trpc.biz/old_archive/wp-content/uploads/5.-jeffrey-yan-msft1.pdf · automatic network planning...
TRANSCRIPT
*2010 Estimates: ITU World Telecommunications/ ICT Indicators database
But 4.8B are not connected
But 3.9B could not afford
But 2.6B could not afford
Still some 2.2B have-not’s
Query the availability database
Transmit in “available frequencies”
Detect if primary user appears
Move to new frequencies
Adapt bandwidth and power levels
Po
wer
Frequency
PU1
PU2
PU4
PU3
http://whitespaces.msresearch.us
Propagation
Modeling TV/MIC data (FCC CDBS, others)
Location (Latitude, Longitude)
Terrain Data (Globe, SRTM)
http://whitespace.i2r.a-star.edu.sg
Asia Development
Bank Demo (Manila)
Cambridge, UK Trial Report
http://whitespace.i2r.a-star.edu.sg
http://www.ida.gov.sg/Policies%20and%20Regulation/20060421164253.aspx#WST
http://www.ida.gov.sg/Policies%20and%20Regulation/20100730141139.aspx
Example: Neul Product Roadmap 2011-2013
WISPs
2011 H2 2012 H1 2012
Network users
Network operators Network
operators
NeulNET 1 Terminal Powering the largest white space radio
trial in the world
NeulNET 1 Basestation
Installed now on three continents
>24Mbps broadband
US, UK and worldwide markets
Neultrino Dev Kit
Link any device to Neul’s Network
Simple PHP/JavaScript coding
Iceni Custom ASIC
Interface identical to Neultrino
Multi year battery life
<$5 chip cost
v2
2013
16Mbps broadband
Up to 10km range
No line of sight required
Cloudbase 1
Automatic network planning
Online data aggregation
Discreet (50cm) omni antennas
Cloudbase 2
Macro and femtocell variants
Multi channel operation
High gain, multi element antennas
Prove Technology Build the ecosystem Roll out International Networks
Findings from Economic Paper
By Richard Thanki
Smart Radio, Smarter City
© 2012 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are or may be registered trademarks and/or trademarks in the U.S. and/or other countries.
The information herein is for informational purposes only and represents the current view of Microsoft Corporation as of the date of this presentation. Because Microsoft must respond to changing market conditions,
it should not be interpreted to be a commitment on the part of Microsoft, and Microsoft cannot guarantee the accuracy of any information provided after the date of this presentation.
MICROSOFT MAKES NO WARRANTIES, EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS PRESENTATION.