Contractors)• Payment & Performance Bonds (Prime Contractors)• Steel Procurement Act, Certified Payrolls
• Electrical• Seating• Ice System