Screening of available technologies Truck to Ship TTS and Ship to Ship - STS 12/09/2018 Truck to ship-TTS The LNG truck is connected to the ship on the quayside, generally using a flexible hose Truck to ship LNG bunkering 1 Ship to Ship - STS A platform with loading arms/flexible hoses will be necessary to deliver the LNG as a marine fuel for bunker ships. Shore to ship - TPS In Shore to Ship bunkering, or “terminal-to-ship via pipeline” (TPS), the LNG is bunkered directly from a storage tank. Pipelines from the terminal to the quay are needed if the LNG terminal is not directly situated at the berth.

Upload: others

Post on 28-Sep-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TTS and Ship to Ship - STS - PROPELLER CLUBS · Screening of available technologies Truck to Ship –TTS and Ship to Ship - STS 12/09/2018 Truck to ship-TTS The LNG truck is connected

Screening of available technologies Truck to Ship –TTS and Ship to Ship - STS

12/09/2018

Truck to ship-TTS

The LNG truck is connected to the ship

on the quayside, generally using a

flexible hose

Truck to ship LNG bunkering

1

Ship to Ship - STS

A platform with loading arms/flexible

hoses will be necessary to deliver the

LNG as a marine fuel for bunker ships. Shore to ship - TPS

In Shore to Ship bunkering, or

“terminal-to-ship via pipeline”

(TPS), the LNG is bunkered

directly from a storage tank.

Pipelines from the terminal to

the quay are needed if the

LNG terminal is not directly

situated at the berth.

Page 2: TTS and Ship to Ship - STS - PROPELLER CLUBS · Screening of available technologies Truck to Ship –TTS and Ship to Ship - STS 12/09/2018 Truck to ship-TTS The LNG truck is connected

Metallic structure and piperack

Truck loading facilities

Weighbridge

Screening of available technologies LNG truck loading

12/09/2018 2

Page 3: TTS and Ship to Ship - STS - PROPELLER CLUBS · Screening of available technologies Truck to Ship –TTS and Ship to Ship - STS 12/09/2018 Truck to ship-TTS The LNG truck is connected

Screening of available technologies Storage technologies

12/09/2018

Two containment

options:

A. Full containment tank with

steel self-supporting Inner

Tank and Reinforced Concrete

Outer Tank.

B. Battery of bullet horizontal

tanks. Vacuum and perlite or

vacuum and multilayer

insulated stainless steel

pressure vessels. These

vessels are modular,

prefabricated in factory in

sections off-site, which

reduces site costs.

Tank Type Full containment

Capacity 5.000 to 180.000 m3

Boil off gas 1 % per day

Oper. Press. Almost atmospheric

Rollover Monit. Yes

Manufact. Met Construction on site

Construction

schedule

2 to 3 years

3

Page 4: TTS and Ship to Ship - STS - PROPELLER CLUBS · Screening of available technologies Truck to Ship –TTS and Ship to Ship - STS 12/09/2018 Truck to ship-TTS The LNG truck is connected

Small scale liquefaction with max 30,000 TPA

capacity (Wartsila catalogue image)

12/09/2018

Small scale liquefaction with 63,000 TPA capacity

and 5000 mc storage (Wartsila catalogue image)

The main LNG processes (small-mid scale liquefaction) can be

categorized as follows:

Mixed refrigerant process

Nitrogen expansion process

Opencycle process Cold box

The process contains this o main equipment:

Cryogenic heat exchanger(s)“cold box”

Refrigerant cycle(s) with compressor(s) and turbo-expanders

Screening of available technologies Liquefaction system (mini/small to mid scale range)

4

Page 5: TTS and Ship to Ship - STS - PROPELLER CLUBS · Screening of available technologies Truck to Ship –TTS and Ship to Ship - STS 12/09/2018 Truck to ship-TTS The LNG truck is connected

Bunkering Satellite Plants Truck Refuelling

SMALL SCALE LNG

12/09/2018 5

Page 6: TTS and Ship to Ship - STS - PROPELLER CLUBS · Screening of available technologies Truck to Ship –TTS and Ship to Ship - STS 12/09/2018 Truck to ship-TTS The LNG truck is connected

12/09/2018

Screening of available technologies SSLNG facilities –storage 10,000 mc

General layout and flow diagram of

plant processes / equipment and

relationship between major equipment

of a satellite plant facility.

