Page 1: Trenchless Construction · 2019. 1. 11. · [DIN EN 13941:2007] Cyclic interaction . EN13941:2003, „Design and installation of preinsulated bonded pipe systems for district heating

Trenchless Construction for District Heating networks

Page 2: Trenchless Construction · 2019. 1. 11. · [DIN EN 13941:2007] Cyclic interaction . EN13941:2003, „Design and installation of preinsulated bonded pipe systems for district heating

+

Source: Weidlich

Combining Trenchless Technology and

District Heating

Page 3: Trenchless Construction · 2019. 1. 11. · [DIN EN 13941:2007] Cyclic interaction . EN13941:2003, „Design and installation of preinsulated bonded pipe systems for district heating

Trenchless Technology: Installation problem.

District Heating pipelines: Operation problem.

Source: AGFW

Combining Trenchless Technology and

District Heating

Page 4: Trenchless Construction · 2019. 1. 11. · [DIN EN 13941:2007] Cyclic interaction . EN13941:2003, „Design and installation of preinsulated bonded pipe systems for district heating

Source: Weidlich, BRUGG

Steel medium pipe

PUR insulation foam

PE-coating

Characteristics of District Heating pipes

Page 5: Trenchless Construction · 2019. 1. 11. · [DIN EN 13941:2007] Cyclic interaction . EN13941:2003, „Design and installation of preinsulated bonded pipe systems for district heating

Structural analysis is required, because of

Temperature up to 140°C,

Pressure of 25 bar,

Pipe – soil interaction.

Source: EN13941

Structural Analysis

Page 6: Trenchless Construction · 2019. 1. 11. · [DIN EN 13941:2007] Cyclic interaction . EN13941:2003, „Design and installation of preinsulated bonded pipe systems for district heating

[DIN EN 13941:2007]

- friction forces f – u (axial interaction)

- bedding pressure p – v (lateral interaction)

F

fu

uu u

p

pu

vu v

Source: AGFW

Characteristics of DH pipelines

[Foto: Weoidlich]

Page 7: Trenchless Construction · 2019. 1. 11. · [DIN EN 13941:2007] Cyclic interaction . EN13941:2003, „Design and installation of preinsulated bonded pipe systems for district heating

)0(MMtH EAN

)0(Ru

)0(MMt

GF

EA

l

2

l

EA

Fw

2G

)0(Ru

max

Normal stresses in the adhering section:

Length of the gliding section:

Maximum displacement:

z,w

x,u

+

0 friction forces

adhering section gliding section

(pressure)

District heatingpipeline

Axial displacement w

Normal force N

Source: AGFW

Characteristics of DH pipelines

Page 8: Trenchless Construction · 2019. 1. 11. · [DIN EN 13941:2007] Cyclic interaction . EN13941:2003, „Design and installation of preinsulated bonded pipe systems for district heating

D

H r

2

02* d

DF rRu

2

1*

2*

kDHm

m

RohrRu G

kDHDF ''2

1*

2****

Source: Weidlich

Characteristics of DH pipelines

Page 9: Trenchless Construction · 2019. 1. 11. · [DIN EN 13941:2007] Cyclic interaction . EN13941:2003, „Design and installation of preinsulated bonded pipe systems for district heating

Contact pressure is not clearly understood.

Main influences:

• Acting earth pressure

• Use of bentonite suspensions

• Temperature

• Time / Durability of the pipe

Because of that, the use of trenchless technology in the DH sector is still seen

with caution. In Germany today ATV A 161 is used.

Source: Weidlich

Contact pressure

Page 10: Trenchless Construction · 2019. 1. 11. · [DIN EN 13941:2007] Cyclic interaction . EN13941:2003, „Design and installation of preinsulated bonded pipe systems for district heating

30 years of service lead to cyclic loads.

