tropical operations and configuration training courses update shannon white, pablo santos, david...
TRANSCRIPT
Tropical Operations and Configuration Training
Courses UpdateShannon White, Pablo Santos, David Sharp, Andy Devanas, Matt Moreland
Status Quo• No changes planned to the following
modules:– Expressions of Uncertainty (1&2) • Possible minor tweaks to module 2
– Hazard Grid Creation– EWW (same as 2010)– TCMWindTool– Using NWR with the HLS– Configuring NWRWAVES for Tropical
Operations • Minor update to jobsheet planned based on user
feedback
What’s Changing• Content– Adding more examples from other sites• Need volunteers to provide those examples
• Tropical Impact Graphics– Rework some content to emphasize the role of
the forecaster in the creation of the tropical impact graphics
– Re-emphasize proper product application and interpretation
– Add a jobsheet outlining what needs to be chosen within each tool and when
What’s Changing• GFE Configuration Course–Last season’s course staying as-is–Add (return) inland-only config course
• HLS Creation Course–Change the format • Overview course for new users• A new web-based decision tree to guide
forecasters through the proper creation process
Sample Decision Tree
Possible New Cases
• We HOPE to have an easier-to-run AWIPS test case for each site
• It will script the ingest of new data sets that can be viewed/manipulated while GFE is in practice mode
• Facilitator jobsheets provided to help run the rest of the staff through the case for training
• All contingent upon getting concrete scripting/testing HELP from the regions
WFO Houston/Galveston 2011 Tropical Simulations
Matt MorelandEmergency Response Meteorologist – Team Lead
WFO New Orleans/Baton Rouge
TROPICAL SIMULATION TRAINING
Critical for all WFOs to run through tropical simulation training prior to peak of the Hurricane Season.
Objectives:-Train forecasters/management on WFO tropical operations in a setting as close as possible to a real-time event-Robust testing of operational AWIPS prior to Hurricane Season-Feedback sessions lead to more efficient WFO tropical operations-Improved IDSS: mock emergency management briefings help to streamline process and gain critical feedback from partners
POSSIBLE PLAN (WITH ERMET OR NATIONAL SUPPORT):ER-Met Teams work with national training team to run through simulation training at Pilot projects - Spring 2012 ER-Met Teams work with national training team to refine process and step-by-step instructions ship instructions for other WFOs and provide support for simulation training
WFO HGX Example -Facilitator Setup
Facilitator must have technical knowledge of AWIPS/GFE-Installed NHC “WGULF” test case on operational AWIPS using procedures on the AWIPS special projects Tropical wiki page. All procedures on the page completed prior to the simulation
-Setup baseline set of GFE grids for simulation (temperatures, relative humidity, Sky, PoP, weather, QPF, WaveHeight). These grids saved for each simulation
-Setup WRKTCM text file and a mock WGULF public advisory (WRKTCP)
-Create WGULF storm in HurrEvac “exercise wizard” for use in mock briefings
-Wind/Surge probability grids put into place just prior to simulation
Conducting Simulations
- Six simulations in June 2011 on “WGULF” test case (large Category 4 hurricane striking southeast Texas). All staff required to attend at least one as part of mandatory training.
- Training elements: tropical GFE grid production, HLS creation, emergency management briefing techniques
- Hardware: one AWIPS workstation with GFE in PRACTICE modeBriefing PC
- Required attendance: Facilitator At least one manager for briefing or overviewThree forecasters – 2 on AWIPS workstation, 1 on briefingSMG meteorologist as observerEmergency Management + other forecasters to serve as “briefing audience”
Conducting Simulations
- Facilitator actions: - Conduct outlined setup steps prior to simulation- Create/issue mock Tornado Watch- Issue mock TCV from NHC for WGULF storm- Provide guidance during the training
- Grid/HLS portion and briefing portions were conducted simultaneously. About 90 minutes total
- Forecasters: had extensive step-by-step instructions for use during the grid editing and HLS creation portion
- Management either monitored or conducted mock emergency management briefing. Other forecasters, managers, or actual emergency managers provided mock questions during briefing.
- Conclusion: a 30 minute debrief or “hotwash” session
FEEDBACK/“HOTWASH” SESSION
- SMG feedback:- Importance of simulating with peers under time constraints
(vs. training individually on the WES)- Limitation: not having a full suite of weather data for the
simulation (satellite, radar)- Teamwork and communications: feedback or “hotwash”
session important to get ideas on improving this
- Important discussions over office operations:- Creating operational checklist and “flow chart” for
hurricane duties- Division of workload discussions- Disseminating evacuation information – PNS or HLS?- Improvements/corrections in step-by-step instructions
BENEFITS OF AWIPS SIMULATION
- Interactive: direct feedback and help from facilitators; better model of actual event
-Management presence adds weight: sets “high priority” example
-AWIPS put through robust test prior to season: Operational system run through a full test during each simulation helping to troubleshoot/correct critical bugs.Example: at WFO HGX, “personalized” GFE configuration file led to problems with creation of HLS and tropical impact graphics
-Emergency Management Briefings streamlined and improved: Provides critical training for forecasters/management. Instructions streamlined/improved with each simulation.