Screening of available technologies Truck to Ship –TTS and Ship to Ship - STS
12/09/2018
Truck to ship-TTS
The LNG truck is connected to the ship
on the quayside, generally using a
flexible hose
Truck to ship LNG bunkering
1
Ship to Ship - STS
A platform with loading arms/flexible
hoses will be necessary to deliver the
LNG as a marine fuel for bunker ships. Shore to ship - TPS
In Shore to Ship bunkering, or
“terminal-to-ship via pipeline”
(TPS), the LNG is bunkered
directly from a storage tank.
Pipelines from the terminal to
the quay are needed if the
LNG terminal is not directly
situated at the berth.
Metallic structure and piperack
Truck loading facilities
Weighbridge
Screening of available technologies LNG truck loading
12/09/2018 2
Screening of available technologies Storage technologies
12/09/2018
Two containment
options:
A. Full containment tank with
steel self-supporting Inner
Tank and Reinforced Concrete
Outer Tank.
B. Battery of bullet horizontal
tanks. Vacuum and perlite or
vacuum and multilayer
insulated stainless steel
pressure vessels. These
vessels are modular,
prefabricated in factory in
sections off-site, which
reduces site costs.
Tank Type Full containment
Capacity 5.000 to 180.000 m3
Boil off gas 1 % per day
Oper. Press. Almost atmospheric
Rollover Monit. Yes
Manufact. Met Construction on site
Construction
schedule
2 to 3 years
3
Small scale liquefaction with max 30,000 TPA
capacity (Wartsila catalogue image)
12/09/2018
Small scale liquefaction with 63,000 TPA capacity
and 5000 mc storage (Wartsila catalogue image)
The main LNG processes (small-mid scale liquefaction) can be
categorized as follows:
Mixed refrigerant process
Nitrogen expansion process
Opencycle process Cold box
The process contains this o main equipment:
Cryogenic heat exchanger(s)“cold box”
Refrigerant cycle(s) with compressor(s) and turbo-expanders
Screening of available technologies Liquefaction system (mini/small to mid scale range)
4
Bunkering Satellite Plants Truck Refuelling
SMALL SCALE LNG
12/09/2018 5
12/09/2018
Screening of available technologies SSLNG facilities –storage 10,000 mc
General layout and flow diagram of
plant processes / equipment and
relationship between major equipment
of a satellite plant facility.
6
Bunkering Satellite Plants Truck Refuelling
SMALL SCALE LNG
12/09/2018 7
LNG- CNG refueling station Process
12/09/2018
• LNG truck tanker 1
• Cryogenic tank 2
• High pressure pump 3
• High pressure vaporizers 4
• Safety panel 5
• Buffer 6 • GNC dispenser 7
• Low pressure vaporizer for saturation 8
• Submerged pump with variable speed 9
• GNL dispenser 10
8
LNG conventional
Terminal -
Tractebel Projects
12/09/2018 9
LNG conventional terminal KRK, Croatia
12/09/2018
FEED for design of a Conventional
receiving terminals (LNG hubs) in the
large-scale LNG chain are also located
by the coast in the KRK Island so that
LNG carriers can arrive and unload the
cargo.
The terminal includes LNG storage facilities, in the range of 2x
180,000 m3, designed to receive at least the full capacity of the
allocated LNG carrier. The LNG is regasified at the hub, and the main
distribution channel for the consumers is normally a national, high-
pressure, natural gas pipeline.
10
LNG conventional terminal KRK, Croatia
12/09/2018
MAIN DESIGN JETTY
Design of the off shore structures for
loading and unloading LNG gas carriers
at the KRK LNG Terminal in Croatia:
LNGC capacity range
LNG import (ship unloading)
• 15 000 to 265 000 m³
LNG export (ship loading)
• 1000 to 75 000 m³ (small ships or
barges)
11
LNG conventional terminal KRK, Croatia
12/09/2018
The major components of the marine facilities
are:
a jetty head (loading platform) and access trestle
breasting and mooring structures
mooring equipment (fenders and mooring hooks)
catwalks between jetty head and dolphins.
sea water intake area for firewater pumps
LNG impounding basin
12
LNG conventional terminal- Panigaglia GNL Italia (SNAM group)
12/09/2018
Pre-feasibility and Feasibility Studies
aimed at verifying the technical feasibility
and evaluating the investment cost
(CAPEX) for the installations required for
the alternative utilization of LNG as fuel for
ship and road transportations.
Panigaglia terminal offering new SSLNG
services in order to use the storage tanks
of the terminal also for bunkering services.
13
LNG conventional terminal- Panigaglia GNL Italia (SNAM group)
12/09/2018
SSLNG facilities to be implemented in
the Terminal:
Truck loading: LNG is loaded on tank trucks
which transport LNG in smaller quantities
and traffic study for trucks to the terminal
Boil off Gas and
Export Boil off Gas through Liquefaction
Ship Reloading: Transfer of LNG from the
LNG reservoirs of the terminal into a vessel
Loading of bunker ships: LNG is loaded on
bunkering ships which supply to LNG-
fuelled ships or LNG bunkering facilities for
vessels
14
LNG conventional terminal - Revithoussa DESFA
12/09/2018
Installation of a pilot LNG truck loading facility
on Revithoussa Island (LNG terminal)
Basic Design for Truck Loading Station
‒ Basic Design of the installation
‒ Site selection
‒ Traffic study
‒ Safety study
‒ Environmental study
‒ Assistance to drafting of operation procedures
and to updating training
‒ Operation and maintenance manuals
15
LNG conventional terminal - Revithoussa DESFA
12/09/2018
The truck loading facility will include:
The process lines
The loading bay The weighbridge
The required utilities
The area gas and fire detection and monitoring
The truck filling computer building
The trucks will arrive through ferries and will leave the island
by the same way when loaded.