Pipe type Equivalent full action cycles in

30 years according to EN13941

Major pipelines 100

Main pipelines 250

House service

connections

1000

[DIN EN 13941:2007]

Cyclic interaction

Page 11: Trenchless Construction · 2019. 1. 11. · [DIN EN 13941:2007] Cyclic interaction . EN13941:2003, „Design and installation of preinsulated bonded pipe systems for district heating

EN13941:2003, „Design and installation of preinsulated bonded pipe systems

for district heating

EN253:2009, „District heating pipes – Preinsulated bonded pipe systems for

directly buried hot water networks – Pipe assembly of steel service pipe,

polyurethane thermal insulation and outer casing of polyethylene“

FW401:2007, „Laying and structural analysis of plastic jacket pipes for district

heating networks “

ATV127:2000, „Statische Berechnung von Abwasserkanälen und -leitungen“

FW420:2004, „Part 1 bis 5, „Flexible district heating pipeline systems “

EN489:2009, „District heating pipes - Preinsulated bonded pipe systems for directly

buried hot water networks - Joint assembly for steel service pipes, polyurethane thermal

insulation and outer casing of polyethylene.“

Source: Weidlich

Standard and technical rules

Page 12: Trenchless Construction · 2019. 1. 11. · [DIN EN 13941:2007] Cyclic interaction . EN13941:2003, „Design and installation of preinsulated bonded pipe systems for district heating

Pipe quality requirements: PE-coating Strong interaction between soil and pipe during installation

Source: BRUGG Pipesystems

Page 13: Trenchless Construction · 2019. 1. 11. · [DIN EN 13941:2007] Cyclic interaction . EN13941:2003, „Design and installation of preinsulated bonded pipe systems for district heating

Strong interaction between soil and pipe during operation

Coarse soil environment will affect the pipe coating

and the joints due to cyclic loading.

Source: FFI

Pipe quality requirements: PE-coating

Page 14: Trenchless Construction · 2019. 1. 11. · [DIN EN 13941:2007] Cyclic interaction . EN13941:2003, „Design and installation of preinsulated bonded pipe systems for district heating

Pipe quality requirements: Joint systems

Damage of joints after 23

cycles in laboratory test

using rough bedding material

Source: AGFW, FFI

Page 15: Trenchless Construction · 2019. 1. 11. · [DIN EN 13941:2007] Cyclic interaction . EN13941:2003, „Design and installation of preinsulated bonded pipe systems for district heating

Stress-strain coupling between the medium pipe,

insulation foam and the PE-coating is necessary.

The allowed shear stress in the foam is tax<0,04

MPa for operation.

The possible pulling forces are restricted by the maximum shear

stress in the PUR-foam.

Pipe quality requirements: PUR-foam

Source: AGFW

Page 16: Trenchless Construction · 2019. 1. 11. · [DIN EN 13941:2007] Cyclic interaction . EN13941:2003, „Design and installation of preinsulated bonded pipe systems for district heating

Pipe curving means additional bending and stress in the pipe

sDCR adesign

bzul

aelast

2

D ER

Source: AGFW

Pipe quality requirements: Steel medium pipe

Page 17: Trenchless Construction · 2019. 1. 11. · [DIN EN 13941:2007] Cyclic interaction . EN13941:2003, „Design and installation of preinsulated bonded pipe systems for district heating

Characteristics of trenchless technology

Use of bentonite slurries as a friction reducer.

Source: TRACTO TECHNIK

Page 18: Trenchless Construction · 2019. 1. 11. · [DIN EN 13941:2007] Cyclic interaction . EN13941:2003, „Design and installation of preinsulated bonded pipe systems for district heating

Reduction of technological barriers

Temperature dependence of bentonite suspensions for drilling

Classification tests showed no influence of the temperature for

typical coating temperatures of 20°, 30° and 40° degrees.

Source: IGth

Page 19: Trenchless Construction · 2019. 1. 11. · [DIN EN 13941:2007] Cyclic interaction . EN13941:2003, „Design and installation of preinsulated bonded pipe systems for district heating

In some tests a temperature dependent behaviour of bentonite-sand

mixture was observed.

Coefficient of friction for 40° C drying

0,29

0,33

0,37

0,42

0

0,05

0,1

0,15

0,2

0,25

0,3

0,35

0,4

0,45

PE + Sand + Bentonite

(fresh)

PE + Sand + Bentonite

(2d drying)

PE + Sand + Bentonite

(10d drying)

PE + Sand

Co

eff

icie

nt

of

fric

tio

n

Reduction of technological barriers

Source: IGth

Page 20: Trenchless Construction · 2019. 1. 11. · [DIN EN 13941:2007] Cyclic interaction . EN13941:2003, „Design and installation of preinsulated bonded pipe systems for district heating

Outlook

Combining Trenchless Technology and District Heating is promising for

preinsulated bonded district heating pipes.

Combining Trenchless Technology and District Heating

Source: BRUGG