Street Address 401 North Wabash AvenueBuilding Function residential / hotelStructural Material concreteProposed 2001
Construction 2005- 2009Global Ranking #11 tallest in the WorldRegional Ranking #2 tallest in North
AmericaNational Ranking #2 tallest in United StatesCity Ranking #2 tallest in ChicagoOfficial Website www.trumpchicago.com
http://www.rediffmail.com/cgi-bin/red.cgi?red=http%3A%2F%2Fwww%2Etrumpchicago%2Ecom%2F&isImage=0&BlockImage=0&rediffng=0http://www.rediffmail.com/cgi-bin/red.cgi?red=http%3A%2F%2Fwww%2Etrumpchicago%2Ecom%2F&isImage=0&BlockImage=0&rediffng=0 -
7/29/2019 Trump Int Hotel
3/36
Height: Architectural 423.2 mHeight: Occupied 340.1 mHeight: To Tip 423.2 m
Floors Above Ground 98Floors Below Ground 2# of Elevators 27
Top Elevator Speed 8 m/sTower GFA 241,548 m
-
7/29/2019 Trump Int Hotel
4/36
Companies Involved
Developer The Trump OrganizationDesign Architect Skidmore Owings & MerrillStructural Engineer Skidmore Owings &
MerrillMEP Engineer WMA Consulting EngineersMain Contractor Bovis Lend Lease Inc.
Material Suppliers Permasteelisa GroupOther Consultants KONE; RWDI; DowCorning Corporation
-
7/29/2019 Trump Int Hotel
5/36
The Trump International Hotel and Tower, alsoknown as Trump Tower Chicago and TrumpTower, is a skyscraper condo-hotel in
downtown Chicago, Illinois
The building, named after billionaire real estatedeveloper Donald Trump, was designed by
architect Adrian Smith of Skidmore, Owings andMerrill. Bovis Lend Lease built the 92-storystructure, which reached a height of 423 m
including its spire, its roof topping out at 360 m It is adjacent to the main branch of the Chicago
River, with a view of the entry to Lake Michigan
beyond a series of bridges over the river
-
7/29/2019 Trump Int Hotel
6/36
The Atrium
-
7/29/2019 Trump Int Hotel
7/36
Trump announced in 2001 that the skyscraperwould become the tallest building in the world,but after the September 11, 2001 terrorists
attacks, he scaled back the building's plans,and its design underwent several revisions
When topped out in 2009, it became thesecond-tallest building in the WesternHemisphere, after another Chicago building, theWillis Tower
Trump Tower surpassed the city's John
Hancock Center as the building with the highestresidence in the world, and held this title untilthe completion of the Burj Khalifa. As of 24November 2012 it is the twelfth-tallest buildingin the world.
-
7/29/2019 Trump Int Hotel
8/36
Trump Towerviewed from Fifth
Avenue
-
7/29/2019 Trump Int Hotel
9/36
The design of the building includes, from the groundup, retail space, a parking garage, a hotel, andcondominiums. The 339-room hotel opened for
business with limited accommodations and serviceson January 30, 2008. April 28 of that year marked thegrand opening with full accommodation and servicesof hotel services. A restaurant on the 16th floor,
named Sixteen, opened in early 2008 to favorablereviews. The building topped out in late 2008 andconstruction was completed in 2009. The hotel is oneof four in Chicago with an elite four- or five-star rating
and the building hosts a restaurant that is one of ninein Chicago with either a four- or five-star rating,according to the Forbes Travel Guide.
-
7/29/2019 Trump Int Hotel
10/36
-
7/29/2019 Trump Int Hotel
11/36
The design incorporates three setback featuresdesigned to provide visual continuity with thesurrounding skyline, each reflecting the height
of a nearby building
The first setback, on the east side of thebuilding, aligns with the cornice line of the
Wrigley Building to the east; the second, on thewest side, aligns with River Plaza to the northand with the Marina City Towers to the west.
The third setback, on the east side, relates to330 North Wabash building (formerly known asIBM Plaza).
-
7/29/2019 Trump Int Hotel
12/36
However, some views distort the alignment ofthe second setback. The setbacks and roundededges of the building combat vortex formation
which may occur in the "Windy City The body of the building is raised 9.1 m above
the main Wabash entrance and 21 m above theChicago River
The building uses clear low-emissivity coatedglass and a curved wing-shaped polishedstainless steel mullion system that projects 23
cm from the glass line It incorporates a brushed stainless steel
spandrel panels and clear anodized aluminum
-
7/29/2019 Trump Int Hotel
13/36
The building has 240,000 m2 of floor space, rises to92 stories, and houses 486 luxury residentialcondominiums- studio apartments, a mixture of suiteswith one to four bedrooms, and five-bedroompenthouses
A 4,900 m2 riverfront park and riverwalk, was openedin 2010
The building surpassed the record for containing theworld's highest residence above ground-level, whichhad been held since 1969 by the nearby JohnHancock Center. Because the Trump Tower has bothhotel condominiums and residential condominiums, itdoes not contest the record held by the 79-story TheTorch in Dubai, which, at 337 meters , is the tallest all-residential building.
