trip reports and software plans for the upgrade

17
10 Nov 2010 Trip reports and BB softwar e 1 Trip Reports and Software Plans Trip Reports and Software Plans for the Upgrade for the Upgrade AAC at Fermilab APEX at BNL Plan for BB software

Upload: lam

Post on 06-Jan-2016

31 views

Category:

Documents


0 download

DESCRIPTION

Trip Reports and Software Plans for the Upgrade. AAC at Fermilab APEX at BNL Plan for BB software. AAC at Fermilab. The A ccerator A dvisory C ommittee has been convened from the 28 th to the 30 th of July 2010 at Fermilab - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Trip Reports and Software Plans for the Upgrade

10 Nov 2010 Trip reports and BB software 1

Trip Reports and Software Plans Trip Reports and Software Plans for the Upgradefor the Upgrade

AAC at Fermilab APEX at BNL

Plan for BB software

Page 2: Trip Reports and Software Plans for the Upgrade

10 Nov 2010 Trip reports and BB software 2

AAC at Fermilab

The Accerator Advisory Committee has been convened from the 28th to the 30th of July 2010 at Fermilab

One of the goals has been to review the proposed experiments for the post-Run II studies

Proposals were put forward by the Tevatron, BNL & CERN

Page 3: Trip Reports and Software Plans for the Upgrade

10 Nov 2010 Trip reports and BB software 3

Tevatron ProposalTevatron Proposal• ½ Integer Tevatron Working Point• Lifetime vs Helix Size (Beam Separation)• Confirm worse lifetime with smaller σz/β* (V.Shiltsev)• Wide tune scans during collisions (Zhang, Shiltsev)• Lifetime vs Phase Advance between CDF & D0 IPs (Yu. Alexahin)• Coherent beam-beam effect• Tevatron as Stretcher Ring for Slow Spill (M. Syphers)• Instability studies• Lifetime measurements for IBS / vacuum / noise• Electron Cloud (X. Zhang)• Space-Charge Compensation with Electron Column

Page 4: Trip Reports and Software Plans for the Upgrade

10 Nov 2010 Trip reports and BB software 4

BNL ProposalBNL Proposal

Page 5: Trip Reports and Software Plans for the Upgrade

10 Nov 2010 Trip reports and BB software 5

Page 6: Trip Reports and Software Plans for the Upgrade

10 Nov 2010 Trip reports and BB software 6

Page 7: Trip Reports and Software Plans for the Upgrade

10 Nov 2010 Trip reports and BB software 7

Recommendations• Prioritize experiments taking into account effort, benefit, academic interest, relevance

for existing problems• Need commitment of management to allocate time on experiments, thus need to iterate

of program planning with management• TEVATRON end of run-II or end of store should start to be coordinated and organized

starting now and a coordinator should be designated. • Experiments should be formally proposed with well defined goals. • A formal process should (which does not have to be very elaborate) be put in place to

approve proposed experiments.• Experiments should be worked out well in advance with clear goals, simulations, clear

understanding of needed instrumentation of hardware and needed time,

Each topic should have an FNAL liaision to assure feasibility and adequate preparation • Completed experiments should be evaluated and results should be captured in a written

report if not a publication. This should be a condition for approval.

Page 8: Trip Reports and Software Plans for the Upgrade

10 Nov 2010 Trip reports and BB software 8

Consequence & PlanConsequence & Plan• Together with the Tevatron experts we have defined the CERN/FERMILAB teams for the 8 first CERN experiments.• It was felt that the last 2 were not quite doable at the Tevatron.• Of course it all depends on whether the RUN II will be prolonged or not.• In any event the collimation experiments will go ahead. There is a strong self-interest between the Tevatron colleagues to do these experiments in a parasitic manner.

Page 9: Trip Reports and Software Plans for the Upgrade

10 Nov 2010 Trip reports and BB software 9

APEX Goals• Improve machine performance

– RHIC– Injector chain

• Support developments for RHIC future– eRHIC, coherent electron cooling

• Support beam instrumentation development– RHIC, AGS, future facilities like pEDM

• Inter-lab collaboration– LHC, Tevatron, CEBAF

• Enrich accelerator physics knowledgement

Page 10: Trip Reports and Software Plans for the Upgrade

10 Nov 2010 Trip reports and BB software 10

Run-11

Wolfram Fischer 10

Recommendation of Program Advisory Committee (June 21-22, 2010):