6

Page 7: TTS and Ship to Ship - STS - PROPELLER CLUBS · Screening of available technologies Truck to Ship –TTS and Ship to Ship - STS 12/09/2018 Truck to ship-TTS The LNG truck is connected

Bunkering Satellite Plants Truck Refuelling

SMALL SCALE LNG

12/09/2018 7

Page 8: TTS and Ship to Ship - STS - PROPELLER CLUBS · Screening of available technologies Truck to Ship –TTS and Ship to Ship - STS 12/09/2018 Truck to ship-TTS The LNG truck is connected

LNG- CNG refueling station Process

12/09/2018

• LNG truck tanker 1

• Cryogenic tank 2

• High pressure pump 3

• High pressure vaporizers 4

• Safety panel 5

• Buffer 6 • GNC dispenser 7

• Low pressure vaporizer for saturation 8

• Submerged pump with variable speed 9

• GNL dispenser 10

8

Page 9: TTS and Ship to Ship - STS - PROPELLER CLUBS · Screening of available technologies Truck to Ship –TTS and Ship to Ship - STS 12/09/2018 Truck to ship-TTS The LNG truck is connected

LNG conventional

Terminal -

Tractebel Projects

12/09/2018 9

Page 10: TTS and Ship to Ship - STS - PROPELLER CLUBS · Screening of available technologies Truck to Ship –TTS and Ship to Ship - STS 12/09/2018 Truck to ship-TTS The LNG truck is connected

LNG conventional terminal KRK, Croatia

12/09/2018

FEED for design of a Conventional

receiving terminals (LNG hubs) in the

large-scale LNG chain are also located

by the coast in the KRK Island so that

LNG carriers can arrive and unload the

cargo.

The terminal includes LNG storage facilities, in the range of 2x

180,000 m3, designed to receive at least the full capacity of the

allocated LNG carrier. The LNG is regasified at the hub, and the main

distribution channel for the consumers is normally a national, high-

pressure, natural gas pipeline.

10

Page 11: TTS and Ship to Ship - STS - PROPELLER CLUBS · Screening of available technologies Truck to Ship –TTS and Ship to Ship - STS 12/09/2018 Truck to ship-TTS The LNG truck is connected

LNG conventional terminal KRK, Croatia

12/09/2018

MAIN DESIGN JETTY

Design of the off shore structures for

loading and unloading LNG gas carriers

at the KRK LNG Terminal in Croatia:

LNGC capacity range

LNG import (ship unloading)

• 15 000 to 265 000 m³

LNG export (ship loading)

• 1000 to 75 000 m³ (small ships or

barges)

11

Page 12: TTS and Ship to Ship - STS - PROPELLER CLUBS · Screening of available technologies Truck to Ship –TTS and Ship to Ship - STS 12/09/2018 Truck to ship-TTS The LNG truck is connected

LNG conventional terminal KRK, Croatia

12/09/2018

The major components of the marine facilities

are:

a jetty head (loading platform) and access trestle

breasting and mooring structures

mooring equipment (fenders and mooring hooks)

catwalks between jetty head and dolphins.

sea water intake area for firewater pumps

LNG impounding basin

12

Page 13: TTS and Ship to Ship - STS - PROPELLER CLUBS · Screening of available technologies Truck to Ship –TTS and Ship to Ship - STS 12/09/2018 Truck to ship-TTS The LNG truck is connected

LNG conventional terminal- Panigaglia GNL Italia (SNAM group)

12/09/2018

Pre-feasibility and Feasibility Studies

aimed at verifying the technical feasibility

and evaluating the investment cost

(CAPEX) for the installations required for

the alternative utilization of LNG as fuel for

ship and road transportations.