16
LNG conventional terminal - Revithoussa DESFA
12/09/2018 17
SSLNG Fos - Scope of the project
18
• Mooring of small LNG vessels (< 20 000 m3)
• Access to jetty
• Reloading of bunkering vessels
• Target call duration : 16h
• Service available : 24/7
• Availability of service : September 2019
23/04/2018
SSLNG Fos - Mooring of small LNG vessels
19
• Addition of 2 new mooring hooks (green)
• Modification of 2 existing hooks (red)
• Displacement of a firefighting manifold
23/04/2018
SSLNG Fos - Access to jetty
20
Technical options :
o Use of the existing access gangway
23/04/2018
o Use of a dedicated/modified access
platform
ESD1
SSLNG Fos - Reloading of small LNG vessels
21
Modification of the existing loading arms (3 out of 4) :
• Addition of new sensors
• Modification of ESDs with a dedicated configuration for small vessels
ELENGY’s small scale LNG 23/04/2018
New SSLNG Tractebel
projects
12/09/2018 22
4PORTS SSLNG FACILITIES DESFA
12/09/2018
PATRAS’ Port
HERAKLION’s Port
IGOUMENITSA’s Port
LIMASSOL’s Port
1. The unloading/loading
2. The BOG (boil off gas) recovery
3. The LNG storage
4. The send-out operation (optional)
5. Truck loading operation
Conceptual design for SSLNG
facilities in order to develop an
infrastructure network of LNG
bunkering:
— jetty facilities,
— storage facilities,
— truck-loading station,
— ship-loading facilities,
— other necessary utilities
23
PATRAS DESFA
12/09/2018
a) Reception/ offices/control room/warehouse
b) Truck loading station
c) Storage area
d) Other utilities
24
PATRAS DESFA
12/09/2018
The dimensions of the
impounding basins for
the storage area
depend on credible
spill scenarios deriving
from a quantitative risk
assessment.
First dimensioning piping/ routes.
P&Id and Operating &
Control Philosophy
were performed and
analyzed during
HAZOP session.
25
PATRAS Jetty facilities
12/09/2018
Main Rules
Speed limit of traffic 4 knots
Distance between LNG and any other ship when
manoeuvring
200 m
Distance from LNG to any other ship when at berth 200 m
Single 8” LNG loading/unloading arm
for connection with the LNG carrier
A recirculation line
A 10” LNG vapor return arm with
related line to return BOG to the LNG
storage tanks
Jetty local control building
26
Infrastructure solutions for the development
of maritime LNG bunkering in Malta’s core
ports and comprehensive ports as well as
offshore bunkering considering the project of
Malta’s Gas Connection (future Pipeline)
Technical studies of the feasible scenarios to
satisfy the demand within three separate
periods identified in the market study:
PHASE I 2020 – 2024
PHASE II 2025 – 2030
PHASE III 2031 - 2056
Cost benefit analysis and sensitivity
scenarios
LNG BUNKERING IN MALTA GOVERNMENT OF MALTA
12/09/2018
Marsaxlokks’ Port
Valletta’s Port
Cirkewwa’s Port
Mgarr’s Port
Offshore areas
27
LNG BUNKERING IN MALTA Technical infrastructure solution
12/09/2018
1
3
Located somewhere
else in Delimara or
in other ports
2
3off
2off
3off
28
12/09/2018
Simulation 3d for storage tank in the place of
existing diesel ones preliminary photomontage of
the 20,000 m3 onshore tanks solution for the visual
impact, safety and risk aspects.
LNG BUNKERING IN MALTA GOVERNMENT OF MALTA
29
LNG BUNKERING IN MALTA LNG Supply
12/09/2018
Source Nautical
mile (NM)
Revithossa 600
La Spezia 600
Rovigo 780
Barcellona 750
Fos-Marsiglia 700
Egypt 800
Algeria 650
Lybia 300
Estimated timing from the possible
sources:
1 day discharge LNG ISOc to be filled
1 day loading LNG ISOc
2-4 days transport/shipping loaded ISOc
1 day to ISOc handling in Malta bunker
area
1 day to board empty ISOc
30
LNG BUNKERING IN MALTA Offshore solutions
12/09/2018
Offshore bunker area
FSU Offshore
Small
onshore
facilities Offshore bunker area Small
onshore
facilities
Pipeline to
Malta from
FSRU
FSRU Offshore
Pipeline
from
Sicily
4/5
FSU/FSRU
1 1
1
31
12/09/2018
LNG BUNKERING IN MALTA Capex & Opex analysis
32
SSLNG Terminal Sardinia SGI
12/09/2018
Pre-feasibility study:
In the optic of Sardinia’s gasification based
on a network of small-scale LNG terminals,
Tractebel’s study evaluates the feasibility
to install storage and vaporization facilities
in the area of Fiume Santo Power Station.
The following items have been considered:
Storage Technology
Regasification Technology
Jetty
Transfer Line
33
SSLNG Terminal Sardinia SGI
12/09/2018 34
Others Projects
12/09/2018 35
VISIT OUR WEBSITE tractebel-engie.com
12/09/2018
Thank you!
36