tri-county technical college student success...

8
TRANSFORMATION. More than Constructio n. TRI-COUNTY TECHNICAL COLLEGE Student Success Center

Upload: others

Post on 21-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TRI-COUNTY TECHNICAL COLLEGE Student Success Centeretcdata.tctc.edu/VPIA/Public_Relations/SSCOverview.pdf · complete refurbishment of Ruby Hicks Hall, and the installation of a central

TRANSFORMATION.More than Construction.

TRI-COUNTY TECHNICAL COLLEGE

Student Success Center

Page 2: TRI-COUNTY TECHNICAL COLLEGE Student Success Centeretcdata.tctc.edu/VPIA/Public_Relations/SSCOverview.pdf · complete refurbishment of Ruby Hicks Hall, and the installation of a central

Student Success Center Project

At a Glance

Project Scope: The Student Success Center is a key component of Tri-County Technical College’s strategy to increase student success, reduce long-term maintenance costs, and address decades of enrollment growth. The project scope includes a new building, the complete refurbishment of Ruby Hicks Hall, and the installation of a central chiller plant and chilled water loop. The new building will be the first built on the Pendleton Campus in twenty years. At that time, enrollment was just over 3,000 students, compared with close to 5,000 students on the Pendleton Campus today.

Cost: $42 Million

New Construction: A 75,000 square-foot building will include a Learning Commons that houses library collections, flexible meeting spaces for students, computer labs, study areas, computer laboratories, supplemental instruction, and tutoring spaces; Student Development Office; Information Technology Services; College Store; Café, Printing Services, meeting spaces, shipping and receiving. Construction of this facility required the removal of the amphitheater and Clarke and McKissick halls.

Ruby Hicks Hall Renovation: A complete renovation and refurbishment of Ruby Hicks Hall to house TC Central, a one-stop enrollment center that will include Admissions, Student Records,

Cashier, Financial Aid, Student Data Center, Assessment, Advising, and Student Success Coaches; Curriculum and Academic Support Services; Administration; and conference/training spaces.

Central chiller plant and chilled water loop: The installation of a central chiller and chilled water loop will cool the new building, Hicks Hall, and Fulp Hall. Eventually, all buildings will be connected to the chilled water loop.

Timeline: Construction of the new building is expected to take 18 months. The entire project, including the renovation of Hicks Hall, will take two and one-half years.

Architectural Firm: LS3P Associates, LTD, Greenville, SC

Construction Firm: Juneau Construction Company, LLC, Atlanta, GA

Gifts: Reliable Automatic Sprinkler Company is the first industry partner to designate a gift for the new Student Success Center. The new Campus Store will be named for the company in honor of its $100,000 contribution to the Tri-County Technical College Foundation.

Page 3: TRI-COUNTY TECHNICAL COLLEGE Student Success Centeretcdata.tctc.edu/VPIA/Public_Relations/SSCOverview.pdf · complete refurbishment of Ruby Hicks Hall, and the installation of a central

SOUTHEAST VIEW, STUDENT SUCCESS CENTER

Page 4: TRI-COUNTY TECHNICAL COLLEGE Student Success Centeretcdata.tctc.edu/VPIA/Public_Relations/SSCOverview.pdf · complete refurbishment of Ruby Hicks Hall, and the installation of a central

NORTHEAST VIEW, STUDENT SUCCESS CENTER

SOUTHWEST VIEW, STUDENT SUCCESS CENTER

Page 5: TRI-COUNTY TECHNICAL COLLEGE Student Success Centeretcdata.tctc.edu/VPIA/Public_Relations/SSCOverview.pdf · complete refurbishment of Ruby Hicks Hall, and the installation of a central

CAMPUS STORE

SERVERY

EAST DINING

WEST DINING

STUDENT ORGANIZATIONS

MULTI-PURPOSE

PLAZA LEVELSERVERY, DINING, STUDENT ORGANIZATIONS, & CAMPUS STORE

More than Construction.TRANSFORMATION.

• Campus Store• Dining• Student Organizations

Page 6: TRI-COUNTY TECHNICAL COLLEGE Student Success Centeretcdata.tctc.edu/VPIA/Public_Relations/SSCOverview.pdf · complete refurbishment of Ruby Hicks Hall, and the installation of a central

OPEN TUTORING

CIRCULATION& INFORMATION

AREA

LEARNING COMMONS STUDY AREA

MAKERS’SPACE

UPPER LEVELLEARNING COMMONS & TUTORING

LARGE CONFERENCE

CLASSROOM

CLASSROOM

More than Construction.TRANSFORMATION.

• Computer Labs• Learning Commons• Tutoring

Page 7: TRI-COUNTY TECHNICAL COLLEGE Student Success Centeretcdata.tctc.edu/VPIA/Public_Relations/SSCOverview.pdf · complete refurbishment of Ruby Hicks Hall, and the installation of a central

D

IT SERVICE DESK

IT STAFF AREA

CENTRAL ENERGY PLANT

PRINT STUDIO CAMPUS STOREINVENTORY

INDUSTRIAL KITCHEN

SHIPPING &RECEIVING

ENGAGED LEARNING

GROUND LEVELENGAGED LEARNING, IT AREA, CENTRAL ENERGY PLANT, & AUXILIARY

More than Construction.TRANSFORMATION.

D

IT SERVICE DESK

IT STAFF AREA

CENTRAL ENERGY PLANT

PRINT STUDIO CAMPUS STOREINVENTORY

INDUSTRIAL KITCHEN

SHIPPING &RECEIVING

ENGAGED LEARNING

GROUND LEVELENGAGED LEARNING, IT AREA, CENTRAL ENERGY PLANT, & AUXILIARY

More than Construction.TRANSFORMATION.

• Help Desk/IT• Kitchen Prep• Print Shop• Shipping & Receiving• Student Support and

Engagement

Page 8: TRI-COUNTY TECHNICAL COLLEGE Student Success Centeretcdata.tctc.edu/VPIA/Public_Relations/SSCOverview.pdf · complete refurbishment of Ruby Hicks Hall, and the installation of a central

www.tctc.edu