Panigaglia terminal offering new SSLNG

services in order to use the storage tanks

of the terminal also for bunkering services.

13

Page 14: TTS and Ship to Ship - STS - PROPELLER CLUBS · Screening of available technologies Truck to Ship –TTS and Ship to Ship - STS 12/09/2018 Truck to ship-TTS The LNG truck is connected

LNG conventional terminal- Panigaglia GNL Italia (SNAM group)

12/09/2018

SSLNG facilities to be implemented in

the Terminal:

Truck loading: LNG is loaded on tank trucks

which transport LNG in smaller quantities

and traffic study for trucks to the terminal

Boil off Gas and

Export Boil off Gas through Liquefaction

Ship Reloading: Transfer of LNG from the

LNG reservoirs of the terminal into a vessel

Loading of bunker ships: LNG is loaded on

bunkering ships which supply to LNG-

fuelled ships or LNG bunkering facilities for

vessels

14

Page 15: TTS and Ship to Ship - STS - PROPELLER CLUBS · Screening of available technologies Truck to Ship –TTS and Ship to Ship - STS 12/09/2018 Truck to ship-TTS The LNG truck is connected

LNG conventional terminal - Revithoussa DESFA

12/09/2018

Installation of a pilot LNG truck loading facility

on Revithoussa Island (LNG terminal)

Basic Design for Truck Loading Station

‒ Basic Design of the installation

‒ Site selection

‒ Traffic study

‒ Safety study

‒ Environmental study

‒ Assistance to drafting of operation procedures

and to updating training

‒ Operation and maintenance manuals

15

Page 16: TTS and Ship to Ship - STS - PROPELLER CLUBS · Screening of available technologies Truck to Ship –TTS and Ship to Ship - STS 12/09/2018 Truck to ship-TTS The LNG truck is connected

LNG conventional terminal - Revithoussa DESFA

12/09/2018

The truck loading facility will include:

The process lines

The loading bay The weighbridge

The required utilities

The area gas and fire detection and monitoring

The truck filling computer building

The trucks will arrive through ferries and will leave the island

by the same way when loaded.

16

Page 17: TTS and Ship to Ship - STS - PROPELLER CLUBS · Screening of available technologies Truck to Ship –TTS and Ship to Ship - STS 12/09/2018 Truck to ship-TTS The LNG truck is connected

LNG conventional terminal - Revithoussa DESFA

12/09/2018 17

Page 18: TTS and Ship to Ship - STS - PROPELLER CLUBS · Screening of available technologies Truck to Ship –TTS and Ship to Ship - STS 12/09/2018 Truck to ship-TTS The LNG truck is connected

SSLNG Fos - Scope of the project

18

• Mooring of small LNG vessels (< 20 000 m3)

• Access to jetty

• Reloading of bunkering vessels

• Target call duration : 16h

• Service available : 24/7

• Availability of service : September 2019

23/04/2018

Page 19: TTS and Ship to Ship - STS - PROPELLER CLUBS · Screening of available technologies Truck to Ship –TTS and Ship to Ship - STS 12/09/2018 Truck to ship-TTS The LNG truck is connected

SSLNG Fos - Mooring of small LNG vessels

19

• Addition of 2 new mooring hooks (green)

• Modification of 2 existing hooks (red)

• Displacement of a firefighting manifold

23/04/2018

Page 20: TTS and Ship to Ship - STS - PROPELLER CLUBS · Screening of available technologies Truck to Ship –TTS and Ship to Ship - STS 12/09/2018 Truck to ship-TTS The LNG truck is connected

SSLNG Fos - Access to jetty

20

Technical options :

o Use of the existing access gangway

23/04/2018

o Use of a dedicated/modified access

platform

Page 21: TTS and Ship to Ship - STS - PROPELLER CLUBS · Screening of available technologies Truck to Ship –TTS and Ship to Ship - STS 12/09/2018 Truck to ship-TTS The LNG truck is connected