Page 11: Trip Reports and Software Plans for the Upgrade

10 Nov 2010 Trip reports and BB software 11

Summary

• Run-11: 250 GeV polarized protons goalsP = 35 50% * = 0.7 0.6 m Nb = 1.1 1.4x1011

• Run-11: 100 GeV/nucleon goals* = 0.75 0.65 m Nb = 1.1 1.1x109 more cooling

• To allow for lower * need to implement reliable optics measurement and correction

Wolfram Fischer 11

Page 12: Trip Reports and Software Plans for the Upgrade

10 Nov 2010 Trip reports and BB software 12

Further polarized beam upgrades

Wolfram Fischer 12

In-situ pipe coating SEYand reduction (start >2013)

Polarized source upgrade 10x intensity, ~5% more polarization (2013)

existing OPPIS

Electron lenses up to 2x luminosity with source upgrade (2013)

Page 13: Trip Reports and Software Plans for the Upgrade

10 Nov 2010 Trip reports and BB software 13

New Developments

APEX Workshop 2010, D. Gassner (10/18/10)

RHIC Orbit, Tune, Coupling, and Chromaticity FeedbackRUN-10: Tune and coupling feedback fully operational First proof-of-principle of simultaneous: Tune, coupling, and chromaticity feedback Orbit, tune, and coupling feedback Simultaneous feedback on all 4

Pictures at right are during the first execution in RUN-10

RUN-11: Goals: Fully operational 4-way simultaneous feedback Orbit feedback during the store

Modifications to BPM and Orbit managers: (Al Marusic)

Merge BpmManager and OrbitManager- Reduce load on FECs, resulting in fewer data gaps

Start using orbit correction library in RhicOrbitDisplay- Integrate existing orbit tools & features into the Controls system.

Exception handling for non-converging orbit corrections (due to machine optical errors).

Reduce CPU usage by modifying loggers to use new fast networking services. - Employ new network features including more efficient and faster paths.Retire multiple loggers, replace with LogView display files

- Carefully clean up redundant logging, employ master loggers.Ensure that existing stone-orbit correction select proper saved orbits.

-Time stamping or data retrieval problems could allow import of bad data.

Additional supporting efforts: (Al Marusic)

Page 14: Trip Reports and Software Plans for the Upgrade

10 Nov 2010 Trip reports and BB software 14

Interlab CollaborationInterlab Collaboration• Strong interest in the LHC Online Model• Massive Tracking planned with BOINC (LHC@HOME) for e-lens tracking. This element has been included by BNL and Eric McIntosh has prepared the SixTrack run environment could be of use for LHC upgrade?• 6D element in Sixtrack has been tested, apparently weaker than expected???• Plan is to benchmark all BB codes of the 3 Labs: CERN, FERMILAB & BNL To this end extended studies planned for beginning of next year.

Page 15: Trip Reports and Software Plans for the Upgrade

10 Nov 2010 Trip reports and BB software 15

LHC Upgrade RequirementsLHC Upgrade Requirements• For the LHC upgrade more severe parameters and/or new techniques might be required.• One option is to use flat instead of round beams.• It also seems that the crossing angle will be larger than for the nominal LHC version.• Both requires to use SixTrack differently than before:

– Presently SixTrack has been set up to make use of the LHC anti-symmetry to calculate BB for round beams a true flat option makes code modifications necessary.– The larger crossing angle raises the question if the plain 4D BB description is still adequate. SixTrack has the 6D BB lens implemented à la Ripken.

Page 16: Trip Reports and Software Plans for the Upgrade

10 Nov 2010 Trip reports and BB software 16

Flat Beams in SixTrackFlat Beams in SixTrack• Emanuele has implemented a first version of flat beams by passing the sigma values to SixTrack via a file produced by MAD.• This is a good approximation but a small issue remains in case of strong coupling. • Eventually this will require to implement the BB force in the MAD-X PTC converter. This will be done in the future but will require extensive testing.• Nevertheless the present solution seems to be sufficient for the case of the LHC upgrade.• Once the benchmarking is finished and its usage is documented we are ready for the upgrade.

Page 17: Trip Reports and Software Plans for the Upgrade

10 Nov 2010 Trip reports and BB software 17

6D BB lens in SixTrack6D BB lens in SixTrack

• Some 10 years ago Gerhard Ripken visited us and had derived a formalism of the 6D BB lens including coupling. This is an extension of the original work by Hirata.• Peter Leunissen implemented this 6D lens into SixTrack.• Besides basic tests it has not been benchmarked nor used extensively.• Since the needs arises now, the code will be reviewed and benchmarked with external codes.