-
7/29/2019 Trump Int Hotel
14/36
Construction By January 2007 all three adult Trump children (Ivanka Trump,
Donald Trump, Jr., and Eric Trump) were executives in theacquisitions and development division of the organization. Bythe time the Chicago Trump Tower's hotel opened in thebuilding in January 2008, Donald Trump and his three adultchildren were in the spotlight, overseeing the construction
Bovis Lend Lease, noted for work on Disneyland Paris,Petronas Towers, and the Time Warner Center, was theconstruction company
James McHugh Construction Co, the concrete subcontractor,
implemented a comprehensive formwork for the construction ofthe building. At the completion of construction the building wasthe tallest formwork structure in the world, and follows in thefootsteps of its neighbor, Marina City, as well asChicago's Two Prudential Plaza, as past record holders.
-
7/29/2019 Trump Int Hotel
15/36
Self Compacting Concrete
Concrete was used, because using atraditional ironwork structure would haverequired a building footprint that would havebeen too big for the property size, proportional
to the height of the designed building. A steelframe would have had to be 7.6 m wider tohave supported a building of this proportion
Concrete will counteract the force of wind with
the force of gravity of the 330,000 t building.SCC that leveraged more fluid liquid concretefacilitated pumping concrete up several
hundred feet to the elevating construction site.
Th b ildi i O Pil F d d li t 34
-
7/29/2019 Trump Int Hotel
16/36
The building is On Piles,Founded on limestone 34 mBelow ground
On top of these Piles , an 7,600 t concrete Raft wasbuilt. The building has 241 Piles, and the majority only
descend 23 m into hard clay. However, 57 of them goan additional 11 m into the ground, including 1.8 m ofbedrock
The concrete spine uses five I-beam-shaped walls and
exterior columns, narrowing to two as the buildingrises. Stainless steel, glass, and aluminum panels are
attached to each floor. 45,000 t of reinforcing steelrebars Are Used. The use of concrete makes the
building more fireproof. Of the $600 million construction budget, $130 million
was earmarked for the James McHugh ConstructionCo, who handled the 140,000 m3 concrete-only
portion of the job.
-
7/29/2019 Trump Int Hotel
17/36
-
7/29/2019 Trump Int Hotel
18/36
Design and Utilisation of HPC
-
7/29/2019 Trump Int Hotel
19/36
HPC Mixes
-
7/29/2019 Trump Int Hotel
20/36
Mat Foundation Construction
-
7/29/2019 Trump Int Hotel
21/36
SCC For Mat
-
7/29/2019 Trump Int Hotel
22/36
Structural System
-
7/29/2019 Trump Int Hotel
23/36
Outrigger
The outriggers are large RC wall-beams (1.7m wideand 5.3m deep) that extend from the flanges of thecore walls to the exterior columns at three of thedouble-height mechanical floors in the tower (Levels28-29, 50-51, and 90-91)
The outrigger levels occur just below the building set-back levels, outriggers also serve as transfer girders,as the columns are relocated at the faade setbacks
At the lowest building setback (Level 16) transfer
girders allow for a column-free space at the tenparking levels. Perimeter belt walls at the roof and thethree mechanical levels provide additional torsionalstiffness and redundancy, as well as serving toequalize column loads along the perimeter.
-
7/29/2019 Trump Int Hotel
24/36
Typical Residential Floor Plan
-
7/29/2019 Trump Int Hotel
25/36
Typical Residential Floor
Typical residential floors are 230mm thick flatplates spanning up to a maximum of 9.1mwithout perimeter spandrel elements. This
construction minimizes the structural depth ofthe floor, allowing higher ceiling heights.
Tower columns are typically 600 by 1200mm
rectangular sections at the top of the buildingand 1800mm diameter circular sections at thebase.
-
7/29/2019 Trump Int Hotel
26/36
Foundation Tower supported by 57 rock caissons. Tower columns
will be supported by 33 of these rock caissons up to2.4m in diameter and stabilized by a series of caissoncaps and grade beams
A 3m thick concrete mat under the core walls transferstheir loads into a grid of the 24 - 3m diameter drilled
shaft rock caissons that extend about 25m downwhere they are socketed 1.8m into bedrock. The design specified an Osterberg load cell test be
preformed on one of the first production rock caissons
to verify an increase in allowable bearing pressureabove the Chicago Building Code allowable 19,100kN/m2. The resulting successful Osterberg load celltest, allowed the design team to utilize allowablebearing pressures up to 25,800 kN/m2.
-
7/29/2019 Trump Int Hotel
27/36
The mat pour in late September of 2005,represented 3,800 cubic meters of self-consolidating concrete over the plandimensions of 60m x 18m in a single
continuous pour accomplished in a period of 22hours and required 30 ready mix trucks makinga total of 600 trips to the job site.
Concrete was dispatched from the batch plantat a distance of approximately 2.5 kilometers,and was placed by conveyors The concreteflow from point of placement was on the order
of up to 15 meters.