ESD1

SSLNG Fos - Reloading of small LNG vessels

21

Modification of the existing loading arms (3 out of 4) :

• Addition of new sensors

• Modification of ESDs with a dedicated configuration for small vessels

ELENGY’s small scale LNG 23/04/2018

Page 22: TTS and Ship to Ship - STS - PROPELLER CLUBS · Screening of available technologies Truck to Ship –TTS and Ship to Ship - STS 12/09/2018 Truck to ship-TTS The LNG truck is connected

New SSLNG Tractebel

projects

12/09/2018 22

Page 23: TTS and Ship to Ship - STS - PROPELLER CLUBS · Screening of available technologies Truck to Ship –TTS and Ship to Ship - STS 12/09/2018 Truck to ship-TTS The LNG truck is connected

4PORTS SSLNG FACILITIES DESFA

12/09/2018

PATRAS’ Port

HERAKLION’s Port

IGOUMENITSA’s Port

LIMASSOL’s Port

1. The unloading/loading

2. The BOG (boil off gas) recovery

3. The LNG storage

4. The send-out operation (optional)

5. Truck loading operation

Conceptual design for SSLNG

facilities in order to develop an

infrastructure network of LNG

bunkering:

— jetty facilities,

— storage facilities,

— truck-loading station,

— ship-loading facilities,

— other necessary utilities

23

Page 24: TTS and Ship to Ship - STS - PROPELLER CLUBS · Screening of available technologies Truck to Ship –TTS and Ship to Ship - STS 12/09/2018 Truck to ship-TTS The LNG truck is connected

PATRAS DESFA

12/09/2018

a) Reception/ offices/control room/warehouse

b) Truck loading station

c) Storage area

d) Other utilities

24

Page 25: TTS and Ship to Ship - STS - PROPELLER CLUBS · Screening of available technologies Truck to Ship –TTS and Ship to Ship - STS 12/09/2018 Truck to ship-TTS The LNG truck is connected

PATRAS DESFA

12/09/2018

The dimensions of the

impounding basins for

the storage area

depend on credible

spill scenarios deriving

from a quantitative risk

assessment.

First dimensioning piping/ routes.

P&Id and Operating &

Control Philosophy

were performed and

analyzed during

HAZOP session.

25

Page 26: TTS and Ship to Ship - STS - PROPELLER CLUBS · Screening of available technologies Truck to Ship –TTS and Ship to Ship - STS 12/09/2018 Truck to ship-TTS The LNG truck is connected

PATRAS Jetty facilities

12/09/2018

Main Rules

Speed limit of traffic 4 knots

Distance between LNG and any other ship when

manoeuvring

200 m

Distance from LNG to any other ship when at berth 200 m

Single 8” LNG loading/unloading arm

for connection with the LNG carrier

A recirculation line

A 10” LNG vapor return arm with

related line to return BOG to the LNG

storage tanks

Jetty local control building

26

Page 27: TTS and Ship to Ship - STS - PROPELLER CLUBS · Screening of available technologies Truck to Ship –TTS and Ship to Ship - STS 12/09/2018 Truck to ship-TTS The LNG truck is connected

Infrastructure solutions for the development

of maritime LNG bunkering in Malta’s core

ports and comprehensive ports as well as

offshore bunkering considering the project of

Malta’s Gas Connection (future Pipeline)

Technical studies of the feasible scenarios to

satisfy the demand within three separate

periods identified in the market study:

PHASE I 2020 – 2024

PHASE II 2025 – 2030

PHASE III 2031 - 2056

Cost benefit analysis and sensitivity

scenarios

LNG BUNKERING IN MALTA GOVERNMENT OF MALTA

12/09/2018

Marsaxlokks’ Port

Valletta’s Port

Cirkewwa’s Port

Mgarr’s Port

Offshore areas

27

Page 28: TTS and Ship to Ship - STS - PROPELLER CLUBS · Screening of available technologies Truck to Ship –TTS and Ship to Ship - STS 12/09/2018 Truck to ship-TTS The LNG truck is connected

LNG BUNKERING IN MALTA Technical infrastructure solution

12/09/2018

1

3

Located somewhere

else in Delimara or

in other ports

2

3off

2off

3off

28

Page 29: TTS and Ship to Ship - STS - PROPELLER CLUBS · Screening of available technologies Truck to Ship –TTS and Ship to Ship - STS 12/09/2018 Truck to ship-TTS The LNG truck is connected

12/09/2018

Simulation 3d for storage tank in the place of

existing diesel ones preliminary photomontage of

the 20,000 m3 onshore tanks solution for the visual

impact, safety and risk aspects.

LNG BUNKERING IN MALTA GOVERNMENT OF MALTA

29

Page 30: TTS and Ship to Ship - STS - PROPELLER CLUBS · Screening of available technologies Truck to Ship –TTS and Ship to Ship - STS 12/09/2018 Truck to ship-TTS The LNG truck is connected

LNG BUNKERING IN MALTA LNG Supply

12/09/2018

Source Nautical

mile (NM)

Revithossa 600

La Spezia 600

Rovigo 780

Barcellona 750

Fos-Marsiglia 700

Egypt 800

Algeria 650

Lybia 300

Estimated timing from the possible

sources:

1 day discharge LNG ISOc to be filled

1 day loading LNG ISOc

2-4 days transport/shipping loaded ISOc

1 day to ISOc handling in Malta bunker

area

1 day to board empty ISOc

30

Page 31: TTS and Ship to Ship - STS - PROPELLER CLUBS · Screening of available technologies Truck to Ship –TTS and Ship to Ship - STS 12/09/2018 Truck to ship-TTS The LNG truck is connected

LNG BUNKERING IN MALTA Offshore solutions

12/09/2018

Offshore bunker area

FSU Offshore

Small

onshore

facilities Offshore bunker area Small

onshore

facilities

Pipeline to

Malta from

FSRU

FSRU Offshore

Pipeline

from

Sicily

4/5

FSU/FSRU

1 1

1

31

Page 32: TTS and Ship to Ship - STS - PROPELLER CLUBS · Screening of available technologies Truck to Ship –TTS and Ship to Ship - STS 12/09/2018 Truck to ship-TTS The LNG truck is connected

12/09/2018

LNG BUNKERING IN MALTA Capex & Opex analysis

32

Page 33: TTS and Ship to Ship - STS - PROPELLER CLUBS · Screening of available technologies Truck to Ship –TTS and Ship to Ship - STS 12/09/2018 Truck to ship-TTS The LNG truck is connected

SSLNG Terminal Sardinia SGI

12/09/2018

Pre-feasibility study:

In the optic of Sardinia’s gasification based

on a network of small-scale LNG terminals,

Tractebel’s study evaluates the feasibility

to install storage and vaporization facilities

in the area of Fiume Santo Power Station.

The following items have been considered:

Storage Technology

Regasification Technology

Jetty

Transfer Line

33

Page 34: TTS and Ship to Ship - STS - PROPELLER CLUBS · Screening of available technologies Truck to Ship –TTS and Ship to Ship - STS 12/09/2018 Truck to ship-TTS The LNG truck is connected

SSLNG Terminal Sardinia SGI

12/09/2018 34

Page 35: TTS and Ship to Ship - STS - PROPELLER CLUBS · Screening of available technologies Truck to Ship –TTS and Ship to Ship - STS 12/09/2018 Truck to ship-TTS The LNG truck is connected

Others Projects

12/09/2018 35

Page 36: TTS and Ship to Ship - STS - PROPELLER CLUBS · Screening of available technologies Truck to Ship –TTS and Ship to Ship - STS 12/09/2018 Truck to ship-TTS The LNG truck is connected

VISIT OUR WEBSITE tractebel-engie.com

12/09/2018

Thank you!

36