-
7/29/2019 Trump Int Hotel
28/36
Mix For Mat Foundation Blend of 12mm and 20mm size coarse aggregate
Natural sand fine aggregate Ternary mix of Type II Portland cement, slag cement
and Class C fly ash
Type D chemical Retarder
Polycarboxylate HRWR admixture and VMA
Target flow spread 66 to 71cm
Target J-Ring 61 to 69cm
Water / Cementitious Ratio 0.26 to 0.28 After completion of the pour, the top surface was
topped with rigid insulation planks and plywood to limitthe heat loss through the exposed top surface.
-
7/29/2019 Trump Int Hotel
29/36
Mix For Mat Foundation The peak temperature within the interior of the mat
pour was recorded at 680C at 72 hours after the pour The maximum differential between mid-height and top
surface of the mat was 160C
At 56 days, concrete cylinder compressive strengths
at nearly 100 MPa and static modulus of elasticity at47 GPa
The mat foundation pour for the Trump Towerrepresented the largest single SCC placement in
North America to date Subsequent core samples taken from the in-place mat
concrete indicated uniform aggregate dispersionthroughout the samples without segregation.
-
7/29/2019 Trump Int Hotel
30/36
Trump Tower is quite slender The aspect ratio of the tower is 8 to 1, significantly
influenced by the dynamic nature of the wind and itsinteraction with the building structure. Movementsunder wind load are affected by a buildings stiffness,mass, and damping as well as the local windenvironment and geometry of the tower shaft.
Concrete chosen as the primary structural material totake advantage of its ability to provide a highlymassive frame with high damping
High lateral stiffness of the tower accomplished by
using high modulus of elasticity concrete in themassive column, wall, and outrigger elements Inherent damping of the concrete frame is About 50%
higher than in a comparable steel scheme.
-
7/29/2019 Trump Int Hotel
31/36
Special Mix 83 MPa and 110 MPa strength SCC mix designs have
been developed for the highly reinforced localoutrigger zones at the building setbacks. Concrete ispumped with Putzmeister 14000 equipment as high as340 meters above grade without horizontal staging.
The 110 MPa design calls for a quadrenarycementitious mix composed of microsilica, slagcement, and fly ash in addition to ordinary portlandcement. Target water / cementitious ratio is 0.25.
Combinations of mid-range and high-range waterreducers, retarder, and VMA are included in the mixdesign. Locally available limestone aggregate from theThornton quarry up 20mm size is being used for the
pumped mix.
-
7/29/2019 Trump Int Hotel
32/36
High Performance Self-
consolidating Concrete
The heavy longitudinal reinforcing steel must passfrom the thicker outrigger through the thinner core wallweb to transfer forces between the columns and core.
To reduce congestion, all primary reinforcing bars inthe outrigger levels are 520 N/mm2 yield strength
In three especially-tight locations, high strengthstructural steel plates with welded shear studs are
used in lieu of reinforcing bars to transfer thenecessary forces through the core wall web
High Performance Self
-
7/29/2019 Trump Int Hotel
33/36
High Performance Self-
consolidating Concrete
A series of high performance concrete mixturesareadvancing the state-of-the-art. Concrete strengths of83 MPa (cylinder strength) at 90 days have beenspecified for all vertical column and wall elements up
to Level 51 Local areas in the outrigger zones, however, require110 MPa (cylinder strength) concrete at 90 days
Because the 110 MPa concrete is located in areas
with high reinforcement congestion, self-consolidatingconcrete (SCC) with a minimum flow spread of600mm has been specified. Further, to reduce theheat gain in the massive elements, the highperformance SCC incorporates slag cement, fly ash,
and silica fume as well as Portland cement.
-
7/29/2019 Trump Int Hotel
34/36
Outrigger wall reinforcing
M d l f El ti it
-
7/29/2019 Trump Int Hotel
35/36
Modulus of Elasticity A collaborative preconstruction concrete design mix
testing program between the concrete supplier, theowners testing agency and Construction TechnologyLaboratories, established a correlation between thedynamic elastic modulus test, and the static modulustest.
Testing of the 83 MPa concrete utilized in the lowerlevel columns and shear walls has resulted in anaverage compressive strength in excess of 93 MPa at90 days with a coefficient of variation below 9%. StaticModulus of elasticity testing has yielded an averagemodulus of 45.5 GPa at 90 days. This exceeds themodulus predicted using the equations in ACI 318 byover one standard deviation.
On August 16 2008 construction crews made
-
7/29/2019 Trump Int Hotel
36/36
On August 16, 2008, construction crews madethe last major concrete pour to top off theTrump tower's concrete core
To celebrate the milestone, a yellow towercrane raised a bucket full of concrete and an
American flag to the rooftop of the skyscraper
Donald Jr., Ivanka and Eric Trump attended thetopping off party on September 24, 2008
Original plans called for the windows to be
completed and the spire erected in October2008. However, the spire installation wasdelayed through high winds in December 2008,
d fi ll l t d J 3 2009